B.08.02 Amend 0001 W9127S23Q0053.pdf
PDF 837 KB Posted
- Attached to
- Environmental Services, IDIQ DeQueen, Dierks, Gillham Lakes, Millwood Tri Lakes Project Office
- Solicitation number
- W9127S23Q0053
About this file
This document is a performance work statement for environmental services at DeQueen, Dierks, and Gillham Lakes in Arkansas. The contractor will provide tree removal and maintenance, herbicide application, boundary line clearing and marking, and equipment rentals. Services include removing trees up to 32 inches in diameter, stump grinding, pruning, underbrushing, and herbicide application for vegetation control. Boundary line work involves clearing a four-foot wide path, painting boundary markers every 50 feet, and replacing missing survey monuments. The contractor must have licenses and certifications for herbicide and pesticide application. The contract is an indefinite delivery/indefinite quantity multiple award task order contract with one base year and two option years. Pricing is by the task order for services, equipment rentals, and miles of boundary line completed. The Army Corps of Engineers district office in Little Rock is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| A.02.11 Corrected bid sheet.pdf | ||
| B.08.02 Combined Synopsis Solicitation (4).pdf | ||
| B.08.02 Combined Synopsis Solicitation (4).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A0001 makes corrections to the Performance Work Statement. Removing sections for shoreline herbicide and embankment mow ing.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S23Q0053
X 9B. DATED (SEE ITEM 11)
23-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Aug-2023
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127S23Q0053
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
STATEMENT OF WORK
TECHNICAL PROVISIONS
SECTION 1
General
1.1 SCOPE OF WORK: The Contractor shall furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, and vehicles, except as otherwise provided for herein, required to perform the services within the area of responsibility of the Tri-Lakes Project Offices, DeQueen Lake, Dierks Lake, and Gillham Lake, and related areas, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by the reference.
Incorporation by reference shall include any and all mandatory provisions required by the Federal Acquisition Regulation (FAR) whether it is referenced or not referenced, current at time of award.
Estimated quantities and/or the work to be performed is described herein and listed on separate sheets as Exhibits.
These quantities are approximate and are provided only for the Contractor’s information to assist in preparation of bids. They are not guaranteed, and the actual quantities may be more or less than shown. Variations in these estimated quantities shall not be justification for or request for additional payment. The services required in this contract are in addition to the routine services performed by Government personnel, however the Government reserves the right to perform any or all of the service described herein with its own personnel or volunteers.
Contractor work and responsibility shall include, but shall not be limited to: all planning, programming, administration and management necessary to assure that all services are conducted in accordance with the contract and all applicable laws, regulations, codes, or directives. Contractor shall ensure that all work meets or exceeds critical Contractor administrative services necessary to perform the work such as supply, procurement, quality control, Contractor financial control, and maintenance of accurate and complete records and files.
1.2 BACKGROUND: The Tri- Lakes are flood control and water supply lakes
The DeQueen Lake Project Office is responsible for the maintenance and operations of one (1) spillway, and seven
(7) parks/public use areas. The Dierks Lake Project Office is responsible for the maintenance and operations of one (1) spillway and five (5) parks/public use areas. The Gillham Lake Project Office is responsible for the maintenance and operations of one (1) spillway and five (5) parks/public use areas. Minor repair, renovation or high lake levels may cause the temporary closing of parts of some parks. The Contractor’s work schedule shall be sufficiently flexible to meet these changing needs.
1.3. DELIVERY ORDERS. All work under this contract will be ordered by issuance of individual Delivery Orders (DD Form 1449). The COR has three basic ways to order work using this contract: Normal Service Call Delivery Order, Emergency Service Call Delivery Order, and Task Item Delivery Order. The type of Delivery Order will be at the discretion of the COR. A separate type Work Order will be issued for each job. All work orders will have a period of performance for work completion and invoicing not to exceed 60 days. Emergency Work Orders will have a period of performance for work completion and invoicing not to exceed 30 days. The Delivery Order will list those items from the bid section that are to be performed or used to perform the work.
1.4. PAYMENT. The Contractor will be paid only for work accomplished and performed in accordance with these specifications and requirements of Delivery Orders. The Contractor will be paid upon completion for work accomplished after submittal of an invoice. The Contractor will furnish a copy of the invoice to the COR.
a. Service Call. The Contractor shall include all labor, travel, man hours and transportation costs to and from the work site, administrative costs, and tools, overhead and profit. The Contractor shall provide the skilled workers (certified arborist, licensed herbicide applicator, and licensed pesticide applicator) as required to perform the specified work.
(1) Normal Service Call – Work to be accomplished and performed during normal working hours as directed in the Delivery Order.
(2) Emergency Service Call – Work to be accomplished and performed at other than normal work hours as directed in the Delivery Order. The Contractor will include any premium pay surcharges in this bid item.
b. Task Items: The Contractor will include all labor, materials, supplies, parts, tools, equipment, transportation to and from the work site, profit overhead, and vehicles except as otherwise provided for herein, required to perform the service listed in the applicable bid item.
c. Disposal of Debris. The Contractor shall dispose of all materials and/or debris from the installation or replacement of work under this contract. Disposal shall be off Government property and in strict accordance with all applicable laws and ordinances. No separate payment for the disposal of materials and debris will be made.
d. The Contractor’s administrative costs to set up office, prepare estimates for task job requests, report results of normal and emergency service calls, and complete all the necessary paperwork required in this scope of work will not be considered as work for payment.
1.5 WORK AREA. The work required under this solicitation will be located at the sites described in 1.2. The work sites, located at this lake, is located around the perimeter of this project, this will necessitate that the Contractor include costs for travel time in the bid amount.
1.6. WORKING HOURS.
a. Normal Working Hours. Normal working hours and days, except as otherwise specified or approved in advance by the Representative of the Contracting Officer (COR), shall be Monday through Friday, 7:00 a.m. to 4:00 p.m. The ten Federal Holidays observed are:
New Years Day (January 1st) Martin Luther King’s Birthday (3rd Monday in January) Presidents’ Day (3rd Monday in February) Memorial Day (Last Monday in May) Juneteenth (19th of June) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
When one of the above designated holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday.
Work that interferes with other ongoing functions at DeQueen Lake, Dierks Lake, and Gillham Lake, and related areas shall be scheduled around normal working hours, as specified by the COR. Work shall be scheduled around the above listed Federal Holidays except as specified herein or as approved by the COR. Refer to individual sections of this specification for specific sections of work.
b. Other than Normal Working Hours. No premium pay surcharge will be paid by the
Government other than that included in the bid item for Emergency Service Call. All other work will be specified in the Delivery Order to be accomplished during normal working hours or as described in 1.18.
1.7. PERMITS AND LICENSES. The Contractor shall, as his/her own expense, obtain any licenses or permits required to perform the contract. The Contractor shall comply with all current federal, state, and local laws and regulations and shall comply with any subsequent changes.
1.7.1 REQUIRED INSURANCE. Any successful offeror under this solicitation shall procure and maintain during the entire period of his performance under this contract the following minimum insurance in accordance with FAR 52.228-5, INSURANCE--WORK ON A GOVERNMENT INSTALLATION:
(1) Workmen's Compensation in amounts required by applicable jurisdictional statutes. (FAR 28.307-2a).
(2) Employers Liability Insurance of at least $100,000. (FAR 28.307-2a).
(3) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability insurance is required. (FAR 28.307-2(b)).
(4) Comprehensive vehicle liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. (FAR 28.3072(c)).
1.8. IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES.
The Contractor shall provide ball caps/hats with the company name or logo to be worn by all employees and subcontractors while working on public recreation areas. Appearance of all employees will be neat and clean at the beginning of each workday. Contractor’s vehicles and major subcontractor’s vehicles shall be identified with the company name prominently displayed (minimum two-inch letters) on the outside of both front doors of each vehicle in such a manner as to provide a readily visible means of identification. Extreme caution should be exercised at all times and especially when operating vehicles to prevent accident and injuries to the contractor and visitors. Vehicles and equipment must be kept in proper mechanical order and clean and neat in appearance.
Vehicles are to be kept on paved surfaces at all times.
1.9 SAFETY AND SECURITY REQUIRMENTS. The Contractor shall comply with all current provisions of the Occupational Safety and Health Act (OSHA) in addition to the standards of the Corps of Engineers manual, EM 385-1-1, “Safety and Health Requirements Manual”. If the Contractor fails or refuses to promptly comply with the safety and security requirements as specified herein, the COR may issue an order stopping all or part of the work for each delivery order affected by the infraction until satisfactory corrective action has been taken. No part of the time lost due to any such stop shall be made subject to claim for extension of time or for excess costs or damages to the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.
The Contractor will be furnished a set of keys to the areas where access is necessary to perform the work described herein or as determined to be necessary by the COR. No duplicates of the keys are authorized to be obtained in any manner by the Contractor or by any Contractor employee. Any additional keys required by the Contractor will be furnished by the COR. Security of the keys shall be the responsibility of the Contractor. The failure of the Contractor to provide adequate key security will result in a deduction from payment due the Contractor in the amount of $20.00 per lost or damaged key and a deduction for setting new combinations for any affected locks at the rate charged by the manufacturer per lock.
1.10 ACCIDENT REPORTING. All serious accidents (those resulting in death or injury requiring medical attention) shall be reported to the COR immediately. The Contractor shall maintain an accurate record of, and shall report to the COR, all accidents within 24 hours of the occurrence.
1.11 CONTRACT EMPLOYEES CONDUCT AND COMPETENCY. All contract employees and subcontractors shall conduct themselves in a proper manner at all times. The majority of work will be performed in the presence of the general public, the conduct of all employees and/or subcontractors is critical and will be closely monitored.
No alcoholic or intoxicating beverages, illegal drugs, controlled substances, or drugs not prescribed by a physician shall be possessed or consumed while on duty. The Contractor shall remove from the site any individual whose continued employment is deemed by the COR to be contrary to the public interest or inconsistent with the best interests of the U.S. Army Corps of Engineers.
1.12 DAMAGES OR LOSS OF CONTRACTOR’S SUPPLIES AND PROPERTY. The Contractor is responsible for taking the action necessary to protect all Contractor property and the personal property of Contractor employees from loss, damage, or theft. The Government assumes no responsibility for theft, damage, etc. of the above.
1.13 SUPERVISION. The Contractor shall personally supervise the work or provide a qualified Contractor Representative who is responsible for quality control whenever the work specified herein is being performed. The Contractor Representative shall conduct overall management coordination and be the central point of contact with the Government for performance of all work under this contract. The Contractor Representative shall have full authority to contractually commit the Contractor for prompt action on matters pertaining to administration of the entire contract. The Contractor Representative shall deal directly with the COR or designated representatives, for normal day-to-day administration of the contract provisions.
1.14 ENVIRONMENTAL PROGRAMS. The Contractor shall comply with Federal, State, and local laws, regulations, and standards regarding environmental protection. All environmental protection matters shall be coordinated with the COR. Any of the facilities operated by the Contractor may be inspected by the COR, or other Federal, State, and local officials on a non-notice basis. Access for inspection shall be granted upon request.
Citations against Government facilities operated by the Contractor for noncompliance with environmental standards are a matter for resolution between the Government and the issuing office. Payment of fines or penalty charges associated with citations issued by Federal, State, or local officials shall be paid by the Government. If the citations are issued due to faulty operation or maintenance practices, the COR shall deduct the fine from any money due the Contractor.
1.15 PERFORMANCE EVALUATION MEETINGS. The Contractor, the Contractor Representative, or both, shall meet with the COR (or a designated representative) weekly or as determined necessary by the COR. However, a meeting shall be held not later than one normal workday after a Contract Deficiency Report (CDR) is issued. Mutual effort will be made to resolve all problems identified.
1.16 QUALITY CONTROL PROGRAM.
a. General. The Contractor shall be responsible for maintaining adequate quality control to satisfactorily meet the specifications of the contract through the development of a Quality Control Plan. The Government will assure quality performance according to a Quality Assurance Surveillance Plan.
Combined, these two programs form the Government’s Quality Assurance Program.
b. Quality Control. The Contractor shall establish a complete quality control program to assure the requirements of the contract are provided as specified. The program shall include, but not be limited to the following:
An inspection system covering all the services stated in the contract specifications (this shall include inspection of work performed on weekends). It must specify areas to be inspected on either a scheduled or unscheduled basis or the individuals who will do the inspection. Inspectors shall be employees of the Contractor, not employees of a subcontractor.
c. Service Call Inspection Reports. The Contractor shall maintain a record of Service Call Reports conducted by the Contractor and shall furnish a copy of normal service call reports to the COR by close of business each day and a copy of emergency service call reports by 9:00 a.m. the following day after completion. This daily record of service call completions shall cover all work requested by a service call delivery order, shall be signed by the Contractor or Contractor Representative, and shall include the following items as a minimum.
(1) Employee’s name (7) Deficiencies beyond scope of service call
(2) Park or area (8) Corrective action needed including list of
(3) Date parts and materials needed
(4) Weather (9) Safety problems
(5) Time in/out of park/area
(6) Work performed
1.17 QUALITY ASSURANCE. The Government will monitor the Contractor’s performance in each functional area under this contract and reserves the right to use whatever additional surveillance procedures are deemed appropriate.
If the Contractor fails to perform according to the performance standards, a Notification of Contract Deficiency or Contract Deficiency Report will be issued by the COR. The Contractor shall explain, in writing, why performance was not satisfactory and how recurrence of the problem will be prevented in the future.
The Government will monitor the Contractor’s services using the planned sampling method and/or the 100% inspection method. The Government reserves the right to alter or change the type of inspection plan at its discretion at any time, and to make deductions accordingly.
Should the Contractor fail to satisfactorily perform any routine service that is required on a daily basis or at a specific time, a deficiency notice will be issued. If the nature and the schedule of this type of work will not afford an opportunity to re-perform the service, a deduction for work not performed will be made.
Defects and deficiencies in Contractor performance, and performance again of same, will be in accordance with a payment analysis addressed in the Government’s surveillance plan (QASP) (see Exhibit B).
The Contractor will be rated outstanding, satisfactory, marginal, or unsatisfactory in the following areas: (1) quality of work, (2) timely performance, (3) effectiveness of management and (4) compliance with safety standards. The Contractor will be advised of any marginal or unsatisfactory rating, either in an individual element or in the overall rating prior to completion of the evaluation, and all Contractor comments will be a part of the official record.
1.18 EMERGENCY WORK. Emergency work is any work required to correct an immediate danger or health hazard, major inconvenience, or a threat to property. The Contractor shall have qualified personnel available on call for emergency work. The name(s), address(es) and phone number(s) of the person(s) to be contacted in case of an emergency shall be submitted to the COR prior to commencement of this contract. This person(s) shall have the authority to act on behalf of the Contractor to perform the necessary emergency work, responding within 2 hours to the COR’s request. Emergency work will be initiated by notice (phone call or other means) from the COR, or a designated representative and the Contractor shall initiate corrective action in accordance with the schedule shown in 1.19. The Contractor shall notify the COR immediately of any work which cannot be corrected within a 24-hour period. When emergency situations are recognized by the Contractor or Contractor personnel, the COR shall be contacted immediately and prior to initiating emergency work unless the nature of the emergency work requires immediate action to preserve life or avoid injury. In such cases the Contractor shall perform remedial work to temporarily correct the situation and shall advise the COR of the problem immediately.
1.19 WORK SITE REPORTING. The Contractor shall report to the designated work site with necessary personnel, vehicles, supplies, tools, materials and parts to accomplish the specified work within specified response time limits.
The response time period will be established by the performance time shown in the Delivery Order or the following response time limits, whichever is greater:
a. For normal service calls for work which constitutes an immediate danger or health hazard, major inconvenience or threat to property, the Contractor will be mobilized at the work site within 4 hours of issuance of a verbal order. Verbal orders will be followed with issuance of a Delivery Order.
b. For emergency service calls, the Contractor will be mobilized at the work site within 2 hours of receipt of notice (phone call or other means). Verbal orders will be followed with issuance of a Delivery Order.
c. For normal service calls involving routine work of urgent but non-critical nature, the Contractor will mobilized at the work site within 1 day of issuance of a Delivery Order.
d. For task item work involving routine work of urgent but non-critical nature, the Contractor will be mobilized at the work site within 1 day of issuance of a Delivery Order.
e. For normal service call or task item work involving preventative maintenance, the Contractor will be mobilized at the work site within 7 days of issuance of a Delivery Order.
1.20 INTERRUPTION TO SYSTEMS. All work that would necessitate an interruption of the use of the project or to the utility systems or otherwise disrupt building occupants and/or the visiting public shall be fully coordinated and approved in advance by the COR. Interruptions shall be kept to an absolute minimum and all repairs or replacements of equipment or components shall be accomplished in an expeditious and efficient manner.
1.21 GOVERNMENT FURNISHED ITEMS
a. General - A certain amount of Government owned materials and supplies are on hand and may be available for use by the Contractor. The Contractor shall be responsible for the proper security of all Government furnished items. All Government furnished property or items are provided in an “as is” condition and shall be used only in connection with performance under this contract consistent with all Federal, Department of Defense, and Environmental Act Policies, standards, codes, or directives.
The Contractor should inspect this property prior to installation to ascertain safe condition. The Contractor shall assume all liability for claims arising from its use or misuse while in the Contractor’s possession and shall hold the Government harmless from any claims by the Contractor employees or others.
b. Utilities - The Contractor may use Government utilities where available. The Contractor shall make a dedicated effort to conserve utilities and shall comply with all Government regulations regarding energy conservation. Government furnished utilities shall be used only in the performance of work specified in this contract. Where water and electricity are not provided, the Contractor must obtain them from other sources at no additional expense to the Government.
c. Forms -All Department of Defense forms required by the Government to be used under this contract will be provided by the Government.
d. Operating Manuals - Equipment or facility operating manuals and suppliers’ catalogs presently maintained by the Government will be made available to the Contractor on an as needed basis.
e. Control - Contractor shall establish a control system to ensure that Government furnished items is utilized only for contract purposes. Upon completion (including any extension of contract terms) or termination of the contract, for any reason, and except for fair wear and tear, the Contractor shall return all Government furnished items and any unused material, supplies or parts in the same condition as received. Any discrepancies (except for fair wear and tear), damages or deficiencies in the inventory shall be chargeable against the Contractor.
1.22 CONTRACTOR FURNISHED ITEMS.
a. General - Except as described elsewhere in this contract, the Contractor shall furnish all personnel, management, inspections, facilities, vehicles, transportation, equipment and operators, supplies, tools, materials, and parts necessary to accomplish all required services. All Contractor furnished items shall meet all applicable Federal, State, and local laws or regulations. When a Delivery Order requires the use of the equipment or vehicles specified, such items shall include a qualified and competent operator.
Unless otherwise specified, when the Contractor provides services under a Delivery Order, the Contractor shall provide all the necessary “tools of the trade” to accomplish the work.
b. Submittals - Contractor shall submit manufacturer’s instructions including special provisions required to install equipment components and system packages. If necessary, data composed of catalog cuts, brochures, circulars, specifications and product data, and printed information in sufficient detail and scope to verify compliance. Submittals must be made prior to installation.
1.23 SAFEGUARDING GOVERNMENT PROPERTY. The Contractor shall cooperate with Government personnel in safeguarding Government property. The Contractor shall be responsible for reporting all acts of vandalism, larceny, or pilferage to the COR. The Contractor shall establish security procedures and safeguards that are compatible with the Government’s existing procedures to protect all equipment, materials, supplies, tools, and other resources. The Contractor shall cooperate with and provide any assistance necessary to the Government during any audits, usage checks of expendable property and inventories of non-expendable property. The Contractor shall maintain accurate records and make them available to the Government upon request.
1.24 NOTIFICATION OF WORK TO BE DONE. When the Contractor is notified of work required under these specifications, the Contractor shall begin work in accordance with 1.19. The notification to the Contractor of work to be performed will be by issuance of Delivery Orders (DD1449). Except for emergency work to correct problems caused by failures or deficiencies to project facilities and property which constitutes an immediate danger or health hazard, major inconvenience, or a threat to property (see1.18 and 1.19), absolutely no work will begin prior to issuance of a Delivery Order.
Upon issuance of a task item Delivery Order, the Delivery Order becomes a firm, fixed-price order for work specified, based on the contract bid prices. The Contractor shall, upon invoicing, be paid the amount shown on the Delivery Order.
1.25 MINIMUM MAN-POWER REQUIREMENTS. The Contractor shall provide an adequate number of fully qualified personnel to perform the work specified herein. Personnel required to handle emergency situations shall be available on call.
1.26 MINIMUM PERSONNEL QUALIFICATIONS. Employees, technical personnel, and subcontractors shall have the education, experience or knowledge as evidenced by license, certificate, diploma, etc., to provide a comprehensive understanding of the systems, components, equipment, and facilities to be serviced, operated, maintained, repaired, renovated, and constructed under this contract. Only qualified applicators shall perform herbicide/pesticide applications. Licensure/Certifications must be supplied to the COR before any herbicide/pesticide application is performed. Only properly trained and qualified employees or subcontractors shall be used in the performance of this contract. All employees shall be subject to such Government regulations as are applicable during the time spent performing work under this contract.
A file containing the qualifications (education and experience) and/or certification and/or licenses of each employee and subcontractor shall be maintained by the Contractor. These files shall be submitted to the COR and will be used as part of the basis for determining the qualifications of personnel. In the event the Contractor does not have a qualified employee to perform the specific work, the Contractor will be required to immediately provide qualified personnel or to subcontract the work to a specialist familiar with the type of work to be accomplished.
1.27 OTHER CONTRACTS. The Government may undertake or award other contracts or have lessees or volunteers performing certain work, and the Contractor shall fully cooperate with such other Contractors, lessees, volunteers, and Government employees and carefully fit their own work to such other additional work as may be directed by the COR. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another Contractor, by a lessee, by volunteers or by Government employees. The COR can alter the work schedules of the Contractor to avoid possible conflicts. Any such change or failure to make such a change by the COR shall not be the basis for a claim by the Contractor.
1.29 DAMAGE TO GOVERNMENT PROPERTY. The Contractor shall use reasonable care to avoid damaging buildings, equipment, vegetation, and other Government property. If the Contractor damages or loses any of this property, the Contractor shall replace or repair the damage, at no cost to the Government, as the COR directs. A written report of the incident and extent of such damage shall be submitted to the COR within 2 working days (less weekends and holidays) of the occurrence. If the Contractor fails or refuses to make such repairs or replacements, the Contractor shall be liable for the cost, which will be deducted from the contract bid price.
1.30 DEFINITIONS. As used throughout descriptions/specification/work statement, the following terms shall have the meaning set forth below:
a. Contractor. The term Contractor refers to the prime Contractor and all contractors’ employees and personnel. The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract.
b. Contractor Representative. Individual selected to represent the interests of the Contractor with regards to all matters involving this contract.
c. Contracting Officer. A person with authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
d. Contracting Officer’s Representative (COR). An individual designated in writing by the Contracting Officer to be responsible for administration of the contract.
e. Emergency Service Call. Services provided by the Contractor after issuance of DD Form 1449 Delivery Order for generally undefinable work for a specified skill such as electrical, plumbing, carpentry, etc., that requires up to two man-hours of labor on-site at any time outside normal working hours. Includes all costs to perform the specified work except the Contractor will be reimbursed separately for the cost of repair parts and replacement parts except as excluded in 1.4a
f. Maintenance. The recurring day-to-day, periodic, or scheduled work required to preserve or maintain a facility, a piece of equipment, or any other item in such condition that it may be effectively utilized for its designated functional purpose. Maintenance includes work undertaken to prevent damage to a facility which otherwise would be more costly to restore. Maintenance also includes work to sustain existing components.
g. Major Subcontractor. A subcontractor that performs other than one-time or incidental services of a minor nature. A subcontractor that is being used to perform services on a routine, recurring basis.
h. Normal Service Call. Services provided by the Contractor after issuance of DD Form 1449 Delivery Order for generally undefinable work of a specified skill such as electrical, plumbing, carpentry, etc.
that requires up to two man-hours of labor on-site during normal working hours. Includes all costs incurred by the Contractor except the Contractor will be reimbursed separately for the invoiced retail cost of repair parts and replacement parts except as excluded in 1.4a.
i. Office. Areas primarily for clerical or administrative functions and which usually contain desks, chairs, file cabinets, tables, and other common office furnishings.
j. Preventative Maintenance. Preventative maintenance is the correction of incipient failures before they develop into major defects requiring costly correction.
k. Preventative Maintenance Service. Acts of maintenance done to prevent failures and to insure efficient operation on a routine schedule.
l. Quality Assurance. A method used by the Government to provide a measure of control over the quality of services performed by the Contractor.
m. Quality Control. A method used by the Contractor to control the quality of services provided.
n. Relocate. All support activities including all miscellaneous parts, labor overhead, transportation, etc. to physically remove an item from one location and move it to another location within the same park.
o. Task Item. Work described in detail in the specifications for services to be provided by the Contractor upon issuance of DD Form 1449 Delivery Order. The Contractor must perform work to the specified standards and within the acceptable quality level for the amount listed in the bid item for that service.
The bid amount is total reimbursement by the Government for the Contractor providing the service.
SECTION 2
EQUIPMENT
2.1 General. The contractor shall make available for use on Government sites, either singly or in multiples, the equipment listed below, complete with operator.
2.2 EQUIPMENT CONDITION. All equipment will be in condition to render efficient, economical, and continuous service. Failure of the equipment or operator to perform to the satisfaction of the COR will be sufficient cause for the removal of the equipment and/or operator from the job, or that the equipment or operator be replaced with those of satisfactory performance.
2.3 EQUIPMENT INSPECTION. All equipment shall be inspected and approved by the COR prior to its use on the job. Equipment, which is not approved, shall be replaced, or repaired at no cost to the Government, prior to commencing work.
2.4 OPERATIONAL CONTROL. The Government shall have operational control and supervision of the work, including equipment utilization, work schedules, priorities, and temporary work suspension due to weather or other factors; however, these conditions will in no way release the contractor nor his employees from the prevention of unsafe operation of equipment or liability from such actions.
2.5 PERMITS/LIABILITY. The contractor shall be responsible for obtaining any necessary licenses and permits for transportation of equipment on public roads and for complying with any applicable Federal, State, and Municipal laws, codes, and regulations that may apply to the equipment operations. The contractor shall also assume full responsibility for the safety of his employees, equipment, and materials, and for any damage or injury done by or to them from any source, and he shall be similarly responsible for all damages to persons or property that occur as a result of negligent operations.
2.6 SAFETY. The contractor will conduct operations in compliance with the current revision of Corps of Engineers Safety Manual EM 385-1-1.
2.7 OPERATIONAL EXPENSES. The contractor shall bear all expenses of operation and repair. The contractor shall furnish, at the contractor’s expense, all skilled and experienced operators, labor, fuel, and necessary equipment for transportation of fuel to equipment, including operators, appliances, and supplies, and bear all expenses incidental to the efficient operation of the equipment in connection with the work. The contractor shall be responsible for the cost of all repairs required for safe and continued equipment operation. If the job task requires several days rental and the contractor chooses to leave the equipment in the job site rather than transporting it to and from the contractor’s storage yard, the contractor shall do so at the contractor’s own risk, and the Government shall not be responsible for acts of nature and/or vandalism.
2.7.1 SPECIFIED EQUIPMENT. The contractor shall deliver only those items of equipment specified. The COR may at any time release any piece of equipment or contractor’s personnel when such is determined unnecessary, unsafe or when the job is completed.
2.8 PAYMENT. Payment for equipment usage shall be based on an hourly rate, with operator, for each individual unit of equipment. The job sites shall be at various locations around DeQueen Lake, Dierks Lake, and Gillham Lake, and related areas; therefore, rates will not begin until the equipment is delivered to the work area. The hours of equipment utilization will be rounded to the nearest whole hour whenever an invoice for payment is submitted, i.e., 54 hours and 30 minutes, will be rounded to 54 hours and 54 hours and 31 minutes will be rounded to 55 hours.
When circumstances warrant using one operator for two separate pieces of equipment, i.e., front-end loader and dump truck, payment for equipment operation will be based on actual operation time of each piece of equipment.
Equipment will not be left idling when not in actual use so as to increase equipment operation time.
Suggested/Anticipated Equipment Needs/Rentals:
1. Brush Mulcher
2. Dump truck, 10-yard capacity, double axel
3. Skidsteer, hydraulic with attachments.
4. Tractor, wheeled type, hydraulic, w/front end loader, minimum one-third (1/3) cubic yard capacity
5. Mini Excavator
6. Bucket Truck, hydraulic, minimum 50 ft. boom with certificate that it passes all safety regulations.
7. Side Boom Bushhog
8. Rubber Tire Loader, (6 yd)
SECTION 3
TREE REMOVAL AND UNDERBRUSHING
SECTION A – TREE REMOVAL
3.1 GENERAL. The contractor will furnish all labor, tools, materials, and equipment to remove trees in accordance with the following specifications.
3.2 MAP OF LOCATION OF TREES TO BE REMOVED. A map will be furnished for each work order showing size, type, and approximate location of trees to be removed, and each individual tree in the field shall be marked with paint.
3.3 TREE SIZE. Tree diameter will be determined by Government personnel as tree diameter at breast high.
3.4 DISPOSAL AND TREATMENT OF DOWNED TREE MATERIAL. At the discretion of the COR, trunk and limbs size 2 inches or larger in diameter maybe cut into lengths of approximately 24 inches and stacked neatly for visitor use on site. Stacking of the wood may be done as near to the site of the marked tree as is practical provided it does not interfere with ongoing traffic, mowing, camper access, or similar activities associated with the park operations. Trunk and limb sections larger than 12 inches in diameter must be split into pieces having a diameter of no more than 6 inches. All other woody material along with all foliage, will be disposed of off Government property, or may be shredded and chipped using a commercially manufactured brush chipper. The Government will designate ONE SPECIFIC LOCATION AT EACH LAKE PROJECT for disposal of chip residue only, and only from materials incurred as a result of this contract. Burning will take place only after COR approval.
3.5 STUMPS REMAINING AT SITE. Those stumps 10ft or less from any campsite or any other government operated facility will be ground with a commercially manufactured stump grinder below ground level at time of cutting. Stumps within the mow line will be ground with a commercially manufactured stump grinder below ground level at time of cutting. All chips from grinding process that remain above ground level will be removed. This stump grinding is to be included in the price of the tree cutting.
3.6 DEBRIS REMOVAL. All debris, trash, and foreign material resulting from Contractor’s operations shall be removed from the area, and the job site shall be cleaned and restored to as near natural conditions as possible upon completion of job tasks.
3.7 Tree Pruning (52 Feet and below): Service requirement to prune limbs from trees between the height of 52 feet and below. All pruning will employ techniques recommended by the International Society of Arboriculture in the publication, Best Management Practices – Pruning. The Contractor will include all labor, travel time and transportation costs to and from the work site, administrative costs, tools/equipment, and trips to obtain repair parts in the event of equipment breakdowns, overhead and profit for this equipment (time starts at work site). For example: Government may desire that an area within a park be pruned, trimmed, limbed. At this time, Government would field mark proposed work areas. Contractor would provide the Government an hourly estimate for the proposed work. Upon agreement between the Government and the Contractor, a delivery or work order would be generated. If the proposed work gets close to exceeding the estimate agreed upon and ordered, Contractor will suspend all work activities before exceeding, and a written notification would be made to the Government representative with an estimate to complete remaining work. The Government would have the right to either complete or suspend remaining work at this time. The previous scenario listed is just one of many that may be encountered. EM 385-1-1 and all other pertinent safety standards must be followed at all times.
3.8 Tree Pruning (52 feet and above): Service requirement to prune limbs from trees 52 feet and above. All pruning will employ techniques recommended by the International Society of Arboriculture in the publication, Best Management Practices – Pruning. The Contractor will include all labor, travel time and transportation costs to and from the work site, administrative costs, tools/equipment, and trips to obtain repair parts in the event of equipment breakdowns, overhead and profit for this equipment (time starts at work site). For example: Government may desire that an area within a park be pruned, trimmed, limbed. At this time, Government would field mark proposed work areas. Contractor would provide the Government an hourly estimate for the proposed work. Upon agreement between the Government and the Contractor, a delivery or work order would be generated. If the proposed work gets close to exceeding the estimate agreed upon and ordered, Contractor will suspend all work activities before exceeding, and a written notification would be made to the Government representative with an estimate to complete remaining work.
The Government would have the right to either complete or suspend remaining work at this time. The previous scenario listed is just one of many that may be encountered. EM 385-1-1 and all other pertinent safety standards must be followed at all times.
3.9 PROPERTY PROTECTION. Contractor will be responsible for damage to private and/or Government property and injury to any person as a result of his/her operations. The Contractor will notify the Contracting Officer’s Representative immediately of any damage or injuries.
3.10 SUPPLIES
The Contractor must furnish all items required for the proper completion of the terms of this work. The Government will not furnish any supplies or materials for the accomplishment of the tree removal task.
3.11 TIME FRAME FOR COMPLETION OF WORK ITEMS.
Work performed as prescribed in this work item must be completed within a time frame not to exceed 10 calendar days upon notification and delivery of work order. If deemed an emergency refer to 1.18
SECTION B: UNDERBRUSH CLEARING
3.12 UNDERBRUSH CLEARING. Woody growth is defined as trees, saplings, shrubs, bushes, vines, stumps, and other types of woody vegetation. The Contractor shall be required to cut and remove all woody growth having a trunk or stem diameter of 3 inches or less at a height of 12 inches or less above ground level unless specifically accepted by Government personnel. Any desirable species of plant material which is not to be cut when under brushing is done will be marked and/or flagged with vinyl ribbon.
3.13 HEIGHT OF CUT. Contractor must cut the woody growth at the ground level, leaving no stumps or stems protruding higher than 12 inch above ground level without damaging the desirable surrounding woody vegetation.
3.14 METHOD OF WORK. Hand tools and powered hand tools only will be used to perform clearing. This may include chainsaw and power brush cutters. In some locations a skidsteer may be used. If a skidsteer is used the contractor will smooth the ground and plant COR approved vegetation.
3.15 REMOVAL OF DEBRIS. Contractor shall dispose of all cut materials resulting from UNDERBRUSHING of Government property. However, if materials are shredded or chipped using a commercially manufactured brush chipper, the Government will designate ONE SPECIFIC LOCATION AT EACH LAKE PROJECT for disposal of chip residue only and only from materials incurred as a result of this contract. Burning will be conducted only if approved by Government.
3.16 CLEANUP OF WORK AREA. All debris, trash, and other foreign materials resulting from Contractor’s operations shall be removed from the area and the job site shall be cleaned and restored to as near natural conditions as possible upon completion of this job task.
SECTION 4
HERBICIDE
4. GENERAL. Vegetation Management Activities: The Contractor will treat/control/remove all target vegetation within the treatment parameter described in each task order. Species of native vegetation shall not be treated, damaged, or removed from the area unless specified in the task order. The final product of each task order shall provide a project site with 100% treatment/removal of target vegetation with a 95% efficacy for all treatments or efficacy rate approved by COR prior to application. In addition, the final product shall result in minimal impacts (and over spray) to native vegetation and habitat surrounding the target vegetation.
4.1 MAP OF AREA FOR HERBICIDE APPLICATION. A map will be furnished for each work order showing the area that will have an herbicide application.
4.2 PROCEDURES. The Contractor shall furnish and apply herbicide to areas shown on the map.
Application will be in accordance with the prescription provided by the COR based on herbicide recommendations provided by the University of Arkansas Cooperative Extension Service in MP44 and MP553. Tree sprouts may require mechanical removal if chemicals are ineffective. It will be the responsibility of the Contractor to proceed or stop all operations due to rainfall or excessive moisture on foliage to assure that all vegetative growth has the proper and sufficient contact time to get an adequate kill. Contractor will be required to reapply herbicide to any vegetation in areas specified not killed due to this condition. Further, it will be the responsibility of the Contractor to suspend applications when environmental conditions such as wind or excessive heat are likely to result in herbicide drift or volatilization. Contractor may be required to use dye at the request of the Contracting Officer’s Representative (COR). All appropriate licensures/certifications for the use of herbicides/pesticides must be provided to the COR 48 hours in advance of the herbicide/pesticide application The Contractor shall use techniques to minimize non-target damage and minimize disturbance. The Contractor shall provide the COR a written explanation of the methods to be utilized and shall include the number operators/laborers, site supervisors, application methods, herbicide rates (if applicable) and equipment to be used 5 business days prior to commencement of work on the specified task order.
This is the start of the file's text. The full file is on GovTribe.