A.07.24 Amendment 2- Released.pdf
PDF 388 KB Posted
- Solicitation number
- W9127S20Q0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24 Amendment 1- Released.pdf | ||
| A.02.01 Combined Synopsis & Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to correct section 1.6.48 Dam Site Park Day Use in the Performance Work Statement. Please see summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S20Q0005
X 9B. DATED (SEE ITEM 11)
11-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jan-2020
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127S20Q0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
AMENDMENT 2 CORRECT 1.6.48
LED, or approved equal bulb, with the equivalent light output that are properly rated for the fixture and location. All bulbs shall be suitable for use in these locations (not break loose from base, burn out too readily, and correct color). If bulbs break loose from base, the contractor will remove the base from the fixture. Special low-heat type bulbs shall be used in light fixtures that burn for 24 hours per day. While most fixtures are minimal maintenance LED lights, other bulb types may vary from facility to facility.
Changes in type and number of fixtures may be made during the contract period. If contractor breaks or damages bulb holders (fixtures), while changing bulbs, the contractor shall repair or replace the holder (fixture) within 24 hours or the cost to repair the damaged fixtures will be deducted from the contractors pay. The contractor shall dispose of burned out light bulbs in accordance with 40 CFR 273.13- 4 and any other applicable state or federal laws and/or regulations.
1.6.45. Door Props: If the contractor props doors open during cleaning operations, an approved/proper door stop (provided by contractor) shall be placed under the doors edge. Rocks shall not be used as door props and no blocks or other objects shall be placed in or around the door hinges. Doors shall not be left propped open outside of service times. Contractor may be held financially responsible for repairing damages to doors, hinges, or facilities resulting from improper placement of door props.
1.6.46. Roadway Cleaning: Contractor will be required to clean all roadways in the parks free of leaves and other vegetative debris up to three times a year when ordered. Dates are to be determined by the COR. The leaves and debris shall be removed in a manner to prevent piles or windrows around buildings, roadsides culverts or campsite areas. Leaves or any vegetative debris may not be placed in the dumpsters or ditches.
1.6.47. Other Areas: John F. Kennedy Overlook, Collins Creek Trail, and the overflow area near the overlook are to be included with John F. Kennedy Park. Mossy Bluff Trail, Buckeye Trail, Josh Park Trail, Mossy Bluff Disc Course, and access roads to those trails, and Greers Ferry Powerhouse and Switchyard are to be included with Dam Site Park.
1.6.48. Dam Site Park Day Use: The Contractor shall clean Dam Site Park Day Use Area after 6:00 a.m. and prior to opening at 9:00 a.m., between 11:00 a.m. and 1:00 p.m., and again between 3:00 p.m. and 5:00 p.m. on weekends, holidays, and the Friday before a holiday from the second weekend in May until the second weekend of September. The cost of cleaning the area shall be included in the price to clean Dam Site Park.
1.6.49. Restriction on Chlorine Bleach: Chlorine bleach, pure or diluted, shall not be allowed as the primary cleaning agent for any aspect of this contract, due to its corrosive action on metal surfaces and potential for damaging sewage treatment facilities. Chlorine bleach may be used along with a primary cleaning agent in a diluted form following manufactures instruction for diluting and standard recommended practices for each type of cleaning being performed.
1.6.50. Maps: Maps are not to scale, nor are they intended to depict all facilities at the projects. Maps are included indicating the approximate park areas to be cleaned as by appropriate legend or note. The
W9127S20Q0005 maps are for INFORMATION ONLY showing the approximate locations for campsites, restrooms, drinking fountains, roads, picnic tables, trailer dump stations, and boat ramps, etc. Variances shall not be cause for an adjustment in the contract price for either the Government or the contractor.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .