Attachment_F_-_Codes_&_Criteria.pdf

PDF 1 MB Posted

Attached to
Tyndall AFB Temporary Modular Medical Facility Federal contract opportunity
Solicitation number
W9127S19Q6039
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

Attachment F

View the file

Other files for this federal contract opportunity

Other files attached to Tyndall AFB Temporary Modular Medical Facility, newest first.
File Type Posted
49_22__TLV2.0_Combined_Clinic_TPF_Low_Voltage_Systems_Notes_&_Details.pdf PDF
1-V1.07_SURVEY_PLAN.pdf PDF
1-V1.02_SURVEY_PLAN.pdf PDF
49_24__TPF2.0_Full_Building_Plan.pdf PDF
49_23__TCP1.4-PII_Combined_Clinic_TPF_RCP-PHASE_II.PDF PDF
1-V1.06_SURVEY_PLAN.pdf PDF
49_24__TPF6.0_Overall_Plumbing_Plan_-_Supply.pdf PDF
49_21__TFP3.1_Combined_Clinic_TPF_Fire_Suppression_Plan_Phase_1.pdf PDF
49_23__TCP1.1_Combined_Clinic_TPF_RCP.pdf PDF
49_25__TPFV1.0_COVER_SHEET_STAMPED.pdf PDF
49_25__TPFV8.0_CANOPY_ASSEMBLY_AND_FOOTING_DETAILS_STAMPED.pdf PDF
55_TQ3.11D_-_FFE_PLAN_-_TPF_PHASE_1,_AREA_D.pdf PDF
55_TQ4.11_-_FFE_PLAN_-_TPF_PHASE_2.pdf PDF
49_21__TFP1.0_Combined_Clinic_TPF_Life_Safety_Narrative.pdf PDF
55_TQ4.11D_-_FFE_PLAN_-_TPF_PHASE_2,_AREA_D.pdf PDF
49_23__TCP1.5_Combined_Clinic_TPF_RCP.pdf PDF
49_25__TPFV2.0_STANDARD_RAMP_AND_STAIR_DETAILS_STAMPED.pdf PDF
49_24__TPF2.0-PI_Full_Building_Plan-Phase_1.pdf PDF
1-V1.01_SURVEY_PLAN.pdf PDF
49_23__TCP1.3_Combined_Clinic_TPF_RCP.pdf PDF
55_TQ4.01_-_FFE_JSN_LEGEND.pdf PDF
1-V1.05_SURVEY_PLAN.pdf PDF
36_12_TSM1.0_Mechanical_HVAC_Plan.pdf PDF
29_03_TNP4.0_Plumbing_Plan_-_DWV.pdf PDF
29_01_TNC1.0_Cover_Sheet-Notes.pdf PDF
29_03_TNP1.0_Plumbing_Schematics.pdf PDF
43_19_TCCX2.0_Roof_Drain_Details.pdf PDF
43_19_TCCX1.0_Building_Cross_Section.pdf PDF
29_07_TNFD1.0_Foundation_Plan_and_Details.pdf PDF
36_11_TSE1.1_Electrical_Panel_Schedules.pdf PDF
36_10_TSP3.0_Plumbing_Plan_-_Supply_Phase_1.pdf PDF
05_1-CU1.01_UTILITY_PLAN_-_PHASE_1.pdf PDF
43_20_TCCFD1.0_Foundation_Plan_and_Details.pdf PDF
36_09_TSA4.0-PII_Egress_Plan.pdf PDF
07_ES1-01_-_ELECTRICAL_SITE_PLAN_-_MEDICAL_CLINIC_BUILDING_1465.pdf PDF
36_11_TSE3.0-PII_Task_Lighting_Illumination_Plan_Phase_2.pdf PDF
36_10_TSP2.0_Plumbing_Schematics.pdf PDF
29_02_TNA3.0_Reflective_Ceiling_Plan.pdf PDF
36_14_TSFD1.0_Foundation_Plan_and_Details.pdf PDF
36_11_TSE4.0_MDP_-_One_Line_Diagram.pdf PDF
36_09_TSA3.0-PII_Reflective_Ceiling_Plan.pdf PDF
29_04_TNE1.0_Elec_Plan.pdf PDF
36_12_TSM1.0-PII_Mechanical_HVAC_Plan.pdf PDF
43_16_TCCA2.0_Floor_Plan.pdf PDF
36_10_TSP4.0_Plumbing_Plan_-_DWV_Phase_1.pdf PDF
36_11_TSE1.0-PII_Electrical_Plan.pdf PDF
36_09_TSA2.1_Interior_Elevations.pdf PDF
29_02_TNA1.0_Exterior_Elevations.pdf PDF
W9127S19Q6039_Tyndall_TMMF_Combined_Synopsis_Solicitation_13Aug19.pdf PDF
Attachment_D_-_DHA_LAN_WLAN_Guides.pdf PDF
Show all 50

Tyndall AFB Temporary Modular Medical Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT

F

CODES

CRITERIA

STANDARDS

Note:

This list supplements codes, criteria and standards listed in

UFC-‐4-‐510-‐01

REVISION:

May

ORDER

OF

PRECEDENCE

(OOP)** ORDER

I.

BETTERMENTS 1

II.

SOLICITATION

A.

Bid Schedule 2 B.

Representations 3 C.

Clauses 4 D.

Other Documents, Exhibits, Attachments 1) Public Law 5 2) Criteria and Code Attach F-‐Codes Criteria) 6 3)

SOW

Attachments 7

Attach A-‐Project Description 7A Attach B-‐Drawings 7B

Attach C-‐Program for Design 7C Attach

D-‐FFE-‐LVS:

Project Room Contents List 7D

Attach

D-‐FFE-‐LVS

Schedule of Deliverables 7E Attach

D-‐FFE-‐LVS:

JSN

Summary 7F

Attach E-‐Existing Condition Information, Apdx G

Environmental

Report

7G

Attach E-‐Existing Condition Information, Apdx J

Predesign Information

7H

Attach G-‐Submittals 7I Attach F-‐Standards 7J

Attach F-‐Supplemental:

Installation Standards 7K E.

Specifications

SOW

Proper 8

III.

CONTRACTOR

PROPOSAL 9

NOTE:

Examples and Information provided as

FIO

are not included in

OOP

**Order of Precedence:

Reference

FAR

52.236-‐5000 52.215-‐8

APPLICABLE

CODE,

CRITERIA

AND

STANDARDS

Projects< $5M

Projects> $5M

ALL

MILCON

NOTES

DoD

UFC

4-‐510-‐01 and 1-‐200-‐01 including all referenced UFCs and 3rd Party Standards. X X X

UFC

1-‐200-‐02 High Performance Sustainable Building

Requirements

X X X

UFC

3-‐190-‐03A X-‐Ray Shielding X X X

UFC

3-‐490-‐06 (or current

UFC

number) Design:

Elevators X X X

UFC

1-‐201-‐01 Non Permanent

DOD

Facilities X X X

MILITARY

HEALTH

SYSTEM

CRITERIA

MHS

Building Information Modeling Requirements X X

MHS

Principals of World Class Healthcare X X

ARCHITECTURAL

BARRIERS

ACT

(ABA)

ACCESSIBILITY

GUIDELINES

FOR

BUILDINGS

AND

FACILITIES.

X X X o http://www.access-‐board.gov/ada-‐aba/final.cfm bethkeck Text Box NOTE: Updates as of 21 May 15:

01 33 00, 01 45 00, Finishes Supplemental, Engineering Quality Standards

ATTACHMENT

F

CODES

CRITERIA

STANDARDS

Note:

This list supplements codes, criteria and standards listed in

UFC-‐4-‐510-‐01

REVISION:

May

APPLICABLE

CODE,

CRITERIA

AND

STANDARDS

Projects< $5M

Projects> $5M

ALL

MILCON

NOTES

AMERICAN

HOSPITAL

ASSOCIATION

(AHA):

Maintenance

Management for Health Care Facilities

X X X

AIR

CONDITIONING

AND

REFRIGERATION

INSTITUTE

(ARI)

ARI

Guideline K Containers for Recovered Fluorocarbon

Refrigerants

X X X

ARI

Standard 1010,Self-‐Contained, Mechanically-‐ Refrigerated Drinking-‐Water Coolers

X X X

AIR

FORCE

MEDICAL

SERVICE

USAF

Surgeon Interior Design Guide http://www.wbdg.org/ccb/AF/AFIDG/

AFMS

Design and Implementation Guidelines Medical

Systems Infrastructure Modernization

(MISM)

X X

AFMS

Medical Systems Infrastructure Modernization

(MISM)

Cable Removal

X X included in doc above

AFMS

Supplementals on Finishes, Signage, Communications, Resource Protection, Casework, CID

Instructions, Artwork

X X X

AFMS

Family Health Initiative Clinic Design X X X

AFMS

Engineering Quality Standards X X X

AFMS

ETL

2010-‐01 Return

HVAC

Ducts X X X

AFMS

ETL

2011-‐1 Emergency Air Distro Shutoff X X X

AIR

FORCE,

HEADQUARTERS

(as applicable) X X X

AF

Policy Memorandum on

SDD X X X

Current ETLs on WBDG.org X X X http://www.wbdg.org/ccb/browse_cat.php?c=125

AIR

FORCE,

LOCAL

INSTALLATION

Architectural Compatibility Standards Installation Development Plan Communications Design Standards Medical Equipment Standards

ARMY

CORPS

OF

ENGINEERS

TECHNICAL

MISCELLANEOUS

Standard Detail No.

40-‐06-‐04 Lighting Fixtures X X X

EM

385-‐1-‐1 U.S.

Army Corps of Engineers Safety and

Health Requirements Manual

X X X

ER

1110-‐345-‐723 Systems Commissioning Procedures X X X

ATTACHMENT

F

CODES

CRITERIA

STANDARDS

Note:

This list supplements codes, criteria and standards listed in

UFC-‐4-‐510-‐01

REVISION:

May

APPLICABLE

CODE,

CRITERIA

AND

STANDARDS

Projects< $5M

Projects> $5M

ALL

MILCON

NOTES

TM

5-‐811-‐3 Electrical Design Lighting and Static Electricity

Protection

X X X

AMERICAN

ARCHITECTURAL

MANUFACTURERS

ASSOCIATION

(AAMA)

AAMA

Voluntary Test Method of Thermal

Transmittance and Condensation Resistance

X X X

AAMA

501.1 Test Method for Water Penetration.

X X X

AAMA

501.5 Test Method for Thermal Cycling of Exterior

Walls

X X X

AMERICAN

INSTITUTE

OF

ARCHITECTS

(AIA)

AIA

FGI

Guidelines for Design and Construction of

Healthcare Facilities

X X X

AMERICAN

SOCIETY

FOR

TESTING

AND

MATERIALS

(ASTM)

ASTM

C-‐1060-‐90 Standard Practice for Thermographic

Inspection of Insulation Installations in Envelope Cavities of

Frame Buildings

X X X

ASTM

D-‐5957 Standard Guide for Flood Testing Horizontal

Waterproofing Installations

X X X

ASTM

E-‐283 Standard Test Method for Determining Rate of

Air Leakage Through Exterior Windows, Curtain Walls, and

Doors Under Specified Pressure Differences Across the

Specimen

X X X

ASTM

E-‐331 Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by

Uniform Static Air Pressure Difference

X X X

ASTM

E-‐783 Standard Test Method for Field Measurement of Air Leakage Through Installed Exterior Windows and

Doors

X X X

ASTM

E-‐966 Standard Guide for Field Measurements of

Airborne Sound Insulation of Building Facades and Facade

Elements

X X X

ASTM

E-‐1105 Standard Test Method for Field

Determination of Water Penetration of Installed Exterior

Windows, Skylights, Doors, and Curtain Walls, by Uniform or Cyclic Static Air Pressure Difference

X X X

ASTM

E-‐1186 Standard Practices for Air Leakage Site

Detection in Building Envelopes and Air Barrier Systems

X X X

BUILDERS

HARDWARE

MANUFACTURERS

ASSOCIATION

(BHMA)

ATTACHMENT

F

CODES

CRITERIA

STANDARDS

Note:

This list supplements codes, criteria and standards listed in

UFC-‐4-‐510-‐01

REVISION:

May

APPLICABLE

CODE,

CRITERIA

AND

STANDARDS

Projects< $5M

Projects> $5M

ALL

MILCON

NOTES

BHMA

STDS

BHMA

Standards for Building Door Hardware X X X

CODE

OF

FEDERAL

REGULATIONS

(CFR)

CFR

Part 433, Energy Efficiency Standard for the Design and Construction of New Federal Commercial and Multi-‐ Family High Rise Residential Buildings

X X X

CFR

Part 436, Subpart A Methodology and Procedures for Life Cycle Cost Analyses

X X X

CFR

1310.72:

Title Code of Federal Regulations

Section 1301.72

X X X

CFR

Safety and Health Regulations for

Construction Respiratory Protection

X X X

CFR

1926.62 Lead X X X

CFR

61-‐SUBPART

A General Provisions X X X

CFR

61-‐SUBPART

M National Emission Standard for

Asbestos

X X X

CFR

Protection of Stratospheric Ozone X X X

CFR

Hazardous Waste Management Systems:

General

X X X

CFR

Land Disposal Restrictions X X X

CFR

Lead;

Requirements for Lead-‐Based Paint

Activities

X X X

CFR

Asbestos Containing Material in Schools X X X

CFR

173.301 Shipment of Compressed Gases in

Cylinders and Spherical Pressure Vessels

X X X

OTHER

National Sanitation Foundation Standard Class

II

Laminar Flow Biohazard Cabinetry

X X X

TELECOMMUNICATIONS

INDUSTRY

ASSOCIATION

(TIA)/ELECTRONIC

INDUSTRIES

ASSOCIATION

(EIA)

TIA/EIA

568-‐B.1, B2.1, B2.3, and B2.4 Commercial Building

Telecommunications Cabling Standards, Part 1:

General

Requirements

(ANSI/TIA/EIA-‐568-‐B.1,

etc.)

X X X

TIA/EIA

569-‐B Commercial Building Standards for

Telecommunications Pathways and Spaces

(ANSI/TIA/EIA-‐

569-‐B)

X X X

ANSI/TIA-‐942

Telecommunications Infrastructure Standard for Data Centers

X X X

UNDERWRITERS

LABORATORY

ATTACHMENT

F

CODES

CRITERIA

STANDARDS

Note:

This list supplements codes, criteria and standards listed in

UFC-‐4-‐510-‐01

REVISION:

May

APPLICABLE

CODE,

CRITERIA

AND

STANDARDS

Projects< $5M

Projects> $5M

ALL

MILCON

NOTES

UNIFIED

FACILITIES

GUIDE

SPECIFICATIONS

(UFGS):

01.00

Project Schedule X X X 16.00

Construction Progress Documentation X X Submittal Procedures X X X Government Safety Requirements X X X 02.10

Quality Control System

(QCS) X X X

Temporary Construction Facilities X X X 20.00 Environmental Protection X X X Recycled/Recovered Materials X X X Operation and Maintenance Data X X X General Commissioning Requirements X X X

LEED™

Documentaion X X Building Air Barrier System X X Fire stopping X X 23.14 Chemical Resistive Resinous Flooring X X 54.00 Electromagnetic

(EM)

Shielding

(USACE) X X

Seismic Protection for Miscellaneous Equipment X X Seismic Protection for Mechanical

Equipment

X X

(x-‐ray shielding) if applicable X X Electric Traction Freight Elevators X X Electric Traction Passenger Elevators X X Plumbing, Healthcare Facilities X X Plumbing Systems Commissioning X X

Gas and Vacuum Systems for Healthcare Facilities X X

Air Supply, Distribution, Ventilation, and Exhaust

System

X X

93.00 Testing, Adjusting, and Balancing of

HVAC

Systems

X X

Thermal Insulation for Mechanical Systems X X 23.13 BACnet Direct Digital Control Systems for

HVAC

X X

00.00 Heating Boilers Water and Steam Heating;

Oil, Gas or Both;

Up to

MBTUH

X X

10.00 Forced Hot Water Heating Systems Using

Water and Steam Heat Exchangers

X X

00.00 Water Liquid Chillers, Vapor compression

type

X X

Chilled, Chilled-‐Hot and Condenser Water Piping

Systems

X X

LONWORKS

Utility Monitoring and Control

System

(UMCS)

X X

See

SOW

for instructions on how to apply the

UFGS

ATTACHMENT

F

CODES

CRITERIA

STANDARDS

Note:

This list supplements codes, criteria and standards listed in

UFC-‐4-‐510-‐01

REVISION:

May

APPLICABLE

CODE,

CRITERIA

AND

STANDARDS

Projects< $5M

Projects> $5M

ALL

MILCON

NOTES

Apparatus Inspection and Testing X X Secondary Unit Substations X X 00.00 Medium-‐Voltage Transformers if applicable

X X

19.10 Three-‐Phase Pad-‐Mounted Transformers X X Interior Distribution System X X 00.00 Motor Control Centers, Switchboards and

Panel boards

X X

01.00 Coordinated Power System Protection X X 15.

“Diesel-‐Generator Set Station

KW”

X X

00.

“Automatic Transfer Switches and By-‐Pass/

Isolation Switches.”

Interior Lighting X X 14.00 Cable Television Premises Distribution

System

Building Telecommunications Cabling System X X 00.00 Nurse Call Audio-‐Visual

(NCAV)

System X X Radio and Public Address Systems X X 32.00 Nurse Call Tone-‐Visual

(NCTV)

System X X Interior Fire Alarm and Mass Notification System X X Telecommunications Outside Plant

(OSP) X X

28, 23.001 Electronic Safety Security X X U.S.

CODE

(USC)

USC

§2687

Department Authorization Amendments and Base Closure and Realignment Act

X X X

USC

§631

Small Business Act X X X

USC

§2227

Fire Administration Authorization Act of

X X X

USC

§2601

Toxic Substances Control Act

(TSCA) X X X

USC

§3301

Natural Gas Policy Act of 1978 X X X

USC

§431-‐433

Antiquities Act of 1906 X X X

USC

§469a-‐c

Archeological and Historic Preservation

Act of

X X X

USC

§470

National Historic Preservation Act X X X

USC

§470a

National Historic Preservation Program X X X

USC

§661

Fish and Wildlife Coordination Act X X X

USC

§667b-‐d

Property for Wildlife Conservation Act X X X

USC

§791

Federal Power Act of 1920 X X X

USC

§1271

Wild and Scenic Rivers Act X X X

USC

§1451

Coastal Zone Management Act of 1972 X X X

USC

§1531

Endangered Species Act X X X

USC

§3501

Coastal Barrier Improvement Act of 1990 X X X

USC

§106a

Visual Artists Rights Act of 1990 X X X

ATTACHMENT

F

CODES

CRITERIA

STANDARDS

Note:

This list supplements codes, criteria and standards listed in

UFC-‐4-‐510-‐01

REVISION:

May

APPLICABLE

CODE,

CRITERIA

AND

STANDARDS

Projects< $5M

Projects> $5M

ALL

MILCON

NOTES

USC

§13

Assimilative Crimes Act X X X

USC

§107

Randolph-‐Sheppard Act X X X

USC

§881

Comprehensive Drug Abuse and Prevention and Control Act

X X X

USC

§3001

Native American Graves Protection and

Repatriation Act

(NAGPRA)

X X X

USC

§651-‐678

Occupational Safety and Health Act of

X X X

USC

§3551-‐3556

Competition in Contracting Act of

X X X

USC

§1251-‐1263

Federal Water Pollution Control Act of

X X X

USC

§101

Postal Reorganization Act X X X

USC

§276

Davis-‐Bacon Act X X X

USC

§318-‐318d

Protection of Public Property Act X X X

USC

§471

Federal Property and Administrative

Services Act of

X X X

USC

§490(16)-‐(19)

Public Buildings Cooperative Use

Act of

X X X

USC

§490b

Trible Amendment X X X

USC

§490c

Edgar Amendment X X X

USC

§490f, Public Buildings Amendments of 1972 X X X

USC

§490h-‐l

Treasury, Postal Service, and General

Government Annual Appropriation Act

X X X

USC

§531

Federal Urban Land Act X X X

USC

§601-‐619

Public Buildings Act of 1959 X X X

USC

§614

Public Buildings Act of 1959 X X X

USC

§46-‐48c

Javits-‐Wagner-‐O'Day Act X X X

USC

§351-‐358

Service Contract Act of 1965 X X X

USC

§300f

Safe Drinking Water Act

(SDWA)

Subchapter

XII

Part B

X X X

USC

§3122

Rural Development Act of 1972 X X X

USC

§4151-‐4157

Architectural Barriers Act of 1968 X X X

USC

§4321

The National Environmental Policy Act

(NEPA)

of

X X X

USC

§4601

Uniform Relocation Assistance and Real

Property Acquisition Policies Act of

X X X

USC

§4655

Uniform Real Property Acquisition Policy

Subchapter

III

X X X

USC

§6201

Energy Policy and Conservation Act

(EPACT)

X X X

USC

§6901

Solid Waste Disposal/Resource

Conservation and Recovery Act and Major Amendments

ATTACHMENT

F

CODES

CRITERIA

STANDARDS

Note:

This list supplements codes, criteria and standards listed in

UFC-‐4-‐510-‐01

REVISION:

May

APPLICABLE

CODE,

CRITERIA

AND

STANDARDS

Projects< $5M

Projects> $5M

ALL

MILCON

NOTES

USC

§6962

Resource Conservation and Recovery Act

Subchapter

IV

Federal Procurement

X X X

USC

§7401

Clean Air Act

(CAA)

of 1970 X X X

USC

§7701-‐7706

Earthquake Hazards Reduction Act of

X X X

USC

§9601

Comprehensive Environmental Response, Compensation, and Liability Act of

(CERCLA)

Subchapter I Hazardous Substances Releases, Liability, Compensation

X X X

USC

§12181

Americans With Disabilities Act of 1990 X X X

USC

§151

Telecommunications Act of 1996 X X X

USC

§47151

The Airport and Airway Development Act of

X X X

U.S.

DEPARTMENT

OF

DEFENSE

(DOD)

DOD

4000.25-‐1-‐M Requisitioning and Issue Procedures X X X DoD Manual 5200.1, DoD Information Security Program X X X DoD Manual 5200.08R, Physical Security Program X X X

DoD Strategic Sustainability Performance Plan (Current

FY) X X X

FEMA-‐310,

Handbook for the Seismic Evaluation of

Buildings, FEMA-‐356, Prestandard and Commentary for the Seismic

Rehabilitation of Buildings, ICSSC

RP6

NISTIR

6762, Standards of Seismic Safety for

Existing Federally Owned and Leased Buildings, X X X

Military Handbook Facility Planning and Design Guide X X X

Military Handbook Grounding, Bonding, and Shielding for Electrical Equipment and Facilities (Vol 2)

X X X

Military Handbook 1013/1A Design Guidance for Physical

Security of Facilities

X X X

Military Handbook 1012/3 Telecommunications Premises

Distribution Planning, Design and Estimating

X X X

MIL-‐M-‐29241

Material Handling Units for Medical Facilities X X X

MIL-‐C-‐29240,

"Casework Moveable and Modular for

Hospital Laboratories

X X X

MIL-‐STD-‐129

(Rev.

P) Military Marking for Shipment and

Storage

X X X

MTFDC

Military Treatment Facility Data Center

Telecommunications Infrastructure in Consideration of

Federal, DoD, and Air Force Security Policy and Regulations

ATTACHMENT

F

CODES

CRITERIA

STANDARDS

Note:

This list supplements codes, criteria and standards listed in

UFC-‐4-‐510-‐01

REVISION:

May

APPLICABLE

CODE,

CRITERIA

AND

STANDARDS

Projects< $5M

Projects> $5M

ALL

MILCON

NOTES

USGBC

Exemption Policy Letter X X X Dep Sec Def Memorandum on

ABA X X X

Revision:

Mar

ATTACHMENT

F (Appendix B)

DOD

MEDICAL

FACILITY

WORLD-‐CLASS

CHECKLIST

The World-‐Class Checklist provides a library of tools that will enable planners, hospital staff, architects, engineers, agents, and facility managers to understand the meaning of world-‐class and how it will affect their facilities and their operations.

The World-‐Class Toolkit also helps to incorporate world-‐class strategies into your projects throughout their life cycles.

In the future, it will allow you to evaluate your projects against world-‐class metrics and to compare against other projects through the development of a World-‐Class Index.

https://facilities.health.mil/checklist

UFGS GENERAL ADMINISTRATIVE REQUIREMENTS

SECTION 01 50 00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

PART 1 GENERAL

1.1 SUMMARY

Requirements of this Section apply to, and are a component of, each section of the specifications.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA C511 (2007) Standard for Reduced-Pressure Principle Backflow Prevention Assembly

FOUNDATION FOR CROSS-CONNECTION CONTROL AND HYDRAULIC RESEARCH

(FCCCHR)

FCCCHR List (continuously updated) List of Approved Backflow Prevention Assemblies

FCCCHR Manual (10th Edition) Manual of Cross-Connection Control

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 241 (2013) Standard for Safeguarding Construction,Alteration, and Demolition Operations

NFPA 70 (2014) National Electrical Code

U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

FAA AC 70/7460-1 (2007; Rev K) Obstruction Marking and Lighting

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2009) Manual on Uniform Traffic Control Devices

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval./information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submitted the following in accordance with Section 01 33 00

SECTION 01 50 00 Page 1

Cross-Out

SUBMITTAL PROCEDURES:

SD-01 Design/Preconstruction Submittals

[ Construction site plan; G [ Traffic control plan; G Electrical/comm connection plan/details; G Water/waste connection plan/details; G Product data, as required; G Construction and Safety Signs: Elevations, graphics, installation details: G

SD-06 Test Reports

Backflow Preventer Tests; G

SD-07 Certificates

Backflow Tester Certification; G

[ Backflow Preventers Certificate of Full Approval ; G

[ 1.4 CONSTRUCTION SITE PLAN

Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities,construction signage and wayfinding, and worker parking areas.

] 1.5 BACKFLOW PREVENTERS CERTIFICATE

Certificate of Full Approval from FCCCHR List , University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval. Certificate of Provisional Approval will not be acceptable.

[ 1.5.1 Backflow Tester Certificate

Prior to testing, submit to the Contracting Officer certification issued by the State or local regulatory agency attesting that the backflow tester has successfully completed a certification course sponsored by the regulatory agency. Tester must not be affiliated with any company participating in any other phase of this Contract.

] 1.5.2 Backflow Prevention Training Certificate

Submit a certificate recognized by the State or local authority that states the Contractor has completed at least 10 hours of training in backflow preventer installations. The certificate must be current.

SECTION 01 50 00 Page 2

PART 2 PRODUCTS

2.1 TEMPORARY SIGNAGE

2.1.1 Bulletin Board

Immediately upon beginning of work, provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches, or as specified by the Contrctin Officer Representative (COR) in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.

2.1.2 Project and Safety Signs

The requirements for the signs, their content, and location are as required by the COR. Erect signs within 15 days after receipt of the notice to proceed. Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.

2.2 TEMPORARY TRAFFIC CONTROL

2.2.1 Haul Roads

At contractors expense construct access and haul roads necessary for proper prosecution of the work under this contract. Construct with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic are be avoided. Provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic.

The method of dust control, although optional, must be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads are subject to approval by the Contracting Officer. Lighting must be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations.

2.2.2 Barricades

Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

2.2.3 Fencing

a. Provide fencing along the construction site at all open excavations and tunnels to control access by unauthorized people. Fencing must be installed to be able to restrain a force of at least 250 pounds.

Enclose the project work area and Contractor field office/lay-down area with a 6 ft high ( or height as required by COR ) chain link fence and gates with brown ( or color designated by COR), UV light resistant, plastic fabric mesh netting (similar to tennis court or other screening)]or as required by COR. Remove the fence upon completion and acceptance of the work. Intent is to block (screen)

SECTION 01 50 00 Page 3 public view of the construction.

In addition, prior to the start of work, enclose those areas at the construction site which are not within the construction fence with a temporary safety fence, including gates and warning signs, to protect the public from construction activities. The safety fence shall match the base standard color (or bright orange where it protects excavated areas), shall be made of [high density polyethylene grid or approved equal][plastic fence from recovered materials containing 60-100 percent recovered content level plastic], a minimum of 42 inches high, supported and tightly secured to steel posts located on minimum 10 foot centers. Remove the fence from the work site upon completion of the contract.]

2.2.4 Temporary Wiring

Provide temporary wiring in accordance with NFPA 241 and NFPA 70 .

Include frequent inspection of all equipment and apparatus.

[ 2.2.5 Backflow Preventers

Reduced pressure principle type conforming to the applicable requirements AWWA C511. Provide backflow preventers complete with [150 pound] [_____] flanged [cast iron], [bronze][brass] mounted gate valve [and strainer], [304][_____] stainless steel or bronze, internal parts. [The particular make, model/design, and size of backflow preventers to be installed must be included in the latest edition of the List of Approved Backflow Prevention Assemblies issued by the FCCCHR List and be accompanied by a Certificate of Full Approval from FCCCHR List .] [After installation conduct Backflow Preventer Tests and provide test reports verifying that the installation meets the FCCCHR Manual Standards.]

] PART 3 EXECUTION

3.1 EMPLOYEE PARKING

Contractor employees will park privately owned vehicles in an area designated by the COR . This area will be within reasonable walking distance of the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.

3.2 AVAILABILITY AND USE OF UTILITY SERVICES

3.2.1 Temporary Utilities

Provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.

3.2.2 Sanitation

a. Provide and maintain within the construction area minimum field-type sanitary facilities approved by the COR and periodically empty wastes into a municipal, district, or station sanitary sewage system, or remove waste to a commercial facility. Sanitary system may

SECTION 01 50 00 Page 4 connect to existing system. Obtain approval from the system owner prior to discharge into any facility, base, municipal, district, or commercial sanitary sewer system. Any penalties and / or fines associated with improper discharge will be the responsibility of the Contractor. Coordinate with the COR and follow station regulations and procedures when discharging into the station sanitary sewer system. Maintain these conveniences at all times without nuisance.

Include provisions for pest control and elimination of odors.

Government toilet facilities will not be available to Contractor's personnel.

3.2.3 Telephone

Make arrangements with the COR to connect contractor construction facility to existing communications systems.

3.2.4 Obstruction Lighting of Cranes

Provide a minimum of 2 aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 100 feet above ground level. Light construction and installation must comply with FAA AC 70/7460-1 . Lights must be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer.

3.2.5 Fire Protection

Provide temporary fire protection equipment for the protection of personnel and property during construction. Remove debris and flammable materials [daily][weekly][monthly] to minimize potential hazards.

3.3 TRAFFIC PROVISIONS

3.3.1 Maintenance of Traffic

a. Conduct operations in a manner that will not close any thoroughfare or interfere in any way with traffic on railways or highways except with written permission of the Contracting Officer at least 15 calendar days prior to the proposed modification date, and provide a Traffic Control Plan detailing the proposed controls to traffic movement for approval. The plan must be in accordance with State and local regulations and the MUTCD, Part VI. [Make all notifications and obtain any permits required for modification to traffic movements outside Station's jurisdiction.]. Contractor may move oversized and slow-moving vehicles to the worksite provided requirements of the highway authority have been met.

b. Conduct work so as to minimize obstruction of traffic, and maintain traffic on at least half of the roadway width at all times. Obtain approval from the COR prior to starting any activity that will obstruct traffic.

c. Provide, erect, and maintain, at contractors expense, lights, barriers, signals, passageways, detours, and other items, that may be required by the Life Safety Signage, overhead protection authority having jurisdiction.

SECTION 01 50 00 Page 5

3.3.2 Protection of Traffic

Maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment the work, and the erection and maintenance of adequate warning, danger, and direction signs, will be as required by the State and local authorities having jurisdiction. Protect the traveling public from damage to person and property. Minimize the interference with public traffic on roads selected for hauling material to and from the site. Investigate the adequacy of existing roads and their allowable load limit. Contractor is responsible for the repair of any damage to roads caused by construction operations.

3.3.3 Rush Hour Restrictions

Do not interfere with the peak traffic flows preceding and during normal operations without notification to and approval by the COR.

3.3.4 Dust Control

Dust control methods and procedures must be approved by the Contracting Officer. Treat dust abatement on access roads with applications of calcium chloride, water sprinklers, or similar methods or treatment.

3.4 CONTRACTOR'S TEMPORARY FACILITIES

Contractor-owned or -leased trailers must be identified by Government assigned numbers. Size and location of the number will be per direction of the COR Apply the number to the trailer within 14[_____] calendar days of notification, or other agreed upon duration, if directed by the Government.

3.4.1 Safety

Protect the integrity of any installed safety systems or personnel safety devices. If entrance into systems serving safety devices is required, the Contractor must obtain prior approval from the Contracting Officer. If it is temporarily necessary to remove or disable personnel safety devices in order to accomplish contract requirements, provide alternative means of protection prior to removing or disabling any permanently installed safety devices or equipment and obtain approval from the Contracting Officer.

3.4.2 Administrative Field Offices

Provide and maintain administrative field office facilities within the construction area at the designated site. Government office and warehouse facilities will not be available to the Contractor's personnel unless indicated in project RFP.

3.4.3 Storage Area

Construct a temporary 6 foot high chain link fence around trailers and materials. Fence posts may be driven, in lieu of concrete bases, where soil conditions permit. Do not place or store Trailers, materials, or equipment outside the fenced area unless such trailers, materials, or equipment are assigned a separate and distinct storage area by the COR away from the vicinity of the construction site but within the

SECTION 01 50 00 Page 6 installation boundaries. Trailers, equipment, or materials must not be open to public view with the exception of those items which are in support of ongoing work on any given day. Do not stockpile materials outside the fence in preparation for the next day's work. Park mobile equipment, such as tractors, wheeled lifting equipment, cranes, trucks, and like equipment within the fenced area at the end of each work day.

3.4.4 Supplemental Storage Area

Upon Contractor's request, the COR will designate another or supplemental area for the Contractor's use and storage of trailers, equipment, and materials. This area may not be in close proximity of the construction site but will be within the installation boundaries. Fencing of materials or equipment will not be required at this site; however, the Contractor is responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area. Utilities will not be provided to this area by the Government.

3.4.5 Appearance of Trailers

a. Trailers utilized by the Contractor for administrative or material storage purposes must present a clean and neat exterior appearance and be in a state of good repair. Trailers which, in the opinion of the COR, require exterior painting or maintenance will not be allowed on installation property.

b. Paint using suitable paint and maintain the temporary facilities.

Failure to do so will be sufficient reason to require their removal.

3.4.6 Maintenance of Storage Area

a. Keep fencing in a state of good repair and proper alignment. Grassed or unpaved areas, which are not established roadways, will be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways, should the Contractor elect to traverse them with construction equipment or other vehicles; gravel gradation will be at the Contractor's discretion.

Mow and maintain grass located within the boundaries of the construction site for the duration of the project. Grass and vegetation along fences, buildings, under trailers, and in areas not accessible to mowers will be edged or trimmed neatly.

3.4.7 New Building

In the event a new building is constructed for the temporary project field office, it will be a minimum 12 feet in width, 16 feet in length and have a minimum of 7 feet headroom. Equip the building with approved electrical wiring, at least one double convenience outlet and the required switches and fuses to provide 110-120 volt power. Provide a work table with stool, desk with chair, two additional chairs, and one legal size file cabinet that can be locked. The building must be waterproof, supplied with a heater, have a minimum of two doors, electric lights, a telephone, a battery operated smoke detector alarm, a sufficient number of adjustable windows for adequate light and ventilation, and a supply of approved drinking water. Approved sanitary facilities must be furnished. Screen the windows and doors and provide the doors with dead bolt type locking devices or a padlock and heavy duty hasp bolted to the door. Door hinge

SECTION 01 50 00 Page 7 pins will be non-removable. Arrange the windows to open and to be securely fastened from the inside. Protect glass panels in windows by bars or heavy mesh screens to prevent easy access. In warm weather, furnish air conditioning capable of maintaining the office at 50 percent relative humidity and a room temperature 20 degrees F below the outside temperature when the outside temperature is 95 degrees F. Any new building erected for a temporary field office must be maintained by the Contractor during the life of the contract and upon completion and acceptance of the work become the property of the Contractor and removed from the site. All charges for telephone service for the temporary field office will be borne by the Contractor, including long distance charges up to a maximum of $75.00 per month.

3.4.8 Security Provisions

Provide adequate outside security lighting at the Contractor's temporary facilities. The Contractor will be responsible for the security of its own equipment; in addition, the Contractor will notify the appropriate law enforcement agency requesting periodic security checks of the temporary project field office.

[] 3.4.9 Weather Protection of Temporary Facilities and Stored Materials

Take necessary precautions to ensure that roof openings and other critical openings in the building are monitored carefully. Take immediate actions required to seal off such openings when rain or other detrimental weather is imminent, and at the end of each workday. Ensure that the openings are completely sealed off to protect materials and equipment in the building from damage.

3.4.9.1 Building and Site Storm Protection

Contractor temporary trailers, storage units, fencing, etc. is required to be designed and anchored to resist listed wind, snow, and any other nature impacts to these elements. When a warning of gale force winds is issued, take precautions to minimize danger to persons, and protect the work and nearby Government property. Precautions must include, but are not limited to, closing openings; removing loose materials, tools and equipment from exposed locations; and removing or securing scaffolding and other temporary work. Close openings in the work when storms of lesser intensity pose a threat to the work or any nearby Government property.

[ 3.4.9.2 Hurricane Condition of Readiness

Unless directed otherwise, comply with:

a. Condition FOUR (Sustained winds of 50 knots or greater expected within 72 hours): Normal daily jobsite cleanup and good housekeeping practices. Collect and store in piles or containers scrap lumber, waste material, and rubbish for removal and disposal at the close of each work day. Maintain the construction site including storage areas, free of accumulation of debris. Stack form lumber in neat piles less than 4 feet high. Remove all debris, trash, or objects that could become missile hazards. [Contact Contracting Officer for [Condition Requirements][Condition of Readiness (COR) updates and completion of required actions].]

b. Condition THREE (Sustained winds of 50 knots or greater expected within 48 hours): Maintain "Condition FOUR" requirements and commence

SECTION 01 50 00 Page 8 securing operations necessary for "Condition ONE" which cannot be completed within 18 hours. Cease all routine activities which might interfere with securing operations. Commence securing and stow all gear and portable equipment. Make preparations for securing buildings. Review requirements pertaining to "Condition TWO" and continue action as necessary to attain "Condition THREE" readiness.

Contact Contracting Officer for weather and COR updates and completion of required actions.

c. Condition TWO (Sustained winds of 50 knots or greater expected within 24 hours): Curtail or cease routine activities until securing operation is complete. Reinforce or remove form work and scaffolding. Secure machinery, tools, equipment, materials, or remove from the jobsite. Expend every effort to clear all missile hazards and loose equipment from general base areas. Contact Contracting Officer for weather and Condition of Readiness (COR) updates and completion of required actions.

d. Condition ONE. (Sustained winds of 50 knots or greater expected within 12 hours): Secure the jobsite, and leave Government premises.

] 3.5 GOVERNMENT FIELD OFFICE

3.5.1 Resident Engineer's Office ( when required by project scope )

Provide the Government Resident Engineer with an office, approximately 200 square feet in floor area, located where directed and providing space heat, electric light and power, and toilet facilities consisting of one lavatory and one water closet complete with connections to water and sewer mains. Provide a mail slot in the door or a lockable mail box mounted on the surface of the door. Include a 4 by 8 foot plan table,[ computer work space] a standard size office desk and chair, and telephone. At completion of the project, the office will remain the property of the Contractor and be removed from the site. Utilities willbe connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer.

[ 3.5.2 Quality Control Manager Records and Field Office

Provide on the jobsite an office with approximately 200square feet of useful floor area for the exclusive use of the QC Manager. Provide a weathertight structure with adequate [heating and cooling,] toilet facilities, lighting, ventilation, a 4 by 8 foot plan table, a standard size office desk and chair, computer station, and working communications facilities. [Provide either a 1,500 watt radiant heater and a window-mounted air conditioner rated at 9,000 Btus minimum or a window-mounted heat pump of the same minimum heating and cooling ratings.] Provide a door with a cylinder lock and windows with locking hardware. Make utility connections. Locate as directed by teh COR or where indicated on government provided site utilization plan. File quality control records in the office and make available at all times to the Government. After completion of the work, remove the entire structure from the site.

] 3.5.3 Trailer-Type Mobile Office

The Contractor may, at its option, furnish and maintain a trailer-type mobile office acceptable to the COR and providing as a minimum the facilities specified above. Securely anchor the trailer to the ground at

SECTION 01 50 00 Page 9 all four corners to guard against movement during high winds.

3.6 PLANT COMMUNICATION

Whenever the Contractor has the individual elements of its plant so located that operation by normal voice between these elements is not satisfactory, the Contractor must install a satisfactory means of communication, such as telephone or other suitable devices and made available for use by Government personnel.

3.7 TEMPORARY PROJECT SAFETY FENCING

As soon as practicable, but not later than 15 days after the date established for commencement of work, furnish and erect temporary project safety fencing at the work site. See section 2.2.3.a above. Maintain the safety fencing during the life of the contract and, upon completion and acceptance of the work, will become the property of the Contractor and be removed from the work site.

3.8 CLEANUP

Remove construction debris, waste materials, packaging material and the like from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways must be cleaned away. Store within the fenced area described above or at the supplemental storage area any materials resulting from demolition activities which are salvageable. Neatly stacked stored materials not in trailers, whether new or salvaged.

3.9 RESTORATION OF STORAGE AREA

Upon completion of the project remove the bulletinboard, signs, barricades, haulroads, and any other temporary products from the site.

After removal of trailers, materials, and equipment from within the fenced area, remove the fence that will become the property of the Contractor.

Restore to the original or better condition, areas used by the Contractor for the storage of equipment or material, or other use. Gravel used to traverse grassed areas must be removed and the area restored to its original condition, including top soil and seeding as necessary.

-- End of Section --

SECTION 01 50 00 Page 10

SECTION 01 50 00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

PART 1 GENERAL

1.1 SUMMARY

Requirements of this Section apply to, and are a component of, each section of the specifications.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA C511 (2007) Standard for Reduced-Pressure Principle Backflow Prevention Assembly

FOUNDATION FOR CROSS-CONNECTION CONTROL AND HYDRAULIC RESEARCH

(FCCCHR)

FCCCHR List (continuously updated) List of Approved Backflow Prevention Assemblies

FCCCHR Manual (10th Edition) Manual of Cross-Connection Control

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 241 (2013) Standard for Safeguarding Construction,Alteration, and Demolition Operations

NFPA 70 (2014) National Electrical Code

U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

FAA AC 70/7460-1 (2007; Rev K) Obstruction Marking and Lighting

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2009) Manual on Uniform Traffic Control Devices

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval./information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submitted the following in accordance with Section 01 33 00

SECTION 01 50 00 Page 1

SUBMITTAL PROCEDURES:

SD-01 Design/Preconstruction Submittals

[ Construction site plan; G [ Traffic control plan; G Electrical/comm connection plan/details; G Water/waste connection plan/details; G Product data, as required; G Construction and Safety Signs: Elevations, graphics, installation details: G

SD-06 Test Reports

Backflow Preventer Tests; G

SD-07 Certificates

Backflow Tester Certification; G

[ Backflow Preventers Certificate of Full Approval ; G

[ 1.4 CONSTRUCTION SITE PLAN

Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities,construction signage and wayfinding, and worker parking areas.

] 1.5 BACKFLOW PREVENTERS CERTIFICATE

Certificate of Full Approval from FCCCHR List , University of Southern California, attesting that the design, size and make of each backflow preventer has satisfactorily passed the complete sequence of performance testing and evaluation for the respective level of approval. Certificate of Provisional Approval will not be acceptable.

[ 1.5.1 Backflow Tester Certificate

Prior to testing, submit to the Contracting Officer certification issued by the State or local regulatory agency attesting that the backflow tester has successfully completed a certification course sponsored by the regulatory agency. Tester must not be affiliated with any company participating in any other phase of this Contract.

] 1.5.2 Backflow Prevention Training Certificate

Submit a certificate recognized by the State or local authority that states the Contractor has completed at least 10 hours of training in backflow preventer installations. The certificate must be current.

SECTION 01 50 00 Page 2

PART 2 PRODUCTS

2.1 TEMPORARY SIGNAGE

2.1.1 Bulletin Board

Immediately upon beginning of work, provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches, or as specified by the Contrctin Officer Representative (COR) in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.

2.1.2 Project and Safety Signs

The requirements for the signs, their content, and location are as required by the COR. Erect signs within 15 days after receipt of the notice to proceed. Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.

2.2 TEMPORARY TRAFFIC CONTROL

2.2.1 Haul Roads

At contractors expense construct access and haul roads necessary for proper prosecution of the work under this contract. Construct with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic are be avoided. Provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic.

The method of dust control, although optional, must be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads are subject to approval by the Contracting Officer. Lighting must be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations.

2.2.2 Barricades

Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

2.2.3 Fencing

a. Provide fencing along the construction site at all open excavations and tunnels to control access by unauthorized people. Fencing must be installed to be able to restrain a force of at least 250 pounds.

Enclose the project work area and Contractor field office/lay-down area with a 6 ft high ( or height as required by COR ) chain link fence and gates with brown ( or color designated by COR), UV light resistant, plastic fabric mesh netting (similar to tennis court or other screening)]or as required by COR. Remove the fence upon completion and acceptance of the work. Intent is to block (screen)

SECTION 01 50 00 Page 3 public view of the construction.

In addition, prior to the start of work, enclose those areas at the construction site which are not within the construction fence with a temporary safety fence, including gates and warning signs, to protect the public from construction activities. The safety fence shall match the base standard color (or bright orange where it protects excavated areas), shall be made of [high density polyethylene grid or approved equal][plastic fence from recovered materials containing 60-100 percent recovered content level plastic], a minimum of 42 inches high, supported and tightly secured to steel posts located on minimum 10 foot centers. Remove the fence from the work site upon completion of the contract.]

2.2.4 Temporary Wiring

Provide temporary wiring in accordance with NFPA 241 and NFPA 70 .

Include frequent inspection of all equipment and apparatus.

[ 2.2.5 Backflow Preventers

Reduced pressure principle type conforming to the applicable requirements AWWA C511. Provide backflow preventers complete with [150 pound] [_____] flanged [cast iron], [bronze][brass] mounted gate valve [and strainer], [304][_____] stainless steel or bronze, internal parts. [The particular make, model/design, and size of backflow preventers to be installed must be included in the latest edition of the List of Approved Backflow Prevention Assemblies issued by the FCCCHR List and be accompanied by a Certificate of Full Approval from FCCCHR List .] [After installation conduct Backflow Preventer Tests and provide test reports verifying that the installation meets the FCCCHR Manual Standards.]

] PART 3 EXECUTION

3.1 EMPLOYEE PARKING

Contractor employees will park privately owned vehicles in an area designated by the COR . This area will be within reasonable walking distance of the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.

3.2 AVAILABILITY AND USE OF UTILITY SERVICES

3.2.1 Temporary Utilities

Provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.

3.2.2 Sanitation

a. Provide and maintain within the construction area minimum field-type sanitary facilities approved by the COR and periodically empty wastes into a municipal, district, or station sanitary sewage system, or remove waste to a commercial facility. Sanitary system may

SECTION 01 50 00 Page 4 connect to existing system. Obtain approval from the system owner prior to discharge into any facility, base, municipal, district, or commercial sanitary sewer system. Any penalties and / or fines associated with improper discharge will be the responsibility of the Contractor. Coordinate with the COR and follow station regulations and procedures when discharging into the station sanitary sewer system. Maintain these conveniences at all times without nuisance.

Include provisions for pest control and elimination of odors.

Government toilet…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.