Attachment_1_-_Bid_Schedule.xlsx

XLSX spreadsheet 150 KB Posted

Attached to
Automated Guid Vehicle System, Navy Medical Hospital San Diego
Solicitation number
W9127S19Q6010
Issued by

About this file

Attachment 1 - Bid Schedule

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule Structure

CLINDESCRIPTIONPRICE
CLIN 0001BASE BID:Equipment Acquisition, Delivery, Installation, Dispoal, Training, and Personnel for the Navy Medical Center San Diego Automate Guide Vehicle System$ - 0
Total Offeror Price:$0.00
Instructions: In cell C2, enter the total price from "CLIN 0001 " tab. .

&"Calibri,Bold"&14BID SCHEDULE STRUCTURE&12 &"Calibri,Regular"&11

IO - NAVAL HOSPITAL OAK

HARBOR MODERNIZATION (NHOH)

W9127S-17-R-6002 &P OF &N &G

CLIN0001

LABOR PRICING TO SUPPORT Equipment Acquisiton, Delivery, Install, Disposal, and Training TASKS (This is "Other than Certified Cost and Pricing Data" IAW FAR 15.403-3)Instructions: Offerors shall list all labor categories, the fully burdened (loaded) labor rate, and the proposed hours for each labor category. Multiply the labor rate by the propsed hours to get the total labor pricing by category.
Labor CategoryFully Burdened Labor RateProposed HoursTotal
Engineering$0.00
Project Manager$0.00
Automated Guide Vehicle Technician$0.00
Design Support-Space Planning$0.00
Quality Control$0.00
Low Voltage Consultant$0.00
Submittal Work - Prepare & Assemble$0.00
Procurement$0.00
OTHER DIRECT COSTS (ODCs) ASSOCIATED WITH IO-T (This is "Other than Certified Cost and Pricing Data" IAW FAR 15.403-3)Instructions: Please provide the costs associated with the project, if any (i.e. travel, CDs, printing, etc). Insert additional cells as necessary. Sum all costs into cell G23 for the ODC subtotal.
ODCExplaination/Brief DescriptionCost
Total
Profit $Profit %Overhead $Overhead %TOTAL IO-T PRICEInstructions: Put in profit (in dollars) in cell A25. Put in profit (by percentage) in cell B25. Put in Overhead cost (in dollars) in cell C25. Put in Overhead cost (by percentage) in cell D25. Sum of Labor, ODCs, Profit $, and Overhead $. The total price populates in cell E25.
$0.00
OTHER DIRECT COSTS (ODCs) ASSOCIATED WITH IO-C (This is "Other than Certified Cost and Pricing Data" IAW FAR 15.403-3)Instructions: List Other Direct Costs associated with the project in cells B29-B43. Refer to Statement of Work for specific requirements for each ODC line. This list may be tailored to fit each Offeror's technical approach or accounting strategy. Each Offeror may add/subtract from rows 29-43 as needed. However, profit and overhead must be discretely bid.
Purchase of New Commodities:
Installation of New Commodities:
De-install/Re-install costs:
Transition/Reuse costs:
Shipping costs:
Training costs:
Insurance costs:
Cleaning costs:
Disposal costs:
Tax:
Warehousing costs:
Other:
Other:
Overhead costs ($):Overhead %
Profit ($):Profit %
TOTAL ODC PRICE

TOTAL CLIN 0001 PRICE $ - 0 Instructions: Add Commodity Pricing, IO-C Labor Pricing, and ODCs together to obtain Total IO-C Price.

&"Times New Roman,Bold"&16 &"-,Bold"&14Attachment A: Initial Outfitting - Transition (IO-T)

IO - NAVAL HOSPITAL OAK

HARBOR MODERNIZATION (NHOH)

W9127S-17-R-6002 &P OF &N &G

Commodities

Content NameQtyUnit PriceTotal Price
Automated Guide Vehicle Units21
Touchscreen Call Stations17
Wireless RF Communication Network1
System Automation Management PC System1
Camera System31
Floor Mounted Quick Charge Stations7
80" Monitor2
40" Monitor1

TOTAL: $0.00

&"Calibri,Bold"&14PHASE 1 Project Contents List (24 May 2017 03:18PM ET)

IO - NAVAL HOSPITAL OAK

HARBOR MODERNIZATION (NHOH)

W9127S-17-R-6002Privacy Act - FOR OFFICAL USE ONLY
Page &P of &N&G

image1.jpeg

File details come from the government source that posted it.