R1MS-Grounds_Maintenance_ELINS_22Oct2018.xlsx
XLSX spreadsheet 126 KB Posted
- Solicitation number
- W9127S19Q0007
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINS Summary
| Grounds Maintenance Services Summary | ||
| Service Code: 404 | ||
| This sheet is filled out automatically as other sheets are completed | ||
| CLIN | TOTAL | |
| 0001 | Base Period Firm Fixed-Price | $0.00 |
| 0002 | Base Period Indefinite Quantity | $70,000.00 |
| 0003 | Base Period Contractor Manpower Reporting | $0.00 |
| 0004 | Contractor Submittals | $0.00 |
| 1001 | First Option Period Firm Fixed-Price | $0.00 |
| 1002 | First Option Period Indefinite Quantity | $70,000.00 |
| 1003 | First Option Contractor Manpower Reporting | $0.00 |
| 2001 | Second Option Period Firm Fixed-Price | $0.00 |
| 2002 | Second Option Period Indefinite Quantity | $70,000.00 |
| 2003 | Second Option Contractor Manpower Reporting | $0.00 |
$210,000.00
&F
&A &P of &N
Site Summary Sheet
GROUNDS MAINTENANCE (1503050)
| This sheet is filled out automatically as other sheets are completed | |||
| CLIN / SUBCLIN | FAC ID | ELINS | Total Price |
| 0001 | Base Period Firm Fixed-Price | ||
| 0001AA | AR002 | (Items A001 Through A006) | $0.00 |
| 0001AB | AR019 | (Items A007 Through A010) | $0.00 |
| 0001AC | AR024 | (Items A011 Through A016) | $0.00 |
| 0001AD | AR025 | (Items A017 Through A019) | $0.00 |
| 0001AE | AR032 | (Items A020 Through A023) | $0.00 |
| 0001AF | AR047 | (Items A024 Through A027) | $0.00 |
| 0001AG | AR064 | (Items A028 Through A032) | $0.00 |
| 0001AH | AR066 | (Items A033 Through A037) | $0.00 |
| 0001AJ | AR069 | (Items A038 Through A041) | $0.00 |
| 0001AK | AR071 | (Items A042 Through A046) | $0.00 |
| 0001AL | OK001 | (Items A047 Through A049) | $0.00 |
| 0001AM | OK003 | (Items A050 Through A053) | $0.00 |
| 0001AN | OK004 | (Items A054 Through A056) | $0.00 |
| 0001AP | OK016 | (Items A057 Through A059) | $0.00 |
| 0001AQ | OK026 | (Items A060 Through A062) | $0.00 |
| 0001AR | OK028 | (Items A063 Through A065) | $0.00 |
| 0001AS | OK031 | (Items A066 Through A068) | $0.00 |
| $0.00 | |||
| 0002 | Base Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - A701 THROUGH A744 | $70,000.00 |
| 0003 | Base Period Contractor Manpower Reporting | $0.00 |
| 0004 | Contractor Submittals | $0.00 |
| 1001 | First Option Period Firm Fixed-Price | ||
| 1001AA | AR002 | (Items B001 Through B006) | $0.00 |
| 1001AB | AR019 | (Items B007 Through B010) | $0.00 |
| 1001AC | AR024 | (Items B011 Through B016) | $0.00 |
| 1001AD | AR025 | (Items B017 Through B019) | $0.00 |
| 1001AE | AR032 | (Items B020 Through B023) | $0.00 |
| 1001AF | AR047 | (Items B024 Through B027) | $0.00 |
| 1001AG | AR064 | (Items B028 Through B032) | $0.00 |
| 1001AH | AR066 | (Items B033 Through B037) | $0.00 |
| 1001AJ | AR069 | (Items B038 Through B041) | $0.00 |
| 1001AK | AR071 | (Items B042 Through B046) | $0.00 |
| 1001AL | OK001 | (Items B047 Through B049) | $0.00 |
| 1001AM | OK003 | (Items B050 Through B053) | $0.00 |
| 1001AN | OK004 | (Items B054 Through B056) | $0.00 |
| 1001AP | OK016 | (Items B057 Through B059) | $0.00 |
| 1001AQ | OK026 | (Items B060 Through B062) | $0.00 |
| 1001AR | OK028 | (Items B063 Through B065) | $0.00 |
| 1001AS | OK031 | (Items B066 Through B068) | $0.00 |
| $0.00 | |||
| 1002 | First Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - B701 THROUGH B744 | $70,000.00 |
1003 First Option Period Contractor Manpower Reporting $0.00
| 2001 | Second Option Period Firm Fixed-Price | ||
| 2001AA | AR002 | (Items C001 Through C006) | $0.00 |
| 2001AB | AR019 | (Items C007 Through C010) | $0.00 |
| 2001AC | AR024 | (Items C011 Through C016) | $0.00 |
| 2001AD | AR025 | (Items C017 Through C019) | $0.00 |
| 2001AE | AR032 | (Items C020 Through C023) | $0.00 |
| 2001AF | AR047 | (Items C024 Through C027) | $0.00 |
| 2001AG | AR064 | (Items C028 Through C032) | $0.00 |
| 2001AH | AR066 | (Items C033 Through C037) | $0.00 |
| 2001AJ | AR069 | (Items C038 Through C041) | $0.00 |
| 2001AK | AR071 | (Items C042 Through C046) | $0.00 |
| 2001AL | OK001 | (Items C047 Through C049) | $0.00 |
| 2001AM | OK003 | (Items C050 Through C053) | $0.00 |
| 2001AN | OK004 | (Items C054 Through C056) | $0.00 |
| 2001AP | OK016 | (Items C057 Through C059) | $0.00 |
| 2001AQ | OK026 | (Items C060 Through C062) | $0.00 |
| 2001AR | OK028 | (Items C063 Through C065) | $0.00 |
| 2001AS | OK031 | (Items C066 Through C068) | $0.00 |
| $0.00 | |||
| 2002 | Second Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - C701 THROUGH C744 | $70,000.00 |
2003 Second Option Period Contractor Manpower Reporting $0.00
&F
&P of &N
ELINS BASE PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE INFORMATION IN SHADED CELLS, PRICES ($) IN "UNIT PRICE" COLUMN TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 THROUGH A068. |
| CLIN 0001 - Base Period - Firm Fixed-Price Work |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| AR002 | BG William O Darby | |||
| Firm Fixed-Price Work | ||||
| A001 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A002 | Semi-Improved Grounds (Spec Item C 3.2) | 11.0 | Month | $ - 0 |
| A003 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A004 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A005 | Un-Paved Areas (Spect Item C 3.5) | 11.0 | Month | $ - 0 |
| A006 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AA (Items A001 Through A006) | $0.00 |
| AR019 | Charles L. Gillihan | |||
| Firm Fixed-Price Work | ||||
| A007 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A008 | Semi-Improved Grounds (Spec Item C 3.2) | 11.0 | Month | $ - 0 |
| A009 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A010 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AB (Items A007 Through A010) | $0.00 |
| AR024 | Maurice L. Britt | |||
| Firm Fixed-Price Work | ||||
| A011 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A012 | Semi-Improved Grounds (Spec Item C 3.2) | 11.0 | Month | $ - 0 |
| A013 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A014 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A015 | Un-Paved Areas (Spect Item C 3.5) | 11.0 | Month | $ - 0 |
| A016 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AC (Items A011 Through A016) | $0.00 |
| AR025 | Oscar C. Finkbeiner | |||
| Firm Fixed-Price Work | ||||
| A017 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A018 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A019 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AD (Items A017 Through A019) | $0.00 |
| AR032 | Russellville | |||
| Firm Fixed-Price Work | ||||
| A020 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A021 | Semi-Improved Grounds (Spec Item C 3.2) | 11.0 | Month | $ - 0 |
| A022 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A023 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AE (Items A020 Through A023) | $0.00 |
| AR047 | Eldridge-Harrington | |||
| Firm Fixed-Price Work | ||||
| A024 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A025 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A026 | Un-Paved Areas (Spect Item C 3.5) | 11.0 | Month | $ - 0 |
| A027 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AF (Items A024 Through A027) | $0.00 |
| AR064 | Arkadelphia AFRC | |||
| Firm Fixed-Price Work | ||||
| A028 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A029 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 |
| A030 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A031 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A032 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AG (Items A028 Through A032) | $0.00 |
| AR066 | El Dorado ARFC | |||
| Firm Fixed-Price Work | ||||
| A033 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A034 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 |
| A035 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A036 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A037 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AH (Items A033 Through A037) | $0.00 |
| AR069 | Jonathan M. Cheatham | |||
| Firm Fixed-Price Work | ||||
| A038 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A039 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 |
| A040 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A041 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AJ (Items A038 Through A041) | $0.00 |
| AR071 | Jonesboro AFRC | |||
| Firm Fixed-Price Work | ||||
| A042 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A043 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 |
| A044 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A045 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A046 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AK (Items A042 Through A046) | $0.00 |
| OK001 | Edward D. Watson | |||
| Firm Fixed-Price Work | ||||
| A047 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A048 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A049 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AL (Items A047 Through A049) | $0.00 |
| OK003 | Horace H. Sayre | |||
| Firm Fixed-Price Work | ||||
| A050 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A051 | Xeriscape Grounds (Spec Item C 3.3) | 11.0 | Month | $ - 0 |
| A052 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A053 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AM (Items A050 Through A053) | $0.00 |
| OK004 | Earnest L. Ripley | |||
| Firm Fixed-Price Work | ||||
| A054 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A055 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A056 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AN (Items A054 Through A056) | $0.00 |
| OK016 | Franklin L. Weeks | |||
| Firm Fixed-Price Work | ||||
| A057 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A058 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A059 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AP (Items A057 Through A059) | $0.00 |
| OK026 | George D. Swanson | |||
| Firm Fixed-Price Work | ||||
| A060 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A061 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A062 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AQ (Items A060 Through A062) | $0.00 |
| OK028 | Tracy W. Young | |||
| Firm Fixed-Price Work | ||||
| A063 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A064 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A065 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AR (Items A063 Through A065) | $0.00 |
| OK031 | Cleo O. Payne | |||
| Firm Fixed-Price Work | ||||
| A066 | Improved Grounds (Spec Item C 3.1) | 11.0 | Month | $ - 0 |
| A067 | Paved Areas (Spec Item C 3.4) | 11.0 | Month | $ - 0 |
| A068 | Storm Drainage Systems (Spec Item C 3.6) | 11.0 | Month | $ - 0 |
| Total CLIN 0003AS (Items A066 Through A068) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A068 $0.00
| 0003 | Contractor Manpower Reporting Base Year Section C 0200000 Mgmt & Admin Spec 2.15 | 1 | Each | $0.00 |
| 0004 | Contractor Pre-Work Submittals; Section F Submittals | 1 | Each | $0.00 |
&F
&P of &N
ELINS BASE PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A744 |
| CLIN 0002 - Base Period - Indefinite Quantity Work |
| UNIT | UNIT OF | MIN. ORDER | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | PRICE | ISSUE | QTY |
| A701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | Each | 1 | |
| A702 | Tree and Stump Removal | ||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | Each | 1 | |
| A703 | Tree and Stump Removal | ||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| A704 | Shrub and Stump Removal | ||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| A705 | Shrub and Stump Removal | ||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| A706 | Shrub and Stump Removal | ||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | Each | 1 | |
| A707 | Complete Tree Pruning | ||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | Each | 1 | |
| A708 | Complete Tree Pruning | ||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | Each | 1 | |||
| A709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | Each | 1 | |
| A710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | SF | 50 | |
| A711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |
| A712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |
| A713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |||
| A714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 10 | |
| A715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | SF | 50 | |
| A716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | SF | 50 | |||
| A717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | SF | 100 | |
| A718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | |||
| Work shall be completed within 14 calendar days. | SF | 100 | |||
| A719 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | SF | 100 | |
| A720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | Each | 5 | |
| A721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | L.F. | 100 | |||
| A722 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | SF | 50 | |
| A723 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | SF | 100 | |
| A724 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | SF | 5,000 | |
| A725 | Control Undesired Vegetation | Remove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | |||
| Work shall be completed within 10 calendar days. | LF | 100 | |||
| A726 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
| Work shall be completed within 10 calendar days. | SF | 50 | |||
| Special Event Grass Cutting at the following sites: | Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site. | ||||
| A727 | AR002 | Each | 1 | ||
| A728 | AR019 | Each | 1 | ||
| A729 | AR024 | Each | 1 | ||
| A730 | AR025 | Each | 1 | ||
| A731 | AR032 | Each | 1 | ||
| A732 | AR047 | Each | 1 | ||
| A733 | AR064 | Each | 1 | ||
| A734 | AR066 | Each | 1 | ||
| A735 | AR069 | Each | 1 | ||
| A736 | AR071 | Each | 1 | ||
| A737 | OK001 | Each | 1 | ||
| A738 | OK003 | Each | 1 | ||
| A739 | OK004 | Each | 1 | ||
| A740 | OK016 | Each | 1 | ||
| A741 | OK026 | Each | 1 | ||
| A742 | OK028 | Each | 1 | ||
| A743 | OK031 | Each | 1 | ||
| A744 | Plant Native Vegetation | All native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape. |
Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. Each 10
TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A744 $70,000.00
&F
&P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELINS FIRST PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE INFORMATION IN SHADED CELLS, PRICES ($) IN "UNIT PRICE" COLUMN TO PROVIDE GROUNDS MAINTENANCE SERVICES-FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 THROUGH B068. |
| CLIN 1001 - Base Period - Firm Fixed-Price Work |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| AR002 | BG William O Darby | |||
| Firm Fixed-Price Work | ||||
| B001 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B002 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Month | $ - 0 |
| B003 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B004 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B005 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Month | $ - 0 |
| B006 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AA (Items B001 Through B006) | $0.00 |
| AR019 | Charles L. Gillihan | |||
| Firm Fixed-Price Work | ||||
| B007 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B008 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Month | $ - 0 |
| B009 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B010 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AB (Items B007 Through B010) | $0.00 |
| AR024 | Maurice L. Britt | |||
| Firm Fixed-Price Work | ||||
| B011 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B012 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Month | $ - 0 |
| B013 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B014 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B015 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Month | $ - 0 |
| B016 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AC (Items b011 Through B016) | $0.00 |
| AR025 | Oscar C. Finkbeiner | |||
| Firm Fixed-Price Work | ||||
| B017 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B018 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B019 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AD (Items B017 Through B019) | $0.00 |
| AR032 | Russellville | |||
| Firm Fixed-Price Work | ||||
| B020 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B021 | Semi-Improved Grounds (Spec Item C 3.2) | 12.0 | Month | $ - 0 |
| B022 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B023 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AE (Items B020 Through B023) | $0.00 |
| AR047 | Eldridge-Harrington | |||
| Firm Fixed-Price Work | ||||
| B024 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B025 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B026 | Un-Paved Areas (Spect Item C 3.5) | 12.0 | Month | $ - 0 |
| B027 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AF (Items B024 Through B027) | $0.00 |
| AR064 | Arkadelphia AFRC | |||
| Firm Fixed-Price Work | ||||
| B028 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B029 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 |
| B030 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B031 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B032 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AG (Items B028 Through B032) | $0.00 |
| AR066 | El Dorado ARFC | |||
| Firm Fixed-Price Work | ||||
| B033 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B034 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 |
| B035 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B036 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B037 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AH (Items B033 Through B037) | $0.00 |
| AR069 | Jonathan M. Cheatham | |||
| Firm Fixed-Price Work | ||||
| B038 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B039 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 |
| B040 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B041 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AJ (Items B038 Through B041) | $0.00 |
| AR071 | Jonesboro AFRC | |||
| Firm Fixed-Price Work | ||||
| B042 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B043 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 |
| B044 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B045 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B046 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AK (Items B042 Through B046) | $0.00 |
| OK001 | Edward D. Watson | |||
| Firm Fixed-Price Work | ||||
| B047 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B048 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B049 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AL (Items B047 Through B049) | $0.00 |
| OK003 | Horace H. Sayre | |||
| Firm Fixed-Price Work | ||||
| B050 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B051 | Xeriscape Grounds (Spec Item C 3.3) | 12.0 | Month | $ - 0 |
| B052 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B053 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AM (Items B050 Through B053) | $0.00 |
| OK004 | Earnest L. Ripley | |||
| Firm Fixed-Price Work | ||||
| B054 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B055 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B056 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AN (Items B054 Through B056) | $0.00 |
| OK016 | Franklin L. Weeks | |||
| Firm Fixed-Price Work | ||||
| B057 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B058 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B059 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AP (Items B057 Through B059) | $0.00 |
| OK026 | George D. Swanson | |||
| Firm Fixed-Price Work | ||||
| B060 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B061 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B062 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AQ (Items B060 Through B062) | $0.00 |
| OK028 | Tracy W. Young | |||
| Firm Fixed-Price Work | ||||
| B063 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B064 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B065 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AR (Items B063 Through B065) | $0.00 |
| OK031 | Cleo O. Payne | |||
| Firm Fixed-Price Work | ||||
| B066 | Improved Grounds (Spec Item C 3.1) | 12.0 | Month | $ - 0 |
| B067 | Paved Areas (Spec Item C 3.4) | 12.0 | Month | $ - 0 |
| B068 | Storm Drainage Systems (Spec Item C 3.6) | 12.0 | Month | $ - 0 |
| Total CLIN 1003AS (Items B066 Through B068) | $0.00 |
TOTAL FFP LINE ITEMS - B001 THROUGH B068 $0.00
1003 Contractor Manpower Reporting First Option Year Section C 0200000 Mgmt & Admin Spec 2.15 1 Each $0.00
&F
&P of &N
ELINS FIRST PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS B701 - B744 |
| CLIN 1002 - First Option Period - Indefinite Quantity Work |
| UNIT | UNIT OF | MIN. ORDER | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | PRICE | ISSUE | QTY |
| B701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | Each | 1 | |
| B702 | Tree and Stump Removal | ||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | Each | 1 | |
| B703 | Tree and Stump Removal | ||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| B704 | Shrub and Stump Removal | ||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| B705 | Shrub and Stump Removal | ||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | Each | 1 | |
| B706 | Shrub and Stump Removal | ||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | Each | 1 | |
| B707 | Complete Tree Pruning | ||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | Each | 1 | |
| B708 | Complete Tree Pruning | ||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | Each | 1 | |||
| B709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | Each | 1 | |
| B710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | SF | 50 | |
| B711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |
| B712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |
| B713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 1 | |||
| B714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | Each | 10 | |
| B715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | SF | 50 | |
| B716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | SF | 50 | |||
| B717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | SF | 100 | |
| B718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | |||
| Work shall be completed within 14 calendar days. | SF | 100 | |||
| B719 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | SF | 100 | |
| B720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | Each | 5 | |
| B721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | L.F. | 100 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.