A.02.01_Combined_SynopsisSolicitation_17Q0011_.pdf

PDF 1 MB Posted

Attached to
US Army Corps of Engineers Dierks Lake Maintenance IDIQ, Arkansas
Solicitation number
W9127S-17-Q-0011
Issued by

About this file

Solicitation for Dierks Lake parks Maintenance IDIQ

View the file

Other files

File Type Posted
A.02.01_Past_Performance_Questionnaire.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION COVER PAGE

US Army Corps of Engineer, Little Rock District Contracting Division

700 W. Capitol Avenue Room 7315 Little Rock, AR 72201

W9127S-17-Q-0011 Dierks Lake Maintenance IDIQ, Millwood Tri-Lakes Project Office, Arkansas

Submitted by

Offeror Name:

Offeror Address:

Street___________________________________________________________________________

City/State________________________________________________________________________

Offeror Email Address:

Cage Code:

DUNS Number:

TIN:

Telephone Number:

Signature:

Date:

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information in this notice. This announcement constitutes the only solicitation, quotes are being requested and a written solicitation will not be issued.

The solicitation number and a statement that the solicitation is issued as a request for quotation (RFQ)

The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-95.

Set Aside, NAICS Code & Size Standard: This solicitation is set-aside for Small Business. The NAICS Code 561210 and the applicable size standard is $38,500,000.00.

A list of contract line item number(s) and items, quantities and units of measure:

Please see attached quote schedule beginning on page ___4__.

Description of requirements for the items to be acquired: This requirement is to perform electrical, plumbing, and carpentry maintenance services for the Corps of Engineers Millwood Tri-Lakes Project Office, Arkansas, Area of Responsibility in accordance with the PWS.

Date(s) and place(s) of delivery/acceptance and FOB point:

Base Year CLINS 0001 through 0119 will be 15 August 2017 (or date of award whichever is later) through 14 August 2018.

Option Year 1 CLINS 1001 through 1119 will be 15 August 2018 through 14 August 2019.

Option Year 2 CLINS 2001 through 2119 will be 15 August 2019 through 14 August 2020.

The place of performance will be the Corps of Engineers Millwood Tri-Lakes Project Office, Arkansas, area of responsibility. (Dierks Lake Parks)

The provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition and a statement regarding any addenda to the provision. Offerors are also required to submit a completed copy of the Request for Quotation cover page on page __1_, and a completed copy of the pricing schedule beginning on page __4___.

The provision at 52.212-2, Evaluation -- Commercial Items, Streamlined Evaluation procedures IAW FAR 12.602 shall be incorporated in this solicitation.

Award shall be made that is most advantageous to the Government based on the factors contained in the solicitation.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_000.htm#P1472_202066 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_000.htm#P1533_213837

Offerors are required to include a completed copy of the provision at 52.212-3 Alt I, Offeror Representations and Certifications -- Commercial Items, with its quote.

The clause at 52.212-4, Contract Terms and Conditions -- Commercial Items, applies to this acquisition.

The clause at 52.212-5 (Deviation), Contract Terms and Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, applies to this acquisition. Please see the Clauses Incorporated By Reference section for additional FAR Clauses applicable to this acquisition.

A site visit is scheduled for:

Tuesday 18 July 2017 at 09:00 A.M. CST at the USACE Dierks Project Office, Jefferson Ridge Road Dierks, AR 71833

Contact Brandee Wright at 501-340-1466 for site visit questions.

Quotes are due on 27 July 2017 at 10:00 am CST. Email submission of quotations are preferred in pdf form, however FAX or Mail submissions are allowed.

Required Documents to Submit

1. Request for Quotation cover page (signed)

2. Completed (filled in) Provisions and Clauses as applicable

3. Signed Amendments (if applicable)

4. Factor 1 – 5 Submission Requirements (See Instructions To Offerors)

5. Completed Quote Schedule

FAX: 501-324-5137

EMAIL: vincent.j.tomasi@usace.army.mil

If sending by mail. Please submit your quotes to the following address:

US Army Corps of Engineers, Attn: Vincent Tomasi, 700 W. Capitol Avenue Room 7315, Little Rock, AR 72201

If you have any questions regarding this solicitation, please contact Vincent Tomasi at 501-340-1260 or submit an email to:

vincent.j.tomasi@usace.army.mil http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_000.htm#P1547_215689 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_000.htm#P1845_256368 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_000.htm#P2045_297176 mailto:vincent.j.tomasi@usace.army.mil mailto:vincent.j.tomasi@usace.army.mil

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION A

CARPENTRY AND PAINTING

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Description/Specs./Work Statement, for the period 15 Aug2017 or date of award, whichever is later, Through 14 Aug 2018.

0001 Normal Service Call 25 EA

0002 Emergency Service Call 10 EA

0003 Emergency Debris Removal 15000 EA $1.00 $15,000.00

0004 Estimated Materials Costs 20000 EA $1.00 $20,000.00 for Service, Repair, and parts

CARPENTRY

0005 Remove/Replace Existing Timbers 2000 LF

0006 Remove/Replace Base Timbers 1500 LF

0007 Install Timbers 1500 LF

0008 Install Base Timbers 1500 LF

0009 Handrails 2x4x16 Ground Contact 2000 LF

0010 Handrails 2x6x16 Ground Contact 1500 LF

0011 Handrails 4x4x10 Ground Contact Post 500 LF

0012 Handrails 4x4x16 Ground Contact Post 500 LF

0013 Replace/Install Pedestal Grills 40 EA

0014 Install Concrete Fire Pit 30 EA

0015 Replace/Install One Post Signs 30 EA

0016 Replace/Install Two Post Signs 30 EA

0017 Fill Material 1000 TN

0018 Sand Material 300 TN

0019 Screening Material 350 TN

QUOTE SCHEDULE

Dierks Lake Maintenance IDIQ-Millwood Tri Lakes Project Office Offeror must fill out all options to be considered.

BASE YEAR

0020 Aggregate Base Material 1000 TN

0021 Aggregate Base Material 3/4" 1000 TN

0022 Rip Rap 6"-12" 100 TN

0023 Rip Rap 6" and smaller 300 TN

0024 Chain link fence with post 500 LF

0025 Replace Door Closure 10 EA

0026 Replace Metal Entry Doors 10 EA

0027 Replace or Install Shower Bench 10 EA

0028 Replace/Install Utility Table Tops 30 EA

0029 Replace/Install 8 Foot Vinyl Coated Picnic Tables 30 EA

0030 Culvert Replacement – 6” to 12" 10 EA

0031 Culvert Replacement – 13” to 24" 10 EA

0032 Culvert Replacement – 25” to 36" 10 EA

0033 Culvert Replacement -37" to 48" 10 EA

0034 Concrete Headwall 13"-48" culverts 30 EA

0035 Concrete 100 CY

0036 Asphalt 400 TN

0037 Metal Picnic Shelter Canopy 10 EA

PAINTING

0038 Oil Base, Primer Coat – (4000 SF) 2000 SF

0039 Oil Base, Intermediate or Finish Coat 3000 SF

(5000 SF)

0040 Latex, Primer Coat, (6000 SF) 2000 SF

0041 Latex, Intermediate or Finish Coat 3000 SF

(5000 SF)

0042 Pavement Marking 8000 LF

TOTAL SECTION A BASE YEAR

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION B

ELECTRICAL

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2017 or date of award, whichever is later, Through 14 Aug 2018.

0043 Normal Service Calls 10 EA

0044 Emergency Service Calls 5 EA

0045 Estimated Material Costs 15000 EA $1.00 $15,000.00

ELECTRICAL

0046 Replace Hand Dryer in Toilet 8 EA

0047 Replace or Install Camper Pedestal (50 amp) 20 EA

0048 Replace Security Light Bulb 20 EA

(LED )

0049 Replace Security Light Fixture 10 EA (LED Retrofit)

0050 Replace/Install Solar Light 5 EA

0051 Replace PE Cells 10 EA

0052 Install Electric Poles (Wood 30 ft.) 5 EA

0053 Install Electric Poles (Metal 25 ft.) 5 EA

0054 Trenching (Electrical Lines) 2500 LF

0055 Replace Underground Electrical 2000 LF Wiring 2/0 AWG (Up to 2000 LF

0056 Replace Underground Electrical 1000 LF Wiring - #4 AWG

0057 Replace Underground Electrical 1000 LF Wiring - #6 AWG

0058 Replace/Install Underground Primary 2500 LF

0059 Replace/Install Motion Sensors 10 EA

TOTAL SECTION B BASE YEAR

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION C

PLUMBING AND SEPTIC SYSTEM

MAINTENANCE

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2017 or date of award, whichever is later, Through 14 Aug 2018.

0060 Normal Service Call 25 EA

0061 Emergency Service Call 5 EA

0062 Estimated Material Costs 10000 EA $1.00 $10,000.00 for Service Call Repair Parts

PLUMBING

0063 Trenching and Backfilling (Water Lines) 1000 LF

0064 Replace Valve/Faucet 10 EA (Sink and Faucet)

0065 Replace Push Button Valve 5 EA

0066 Replace Urinal or Stool Valve 5 EA

0067 Replace Water Mixing Valve 6 EA (Sinks and Showers)

0068 Replace Toilet Stool (commode) 8 EA

0069 Replace Urinal (waterborne) 6 EA

0070 Replace Riser (vault toilet) 2 EA

0071 Replace Sump Pump (submergible) 2 EA

0072 Replace Lift Station Pump 6 EA

0073 Replace or Install Underground Water Line - 2500 LF

PVC ¾” – 2”

0074 Replace Underground Water Line - 1500 LF PVC over 2” – 4” pipe

0075 Replace Water Heater( 50 Gallon or less) 6 EA

0076 Replace Water Heater(75 to 85 Gallon) 4 ea

0077 Replace Water Heater (105 to 120 Gallon) 4 ea

0078 Install Vermiculite 75 Bags

0079 Replace Frost Proof Water Hydrant 15 EA

0080 Replace or Install Hydrant Assembly to include 10 EA Valve Box, Riser & Cap, Hydrant,& Vermicelite

0081 Replace Trailer Dump Station Water Tower 4 EA

0082 Replace Valve Box 10 EA

0083 Replace Meter Box 5 EA

0084 Septic Tank Pump Out Service 20 EA

TOTAL SECTION C BASE YEAR

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION D

CIVIL ENGINEERING SERVICES

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2017 or date of award, whichever is later, Through 14 Aug 2018.

0085 Brush Mulcher 100 HR

0086 Dump Truck, 10 yard 100 HR

0087 Backhoe 150 HR

0088 Tractor w/Blade 60 HR

0089 Skidsteer with Auger 10 HR

0090 Tractor w/Front Loader 60 HR

0091 Dozer Work 200 HR

0092 Trackhoe 200 HR

0093 Road Grader 30 HR

0094 Bucket Truck 100 HR

0095 Concrete Saw 60 HR

0096 Side Boom Bushhog 200 HR

0097 Crane (up to 100 tons) 100 HR

0098 Compactor (Walk Behind) 50 HR

0099 Rubber Tire Loader 50 HR

TOTAL SECTION D BASE YEAR

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION E

TREE REMOVAL/ UNDERBRUSHING

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2017 or date of award, whichever is later, Through 14 Aug 2018.

0100 Tree Removal – 6” to 12” Pine 40 EA

0101 Tree Removal – 13” to 20” Pine 40 EA

0102 Tree Removal – 21” to 26” Pine 30 EA

0103 Tree Removal – 26” & Above Pine 25 EA

0104 Tree Removal – 6” to 12” Hardwood 35 EA

0105 Tree Removal – 13’ to 16” Hardwood 50 EA

0106 Tree Removal – 17” to 20’ Hardwood 30 EA

0107 Tree Removal – 21” to 26’ Hardwood 30 EA

0108 Tree Removal – 27” to 32’ Hardwood 20 EA

0109 Tree Removal – 33” and Above Hardwood 20 EA

0110 Underbrushing 60 Acres

0111 Stump Grinding 18" and under 125 EA

0112 Stump Grinding 19" and above 125 EA

TOTAL SECTION E BASE YEAR

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION F

HERBICIDE APPLICATION

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2017 or date of award, whichever is later, Through 14 Aug 2018.

0113 Herbicide Application 300 Acres

TOTAL SECTION F BASE YEAR

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION G

GABION INSTALLATION

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2017 or date of award, whichever is later, Through 14 Aug 2018.

0114 Gabion Installation 100 CY

TOTAL SECTION G BASE YEAR

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION H

BOUY INSTALLATION/REMOVAL

Furnish all necessary management, tools, equipment, etc., to provide

Statement, for the period 15 Aug2017 or date of award, whichever is later, Through 14 Aug 2018.

0115 Bouy Installation/Removal 100 EA

0116 Estimated Material Cost 6000 EA $1.00 $6,000.00

TOTAL SECTION H BASE YEAR

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION I

GENERATOR MAINTENANCE/REPAIR

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2017 or date of award, whichever is later, Through 14 Aug 2018.

0117 Yearly Maintenance-Generator 2 EA

0118 Emergency Service Call-Generator 3 EA

0119 Estimated Material Cost -Generator 12000 EA $1.00 $12,000.00

TOTAL SECTION I BASE YEAR

TOTAL PRICE BASE YEAR SECTION A-I

(CLINS 0001-0119)

ITEM ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION A

CARPENTRY AND PAINTING

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2018 or date of award, whichever is later, Through 14 Aug 2019.

1001 Normal Service Call 25 EA

1002 Emergency Service Call 10 EA

1003 Emergency Debris Removal 15000 EA $1.00 $15,000.00

1004 Estimated Materials Costs 20000 EA $1.00 $20,000.00

OPTION YEAR 1

for Service, Repair, and parts

CARPENTRY

1005 Remove/Replace Existing Timbers 2000 LF

1006 Remove/Replace Base Timbers 1500 LF

1007 Install Timbers 1500 LF

1008 Install Base Timbers 1500 LF

1009 Handrails 2x4x16 Ground Contact 2000 LF

1010 Handrails 2x6x16 Ground Contact 1500 LF

1011 Handrails 4x4x10 Ground Contact Post 500 LF

1012 Handrails 4x4x16 Ground Contact Post 500 LF

1013 Replace/Install Pedestal Grills 40 EA

1014 Install Concrete Fire Pit 30 EA

1015 Replace/Install One Post Signs 30 EA

1016 Replace/Install Two Post Signs 30 EA

1017 Fill Material 1000 TN

1018 Sand Material 300 TN

1019 Screening Material 350 TN

1020 Aggregate Base Material 1000 TN

1021 Aggregate Base Material 3/4" 1000 TN

1022 Rip Rap 6"-12" 100 TN

1023 Rip Rap 6" and smaller 300 TN

1024 Chain link fence with post 500 LF

1025 Replace Door Closure 10 EA

1026 Replace Metal Entry Doors 10 EA

1027 Replace or Install Shower Bench 10 EA

1028 Replace/Install Utility Table Tops 30 EA

1029 Replace/Install 8 Foot Vinyl Coated Picnic Tables 30 EA

1030 Culvert Replacement – 6” to 12" 10 EA

1031 Culvert Replacement – 13” to 24" 10 EA

1032 Culvert Replacement – 25” to 36" 10 EA

1033 Culvert Replacement -36" to 48" 10 EA

1034 Concrete Headwall 13"-48" culverts 30 EA

1035 Concrete 100 CY

1036 Asphalt 400 TN

1037 Metal Picnic Shelter Canopy 10 EA

PAINTING

1038 Oil Base, Primer Coat – (4000 SF) 2000 SF

1039 Oil Base, Intermediate or Finish Coat 3000 SF

(5000 SF)

1040 Latex, Primer Coat, (6000 SF) 2000 SF

1041 Latex, Intermediate or Finish Coat 3000 SF

(5000 SF)

1042 Pavement Marking 8000 LF

TOTAL SECTION A OPTION 1

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION B

ELECTRICAL

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2018 or date of award, whichever is later, Through 14 Aug 2019.

1043 Normal Service Calls 10 EA

1044 Emergency Service Calls 5 EA

1045 Estimated Material Costs 15000 EA $1.00 $15,000.00

ELECTRICAL

1046 Replace Hand Dryer in Toilet 8 EA

1047 Replace or Install Camper Pedestal (50 amp) 20 EA

1048 Replace Security Light Bulb 20 EA

(LED )

1049 Replace Security Light Fixture 10 EA (LED Retrofit)

1050 Replace/Install Solar Light 5 EA

1051 Replace PE Cells 10 EA

1052 Install Electric Poles (Wood 30 ft.) 5 EA

1053 Install Electric Poles (Metal 25 ft.) 5 EA

1054 Trenching (Electrical Lines) 2500 LF

1055 Replace Underground Electrical 2000 LF Wiring 2/0 AWG (Up to 2000 LF

1056 Replace Underground Electrical 1000 LF Wiring - #4 AWG

1057 Replace Underground Electrical 1000 LF Wiring - #6 AWG

1058 Replace/Install Underground Primary 2500 LF

1059 Replace/Install Motion Sensors 10 EA

TOTAL SECTION B OPTION 1

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION C

PLUMBING AND SEPTIC SYSTEM

MAINTENANCE

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2018 or date of award, whichever is later, Through 14 Aug 2019.

1060 Normal Service Call 25 EA

1061 Emergency Service Call 5 EA

1062 Estimated Material Costs 10000 EA $1.00 $10,000.00 for Service Call Repair Parts

PLUMBING

1063 Trenching and Backfilling (Water Lines) 1000 LF

1064 Replace Valve/Faucet 10 EA (Sink and Faucet)

1065 Replace Push Button Valve 5 EA

1066 Replace Urinal or Stool Valve 5 EA

1067 Replace Water Mixing Valve 6 EA (Sinks and Showers)

1068 Replace Toilet Stool (commode) 8 EA

1069 Replace Urinal (waterborne) 6 EA

1070 Replace Riser (vault toilet) 2 EA

1071 Replace Sump Pump (submergible) 2 EA

1072 Replace Lift Station Pump 6 EA

1073 Replace or Install Underground Water Line - 2500 LF

PVC ¾” – 2”

1074 Replace Underground Water Line - 1500 LF PVC over 2” – 4” pipe

1075 Replace Water Heater( 50 Gallon or less) 6 EA

1076 Replace Water Heater(75 to 85 Gallon) 4 ea

1077 Replace Water Heater (105 to 120 Gallon) 4 ea

1078 Install Vermiculite 75 Bags

1079 Replace Frost Proof Water Hydrant 15 EA

1080 Replace or Install Hydrant Assembly to include 10 EA Valve Box, Riser & Cap, Hydrant,& Vermicelite

1081 Replace Trailer Dump Station Water Tower 4 EA

1082 Replace Valve Box 10 EA

1083 Replace Meter Box 5 EA

1084 Septic Tank Pump Out Service 20 EA

TOTAL SECTION C OPTION 1

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION D

CIVIL ENGINEERING SERVICES

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2018 or date of award, whichever is later, Through 14 Aug 2019.

1085 Brush Mulcher 100 HR

1086 Dump Truck, 10 yard 100 HR

1087 Backhoe 150 HR

1088 Tractor w/Blade 60 HR

1089 Skidsteer with Auger 10 HR

1090 Tractor w/Front Loader 60 HR

1091 Dozer Work 200 HR

1092 Trackhoe 200 HR

1093 Road Grader 30 HR

1094 Bucket Truck 100 HR

1095 Concrete Saw 60 HR

1096 Side Boom Bushhog 200 HR

1097 Crane (up to 100 tons) 100 HR

1098 Compactor (Walk Behind) 50 HR

1099 Rubber Tire Loader 50 HR

TOTAL SECTION D OPTION 1

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION E

TREE REMOVAL/ UNDERBRUSHING

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2018 or date of award, whichever is later, Through 14 Aug 2019.

1100 Tree Removal – 6” to 12” Pine 40 EA

1101 Tree Removal – 13” to 20” Pine 40 EA

1102 Tree Removal – 21” to 26” Pine 30 EA

1103 Tree Removal – 26” & Above Pine 25 EA

1104 Tree Removal – 6” to 12” Hardwood 35 EA

1105 Tree Removal – 13’ to 16” Hardwood 50 EA

1106 Tree Removal – 17” to 20’ Hardwood 30 EA

1107 Tree Removal – 21” to 26’ Hardwood 30 EA

1108 Tree Removal – 27” to 32’ Hardwood 20 EA

1109 Tree Removal – 33” and Above Hardwood 20 EA

1110 Underbrushing 60 Acres

1111 Stump Grinding 18" and under 125 EA

1112 Stump Grinding 19" and above 125 EA

TOTAL SECTION E OPTION 1

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION F

HERBICIDE APPLICATION

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide

Statement, for the period 15 Aug2018

Through 14 Aug 2019.

1113 Herbicide Application 300 Acres

TOTAL SECTION F OPTION 1

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION G

GABION INSTALLATION

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2018 or date of award, whichever is later, Through 14 Aug 2019.

1114 Gabion Installation 100 CY

TOTAL SECTION G OPTION 1

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION H

BOUY INSTALLATION/REMOVAL

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2018 or date of award, whichever is later, Through 14 Aug 2019.

1115 Bouy Installation/Removal 100 EA

1116 Estimated Material Cost 6000 EA $1.00 $6,000.00

TOTAL SECTION H OPTION 1

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION I

GENERATOR MAINTENANCE/REPAIR

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2018 or date of award, whichever is later, Through 14 Aug 2019.

1117 Yearly Maintenance-Generator 2 EA

1118 Emergency Service Call-Generator 3 EA

1119 Estimated Material Cost -Generator 12000 EA $1.00 $12,000.00

TOTAL SECTION I OPTION 1

TOTAL OPTION 1 SECTION A-I

(CLINs 1001 - 1119)

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION A

CARPENTRY AND PAINTING

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2019 or date of award, whichever is later, Through 14 Aug 2020.

2001 Normal Service Call 25 EA

2002 Emergency Service Call 10 EA

2003 Emergency Debris Removal 15000 EA $1.00 $15,000.00

2004 Estimated Materials Costs 20000 EA $1.00 $20,000.00 for Service, Repair, and parts

CARPENTRY

2005 Remove/Replace Existing Timbers 2000 LF

2006 Remove/Replace Base Timbers 1500 LF

2007 Install Timbers 1500 LF

2008 Install Base Timbers 1500 LF

2009 Handrails 2x4x16 Ground Contact 2000 LF

2010 Handrails 2x6x16 Ground Contact 1500 LF

2011 Handrails 4x4x10 Ground Contact Post 500 LF

2012 Handrails 4x4x16 Ground Contact Post 500 LF

2013 Replace/Install Pedestal Grills 40 EA

2014 Install Concrete Fire Pit 30 EA

2015 Replace/Install One Post Signs 30 EA

2016 Replace/Install Two Post Signs 30 EA

2017 Fill Material 1000 TN

OPTION 2

2018 Sand Material 300 TN

2019 Screening Material 350 TN

2020 Aggregate Base Material 1000 TN

2021 Aggregate Base Material 3/4" 1000 TN

2022 Rip Rap 6"-12" 100 TN

2023 Rip Rap 6" and smaller 300 TN

2024 Chain link fence with post 500 LF

2025 Replace Door Closure 10 EA

2026 Replace Metal Entry Doors 10 EA

2027 Replace or Install Shower Bench 10 EA

2028 Replace/Install Utility Table Tops 30 EA

2029 Replace/Install 8 Foot Vinyl Coated Picnic Tables 30 EA

2030 Culvert Replacement – 6” to 12" 10 EA

2031 Culvert Replacement – 13” to 24" 10 EA

2032 Culvert Replacement – 25” to 36" 10 EA

2033 Culvert Replacement -36" to 48" 10 EA

2034 Concrete Headwall 13"-48" culverts 30 EA

2035 Concrete 100 CY

2036 Asphalt 400 TN

2037 Metal Picnic Shelter Canopy 10 EA

PAINTING

2038 Oil Base, Primer Coat – (4000 SF) 2000 SF

2039 Oil Base, Intermediate or Finish Coat 3000 SF

(5000 SF)

2040 Latex, Primer Coat, (6000 SF) 2000 SF

2041 Latex, Intermediate or Finish Coat 3000 SF

(5000 SF)

2042 Pavement Marking 8000 LF

TOTAL SECTION A OPTION 2

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION B

ELECTRICAL

Furnish all necessary management, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2019 or date of award, whichever is later, Through 14 Aug 2020.

2043 Normal Service Calls 10 EA

2044 Emergency Service Calls 5 EA

2045 Estimated Material Costs 15000 EA $1.00 $15,000.00

ELECTRICAL

2046 Replace Hand Dryer in Toilet 8 EA

2047 Replace or Install Camper Pedestal (50 amp) 20 EA

2048 Replace Security Light Bulb 20 EA

(LED )

2049 Replace Security Light Fixture 10 EA (LED Retrofit)

2050 Replace/Install Solar Light 5 EA

2051 Replace PE Cells 10 EA

2052 Install Electric Poles (Wood 30 ft.) 5 EA

2053 Install Electric Poles (Metal 25 ft.) 5 EA

2054 Trenching (Electrical Lines) 2500 LF

2055 Replace Underground Electrical 2000 LF Wiring 2/0 AWG (Up to 2000 LF

2056 Replace Underground Electrical 1000 LF Wiring - #4 AWG

2057 Replace Underground Electrical 1000 LF Wiring - #6 AWG

2058 Replace/Install Underground Primary 2500 LF

2059 Replace/Install Motion Sensors 10 EA

TOTAL SECTION B OPTION 2

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION C

PLUMBING AND SEPTIC SYSTEM

MAINTENANCE

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in

Statement, for the period 15 Aug2019

Through 14 Aug 2020.

2060 Normal Service Call 25 EA

2061 Emergency Service Call 5 EA

2062 Estimated Material Costs 10000 EA $1.00 $10,000.00 for Service Call Repair Parts

PLUMBING

2063 Trenching and Backfilling (Water Lines) 1000 LF

2064 Replace Valve/Faucet 10 EA (Sink and Faucet)

2065 Replace Push Button Valve 5 EA

2066 Replace Urinal or Stool Valve 5 EA

2067 Replace Water Mixing Valve 6 EA (Sinks and Showers)

2068 Replace Toilet Stool (commode) 8 EA

2069 Replace Urinal (waterborne) 6 EA

2070 Replace Riser (vault toilet) 2 EA

2071 Replace Sump Pump (submergible) 2 EA

2072 Replace Lift Station Pump 6 EA

2073 Replace or Install Underground Water Line - 2500 LF

PVC ¾” – 2”

2074 Replace Underground Water Line - 1500 LF PVC over 2” – 4” pipe

2075 Replace Water Heater( 50 Gallon or less) 6 EA

2076 Replace Water Heater(75 to 85 Gallon) 4 ea

2077 Replace Water Heater (105 to 120 Gallon) 4 ea

2078 Install Vermiculite 75 Bags

2079 Replace Frost Proof Water Hydrant 15 EA

2080 Replace or Install Hydrant Assembly to include 10 EA Valve Box, Riser & Cap, Hydrant,& Vermicelite

2081 Replace Trailer Dump Station Water Tower 4 EA

2082 Replace Valve Box 10 EA

2083 Replace Meter Box 5 EA

2084 Septic Tank Pump Out Service 20 EA

TOTAL SECTION C OPTION 2

SECTION D

CIVIL ENGINEERING SERVICES

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2019 or date of award, whichever is later, Through 14 Aug 2020.

2085 Brush Mulcher 100 HR

2086 Dump Truck, 10 yard 100 HR

2087 Backhoe 150 HR

2088 Tractor w/Blade 60 HR

2089 Skidsteer with Auger 10 HR

2090 Tractor w/Front Loader 60 HR

2091 Dozer Work 200 HR

2092 Trackhoe 200 HR

2093 Road Grader 30 HR

2094 Bucket Truck 100 HR

2095 Concrete Saw 60 HR

2096 Side Boom Bushhog 200 HR

2097 Crane (up to 100 tons) 100 HR

2098 Compactor (Walk Behind) 50 HR

2099 Rubber Tire Loader 50 HR

TOTAL SECTION D OPTION 2

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION E

TREE REMOVAL/ UNDERBRUSHING

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2019 or date of award, whichever is later, Through 14 Aug 2020.

2100 Tree Removal – 6” to 12” Pine 40 EA

2101 Tree Removal – 13” to 20” Pine 40 EA

2102 Tree Removal – 21” to 26” Pine 30 EA

2103 Tree Removal – 26” & Above Pine 25 EA

2104 Tree Removal – 6” to 12” Hardwood 35 EA

2105 Tree Removal – 13’ to 16” Hardwood 50 EA

2106 Tree Removal – 17” to 20’ Hardwood 30 EA

2107 Tree Removal – 21” to 26’ Hardwood 30 EA

2108 Tree Removal – 27” to 32’ Hardwood 20 EA

2109 Tree Removal – 33” and Above Hardwood 20 EA

2110 Underbrushing 60 Acres

2111 Stump Grinding 18" and under 125 EA

2112 Stump Grinding 19" and above 125 EA

TOTAL SECTION E OPTION 2

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION F

HERBICIDE APPLICATION

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2019 or date of award, whichever is later, Through 14 Aug 2020.

2113 Herbicide Application 300 Acres

TOTAL SECTION F OPTION 2

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION G

GABION INSTALLATION

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2019 or date of award, whichever is later, Through 14 Aug 2020.

2114 Gabion Installation 100 CY

TOTAL SECTION G OPTION 2

SECTION H

BOUY INSTALLATION/REMOVAL

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2019 or date of award, whichever is later, Through 14 Aug 2020.

2115 Bouy Installation/Removal 100 EA

2116 Estimated Material Cost 6000 EA $1.00 $6,000.00

TOTAL SECTION H OPTION 2

CLIN ESTIMATED

NUMBER DESCRIPTION QUANTITY U/M U/P AMOUNT

SECTION I

GENERATOR MAINTENANCE/REPAIR

Furnish all necessary management, personnel, materials, supplies, parts, tools, equipment, etc., to provide maintenance services as described in Section C – Description/Specs./Work Statement, for the period 15 Aug2019 or date of award, whichever is later, Through 14 Aug 2020.

2117 Yearly Maintenance-Generator 2 EA

2118 Emergency Service Call-Generator 3 EA

2119 Estimated Material Cost -Generator 12000 EA $1.00 $12,000.00

TOTAL SECTION I OPTION 2

TOTAL OPTION 2 SECTION A-I

(CLINS 2001 - 2119)

GRAND TOTAL

(Total of Base year, Option year 1 and Option year 2)

W9127S-17-Q-0011

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government

(Sep 2006) -- Alternate I

OCT 1995

52.203-7 Anti-Kickback Procedures MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.207-1 Notice Of Standard Competition MAY 2006 52.212-1 Instructions to Offerors--Commercial Items JAN 2017 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.217-5 Evaluation Of Options JUL 1990 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-14 Limitations On Subcontracting JAN 2017 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-17 Nondisplacement of Qualified Workers MAY 2014 52.222-19 Child Labor -- Cooperation with Authorities and Remedies OCT 2016 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-41 Service Contract Labor Standards MAY 2014 52.222-50 Combating Trafficking in Persons MAR 2015 52.222-51 Exemption from Application of the Service Contract Labor

Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements

MAY 2014

52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements

MAY 2014

52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-59 Compliance with Labor Laws (Executive Order 13673) DEC 2016 52.222-60 Paycheck Transparency (Executive Order 13673) OCT 2016 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

52.225-26 Contractors Performing Private Security Functions Outside the United States

OCT 2016

52.226-6 Promoting Excess Food Donation to Nonprofit Organizations MAY 2014 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.237-3 Continuity Of Services JAN 1991 52.242-13 Bankruptcy JUL 1995 52.242-17 Government Delay Of Work APR 1984 52.244-6 Subcontracts for Commercial Items JAN 2017 52.245-1 Government Property JAN 2017 52.245-9 Use And Charges APR 2012 52.247-64 Preference for Privately Owned U.S. - Flag Commercial

Vessels

FEB 2006

52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

SEP 2004

252.227-7000 Non-estoppel OCT 1966 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7004 DOD Progress Payment Rates OCT 2014 252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished

Property

APR 2012

252.245-7002 Reporting Loss of Government Property APR 2012 252.245-7003 Contractor Property Management System Administration APR 2012

252.245-7004 Reporting, Reutilization, and Disposal SEP 2016

CLAUSES INCORPORATED BY FULL TEXT

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;

or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.

(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:

Immediate owner CAGE code:

Immediate owner legal name: ___

(Do not use a ``doing business as'' name)

Is the immediate owner owned or controlled by another entity?:

[ ___ ] Yes or [ ___ ] No.

(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:

Highest-level owner CAGE code:

Highest-level owner legal name:

(Do not use a ``doing business as'' name)

(End of provision)

52.204-20 Predecessor of Offeror (JUL 2016)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means--

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;

or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.

Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.

(b) The Offeror represents that it [____] is or [____] is not a successor to a predecessor that held a Federal contract or grant within the last three years.

(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):

Predecessor CAGE code: ____ (or mark “Unknown”).

Predecessor legal name: ____.

(Do not use a “doing business as” name).

52.209-12 CERTIFICATION REGARDING TAX MATTERS (FEB 2016)

(a) This provision implements section 523 of Division B of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts.

(b) If the Offeror is proposing a total contract price that will exceed $5,000,000 (including options), the Offeror shall certify that, to the best of its knowledge and belief, it--

(1) Has [ ] filed all Federal tax returns required during the three years preceding the certification;

(2) Has not [ ] been convicted of a criminal offense under the Internal Revenue Code of 1986; and

(3) Has not [ ], more than 90 days prior to certification, been notified of any unpaid Federal tax assessment for which the liability remains unsatisfied, unless the assessment is the subject of an installment agreement or offer in compromise that has been approved by the Internal Revenue Service and is not in default, or the assessment is the subject of a non-frivolous administrative or judicial proceeding.

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

See Instructions To Offerors, Evaluation of Factors for relative order of importance of the evaluation factors.

Technical and past performance, when combined, are See Instructions To Offerors, Evaluation of Factors Evaluation of Factors for the relative importance of all other evaluation factors, when combined, when compared to price.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (JAN 2017)

ALTERNATE I (Jan 2017)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site located at https://www.sam.gov/portal. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (u) of this provision.

(a) Definitions. As used in this provision --

“Administrative merits determination” means certain notices or findings of labor law violations issued by an enforcement agency following an investigation. An administrative merits determination may be final or be subject to appeal or further review. To determine whether a particular notice or finding is covered by this definition, it is necessary to consult section II.B. in the DOL Guidance.

“Arbitral award or decision” means an arbitrator or arbitral panel determination that a labor law violation occurred, or that enjoined or restrained a violation of labor law. It includes an award or decision that is not final or is subject to being confirmed, modified, or vacated by a court, and includes an award or decision resulting from private or confidential proceedings. To determine whether a particular award or decision is covered by this definition, it is necessary to consult section II.B. in the DOL Guidance.

https://www.sam.gov/portal

“Civil judgment” means—

(1) In paragraph (h) of this provision: A judgment or finding of a civil offense by any court of competent jurisdiction.

(2) In paragraph (s) of this provision: Any judgment or order entered by any Federal or State court in which the court determined that a labor law violation occurred, or enjoined or restrained a violation of labor law. It includes a judgment or order that is not final or is subject to appeal. To determine whether a particular judgment or order is covered by this definition, it is necessary to consult section II.B. in the DOL Guidance.

“DOL Guidance” means the Department of Labor (DOL) Guidance entitled: ``Guidance for Executive Order 13673, `Fair Pay and Safe Workplaces' ''. The DOL Guidance, dated August 25, 2016, can be obtained from www.dol.gov/fairpayandsafeworkplaces.

“Economically disadvantaged women-owned small business (EDWOSB) Concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

“Enforcement agency” means any agency granted authority to enforce the Federal labor laws. It includes the enforcement components of DOL (Wage and Hour Division, Office of Federal Contract Compliance Programs, and Occupational Safety and Health Administration), the Equal Employment Opportunity Commission, the Occupational Safety and Health Review Commission, and the National Labor Relations Board. It also means a State agency designated to administer an OSHA-approved State Plan, but only to the extent that the State agency is acting in its capacity as administrator of such plan. It does not include other Federal agencies which, in their capacity as contracting agencies, conduct investigations of potential labor law violations. The enforcement agencies associated with each labor law under E.O. 13673 are--

(1) Department of Labor Wage and Hour Division (WHD) for--

(i) The Fair Labor Standards Act;

(ii) The Migrant and Seasonal Agricultural Worker Protection Act;

(iii) 40 U.S.C. chapter 31, subchapter IV, formerly known as the Davis-Bacon Act;

(iv) 41 U.S.C. chapter 67, formerly known as the Service Contract Act;

(v) The Family and Medical Leave Act; and

(vi) E.O. 13658 of February 12, 2014 (Establishing a Minimum Wage for Contractors);

(2) Department of Labor Occupational Safety and Health Administration (OSHA) for--

(i) The Occupational Safety and Health Act of 1970; and

(ii) OSHA-approved State Plans;

(3) Department of Labor Office of Federal Contract Compliance Programs (OFCCP) for--

(i) Section 503 of the Rehabilitation Act of 1973;

http://www.dol.gov/fairpayandsafeworkplaces

(ii) The Vietnam Era Veterans' Readjustment Assistance Act of 1972 and the Vietnam Era Veterans' Readjustment Assistance Act of 1974; and

(iii) E.O. 11246 of September 24, 1965 (Equal Employment Opportunity);

(4) National Labor Relations Board (NLRB) for the National Labor Relations Act; and

(5) Equal Employment Opportunity Commission (EEOC) for--

(i) Title VII of the Civil Rights Act of 1964;

(ii) The Americans with Disabilities Act of 1990;

(iii) The Age Discrimination in Employment Act of 1967; and

(iv) Section 6(d) of the Fair Labor Standards Act (Equal Pay Act).

"Forced or indentured child labor" means all work or service-

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

“Inverted domestic corporation” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

“Labor compliance agreement” means an agreement entered into between a contractor or subcontractor and an enforcement agency to address appropriate remedial measures, compliance assistance, steps to resolve issues to increase compliance with the labor laws, or other related matters.

“Labor laws” means the following labor laws and E.O.s:

(1) The Fair Labor Standards Act.

(2) The Occupational Safety and Health Act (OSHA) of 1970.

(3) The Migrant and Seasonal Agricultural Worker Protection Act.

(4) The National Labor Relations Act.

(5) 40 U.S.C. chapter 31, subchapter IV, formerly known as the Davis-Bacon Act.

(6) 41 U.S.C. chapter 67, formerly known as the Service Contract Act.

(7) E.O. 11246 of September 24, 1965 (Equal Employment Opportunity).

(8) Section 503 of the Rehabilitation Act of 1973.

(9) The Vietnam Era Veterans' Readjustment Assistance Act of 1972 and the Vietnam Era Veterans' Readjustment Assistance Act of 1974.

(10) The Family and Medical Leave Act.

(11) Title VII of the Civil Rights Act of 1964.

(12) The Americans with Disabilities Act of 1990.

(13) The Age Discrimination in Employment Act of 1967.

(14) E.O. 13658 of February 12, 2014 (Establishing a Minimum Wage for Contractors).

(15) Equivalent State laws as defined in the DOL Guidance. (The only equivalent State laws implemented in the FAR are OSHA-approved State Plans, which can be found at www.osha.gov/dcsp/osp/approved_state_plans.html).

“Labor law decision” means an administrative merits determination, arbitral award or decision, or civil judgment, which resulted from a violation of one or more of the laws listed in the definition of ``labor laws''.

“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .