A.07.24_Solicitation__Amendment_1.pdf
PDF 1 MB Posted
- Solicitation number
- W9127S-16-T-0065
About this file
Outboard Motor Specification Changes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.23_SynopsisSolicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to: 1) Change the specifications of the outboard motors; 2) Change the delivery schedule; 3) Extend the quote due date; 4) Include pictures of the boat. All other terms and conditions remain unchanged. See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127S-16-T-0065
X 9B. DATED (SEE ITEM 11)
14-Sep-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Sep-2016
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Change: 1
The requirements listed on page 2 of the solicitation has been changed from:
Description of requirements for the items to be acquired: This requirement is to provide and install four new Mercury Pro XS 200 HP outboard motors or equivalent for Montgomery Point crew boats; two right hand rotation and two left hand rotation in accordance with the Statement of Work. Vendor shall be located within 150 miles of 42 Wild Goose Lane, Tichnor, AR so that Government personnel can transport boats to the vendor’s location.
To read as:
Description of requirements for the items to be acquired: This requirement is to provide and install four new Mercury outboard motors part numbers M3200XLOPTI and M3200CXLOPTI (counter rotation) or equivalent for Montgomery Point crew boats; two right hand rotation and two left hand rotation in accordance with the Statement of Work. Vendor shall be located within 150 miles of 42 Wild Goose Lane, Tichnor, AR so that Government personnel can transport boats to the vendor’s location.
***Note***
The specifications for the motors has changed to accommodate the shaft length change from 20” to 25”.
OptiMax : 3.0L 200-250 hp
200 hp
HP / kW 200 / 147
Engine type V-6
Displacement (L) 3.0
Full throttle RPM 5000-5750
Alternator amp / Watt 60 amp / 756 watt
Recommended fuel 87% octane / up to 10% ethanol
Recommended oil Mercury OptiMax/DFI Outboard Oil
Engine protection operator warning system
Low oil level Over-rev Overheat SmartCraft Engine Guardian
Compatible with SmartCraft digital technology
Yes
Starting Electric (turn-key)
Controls Remote Mechanical
Steering Remote
Shaft length 25" / 635 mm
Gearcase ratio 1.75:1
Dry weight *Lightest model available
505 lbs / 229 kg
CARB star rating 3
Bore and stroke 3.63 x 3.00" / 92 x 76 mm
Ignition PCM Digital Inductive
Fuel system 2-stage Direct Fuel Injection (DFI)
Cooling system Water-cooled with thermostat & pressure-controlled
Gear shift F-N-R
Gearcase options Standard
Trim system Power Trim
Exhaust system Through prop
Shallow water trim range (degrees)
Counter Rotation Available
Color Phantom Black
OptiMax® 3.0L 200-250 hp | Mercury Marine
9/19/2016https://www.mercurymarine.com/en/us/engines/outboard/optimaxr/30l-200-250-hp/
Change: 2
The DELIVERY SCHEDULE listed on page 2 of the solicitation has been changed from:
Date(s) and place(s) of delivery and acceptance and FOB point: Work shall be performed at vendor’s location and completed within 10 working days after contract award.
Date(s) and place(s) of delivery and acceptance and FOB point: Work shall be performed at vendor’s location and completed within 90 days after contract award.
Change: 3
The QUOTE DUE DATE on page 3 of the solicitation has changed from:
Quotes are due on 22 September 2016 at 10:00 am CST
Quotes are due on 26 September 2016 at 10:00 am CST
Change: 4
The following pictures of the vessel have been added.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .