ELINS_1503050_Grounds_Maintenance_Reg_2_4-FEB-2016.xlsx
XLSX spreadsheet 159 KB Posted
- Solicitation number
- W9127S-16-R-0015
About this file
ELINS Ground Maintenance
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINS Summary
| Grounds Maintenance Services Summary | ||
| Service Code: 404 | ||
| This sheet is filled out automatically as other sheets are completed | ||
| CLIN | TOTAL | |
| 0009 | Base Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 0010 | Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | -- |
| 0010AA | TX050 | $0.00 |
| 0010AB | TX056 | $0.00 |
| 0010AC | TX181 | $0.00 |
| 0010AD | TX202 | $0.00 |
| 0010AE | TX211 | $0.00 |
| 0011 | Base Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 0012 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | -- |
| 0012AA | TX050 | $0.00 |
| 0012AB | TX056 | $0.00 |
| 0012AC | TX181 | $0.00 |
| 0012AD | TX202 | $0.00 |
| 0012AE | TX211 | $0.00 |
| 0013 | Base Period Indefinite Quantity | $70,000.00 |
| 1009 | First Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 1010 | First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | -- |
| 1010AA | TX050 | $0.00 |
| 1010AB | TX056 | $0.00 |
| 1010AC | TX181 | $0.00 |
| 1010AD | TX202 | $0.00 |
| 1010AE | TX211 | $0.00 |
| 1011 | First Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 1012 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | -- |
| 1012AA | TX050 | $0.00 |
| 1012AB | TX056 | $0.00 |
| 1012AC | TX181 | $0.00 |
| 1012AD | TX202 | $0.00 |
| 1012AE | TX211 | $0.00 |
| 1013 | First Option Period Indefinite Quantity | $70,000.00 |
| 2009 | Second Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 2010 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | -- |
| 2010AA | TX050 | $0.00 |
| 2010AB | TX056 | $0.00 |
| 2010AC | TX181 | $0.00 |
| 2010AD | TX202 | $0.00 |
| 2010AE | TX211 | $0.00 |
| 2011 | Second Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 2012 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | -- |
| 2012AA | TX050 | $0.00 |
| 2012AB | TX056 | $0.00 |
| 2012AC | TX181 | $0.00 |
| 2012AD | TX202 | $0.00 |
| 2012AE | TX211 | $0.00 |
| 2013 | Second Option Period Indefinite Quantity | $70,000.00 |
| $210,000.00 | |
| Note: Either CLIN 0009 or CLIN 0011 (but not both) will be awarded for fixed-price grounds maintenance services, at the discretion of the Contracting Officer. |
&F
&A &P of &N
Site Summary Sheet
GROUNDS MAINTENANCE (1503050)
| This sheet is filled out automatically as other sheets are completed | |||
| CLIN / SUBCLIN | FAC ID | ELINS | Total Price |
| 0009 | Base Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 0009AA | TX058 | (Items A001 Through A002) | $0.00 |
| 0009AB | TX068 | (Items A003 Through A005) | $0.00 |
| 0009AC | TX114 | (Item A006) | $0.00 |
| 0009AD | TX122 | (Items A007 Through A008) | $0.00 |
| 0009AE | TX184 | (Item A009) | $0.00 |
| 0009AF | TX187 | (Items A010 Through A011) | $0.00 |
| 0009AG | TX189 | (Items A012 Through A013) | $0.00 |
| 0009AH | TX190 | (Items A014 Through A016) | $0.00 |
| 0009AJ | TX195 | (Items A017 Through A019) | $0.00 |
| 0009AK | TX196 | (Items A020 Through A021) | $0.00 |
| 0009AL | TX209 | (Items A022 Through A024) | $0.00 |
| 0009AM | TX213 | (Items A025 Through A026) | $0.00 |
| $0.00 | |||
| 0010 | Base Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 0010AA | TX050 | (Items A001 Through A003) | $0.00 |
| 0010AB | TX056 | (Items A004 Through A006) | $0.00 |
| 0010AC | TX181 | (Items A007 Through A008) | $0.00 |
| 0010AD | TX202 | (Items A009 Through A010) | $0.00 |
| 0010AE | TX211 | (Items A011 Through A012) | $0.00 |
| $0.00 | |||
| 0011 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 0011AA | TX011 | (Items A101 Through A102) | $0.00 |
| 0011AB | TX018 | (Items A103 Through A105) | $0.00 |
| 0011AC | TX019 | (Item A106) | $0.00 |
| 0011AD | TX046 | (Items A107 Through A108) | $0.00 |
| 0011AE | TX054 | (Item A109) | $0.00 |
| 0011AF | TX075 | (Items A110 Through A111) | $0.00 |
| 0011AG | TX078 | (Items A112 Through A113) | $0.00 |
| 0011AH | TX154 | (Items A114 Through A116) | $0.00 |
| 0011AJ | TX160 | (Items A117 Through A119) | $0.00 |
| 0011AK | TX188 | (Items A120 Through A121) | $0.00 |
| 0011AL | TX201 | (Items A122 Through A124) | $0.00 |
| 0011AM | TX210 | (Items A125 Through A126) | $0.00 |
| $0.00 | |||
| 0012 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 0012AA | TX050 | (Items A101 Through A103) | $0.00 |
| 0012AB | TX056 | (Items A104 Through A106) | $0.00 |
| 0012AC | TX181 | (Items A107 Through A108) | $0.00 |
| 0012AD | TX202 | (Items A109 Through A110) | $0.00 |
| 0012AE | TX211 | (Items A111 Through A112) | $0.00 |
| $0.00 | |||
| 0013 | Base Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - A701 THROUGH A737 | $70,000.00 |
| 1009 | First Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 1009AA | TX011 | (Items B001 Through B002) | $0.00 |
| 1009AB | TX018 | (Items B003 Through B005) | $0.00 |
| 1009AC | TX019 | (Item B006) | $0.00 |
| 1009AD | TX046 | (Items B007 Through B008) | $0.00 |
| 1009AE | TX054 | (Item B009) | $0.00 |
| 1009AF | TX075 | (Items B010 Through B011) | $0.00 |
| 1009AG | TX078 | (Items B012 Through B013) | $0.00 |
| 1009AH | TX154 | (Items B014 Through B016) | $0.00 |
| 1009AJ | TX160 | (Items B017 Through B019) | $0.00 |
| 1009AK | TX188 | (Items B020 Through B021) | $0.00 |
| 1009AL | TX201 | (Items B022 Through B024) | $0.00 |
| 1009AM | TX210 | (Items B025 Through B026) | $0.00 |
| $0.00 | |||
| 1010 | First Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 1010AA | TX050 | (Items B001 Through B003) | $0.00 |
| 1010AB | TX056 | (Items B004 Through B006) | $0.00 |
| 1010AC | TX181 | (Items B007 Through B008) | $0.00 |
| 1010AD | TX202 | (Items B009 Through B010) | $0.00 |
| 1010AE | TX211 | (Items B011 Through B012) | $0.00 |
| $0.00 | |||
| 1011 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 1011AA | TX011 | (Items B101 Through B102) | $0.00 |
| 1011AB | TX018 | (Items B103 Through B105) | $0.00 |
| 1011AC | TX019 | (Item B106) | $0.00 |
| 1011AD | TX046 | (Items B107 Through B108) | $0.00 |
| 1011AE | TX054 | (Item B109) | $0.00 |
| 1011AF | TX075 | (Items B110 Through B111) | $0.00 |
| 1011AG | TX078 | (Items B112 Through B113) | $0.00 |
| 1011AH | TX154 | (Items B114 Through B116) | $0.00 |
| 1011AJ | TX160 | (Items B117 Through B119) | $0.00 |
| 1011AK | TX188 | (Items B120 Through B121) | $0.00 |
| 1011AL | TX201 | (Items B122 Through B124) | $0.00 |
| 1011AM | TX210 | (Items B125 Through B126) | $0.00 |
| $0.00 | |||
| 1012 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 1012AA | TX050 | (Items B101 Through B103) | $0.00 |
| 1012AB | TX056 | (Items B104 Through B106) | $0.00 |
| 1012AC | TX181 | (Items B107 Through B108) | $0.00 |
| 1012AD | TX202 | (Items B109 Through B110) | $0.00 |
| 1012AE | TX211 | (Items B111 Through B112) | $0.00 |
| $0.00 | |||
| 1013 | First Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - B701 THROUGH B737 | $70,000.00 |
| 2009 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green) | ||
| 2009AA | TX011 | (Items C001 Through C002) | $0.00 |
| 2009AB | TX018 | (Items C003 Through C005) | $0.00 |
| 2009AC | TX019 | (Item C006) | $0.00 |
| 2009AD | TX046 | (Items C007 Through C008) | $0.00 |
| 2009AE | TX054 | (Item C009) | $0.00 |
| 2009AF | TX075 | (Items C010 Through C011) | $0.00 |
| 2009AG | TX078 | (Items C012 Through C013) | $0.00 |
| 2009AH | TX154 | (Items C014 Through C016) | $0.00 |
| 2009AJ | TX160 | (Items C017 Through C019) | $0.00 |
| 2009AK | TX188 | (Items C020 Through C021) | $0.00 |
| 2009AL | TX201 | (Items C022 Through C024) | $0.00 |
| 2009AM | TX210 | (Items C025 Through C026) | $0.00 |
| $0.00 | |||
| 2010 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green), OPTIONAL | ||
| 2010AA | TX050 | (Items C001 Through C003) | $0.00 |
| 2010AB | TX056 | (Items C004 Through C006) | $0.00 |
| 2010AC | TX181 | (Items C007 Through C008) | $0.00 |
| 2010AD | TX202 | (Items C009 Through C010) | $0.00 |
| 2010AE | TX211 | (Items C011 Through C012) | $0.00 |
| $0.00 | |||
| 2011 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | ||
| 2011AA | TX011 | (Items C101 Through C102) | $0.00 |
| 2011AB | TX018 | (Items C103 Through C105) | $0.00 |
| 2011AC | TX019 | (Item C106) | $0.00 |
| 2011AD | TX046 | (Items C107 Through C108) | $0.00 |
| 2011AE | TX054 | (Item C109) | $0.00 |
| 2011AF | TX075 | (Items C110 Through C111) | $0.00 |
| 2011AG | TX078 | (Items C112 Through C113) | $0.00 |
| 2011AH | TX154 | (Items C114 Through C116) | $0.00 |
| 2011AJ | TX160 | (Items C117 Through C119) | $0.00 |
| 2011AK | TX188 | (Items C120 Through C121) | $0.00 |
| 2011AL | TX201 | (Items C122 Through C124) | $0.00 |
| 2011AM | TX210 | (Items C125 Through C126) | $0.00 |
| $0.00 | |||
| 2012 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber), OPTIONAL | ||
| 2012AA | TX050 | (Items C101 Through C103) | $0.00 |
| 2012AB | TX056 | (Items C104 Through C106) | $0.00 |
| 2012AC | TX181 | (Items C107 Through C108) | $0.00 |
| 2012AD | TX202 | (Items C109 Through C110) | $0.00 |
| 2012AE | TX211 | (Items C111 Through C112) | $0.00 |
| $0.00 | |||
| 2013 | Second Option Period Indefinite Quantity | ||
| TOTAL IQ LINE ITEMS - C701 THROUGH C737 | $70,000.00 |
&F
&P of &N
ELINS BASE PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A126 |
| CLIN 0009 - Base Period - Firm Fixed-Price Work - High Service Level (Green) |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| TX058 | Boyle Memorial USARC | 48795 | |||
| Firm Fixed-Price Work | |||||
| A001 | Improved Grounds (Spec Item C, 3.1) | 10.5 | Month | $ - 0 | $ - 0 |
| A002 | Storm Drainage Systems (Spec Item 3.3) | 10.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AA (Items A001 Through A002) | $0.00 |
| TX068 | Seagoville USARC | 48837 | |||
| Firm Fixed-Price Work | |||||
| A003 | Improved Grounds (Spec Item C, 3.1) | 8.0 | Month | $ - 0 | $ - 0 |
| A004 | Semi-Improved Grounds (Spec Item C, 3.2) | 8.0 | Month | $ - 0 | $ - 0 |
| A005 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AB (Items A003 Through A005) | $0.00 |
| TX114 | Grand Prairie Reserve Complex | 48491 | |||
| Firm Fixed-Price Work | |||||
| A006 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AC (Item A006) | $0.00 |
| TX122 | Waco USARC | 48875 | |||
| Firm Fixed-Price Work | |||||
| A007 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A008 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AD (Items A007 Through A008) | $0.00 |
| TX184 | Fort Worth AFRC/OMS/Storage | 48878 | |||
| Firm Fixed-Price Work | |||||
| A009 | Storm Drainage Systems (Spec Item 3.3) | 8.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AE (Item A009) | $0.00 |
| TX187 | Amarillo AFRC | 48277 | |||
| Firm Fixed-Price Work | |||||
| A010 | Improved Grounds (Spec Item C, 3.1) | 8.0 | Month | $ - 0 | $ - 0 |
| A011 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AF (Items A010 Through A011) | $0.00 |
| TX189 | Lewisville AFRC | 48622 | |||
| Firm Fixed-Price Work | |||||
| A012 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A013 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AG (Items A012 Through A013) | $0.00 |
| TX190 | Denton USARC | 48797 | ||||
| Firm Fixed-Price Work | ||||||
| A014 | Improved Grounds (Spec Item C, 3.1) | 8.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AA (Items A001 Through A003) |
| A015 | Semi-Improved Grounds (Spec Item C, 3.2) | 8.0 | Month | $ - 0 | $ - 0 | |
| A016 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AB (Items A004 Through A006) |
| Total CLIN 0009AH (Items A014 Through A016) | $0.00 | Total CLIN 0009AC (Items A007 Through A009) | ||||
| Total CLIN 0009AD (Items A010 Through A012) | ||||||
| TX195 | Huntsville AFRC | 48437 | Total CLIN 0009AE (Items A013 Through A015) | |||
| Firm Fixed-Price Work | Total CLIN 0009AF (Items A016 Through A017) | |||||
| A017 | Improved Grounds (Spec Item C, 3.1) | 10.0 | Month | $ - 0 | $ - 0 | |
| A018 | Semi-Improved Grounds (Spec Item C, 3.2) | 10.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AH (Items A021 Through A023) |
| A019 | Storm Drainage Systems (Spec Item 3.3) | 10.0 | Month | $ - 0 | $ - 0 | Total CLIN 0009AJ (Items A024 Through A026) |
| Total CLIN 0009AJ (Items A017 Through A019) | $0.00 |
| TX196 | Tyler AFRC | 48057 | |||||
| Firm Fixed-Price Work | Total CLIN 0009AA | (Items A001 Through A003) | |||||
| A020 | Improved Grounds (Spec Item C, 3.1) | 9.5 | Month | $ - 0 | $ - 0 | Total CLIN 0009AB | (Items A004 Through A006) |
| A021 | Storm Drainage Systems (Spec Item 3.3) | 9.5 | Month | $ - 0 | $ - 0 | Total CLIN 0009AD | (Items A010 Through A012) |
| Total CLIN 0009AK (Items A020 Through A021) | $0.00 | Total CLIN 0009AE | (Items A013 Through A015) | ||||
| Total CLIN 0009AF | (Items A016 Through A017) | ||||||
| TX209 | LUFKIN AFRC | 48763 | Total CLIN 0009AG | (Items A018 Through A020) | |||
| Firm Fixed-Price Work | Total CLIN 0009AH | (Items A021 Through A023) | |||||
| A022 | Improved Grounds (Spec Item C, 3.1) | 9.5 | Month | $ - 0 | $ - 0 | ||
| A023 | Semi-Improved Grounds (Spec Item C, 3.2) | 9.5 | Month | $ - 0 | $ - 0 | ||
| A024 | Storm Drainage Systems (Spec Item 3.3) | 9.5 | Month | $ - 0 | $ - 0 | ||
| Total CLIN 0009AL (Items A022 Through A024) | $0.00 |
| TX213 | Bryan USARC/OMS/Storage | 48275 | |||
| Firm Fixed-Price Work | |||||
| A025 | Improved Grounds (Spec Item C, 3.1) | 10.0 | Month | $ - 0 | $ - 0 |
| A026 | Storm Drainage Systems (Spec Item 3.3) | 10.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0009AM (Items A025 Through A026) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A026 $0.00
CLIN 0011 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber)
| TX058 | Boyle Memorial USARC | 48795 | |||
| Firm Fixed-Price Work | |||||
| A101 | Improved Grounds (Spec Item C, 3.1) | 10.5 | Month | $ - 0 | $ - 0 |
| A102 | Storm Drainage Systems (Spec Item 3.3) | 10.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AA (Items A101 Through A102) | $0.00 |
| TX068 | Seagoville USARC | 48837 | |||
| Firm Fixed-Price Work | |||||
| A103 | Improved Grounds (Spec Item C, 3.1) | 8.0 | Month | $ - 0 | $ - 0 |
| A104 | Semi-Improved Grounds (Spec Item C, 3.2) | 8.0 | Month | $ - 0 | $ - 0 |
| A105 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AB (Items A103 Through A105) | $0.00 |
| TX114 | Grand Prairie Reserve Complex | 48491 | |||
| Firm Fixed-Price Work | |||||
| A106 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AC (Item A106) | $0.00 |
| TX122 | Waco USARC | 48875 | |||
| Firm Fixed-Price Work | |||||
| A107 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A108 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AD (Items A107 Through A108) | $0.00 |
| TX184 | Fort Worth AFRC/OMS/Storage | 48878 | |||
| Firm Fixed-Price Work | |||||
| A109 | Storm Drainage Systems (Spec Item 3.3) | 8.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AE (Item A109) | $0.00 |
| TX187 | Amarillo AFRC | 48277 | |||
| Firm Fixed-Price Work | |||||
| A110 | Improved Grounds (Spec Item C, 3.1) | 8.0 | Month | $ - 0 | $ - 0 |
| A111 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AF (Items A110 Through A111) | $0.00 |
| TX189 | Lewisville AFRC | 48622 | |||
| Firm Fixed-Price Work | |||||
| A112 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A113 | Storm Drainage Systems (Spec Item 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AG (Items A112 Through A113) | $0.00 |
| TX190 | Denton USARC | 48797 | |||
| Firm Fixed-Price Work | |||||
| A114 | Improved Grounds (Spec Item C, 3.1) | 8.0 | Month | $ - 0 | $ - 0 |
| A115 | Semi-Improved Grounds (Spec Item C, 3.2) | 8.0 | Month | $ - 0 | $ - 0 |
| A116 | Storm Drainage Systems (Spec Item 3.3) | 8.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AH (Items A114 Through A116) | $0.00 |
| TX195 | Huntsville AFRC | 48437 | |||
| Firm Fixed-Price Work | |||||
| A117 | Improved Grounds (Spec Item C, 3.1) | 10.0 | Month | $ - 0 | $ - 0 |
| A118 | Semi-Improved Grounds (Spec Item C, 3.2) | 10.0 | Month | $ - 0 | $ - 0 |
| A119 | Storm Drainage Systems (Spec Item 3.3) | 10.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AJ (Items A117 Through A119) | $0.00 |
| TX196 | Tyler AFRC | 48057 | |||
| Firm Fixed-Price Work | |||||
| A120 | Improved Grounds (Spec Item C, 3.1) | 9.5 | Month | $ - 0 | $ - 0 |
| A121 | Storm Drainage Systems (Spec Item 3.3) | 9.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AK (Items A120 Through A121) | $0.00 |
| TX209 | LUFKIN AFRC | 48763 | |||
| Firm Fixed-Price Work | |||||
| A122 | Improved Grounds (Spec Item C, 3.1) | 9.5 | Month | $ - 0 | $ - 0 |
| A123 | Semi-Improved Grounds (Spec Item C, 3.2) | 9.5 | Month | $ - 0 | $ - 0 |
| A124 | Storm Drainage Systems (Spec Item 3.3) | 9.5 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AL (Items A122 Through A124) | $0.00 |
| TX213 | Bryan USARC/OMS/Storage | 48275 | |||
| Firm Fixed-Price Work | |||||
| A125 | Improved Grounds (Spec Item C, 3.1) | 10.0 | Month | $ - 0 | $ - 0 |
| A126 | Storm Drainage Systems (Spec Item 3.3) | 10.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0011AM (Items A125 Through A126) | $0.00 |
TOTAL FFP LINE ITEMS - A101 THROUGH A126 $0.00
&F
&P of &N
ELINS BASE PERIOD FFP (OPTNL)
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH Spec Item C, SPEC ITEM 3 ELINS A001 - A112 |
| CLIN 0010 - Base Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| TX050 | Lubbock AFRC | 4867B | |||
| Firm Fixed-Price Work | |||||
| A001 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A002 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A003 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AA (Items A001 Through A003) | $0.00 |
| TX056 | Midland USARC | 48793 | |||
| Firm Fixed-Price Work | |||||
| A004 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A005 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A006 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AB (Items A004 Through A006) | $0.00 |
| TX181 | NAS JRB Fort Worth | 48992 | |||
| Firm Fixed-Price Work | |||||
| A007 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A008 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AB (Items A007 Through A008) | $0.00 |
| TX202 | Red River AD AFRC | 48515 | |||
| Firm Fixed-Price Work | |||||
| A009 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A010 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AB (Items A009 Through A010) | $0.00 |
| TX211 | Dyess AFB AFRC | 48248 | |||
| Firm Fixed-Price Work | |||||
| A011 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A012 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0010AB (Items A011 Through A012) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A012 $0.00
CLIN 0012 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL
| TX050 | Lubbock AFRC | 4867B | |||
| Firm Fixed-Price Work | |||||
| A101 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A102 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A103 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AA (Items A101 Through A103) | $0.00 |
| TX056 | Midland USARC | 48793 | |||
| Firm Fixed-Price Work | |||||
| A104 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A105 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A106 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AB (Items A104 Through A106) | $0.00 |
| TX181 | NAS JRB Fort Worth | 48992 | |||
| Firm Fixed-Price Work | |||||
| A107 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A108 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AB (Items A107 Through A108) | $0.00 |
| TX202 | Red River AD AFRC | 48515 | |||
| Firm Fixed-Price Work | |||||
| A109 | Semi-Improved Grounds (Spec Item C, 3.2) | 11.0 | Month | $ - 0 | $ - 0 |
| A110 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AB (Items A109 Through A110) | $0.00 |
| TX211 | Dyess AFB AFRC | 48248 | |||
| Firm Fixed-Price Work | |||||
| A111 | Improved Grounds (Spec Item C, 3.1) | 11.0 | Month | $ - 0 | $ - 0 |
| A112 | Storm Drainage Systems (Spec Item C, 3.3) | 11.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 0012AB (Items A111 Through A112) | $0.00 |
TOTAL FFP LINE ITEMS - A101 THROUGH A112 $0.00
&F
&P of &N
ELINS BASE PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A737 |
| CLIN 0013 - Base Period - Indefinite Quantity Work |
| UNIT | UNIT OF | MIN. ORDER | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | PRICE | ISSUE | QTY |
| A701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | $ - 0 | Each | 1 |
| A702 | Tree and Stump Removal | ||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | $ - 0 | Each | 1 |
| A703 | Tree and Stump Removal | ||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A704 | Shrub and Stump Removal | ||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A705 | Shrub and Stump Removal | ||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A706 | Shrub and Stump Removal | ||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 1 |
| A707 | Complete Tree Pruning | ||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | $ - 0 | Each | 1 |
| A708 | Complete Tree Pruning | ||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | $ - 0 | Each | 1 | |||
| A709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | $ - 0 | Each | 1 | |
| A710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | $ - 0 | SF | 50 |
| A711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 | |||
| A714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 10 | |
| A715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 |
| A716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 | |||
| A717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 | |
| A718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | ||||
| Work shall be completed within 14 calendar days. | $ - 0 | SF | 100 | |||
| A719 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 |
| A720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 5 |
| A721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | L.F. | 100 | |||
| A722 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | $ - 0 | SF | 50 | |
| A723 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 | |
| A724 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | $ - 0 | SF | 5,000 | |
| A725 | Control Undesired Vegetation | Remove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | ||||
| Work shall be completed within 10 calendar days. | $ - 0 | LF | 100 | |||
| A726 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
| Work shall be completed within 10 calendar days. | $ - 0 | SF | 50 | |||
| Special Event Grass Cutting at the following sites: | Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site. | |||||
| A727 | CA001 | $ - 0 | Each | 1 | ||
| A728 | CA012 | $ - 0 | Each | 1 | ||
| A729 | CA014 | $ - 0 | Each | 1 | ||
| A730 | CA021 | $ - 0 | Each | 1 | ||
| A731 | CA062 | $ - 0 | Each | 1 | ||
| A732 | CA070 | $ - 0 | Each | 1 | ||
| A733 | CA090 | $ - 0 | Each | 1 | ||
| A734 | CA150 | $ - 0 | Each | 1 | ||
| A735 | CA187 | $ - 0 | Each | 1 | ||
| A736 | CA207 | $ - 0 | Each | 1 | ||
| A737 | Plant Native Vegetation | All native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape. |
Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. $ - 0 Each 10
TOTAL IQ CAPACITY FOR LINE ITEMS - A701 THROUGH A737 $70,000.00
&F
&P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELINS FIRST PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 - B126 |
| CLIN 1009 - First Option Period - Firm Fixed-Price Work - High Service Level (Green) |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| TX058 | Boyle Memorial USARC | 48795 | |||
| Firm Fixed-Price Work | |||||
| B001 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B002 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AA (Items B001 Through B002) | $0.00 |
| TX068 | Seagoville USARC | 48837 | |||
| Firm Fixed-Price Work | |||||
| B003 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B004 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B005 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AB (Items B003 Through B005) | $0.00 |
| TX114 | Grand Prairie Reserve Complex | 48491 | |||
| Firm Fixed-Price Work | |||||
| B006 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AC (Item B006) | $0.00 |
| TX122 | Waco USARC | 48875 | |||
| Firm Fixed-Price Work | |||||
| B007 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B008 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AD (Items B007 Through B008) | $0.00 |
| TX184 | Fort Worth AFRC/OMS/Storage | 48878 | |||
| Firm Fixed-Price Work | |||||
| B009 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AE (Item B009) | $0.00 |
| TX187 | Amarillo AFRC | 48277 | |||
| Firm Fixed-Price Work | |||||
| B010 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B011 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AF (Items B010 Through B011) | $0.00 |
| TX189 | Lewisville AFRC | 48622 | |||
| Firm Fixed-Price Work | |||||
| B012 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B013 | Total CLIN 0009AE (Items A013 Through A014) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AG (Items B012 Through B013) | $0.00 |
| TX190 | Denton USARC | 48797 | |||
| Firm Fixed-Price Work | |||||
| B014 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B015 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B016 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AH (Items B014 Through B016) | $0.00 |
| TX195 | Huntsville AFRC | 48437 | |||
| Firm Fixed-Price Work | |||||
| B017 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B018 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B019 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AJ (Items B017 Through B019) | $0.00 |
| TX196 | Tyler AFRC | 48057 | |||
| Firm Fixed-Price Work | |||||
| B020 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B021 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AK (Items B020 Through B021) | $0.00 |
| TX209 | LUFKIN AFRC | 48763 | |||
| Firm Fixed-Price Work | |||||
| B022 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B023 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B024 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AL (Items B022 Through B024) | $0.00 |
| TX213 | Bryan USARC/OMS/Storage | 48275 | |||
| Firm Fixed-Price Work | |||||
| B025 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B026 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1009AM (Items B025 Through B026) | $0.00 |
TOTAL FFP LINE ITEMS - B001 THROUGH B026 $0.00
CLIN 1011 - First Option Period - Firm Fixed-Price Work - Medium Service Level (Amber)
| TX058 | Boyle Memorial USARC | 48795 | |||
| Firm Fixed-Price Work | |||||
| B101 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B102 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AA (Items B101 Through B102) | $0.00 |
| TX068 | Seagoville USARC | 48837 | |||
| Firm Fixed-Price Work | |||||
| B103 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B104 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B105 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AB (Items B103 Through B105) | $0.00 |
| TX114 | Grand Prairie Reserve Complex | 48491 | |||
| Firm Fixed-Price Work | |||||
| B106 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AC (Item B106) | $0.00 |
| TX122 | Waco USARC | 48875 | |||
| Firm Fixed-Price Work | |||||
| B107 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B108 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AD (Items B107 Through B108) | $0.00 |
| TX184 | Fort Worth AFRC/OMS/Storage | 48878 | |||
| Firm Fixed-Price Work | |||||
| B109 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AE (Item B109) | $0.00 |
| TX187 | Amarillo AFRC | 48277 | |||
| Firm Fixed-Price Work | |||||
| B110 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B111 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AF (Items B110 Through B111) | $0.00 |
| NM014 | Lewisville AFRC | 48622 | |||
| Firm Fixed-Price Work | |||||
| B112 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B113 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AG (Items B112 Through B113) | $0.00 |
| TX190 | Denton USARC | 48797 | |||
| Firm Fixed-Price Work | |||||
| B114 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B115 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B116 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AH (Items B114 Through B116) | $0.00 |
| TX195 | Huntsville AFRC | 48437 | |||
| Firm Fixed-Price Work | |||||
| B117 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B118 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B119 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AJ (Items B117 Through B119) | $0.00 |
| TX196 | Tyler AFRC | 48057 | |||
| Firm Fixed-Price Work | |||||
| B120 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B121 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AK (Items B120 Through B121) | $0.00 |
| TX209 | LUFKIN AFRC | 48763 | |||
| Firm Fixed-Price Work | |||||
| B122 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B123 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B124 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AL (Items B122 Through B124) | $0.00 |
| TX213 | Bryan USARC/OMS/Storage | 48275 | |||
| Firm Fixed-Price Work | |||||
| B125 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B126 | Storm Drainage Systems (Spec Item 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1011AM (Items B125 Through B126) | $0.00 |
TOTAL FFP LINE ITEMS - B101 THROUGH B126 $0.00
&F
&P of &N
ELINS FIRST PERIOD FFP (OPTNL)
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH Spec Item C, SPEC ITEM 3 ELINS B001 - B112 |
| CLIN 0010 - Base Period - Firm Fixed-Price Work - High Service Level (Green), OPTIONAL |
| FACID | SITE NAME | SITE CODE | |||
| ELIN | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| TX050 | Lubbock AFRC | 4867B | |||
| Firm Fixed-Price Work | |||||
| B001 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B002 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B003 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AA (Items B001 Through B003) | $0.00 |
| TX056 | Midland USARC | 48793 | |||
| Firm Fixed-Price Work | |||||
| B004 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B005 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B006 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AB (Items B004 Through B006) | $0.00 |
| TX181 | NAS JRB Fort Worth | 48992 | |||
| Firm Fixed-Price Work | |||||
| B007 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B008 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AB (Items B007 Through B008) | $0.00 |
| TX202 | Red River AD AFRC | 48515 | |||
| Firm Fixed-Price Work | |||||
| B009 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B010 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AB (Items B009 Through B010) | $0.00 |
| TX211 | Dyess AFB AFRC | 48248 | |||
| Firm Fixed-Price Work | |||||
| B011 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B012 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1010AB (Items B011 Through B012) | $0.00 |
TOTAL FFP LINE ITEMS - B001 THROUGH B012 $0.00
CLIN 0012 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber), OPTIONAL
| TX050 | Lubbock AFRC | 4867B | |||
| Firm Fixed-Price Work | |||||
| B101 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B102 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B103 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1012AA (Items B101 Through B103) | $0.00 |
| TX056 | Midland USARC | 48793 | |||
| Firm Fixed-Price Work | |||||
| B104 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B105 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B106 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1012AB (Items B104 Through B106) | $0.00 |
| TX181 | NAS JRB Fort Worth | 48992 | |||
| Firm Fixed-Price Work | |||||
| B107 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B108 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1012AB (Items B107 Through B108) | $0.00 |
| TX202 | Red River AD AFRC | 48515 | |||
| Firm Fixed-Price Work | |||||
| B109 | Semi-Improved Grounds (Spec Item C, 3.2) | 12.0 | Month | $ - 0 | $ - 0 |
| B110 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1012AB (Items B109 Through B110) | $0.00 |
| TX211 | Dyess AFB AFRC | 48248 | |||
| Firm Fixed-Price Work | |||||
| B111 | Improved Grounds (Spec Item C, 3.1) | 12.0 | Month | $ - 0 | $ - 0 |
| B112 | Storm Drainage Systems (Spec Item C, 3.3) | 12.0 | Month | $ - 0 | $ - 0 |
| Total CLIN 1012AB (Items B111 Through B112) | $0.00 |
TOTAL FFP LINE ITEMS - B101 THROUGH B112 $0.00
&F
&P of &N
ELINS FIRST PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE UNIT PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS B701 - B737 |
| CLIN 1013 - First Option Period - Indefinite Quantity Work |
| UNIT | UNIT OF | MIN. ORDER |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .