PWS_DOD6Firebreak_Camp Shelby updated 20250909.pdf
PDF 2 MB Posted
- Attached to
- MSARNG Firebreak Preparation Services - Camp Shelby Federal contract opportunity
- Solicitation number
- W9127Q-25-Q-A015
About this file
This Performance Work Statement (PWS) details firebreak preparation services for the Mississippi Army National Guard (MSARNG) at Camp Shelby Joint Forces Training Center. The primary requirement is to prepare approximately 2.8 miles of firebreaks down to mineral soil for prescribed fire purposes, with potential options for three additional sections totaling 0.93 miles. The contract period of performance is 3 months after award, with work to be completed between 0700-1630 hours Monday through Friday, excluding US holidays.
Key requirements include constructing firebreaks a minimum of 15 feet wide, minimizing damage to adjacent trees, constructing water bars according to specific grade and spacing guidelines, and protecting environmental resources such as gopher tortoise habitats and wetlands. The contractor must provide all personnel, equipment, and materials, comply with strict environmental protection protocols, and follow safety guidelines including unexploded ordnance awareness. The work will be performed at DOD Unit 6, with potential option areas in DOD Units 01A, 10, and 28, requiring careful navigation of a military installation founded in 1917 that may contain hidden structural foundations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers as of 20250912.pdf | ||
| PWS_DOD6Firebreak_Camp Shelby updated 20250910.pdf | ||
| Additional Firebreaks with Mileage.pdf | ||
| DOD28 Firebreak.pdf | ||
| DOD10 Firebreak.pdf | ||
| DOD01A Firebreak.pdf | ||
| DOD06Firebreak.pdf | ||
| Questions and Answers as of 20250909.pdf | ||
| WD 2015-5151 Rev 28 8Jul2025.pdf | ||
| PWS_DOD6Firebreak_Camp Shelby.pdf | ||
| Provisions and Clauses.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Firebreak Preparation Services for Camp Shelby Joint Forces Training Center, MS 1 May 2025
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Firebreak Preparation Services at Camp Shelby Joint Forces Training Center, MS as defined in this PWS.
1.2 Background: The Mississippi Army National Guard (MSARNG) has a requirement to prepare fire breaks on approximately 2.8 miles of Department of Defense property at Camp Shelby, Mississippi. The intent of this project is to prepare fire breaks down to mineral soil for the purpose of prescribed fire. Pending availability of additional Government funding, there will be options for three additional sections of .07 miles, .32 miles, and .54 miles.
1.3 Period of Performance (PoP): The Period of Performance shall be 3 months after receipt of award.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700-1630 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at DOD Unit 6 (see Exhibit 3). The Options shall be at DOD Units 01A, 10, and 28. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.1.1 Telework:
The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance.
Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety, and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS).
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 Reserved
1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a Government representative).
1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website:
https://jko.jten.mil/courses/atl1/launch.html.
1.4.5.4 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR within 15 calendar days after completion of training.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating machinery used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.
The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.
The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contractor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the COR within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at
FAR 22.17.
1.4.12 Reserved
1.4.13 Reserved
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
CM Contract Manager DoD Department of Defense KO Contracting Officer MSARNG Mississippi Army National Guard PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: NONE
3.2 Materials: NONE
3.3 Equipment: NONE
3.4 Services: NONE
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E): The contractor shall furnish all transportation, materials, equipment, tools, and supplies necessary to mechanically treat sites in accordance with the attached specifications, provisions, and clauses. These items will remain the property of the contractor after the contract ends.
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
5.0 Requirements: The contractor shall:
5.1 Comply with Operation Parameters Requirements
5.1.1 The construction/ maintenance of firebreaks will be a minimum of 15 feet wide unless trees >10 inches in diameter at breast height on both sides of the lane prevent this.
5.1.2 Damage to trees adjacent to firebreak will be minimized.
5.1.3 Water bars will be constructed or maintained at the head of all steep grades on the bladed firebreak.
5.1.4 A compacted water bar-berm shall be one foot in height when settled; have a minimum down cut below bladed firebreak surface of one-half foot; extend total width of firebreak; angled 30-45 degrees downgrade from the center of the bladed firebreak; and with lead outs extending to undisturbed forest soil.
5.1.5 The berm shall be compacted by construction equipment tracking the length of the berm.
5.1.6 Debris will be removed from the berm.
5.1.7 Water bars shall be constructed and/or maintained in accordance with the percent grade and spacing listed in Table A below.
Percent Grade of Fire lane Minimum feet between Waterbars 0-4 212 4-8 148
8-12 110 12-16 95 16-22 84 22-30 60 30-40 35
5.1.8 The contractor should be made aware that this area could potentially have concrete, structural foundations, etc. located within the project area due to the site being a military installation founded in 1917.
5.2 Comply with Resources Protection Requirements
5.2.1 Gopher tortoise burrows could possibly be located within the treatment area, but none are known to MSARNG personnel on this area. Practices will be used to avoid causing damage to the burrow or disturbing the apron with equipment, such as maintaining a buffer of 25 feet around burrows. Burrows will be marked with orange posts and yellow “Restricted Area” signs or pink/black flagging. If an unmarked burrow or individual gopher tortoise is discovered, the contractor will notify the project officer and provide GPS coordinates.
5.2.2 Areas containing cogongrass will be avoided and a minimum 10-foot buffer shall be maintained around the area. Any new areas of cogongrass not previously flagged, shall be flagged with ribbon by the contractor and location reported to MSARNG representative prior to submission of that month’s invoice. (Ribbon will be provided by the MSARNG upon request).
5.2.3 All water bodies will be kept free of contractor generated debris.
5.2.4 Equipment access is prohibited within wetland areas.
5.2.5 Machinery will not be operated when soil moisture conditions are such that excessive rutting or soil movement will occur. Clearance will be granted by Camp Shelby Environmental or Installation Forester.
5.2.6 All vehicular equipment used to perform this contract will be operated in such a manner as to cause the least amount of soil disturbance.
5.3 Comply with Unexploded Ordnance Requirements
5.3.1 The possibility exists that unexploded ordnance will be encountered in the proposed areas of project. If any unknown metal object in located during this project, Camp Shelby Range Control shall be notified immediately at 601-558-2709 and all work shall cease until the area is cleared by Range Control personnel.
5.3.2 The contractor and all associated workers shall complete an Unexploded Ordnance Safety Brief prior to commencing work.
5.4 Comply with Spills/ Accidents/ Safety Requirements
5.4.1 The contractor shall have a list at the project site at all times of all the proper agencies to be notified along with their telephone numbers, in case of any herbicide, petroleum, oil or lubricant spills or accidents occurring during the project.
5.4.2 If an accident occurs, the contractor is responsible for notifying all proper agencies and the Camp Shelby Environmental Office immediately.
5.4.3 The contractor shall be solely responsible for the clean-up and restoration due to any accidents at no additional cost to the MSARNG.
5.4.4 The contractor shall have a chemical spill plan on board working equipment.
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance
Objective Performance Standard Acceptable Quality
Levels (AQL) Surveillance Method / By
Whom
5.1.1 Firebreak
construction/ maintenance
The contractor shall prepare firebreaks a minimum of 15 feet wide with minimal damage to adjacent trees >10 inches in diameter at breast height.
Firebreak falls within PWS parameters with less than 2% deficiency
Periodic Inspection / COR
5.1.4 Water bar-berm
construction
The contractor shall construct water bar-berms
Water bar-berms fall within PWS parameters with less than 2% deficiency
Periodic Inspection / COR
5.1.7 Water bar-berm
location
The contractor shall construct water bar-berms in accordance with the specified percent grade and spacing
Water bar-berms are located according to
PWS parameters with less than 2% deficiency
Periodic Inspection / COR
5.2 Resource Protection
Contractor shall treat gopher tortoises, cogongrass, Buffers are maintained around resources with less than 2% deficiency
Periodic Inspection / COR
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
1.4.5.3 AT Level 1
Awareness Training
Certificates
Provide within 30calendar days after employee completes training.
1 Electronic Submission
COR
1.4.5.4 iWATCH Training Certificates
Provide within 30 calendar days after employee completes training.
1 Electronic Submission
COR
1.4.9 Contract Manager
Provide within 30 days of receiving contract.
1 Electronic Submission
COR
TECHNICAL EXHIBIT 3
File details come from the government source that posted it. Updated .