Description_of_Breathing_Air_Compressor_and_Air_Purifier_Final.pdf
PDF 84 KB Posted
- Attached to
- Breathing Air Compressor and Air Purifier
- Solicitation number
- W9127Q-17-T-0068
About this file
Description of_Breathing Air Compressor and Air Purifier_Final
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_PreAnnouncement_Sheet_Breathing_Air.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description of Requirement
Breathing Air Compressor and Air Purifier, Bldg 235
1. Requirement Overview: The 172d Maintenance Squadron (MXS), Jackson MS, has a requirement to replace an existing breathing air compressor and air purifier with a new, more energy efficient product. These items are utilized in the manufacturing, painting, and repair of aircraft and equipment.
2. Scope of Work: Contractor shall furnish all labor, material, equipment, appliances and supervision necessary to remove an existing Gardner Denver brand breathing air compressor and
Del-Monox brand air purifier, to provide and install a new breathing air compressor and purifier, and to provide on-site operator training on the new equipment. Additional specifications follow.
2.1. Air Compressor Minimum Specifications:
- Industrial Machine rated at cubic feet per minute of 125PSI to 145PSI.
-Voltage 460v
-60 horse power, gear drive oil free
-Low Sound not to exceed 85dba
- High efficiency rotary screw
-Air cooled intercooler and aftercooler
-Floor mounted
-Compressor- safety relief valve
-Full sound enclosure with access doors or panels
-Pre-filtration and carbon monoxide monitor
-Compressor- Air intake filter
-ACFM (Actual cubic feet per minute) must meet or exceed 220
-Max PSIG (pounds per square inch gauge): 150
-Compressor installation location size restrictions: Length: 10 Feet. Width: 4 feet 8 inches.
Height: 6 feet
-Must include all user manuals needed to operate machine
2.2. Air Purifier Minimum Specifications:
-Must be rated to perform with the breathing air compressor cubic feet per minute (CFM) output
-Grade D breathing air quality
-Must meet or exceed the OSHA Breathing Air Quality Standards, respirator protective equipment standard as defined in 29 CFR (1910.134)
-Allowable oxygen range: 19.5-23.5%
-Maximum carbon monoxide levels: 10 part per million
-Less than 5 milligrams per cubic meter of hydrocarbons
-Less than 1000 parts per million carbon dioxide
-Lack of noticeable odor
-Must include all user manuals needed to operate machine
2.3. Removal, Installation, Disposal and Training: All work to be performed in the Corrosion
Control Hangar (Bldg 235 West end equipment room).
2.3.1. Removal of existing breathing air compressor (Mfg: Gardner Denver, Model: EWD99E) and air purifier (Mfg: Del-Monox, Model DM260) in accordance with industry standards and any applicable state, federal or local regulations.
2.3.2. Installation of new breathing air compressor and purifier and ensure units are fully operational per manufacturer specifications, upon installation completion.
2.3.3. Clean up and properly dispose of, off-site, all debris, old hardware, packaging, or other trash created during the removal/installation process.
2.3.4. Provide on-site operator training on the new air compressor and air purifier units; to include: correct operational processes and any regular minor maintenance or servicing required.
3. Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of
Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
4. Contractor Manpower Reporting Application (CMRA): Required for projects with a services cost greater than $2,500.
4.1. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 172d Maintenance
Squadron via the secure data collection site.
4.2. The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through
September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at http://www.ecmra.mil.
http://www.ecmra.mil/ http://www.ecmra.mil/