Oregon/Washington Clamshell Maintenance Dredging 2026
Solicitation number
W9127N26BA015
Issued by

About this file

This is a pre-solicitation meeting notice for a federal dredging contract. The contract, W9127N26BA009, is for Oregon Washington Clamshell Maintenance Dredging 2026, managed by the U.S. Army Corps of Engineers (USACE). The contract will be advertised on 29 May 2026, with bid opening on 29 June 2026, award targeted for 15 July 2026, Notice to Proceed on 22 July 2026, and project start on 22 July 2026. The contracting officer is Brandon Lasich, with Stephen Straw serving as the Resident Engineer/Administrative Contracting Officer post-award.

The scope encompasses 14 work locations across Oregon and Washington: 11 mandatory sites and 3 optional areas, totaling 456,000 cubic yards (CY) of base dredging and 32,100 CY of optional work. Mandatory locations include Chetco Boat Basin (9,000 CY), Port Orford (20,000 CY), Baker Bay (90,000 CY), Chinook (100,000 CY), Skipanon River (120,000 CY), Skamokawa Creek (30,000 CY), Wahkiakum Ferry Channel (7,000 CY), Longview Turning Basin (5,000 CY), Old Mouth Cowlitz (13,000 CY), Lower Vancouver Anchorage (55,000 CY), and Oregon Slough Lower (7,000 CY). Optional locations are USCG Cape Disappointment (15,000 CY), Port of Longview Willow Grove Boat Basin (3,100 CY), and Port of Longview Berths 1-9 (14,000 CY). Required depths range from 5 feet to 45 feet, with paid overdepth allowances specified for each location. The contractor has flexibility in work order sequencing provided all environmental work windows are met and no remobilization occurs between Oregon Coast and Columbia River areas. Specific constraints include third-party hydrographic/land surveys required in Port Orford with optional surveys at other locations, anticipated ship transiting at Longview facilities requiring operational coordination, and submerged utilities at Oregon Slough requiring contractor awareness.

View the file

Other files

File Type Posted
26BA015 Consolidation DF ORWA_CLAM_2026_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9127N26BA009

Oregon Washington Clamshell Maintenance Dredging 2026 Pre-Solicitation Meeting

29 April 2026 – 0930 PST

Call-in Number: +1 503-207-9433 Access Code: 567 699 256# Meeting ID: 993 103 173 038 Meeting Password: GX2bE2Ln

• Attendees:

• Introduction: The purpose of this meeting is to openly share information and discuss the project and assumptions prior to the solicitation being issued. Any items discussed are subject to change, and the final solicitation set should be reviewed when posted. This is now a planned dredging contract, and all communication regarding this contract should go through the proper channels.

• Corps of Engineers Roles and Responsibilities:

USACE: Primary Members of the Product Deliver Team:

Karla Ellis, Deputy Chief, Navigation Division Julia Keiter, PM MCR Side Channels Jessica Stokke, PM Columbia River Sam Lynch, PM Oregon Coast Alec Bittner, Dredging Contracts Team Lead Patricia Riley, Technical Lead Alyssa Moore, GIS Analyst Ian Lutjens, Contract Specialist Brandon Lasich, Contracting Officer

• Post-Award: Vancouver Resident Office:

Stephen Straw, Resident Engineer / ACO Nathan Miller, Project Engineer

Andrew Donahoe, Project Engineer

• Contract Schedule (Projected Dates):

Advertise 29 May 2026 Bid Opening 29 June 2026

Award 15 July 2026 NTP 22 July 2026

Project Start 22 July 2026

Order of Work: Starting Location and order of work is decided by the Contractor provided that all environmental work windows are met and no re-mobilization between the Oregon Coast and Columbia River occurs. Fourteen total work locations; eleven mandatory, and three option areas. See scope table below.

• Dredging Work Windows:

Chetco Boat Basin 15 July 2026 – 31 October 2026 Port Orford 1 May 2026 - 31 October 2026 Baker Bay 1 August 2026 - 15 December 2026 USCG Cape Disappointment (Optional) 1 June 2026 – 15 December 2026 Chinook 1 August 2026 - 15 December 2026 Skipanon River 1 August 2026 - 15 December 2026 Skamokawa Creek 1 August 2026 - 15 December 2026 Wahkiakum Ferry Channel 1 August 2026 - 15 December 2026 Port of Longview Willow Grove Boat Basin (Optional) 1 October 2026 - 31 December 2026* Longview Turning Basin 1 June 2026 - 15 December 2026 Port of Longview Berths 1-9 (Optional) 1 October 2026 to 31 December 2026* Old Mouth Cowlitz 1 September 2026 to 1 December 2026 Lower Vancouver Anchorage 1 August 2026 to 31 January 2027 Oregon Slough Lower 1 August 2026 to 15 December 2026

*Full placement site use starts 1 November, limited to one placement site 1 October to 1 November- See specifications

• Scope- Total Anticipated Cubic Yardage and Depth at Each Project:

Work Area Quantity Depths

Chetco Boat Basin 9,000 CY 13 ft required plus 1 ft Paid OD

Port Orford 20,000 CY 15 ft required plus 1 ft Paid OD 18 ft required plus 2 ft Paid OD

Baker Bay 90,000 CY 15-16 ft required plus 2 ft Paid OD 16-17 ft required plus 1 ft Paid OD

USCG Cape Disappointment (Optional) 15,000 CY 10 ft required plus 2 ft Paid OD

Chinook 100,000 CY 10-11 ft required plus 1 ft Paid OD

Skipanon River 120,000 CY 13-14 ft required plus 1 ft Paid OD 15-16 ft required plus 1 ft Paid OD

Skamokawa Creek 30,000 CY 7 ft required plus 1 ft Paid OD

Wahkiakum Ferry Channel 7,000 CY 10 ft required plus 1 ft Paid OD

Port of Longview Willow Grove Boat Basin 3,100 CY 5 ft required plus 1 ft Paid OD

Longview Turning Basin 5,000 CY

44 ft required plus 1 ft Paid OD

Port of Longview (Optional) 14,000 CY 41 and 44 ft required plus 1 ft Paid OD

Old Mouth Cowlitz 13,000 CY

9 ft required plus 1 ft Paid OD

Lower Vancouver Anchorage 55,000 CY 45 ft required plus 1 ft Paid OD

Oregon Slough Lower 7,000 CY 20 ft required plus 1 ft Paid OD

456,000 CY BASE TOTAL, 32,100 CY OPTION TOTAL

• Discussion Points:

• Third Party Hydrographic/Land Survey is required in Port Orford, optional in

Chetco, Baker Bay and/or Chinook, USCG Cape Disappointment, Port of Longview Willow Grove Boat Basin, and Port of Longview Berths 1-9.

• Survey Constraints (Multi‐beam vs Single beam) & Vertical side slope in some areas. Floating docks.

- Several optional CLINs/work areas. Reasons for optional work: USCG Cape Disappointment, Port of Longview Willow Grove Boat Basin, and Port of Longview Berths 1-9 are optional because we are not certain about dredging need, if shoaling develops, it typically happens after the spring snowmelt flows. The Contract will likely be structured to allow for any combination of optional work area CLINs to be exercised.

• Specific requirements for Port of Longview Work Plan in the Environmental Protection Spec and Port of Longview Berth 1-9 Dredging underpier sloughing dredge passes and surveys in Dredging and Channel Clearing Spec.

• At the Longview Turning Basin and Port of Longview work areas, anticipate ships transiting and mooring at berths and dredge contractor will need to move as needed to accommodate commercial vessel operations.

• Anchorage dredging is a new authority from WRDA 2020 so this area of Lower Vancouver anchorage has not been dredged before. If the contractor provides a 7-day notice, the River Pilots will keep the anchorage dredge area clear of ships.

• Port of Longview Willow Grove Boat Basin is very shallow with constrained access. The boat launch will be closed to public use during dredging operations for a maximum of three days.

• There are existing submerged utilities at Oregon Slough. The acceptance area was cleared to required depth most recently in 2022. All known information about the utilities will be provided in the contract attachment.