This document is a Special Notice prepared in accordance with the Federal Acquisition Regulation (FAR), announcing the U.S. Army Corps of Engineers' (USACE) intent to award a firm-fixed price contract for the purchase and installation of Cisco network switches for the John Day Powerhouse Generator Cooling Water project.

The procurement requires two (2) Cisco C9300-24S switches to aggregate communications from sixteen cooling system Programmable Logic Controllers (PLCs) into the plant's Human-Machine Interface (HMI) system, as well as sixteen (16) Cisco C9300-24T switches for future network expansion in the Remote Terminal Unit (RTU) cabinets. The switches will connect the generator cooling PLCs and other devices using Ethernet and fiber optic cabling. USACE has justified the sole-source procurement of Cisco equipment due to standardization, interoperability, and personnel training requirements. The Government intends to solicit through the CHESS contract vehicle around June 2024. Interested parties may submit capability statements by the July 5, 2024 deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS IS A SPECIAL NOTICE PREPARED IN ACCORDANCE WITH FEDERAL ACQUISITION

REGULATION (FAR) SUBPART 5.2 “SYNOPSES OF PROPOSED CONTRACT ACTIONS”

NAICS 334513, Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

Response Deadline: 05-JULY-2024

The U.S. Army Corps of Engineers (USACE), Portland District (NWP) intends to compete/award a firm-fixed price (FFP) for supplies as a competitive procurement on CHESS.

REASON FOR SINGLE SOURCE ACQUISITION:

The statutory authority for this 10 United States Code 3406(c)(5) as implemented in Federal Acquisition Regulation16.505(b)(2)

John Day Generator Cooling Water project requires the purchase and installation of two (2) Cisco C9300- 24S network switches to aggregate communication of all sixteen cooling system PLCs into plant HMI system. These network switches will be installed in the control room. The PLC connections will be made over existing fiber runs between unit RTU cabinets and control room.

The purchase and installation of sixteen (16) Cisco C9300-24T network switches is required for future network expansion. Switches will be installed in each unit RTU cabinet. Generator cooling PLC and other devices will be connected to this switch using ethernet cooper connection, while the uplink to control room will utilize existing fiber runs.

Network Equipment List

Part Number Description Qty

Group Name: ER Room

C9300-24S-A Catalyst 9300 24 GE SFP Ports, modular uplink Switch 2

C9300-NW-A-24 C9300 Network Advantage, 24-port license 2

SC9300UK9-177 Cisco Catalyst 9300 XE 17.7 UNIVERSAL UNIVERSAL 2

PWR-C1-715WAC-P 715W AC 80+ platinum Config 1 Power Supply 2

PWR-C1-715WAC-P/2 715W AC 80+ platinum Config 1 SecondaryPower Supply 2

CAB-TA-NA North America AC Type A Power Cable 4

C9300-NM-4G Catalyst 9300 4 x 1GE Network Module 2

C9300-SSD-NONE No SSD Card Selected 2

TE-C9K-SW TE agent for IOSXE on C9K 2

C9300-DNA-A-24S C9300 DNA Advantage, 24-port Fiber Term Licenses 2

C9300-DNA-A-24S-5Y C9300 DNA Advantage, 24-Port Fiber, 5 Year Term License 2

PI-LFAS-T Prime Infrastructure Lifecycle & Assurance Term - Smart Lic 2

PI-LFAS-AP-T-5Y PI Dev Lic for Lifecycle & Assurance Term 5Y 2

TE-EMBEDDED-T Cisco ThousandEyes Enterprise Agent IBN Embedded 2

TE-EMBEDDED-T-5Y ThousandEyes - Enterprise Agents 2

NETWORK-PNP-LIC Network Plug-n-Play Connect for zero-touch device deployment 2

GLC-GE-100FX 100FX SFP on GE ports 32

C9300-STACK-NONE No Stack Cable Selected 2

C9300-SPWR-NONE No Stack Power Cable Selected 2

GLC-SX-MMD++= 1000BASE-SX SFP transceiver module, MMF, 850nm, DOM 4

GLC-TE++= 1000BASE-T SFP, TAA Compliant. 4

Group Name: RTU Cabinet

C9300-24T-A Catalyst 9300 24-port data only, Network Advantage 16

C9300-NW-A-24 C9300 Network Advantage, 24-port license 16

SC9300UK9-177 Cisco Catalyst 9300 XE 17.7 UNIVERSAL UNIVERSAL 16

PWR-C1-350WAC-P 350W AC 80+ platinum Config 1 Power Supply 16

PWR-C1-715WAC-P/2 715W AC 80+ platinum Config 1 SecondaryPower Supply 16

CAB-TA-NA North America AC Type A Power Cable 32

C9300-SSD-NONE No SSD Card Selected 16

TE-C9K-SW TE agent for IOSXE on C9K 16

C9300-DNA-A-24 C9300 DNA Advantage, 24-port Term Licenses 16

C9300-DNA-A-24-5Y C9300 DNA Advantage, 24-Port, 5 Year Term License 16

PI-LFAS-T Prime Infrastructure Lifecycle & Assurance Term - Smart Lic 16

PI-LFAS-AP-T-5Y PI Dev Lic for Lifecycle & Assurance Term 5Y 16

D-DNAS-EXT-S-T Cisco DNA Spaces Extend Term License for Catalyst Switches 16

D-DNAS-EXT-S-5Y Cisco DNA Spaces Extend for Catalyst Switching - 5Year 16

TE-EMBEDDED-T Cisco ThousandEyes Enterprise Agent IBN Embedded 16

TE-EMBEDDED-T-5Y ThousandEyes - Enterprise Agents 16

C9300-NM-4G Catalyst 9300 4 x 1GE Network Module 16

NETWORK-PNP-LIC Network Plug-n-Play Connect for zero-touch device deployment 16

C9300-STACK-NONE No Stack Cable Selected 16

C9300-SPWR-NONE No Stack Power Cable Selected 16

GLC-SX-MMD++= 1000BASE-SX SFP transceiver module, MMF, 850nm, DOM 32

BACKGROUND: The John Day Powerhouse has experienced a large number of issues with generator cooling system causing damage to the generator windings, winding insulation and other components. To mitigate this issue a cooling system is getting an upgrade. In order to efficiently control and monitor all unit cooling systems from a control room, a new network has to be constructed using Cisco hardware listed above.

JUSTIFICATION: John Day Project uses Cisco networking equipment throughout the plant, and the project personnel is trained to operate and troubleshoot this equipment. Equipment used in DOD information systems must be approved for use by either DISA (DOD Information Systems Agency), or the Information Systems Security Management (ISSM) proponent. For USACE, this is the USACE Critical Infrastructure and Cybersecurity Mandatory Center of Expertise (UCIC-MCX). DISA approves the use of equipment via their approved product list website https://aplits.disa.mil/processAPList.action).

For UCIC-MCX approval, USACE (HDC or project personnel) corresponds with the Regional Information Systems Security Manager (RISSM). These agencies consider the manufacture country of origin and test the equipment to ensure that it complies with RMF stands and functionality with other DOD information system products. The parts listed above have already been approved for use at USACE facilities.

IMPACT: Procurement of another brand name hardware and software would cause issues with standardization, interoperability, and stability. An alternative brand of network equipment vendor will require the project personnel and design engineers to expend additional time and resources to acquire the training and knowledge necessary to both design, procure, and maintain a network if different brand equipment is used.

The Government intends to solicit on CHESS directly for this project on or around JUNE 2024.

Currently, a solicitation does not exist. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency.

*NO PHONE INQUIRIES, PLEASE.

CAPABILITY STATEMENT SUBMISSION REQUIREMENTS

(PLEASE REVIEW ALL BELOW)

Point of Contact name, email address and phone number, CAGE code and SAM UEI number (if available); In the event that the organization is a small business, please state the category of small business, such as 8(a), HUBZone, SDVOSB/VOSB, Women-Owned Small Business.

The Government will evaluate the capabilities of an interested party based on their ability to provide and install the above listed items, with all original warranties, support, terms, and conditions.

Send responses, labeled as “W9127N24Q0109 Single Source CISCO Software and Hardware for JD Gen System,” to the following: Andrea.K.Smothers@usace.army.mil & Andrew.J.Sprys@usace.army.mil