This document is a Vendor Question and Answer Sheet related to a federal contract opportunity for the repair of the Survey Vessel (SV) REDLINGER.
The key details are:
- The 300-mile radius restriction from the vessel's home station in St. Helens, OR is in nautical miles.
- Drydock is an acceptable method for the crane or travel lift requirement in work item 5.2, but marine railway is likely not due to work performed underneath the hull.
- The 4 hatches needing repair can be addressed using overhaul kits, and any work beyond that will require a Contract Funds Request (CFR).
- Ship check days are scheduled for the SV REDLINGER on May 7-9, 2024, with contact information provided.
- The reduction gear box disassembly/assembly requirement has been removed from the Performance Work Statement (PWS).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. The restric on is a 300 mile radius from the vessel’s home sta on in St. Helens, OR. Can you confirm if this is driving or Nau cal miles?
This is in nau cal miles.
2. The solicita on for the Elton and Redlinger specifies a crane or travel li as the li ing possibili es in work item 5.2. Is the use of a drydock or marine railway acceptable?
Drydock works. Marine railway probably not due to work performed underneath hull.
3. The PWS states that 4 hatches need to be repaired. What kind of repairs are needed? Do they need to be fully removed and replaced or do they just need to be resealed, or something else?
Repaired with overhaul kits. If work is needed beyond the overhaul kit a CFR shall be submi ed.
4. Is their going to be a ship check day?
Redlinger can be seen any me Tuesday 7-May-2024 to 9-May-2024 before 2:00PM each day.
Elton can be seen possibly Thursday 9-May-2024 once the vessel returns from survey. POC to contact for SV Elton ship check is Will Johnson 503-717-2341.
5. The disassembly/assembly of reduc on gear box, what is inten on? Is this just to inspect and confirm no damage? Is it to perform maintenance? Is their known damage that needs repair?
The PWS has been corrected in sec on 5.7 and the reduc on gear is no longer on the PWS.