A.02 2024 PWS Annual SLOPS Removal.pdf
PDF 468 KB Posted
- Attached to
- FY24 SLOPS Removal Federal contract opportunity
- Solicitation number
- W9127N24Q0066
About this file
This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide labor, materials, and equipment to perform annual removal of oily slops (waste) from two U.S. Army Corps of Engineers dredge vessels, the Essayons and the Yaquina.
The key details are: The contractor will be required to remove up to 4,500 gallons of slops from the Essayons and up to 2,500 gallons from the Yaquina at various ports in Oregon and Washington between April and December 2024. The contractor must supply all necessary equipment and follow all applicable safety and environmental regulations. The period of performance is April 12, 2024 through December 7, 2024, with specific service dates provided. Pricing is requested for the scheduled slops removal services. The contract will be administered by the U.S. Army Corps of Engineers, Portland District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.04 SCA Wage Determination 2015-5577.pdf | ||
| B.04 SCA Wage Determination 2015-5563.pdf | ||
| B.04 SCA Wage Determination 2015-5529.pdf | ||
| B.04 SCA Wage Determination 2015-5579.pdf | ||
| B.08_CombinedSynopsisSolicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9127N23Q0066
PWS: FY24 SLOPS Removal
1. General Contractor to load from dredge Essayons approximately 4,500 and from dredge Yaquina 2,500 gallons of oily waste (slops), across the water transfer.
2. References Port or Starboard side poop deck frame 130. Vessel has a female 2” cam-lock discharge.
Contractor shall supply a 2” male cam-lock with shut off valve for off-loading.
3. GFM
None
4. Safety Precautions Prior to commencing work, follow vessel’s LOTO policy and procedures.
Follow all applicable state, local, and federal requirements including those specified in EM-385- 1-1 latest revision.
Declaration of inspection, comms, safety shut-downs, Bravo flag, no open lights, smoking, etc.
signage will be in place prior to commencement of discharge.
5. Specifications Contractor to supply all labor, materials and equipment to complete the following:
Supply vacuum truck, 150’ of 2” hose with male 2” cam-lock fitting with shut off valve and cap to fasten to vessels discharge piping. Vessel will supply communications via handheld radio.
Contractor to receive up to approximately 4,500 and 2,500 gallons of oily slop water from the vessel manifold located at Frame 130 either Port or Stbd as needed.
Work expected to be performed on the following dates and locations:
Dredge Essayons:
April 12, 2024 - Port of Astoria, 100 Portway St Astoria, OR 97103 May 02, 2024 - Port of Astoria 100 Portway St Astoria, OR 97103 June 27, 2024 - Port of Astoria 100 Portway St Astoria, OR 97103 August 22, 2024 - Port of Astoria 100 Portway St Astoria, OR 97103 October 03, 2024 - Port of Longview 10 International Way, Longview WA 98632 November 14, 2024 - Port of Portland Terminal 23556 NW Front Ave 97210 Drdge Yaquina:
April 16, 2024 - Port of Portland Terminal 2 3556 NW Front Ave Portland, OR 97210 June 11, 2024 - Coos Bay June 23, 2024 - Port of Portland Terminal 2 3556 NW Front Ave Portland, OR 97210 or Port of Longview 10 International Way Longview, WA 98632 August 20, 2024 - Port of Portland Terminal 2 3556 NW Front Ave Portland, OR 97210 or Port of Longview 10 International Way Longview, WA 98632 September 17, 2024 – Newport, OR If the above locations or dates must be changed for any reason, notification will be given a minimum of seven (7) days prior to required discharge date to allow for scheduling of personnel and equipment. The period of performance for this requirement shall be 12 April 2024 through 7 December 2024.
Contractor shall only invoice for days slops removal services were provided. The Government will confirm date of service 7 days prior to scheduled date that the services are still needed.
Provide pricing for the removal and disposal of not more than 4,500 and 2,500 gallons of slops from each of the locations listed above. It is assumed the fluids being disposed are not contaminated with salts or other materials. If contamination is found in samples, Contractor shall submit a CFR detailing the nature of contaminants and additional disposal fees, if any.
Contractor shall be in compliance with all state, federal local laws and guidelines for over the water transfer. Contractor shall make all notifications if required.
6. Inspection
7. Testing Contractor shall supply sample bottles if they choose to sample oily water.
8. Anti-terrorism Operational Security General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection 8. Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
CONTRACT ADMINISTRATOR:
Contract will be administered by:
Department of the Army, Portland District Corps of Engineers
Attn: CENWP-CT-P, Ian Lutjens P. O. Box 2946 Portland, Oregon 97208-2946 Name: Ian Lutjens E-mail: ian.k.lutjens@usace.army.mil
INVOICE SUBMITTAL:
Submit Original Invoice to:
U.S. Army, COE, Finance Center Attn: CEFC-AO-P 5722 Integrity Drive Millington, TN 38054-5005 One Invoice Copy to Jon Sandstrom and Trista Stark:
jon.j.sandstrom@usace.army.mil trista.m.stark@usace.army.mil mailto:Brandon.M.Lasich@usace.army.mil mailto:jon.j.sandstrom@usace.army.mil mailto:trista.m.stark@usace.army.mil