This document is an Abstract of Offers for Solicitation W9127N24B0013 for the Oregon/Washington Coast Clamshell Maintenance Dredging 2024 project.

The U.S. Army Corps of Engineers, Portland District has a requirement to perform clamshell dredging at seven locations in Oregon and Washington. The scope includes dredging and placement of materials at Port Orford, Charleston, Baker Bay, Chinook, Longview Turning Basin, Old Mouth Cowlitz, and the Columbia River at Vancouver. The overall magnitude of construction is between $5,000,000 and $10,000,000. The solicitation was released on June 24, 2024, and bids are due on July 24, 2024 at 11:00 AM Pacific Time. The abstract provides the bid prices and other details for the three offerors - HME Construction Inc, The Dutra Group, and a third unnamed offeror. It includes both mandatory and optional contract line items. The government estimate is not provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO. 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1

6/24/2024 7/24/2024

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR

X A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY B. BID SECURITY

(WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED

(INCLUDING PROFIT) YES YES YES

6. NUMBER OF ADDENDA ISSUED

7A.

ITEM D. E. UNIT F. ESTIMATED D. UNIT F. AMOUNT D. UNIT F. AMOUNT D. UNIT F. AMOUNT

NO. QUANTITY UNIT PRICE AMOUNT PRICE PRICE PRICE

MANDATORY CLINS

0001 Mobilization and Demobilization 1 JOB 1,600,000.00$ 1,600,000.00$ 2,150,000.00$ 2,150,000.00$ 1,750,000.00$ 1,750,000.00$ 0002 Dredging and Placement of Materials: Port Orford 0002AA First 11,000 Cubic Yards 11,000 CY 12.60$ 138,600.00$ 27.00$ 297,000.00$ 15.00$ 165,000.00$ 0002AB Above 11,000 Cubic Yards 8,000 CY 11.90$ 95,200.00$ 25.00$ 200,000.00$ 11.50$ 92,000.00$ 0003 Dredging and Placement of Materials: Charleston Channel 0003AA First 35,000 Cubic Yards 35,000 CY 13.60$ 476,000.00$ 30.00$ 1,050,000.00$ 28.00$ 980,000.00$ 0003AB Above 35,000 Cubic Yards 15,000 CY 12.80$ 192,000.00$ 27.00$ 405,000.00$ 15.00$ 225,000.00$ 0004 Dredging and Placement of Materials: Baker Bay, RM 00+10+00 to 03+10+00 0004AA First 45,000 Cubic Yards 45,000 CY 13.60$ 612,000.00$ 14.00$ 630,000.00$ 30.00$ 1,350,000.00$ 0004AB Above 45,000 Cubic Yards 20,000 CY 11.90$ 238,000.00$ 14.00$ 280,000.00$ 20.00$ 400,000.00$ 0005 Dredging and Placement of Materials: Chinook 0005AA First 60,000 Cubic Yards 60,000 CY 12.80$ 768,000.00$ 14.00$ 840,000.00$ 22.00$ 1,320,000.00$ 0005AB Above 60,000 Cubic Yards 15,000 CY 11.20$ 168,000.00$ 14.00$ 210,000.00$ 15.00$ 225,000.00$

SUBTOTAL FOR MANDATORY LINE ITEMS 4,287,800.00$ 6,062,000.00$ 6,507,000.00$ -$

OPTIONAL CLINS

0006 Incremental Mobilization and Demobilization: Longview Turning Basin and Old Mouth

Cowlitz

1 JOB 290,000.00$ 290,000.00$ 265,000.00$ 265,000.00$ 100,000.00$ 100,000.00$

0007 Dredging and Placement of Materials: Longview Turning Basin 0007AA First 2,000 Cubic Yards 2,000 CY 24.10$ 48,200.00$ 25.00$ 50,000.00$ 42.00$ 84,000.00$ 0007AB Above 2,000 Cubic Yards 3,000 CY 16.10$ 48,300.00$ 25.00$ 75,000.00$ 30.00$ 90,000.00$ 0008 Dredging and Placement of Materials: Port of Longview 0008AA First 4,000 Cubic Yards 4,000 CY 26.20$ 104,800.00$ 36.00$ 144,000.00$ 60.00$ 240,000.00$ 0008AB Above 4,000 Cubic Yards 4,000 CY 24.90$ 99,600.00$ 36.00$ 144,000.00$ 45.00$ 180,000.00$ 0009 Dredging and Placement of Materials: Old Mouth Cowlitz 0009AA First 5,000 Cubic Yards 5,000 CY 15.60$ 78,000.00$ 17.00$ 85,000.00$ 31.00$ 155,000.00$ 0009AB Above 5,000 Cubic Yards 7,000 CY 14.00$ 98,000.00$ 15.00$ 105,000.00$ 20.00$ 140,000.00$ 0010 Incremental Mobilization and Demobilization: Vancouver Lower Anchorage 1 JOB 210,000.00$ 210,000.00$ 125,000.00$ 125,000.00$ 100,000.00$ 100,000.00$ 0011 Dredging and Placement of Materials: Vancouver Lower Anchorage 0011AA First 40,000 Cubic Yards 40,000 CY 15.70$ 628,000.00$ 17.00$ 680,000.00$ 33.00$ 1,320,000.00$ 0011AB Above 40,000 Cubic Yards 10,000 CY 11.30$ 113,000.00$ 15.00$ 150,000.00$ 20.00$ 200,000.00$

SUBTOTAL FOR OPTIONAL LINE ITEMS 1,717,900.00$ 1,823,000.00$ 2,609,000.00$ -$

6,005,700.00$ 7,885,000.00$ 9,116,000.00$ -$

NSN 7540-01-150-0981

ABSTRACT OF OFFERS

W9127N24B0013

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

Oregon/Washington Coast Clamshell Maintenance Dredging 2024

7B. DESCRIPTION OF OFFERED ITEM

TOTAL

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

HME Construction Inc

STANDARD FORM 1419 (10-3)

The Dutra Group

B. BID SECURITY

2024-07-24T11:07:31-0700
SMOTHERS.ANDREA.KATHERINE.1243096681