W9127N24B0003 WCHC24 Abstract.pdf

PDF 247 KB Posted

Attached to
West Coast Hopper Maintenance Dredging 2024
Solicitation number
W9127N24B0003
Issued by

About this file

This document provides details on a federal solicitation for hopper dredging services on the West Coast of the United States. The U.S. Army Corps of Engineers, Portland District, is seeking a contractor to perform hopper dredging at multiple locations including Humboldt Bay, CA, the Mouth of the Columbia River in Oregon and Washington, the Lower Columbia River in Oregon and Washington, and Grays Harbor, WA. The scope of work involves furnishing all supervision, engineering, labor, materials and equipment to complete the dredging work in accordance with contract requirements. The magnitude of construction costs is estimated between $10 million and $50 million. The solicitation was released on January 30th, 2024 and bids are due by February 29th, 2024 at 11:00 AM Pacific Time. Inquiries are to be directed to three specified contracting officers at the USACE-NWP Contracting Office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO. 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1

1/30/2024 2/29/2024

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR

X A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY

(WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED

(INCLUDING PROFIT) YES YES

6. NUMBER OF ADDENDA ISSUED

7A.

ITEM D. E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED

NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

MANDATORY CLINS

0001 Mobilization and Demobilization 1 JOB 8,200,000.00$ 8,200,000.00$ 5,450,000.00$ 5,450,000.00$ -$ -$ 0004 HUM, Bin Measure to Required Depth, HOOD Ocean Placement 600,000 CY 4.30$ 2,580,000.00$ 5.30$ 3,180,000.00$ -$ -$ 0006 LCR Maintenance, RM 3+00 to RM 25+00, Bin Measure, Flow Lane (FL) Placement 200,000 CY 4.10$ 820,000.00$ 3.50$ 700,000.00$ -$ -$ 0007 LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, Flow Lane (FL) Placement 650,000 CY 4.70$ 3,055,000.00$ 4.70$ 3,055,000.00$ -$ -$ 0010 LCR Maintenance, RM 3+00 to RM 105+00, Bin Measure to Required Depth 250,000 CY 4.10$ 1,025,000.00$ 4.20$ 1,050,000.00$ -$ -$ 0011 LCR Increment Transit Miles for Material Placement Site (other than five miles one-way) - CY x Miles 3,300,000 CY 0.30$ 990,000.00$ 0.35$ 1,155,000.00$ -$ -$

0012 LCR Intra-Project Transit Miles 250 MILES 417.00$ 104,250.00$ 450.00$ 112,500.00$ -$ -$ 0013 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 1,300,000 CY 3.70$ 4,810,000.00$ 4.20$ 5,460,000.00$ -$ -$ 0016 MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement 300,000 CY 2.30$ 690,000.00$ 2.20$ 660,000.00$ -$ -$

SUBTOTAL FOR MANDATORY LINE ITEMS 22,274,250.00$ 20,822,500.00$ -$ -$

OPTIONAL CLINS

0002 GRY, Incremental Mobilization and Demobilization 1 JOB 210,000.00$ 210,000.00$ 550,000.00$ 550,000.00$ -$ -$

0003 GRY, Bin Measure to Required Depth, SBBUS and Point Chehalis Placement 300,000 CY 5.10$ 1,530,000.00$ 4.70$ 1,410,000.00$ -$ -$

0005 HUM, Bin Measure to Required Depth, HOOD Ocean Placement 300,000 CY 4.30$ 1,290,000.00$ 5.00$ 1,500,000.00$ -$ -$

0008 LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, Flow Lane (FL) Placement 350,000 CY 4.70$ 1,645,000.00$ 4.60$ 1,610,000.00$ -$ -$ 0009 LCR Maintenance, RM 3+00 to RM 105+00, Pre/Post Dredge Survey, Flow Lane (FL) Placement 350,000 CY 4.70$ 1,645,000.00$ 4.30$ 1,505,000.00$ -$ -$

0014 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 300,000 CY 3.60$ 1,080,000.00$ 3.50$ 1,050,000.00$ -$ -$

0015 MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 250,000 CY 3.80$ 950,000.00$ 3.00$ 750,000.00$ -$ -$

0017 MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement 300,000 CY 2.30$ 690,000.00$ 2.20$ 660,000.00$ -$ -$

0018 MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement 250,000 CY 2.30$ 575,000.00$ 2.00$ 500,000.00$ -$ -$

0019 MCR, Bin Measure, Increment for Operations and Maintenance South Jetty Site (SJS) Placement 250,000 CY 1.90$ 475,000.00$ 0.50$ 125,000.00$ -$ -$

SUBTOTAL FOR OPTIONAL LINE ITEMS 10,090,000.00$ 9,660,000.00$ -$ -$

32,364,250.00$ 30,482,500.00$ -$ -$

NSN 7540-01-150-0981

West Coast Hopper Maintenance Dredging 2024

7B. DESCRIPTION OF OFFERED ITEM

TOTAL

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

Manson Construction Co.

5209 E Marginal Way S Seattle, WA 98134

B. BID SECURITY B. BID SECURITY

STANDARD FORM 1419 (10-3)

ABSTRACT OF OFFERS

W9127N24B0003

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

2024-02-29T11:04:45-0800
FLORES.KRISTEL.MADARIAGA.1280597402
2024-02-29T11:14:43-0800
JOHNSON.BRIAN.M.1248919244

File details come from the government source that posted it. Updated .