Questions from Contractors.pdf
PDF 285 KB Posted
- Attached to
- GREEN PETER DAM DIESEL GENERATOR RENTAL
- Solicitation number
- W9127N-23-Q-0079
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127N23Q0079 Solicitation.pdf | ||
| A.02 Statement Of Work (SOW).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Does the generator and 1000 fuel tank need to arrive full or will the US Army Corps of Engineers take care of fueling?
The generator and 1000 fuel tank needs to arrive full. US Army Corps of Engineers will take care of refueling as needed during the lease/rental agreement.
2. Is there an anticipated number of hours this generator will run per month for the deep drawdown test?
a. For standby emergency generators the rate is typically a Single Shift rate, however if it is used there are different rates for Double and Triple Shift? If the generator is used, would we be able to do change order for any shift differential?
There are no anticipated number of hours per month the generator will run because it will be used for standby mode only.