This document provides details for a solicitation seeking multi-disciplined engineering and design services. The U.S. Army Corps of Engineers Portland District is soliciting proposals for indefinite delivery, firm-fixed price multiple award task order contracts to provide professional architect-engineering services in the areas of dams and appurtenant structures, fish conveyance systems, flood risk reduction, and coastal, rivers, and harbors projects. The base period of performance is five years with a total shared capacity among contracts of $49 million and a minimum task order amount of $5,000. Proposals are due in the fourth quarter of fiscal year 2024. The North American Industry Classification code is 541330 with an average annual receipts size standard of $22.5 million. While unrestricted, the contracting officer may reserve up to three awards for small businesses and set aside task orders at the small business level.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Public (Public)
Bid Inquiry Contractor Report All Inquiries
Project: AE Multidisciplined engineering and Design Services MATOC Review: W9127N22R0028 (00001) (sorted by CommentID ) Displaying 40 inquiries.
Id Discipline Sheet Detail Spec
10596786 Contracting A-E Synopsis-Section IV Sub Section 2- SF 330 Part I- Section E
SF330 Part I- Section E
Comment Classification: Public (Public)
First question- Section III Project Information has five categories. But in Section E- four categories are listed - skipped the Flood Risk Management category. I was wondering if that is intentional and if so- why.
Second Question-Under SF330 Part I- Section E submittal requirements, the hydraulic engineer as a professional category is listed only under the 'Dams and Appurtenant Structures'. But the description of SOW within this solicitation includes hydraulic engineering as a discipline of work required under the Fish Conveyance, Flood Risk Management, and Coastal, River, and Harbor categories. As such - I was wondering if the District would like to include Hydraulic Engineer as a professional list for the remaining three categories. Based on our experience with task orders in all these categories, hydraulic engineer is a required category. Thank you.
On: Jan 13 2024.
Government Response. . Flood Risk Management is included along with Dams and Appurtenant Structures in Key Personnel Position (1) since the skills for Key Personnel positions for Dams and Appurtenant Structures is considered very similar to the skills needed for Key Personnel for Flood Risk Management and could be considered to be relevant to either category.
A Hydraulic Engineer Key Personnel Position should be included for the first 3 functional areas:
(1) Dams and Appurtenant Structures AND Flood Risk Management
(2) Fish Conveyance Systems
(3) Coastal, Rivers, and Harbors On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10597237 Contracting A-E Synopsis Section IV Submission Requirements A. General Instructions SF 330
Comment Classification: Public (Public)
Are we required to use the fillable version of the SF 330 form from the GSA website, or can we use a Word version of the form as long as the form remains unchanged.
On: Jan 15 2024.
Government Response. . In order to standardize submittals from industry, per Section IV.A General Instructions:
"firms must use the fillable version of SF 330 available on the U.S. General Services Administration website." The most recent SF330 posted to GSA should be used. On: Jan 16 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10597280 Contracting A-E Synopsis Section IV Submission Requirements B. Supplemental Instructions 3. SF 330 Part I, Section F Comment Classification: Public (Public)
Is there a page limitation for the Section F projects (per project)
On: Jan 15 2024.
Government Response. . There is no page limit for Section F. Use Section H of the SF330 to provide additional information as needed. Ensure any additional information submitted via Section H clearly references which project is being expanded on.
Note: Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal. Extraneous information provided in the proposals will not be considered in the evaluations;
therefore, the Offeror should provide only information that satisfies the solicitation requirements. On: Jan 16 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive. CBII Help https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=SpecText https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
10597296 Other Submission Requirements Submission Requirements Submission Requirements
Comment Classification: Public (Public)
Will the District reconsider the use of the GSA SF330 forms? They are difficult to work within. They do not provide for the ability to provide pictures nor customization.
If this request is not granted, please advise:
1. If we are allowed more than one page per resume for Section E.
2. If we are allowed an additional page for Section F projects other than for Box 25.
3. Please advise how many pages we are allowed for Section H.
On: Jan 15 2024.
Government Response. . 1. In order to standardize submittals from industry, per Section IV.A General Instructions:
"firms must use the fillable version of SF 330 available on the U.S. General Services Administration website." The most recent SF330 posted to GSA should be used.
2.There is no page limit for Section F. Use Section H of the SF330 to provide additional information as needed.
Ensure any additional information submitted via Section H clearly references which project is being expanded on.
3. There is no page limit for Section H.
Important Note: Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal. Extraneous information provided in the proposals will not be considered in the evaluations; therefore, the Offeror should provide only information that satisfies the solicitation requirements. On: Jan 16 2024 Government Response. . The text below appends or clarifies ALL previous replies.
Offerors may provide up to two (2) Section E pages for each Resume. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10597305 Contracting A-E Synopsis Section IV Submission Requirements B. Supplemental Instructions 2. Sf 220 Part I, Section E Comment Classification: Public (Public)
Can the following key personnel positions be added to Dam and Appurtenant Structures and Flood Risk Management:
Geologic Seismic Engineer
On: Jan 15 2024.
Government Response. . Geologic and Seismic Engineers are not considered Key Personnel Positions for work anticipated under this MATOC, and therefore will not be added or required. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10597378 Contracting A-E Synopsis Section IV Submission Requirements B. Supplemental Instructions 6. Past Performance
Comment Classification: Public (Public)
The synopsis references "Attachment B" - Past Performance Questionnaire - but there was no Attachment B posted.
On: Jan 15 2024.
Government Response. . The Past Performance Questionnaire will be added to SAM.gov on 16 January 2024. On:
Jan 16 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10598488 Contracting Submission Requirements Submission Requirements Submission Requirements
Comment Classification: Public (Public)
Will the District please update the submission instructions to DoD Safe? The current instructions:
Responses to this Sources Sought notice must be submitted electronically (via email) Subject: W9127N22R0028, Multi-Disciplined Engineering and Design Services. Please send to Cory Pfenning, Contracting Officer, at cory.r.pfenning@usac e.army.mil and Nicole Adams, Contract Specialist, at nicole.a.adams@usac e.army.mil CBII Help https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
On: Jan 16 2024.
Government Response. . Due to the potential file size of the completed SF330s, contractors can submit its proposal and required documents via DOD SAFE (https://safe.apps.mil/) rather than via email.
Recipients must include Cory Pfenning and Nicole Adams. See synopsis for email addresses. On: Jan 16 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10602635 General 1 1 1 Comment Classification: Public (Public)
Solicitation page 7, 5. SF330 Part I, Section H asks for one Part I, Section H for each of the two requirements below: Small Business Participation and Volume of DoD Contracts. Section H pages are unlimited per ProjNet Inquiry 10597296. Can we use Section H to further address selection criteria A through E here?
On: Jan 17 2024.
Government Response. . There is no page limit for Section H. Section H should not be used to provide additional information for all Sections.
Sections A and B are Contract and Contact Information and do not require additional information.
Section C: The synopsis states, "If additional room is needed to complete Part I, Section C because the proposed team consists of more than six firms, attach as many additional Part I, Section Cs as necessary to complete Part I, Section C."
Section D: A separate attachment.
Section E: Up to 2 pages Section E pages may be provided for each resume. (See Bidder Inquiry 10602656) On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10602643 General 1 1 1 Comment Classification: Public (Public)
Page 6, 2. SF330 Part I, Section E, (1) Dams and Appurtenant Structures AND Flood Risk Management. Is the government looking for Key Personnel Positions a. through g (7 staff positions) for Dams and Appurtenant Structures AND 7 staff positions for Flood Risk Management? Or is the intent that the 7 staff positions for Dams and Appurtenant Structures will be the same staff proposed for Flood Risk Management?
On: Jan 17 2024.
Government Response. . The skills for Key Personnel positions for Dams and Appurtenant Structures is considered very similar to the skills needed for Key Personnel for Flood Risk Management and could be considered to be relevant to either category. Only 7 staff positions total should be provided for Key Personnel (1). On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10602656 General 1 1 1 Comment Classification: Public (Public)
Are we allowed more than one page per resume for Section E?
On: Jan 17 2024.
Government Response. . Offerors may provide up to two (2) Section E pages for each Resume. Section H should NOT be used to provide additional information. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10605313 General 1 1 1 Comment Classification: Public (Public)
Solicitation page 7, 54. SF 330, Part I, Section G says "submit up to four Section Gs as needed..."
Since we can submit 52 key personnel for the five functional areas, we will need three Section G pages to show all 52 key personnel, because the fillable pdf allows 20 names on each sheet.
Since we can submit 12 projects, we will need six total pages of Section Gs to accommodate all 52 key personnel and 12 projects. Please increase the number of Section G pages from four to six.
On: Jan 18 2024.
CBII Help https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
Government Response. . Offerors may submit up to six (6) Section Gs to cover all 12 projects, or may choose to use the Section G - 12 Projects Attachment posted to SAM.gov.
Note: With the addition of Hydraulic Engineer to Key Positions (2) Fish Conveyance Systems and (3) Coastal, Rivers, and Harbors, there are only 23 Key Personnel listed for Section E (Dams and Appurtenant Structures AND Flood Risk Management share Key Personnel as the skills needed for each are considered relevant for both categories) for a max total of 46 Key Personnel. On: Jan 24 2024 Government Response. . The text below appends or clarifies ALL previous replies.
*Corrects count of Key positions from 23 to 21. See Amendment 0001_13FEB24 on SAM.gov for list of positions.
Offerors may submit up to six (6) Section Gs to cover all 12 projects, or may choose to use the Section G - 12 Projects Attachment posted to SAM.gov.
Note: With the addition of Hydraulic Engineer to Key Positions (2) Fish Conveyance Systems and (3) Coastal, Rivers, and Harbors, there are only 21 Key Personnel listed for Section E (Dams and Appurtenant Structures AND Flood Risk Management share Key Personnel as the skills needed for each are considered relevant for both categories) for a max total of 42 Key Personnel. On: Feb 13 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10606415 General IV. Submission Requirements, B.
Supplemental Instructions, 6. Past Performance
Supplemental Instructions Past Performance
Comment Classification: Public (Public)
In the Synopsis - Section IV. Submission Requirements, B. Supplemental Instructions, 6. Past Performance, a sentence states, "For each project submitted in Part I, Section F, submit for each firm listed in Block 25:" and lists CPARS and PPQ requirements.
Block 25 includes subcontractors for which a CPARS or PPQ is not provided. Please confirm this requirement is asking for a CPARS or PPQ from the prime firm listed in Block 25.
On: Jan 19 2024.
Government Response. . Confirmed. A CPARS or PPQ is only required for the Prime Firm listed in Block 25. On:
Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10606420 General IV. Submission Requirements, 3. SF 330 Part I, Section F Supplemental Instructions SF 330 Section F
Comment Classification: Public (Public)
Please confirm that the project descriptions we include in Section F can include projects performed by either the prime A-E firm or a key subcontractor.
On: Jan 19 2024.
Government Response. . Section F can include projects performed by a Key Subcontractor. A CPARS or PPQ shall be provided for the Key Subcontractor since they were the Prime on that project. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10606427 General IV. Submission Requirements, A. General Instructions General Instructions Submission
Requirements Comment Classification: Public (Public)
Question 10598488 states that the government will accept submissions via DOD SAFE. The DOD SAFE webpage has an alert that states, "DoD SAFE is NOT to be used for contract solicitation or proposal submission. Use the Procurement Integrated Enterprise Environment (PIEE) for time-sensitive submission. Please consider switching to PIEE.eb.mil rather than DOD SAFE.
On: Jan 19 2024.
Government Response. . A synopsis containing requests made IAW FAR 36.306 do not constitute a Solicitation nor do responses to such inquiries qualify as proposals. Contractors are reminded to be aware of the disclaimer, "DoD SAFE does not guarantee delivery of documents within a specified time period under 4 hours", listed on the Drop-Off webpage https://safe.apps.mil/verify.php. On: Feb 02 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
CBII Help https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
10606440 General V. Selection Criteria C. Capacity to Accomplish the Work in the Required Time Capacity
Comment Classification: Public (Public)
In the Synopsis - Section V. Selection Criteria, C. Capacity to Accomplish the Work in the Required Time, a sentence states, "NWP will evaluate firms' ability to meet workload requirements (including multiple concurrent task orders) primarily through a review of Part II of firms' SF 330s but may consider any other relevant information bearing on capacity." How does the government expect to evaluate workload regarding multiple concurrent task orders by reviewing Part II forms? The SF330 Part II shows a lot of information, but doesn't directly correlate to concurrent task orders. Would we be able to show this information in Section H?
On: Jan 19 2024.
Government Response. . The Government will evaluate each firm's function code capacity and claimed numbers of personnel support. On: Jan 31 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10606446 General IV. Submission Requirements, 3. SF 330 Part I, Section F Supplemental Instructions SF 330 Section F
Comment Classification: Public (Public)
Please confirm that a Section F project can include multiple progressive task orders at one project site.
On: Jan 19 2024.
Government Response. . A single "project" may span multiple task orders or contracts if they are for multiple phases of the same project at the same site. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10606451 General IV. Submission Requirements, 3. SF 330 Part I, Section G Supplemental Instructions SF 330 Section F
Comment Classification: Public (Public)
In our experience, the easiest way to show our Section G qualifications is to show every project and person in the same table.
The Section G table in the GSA Fillable Form only allows space for a maximum of 10 projects, while the synopsis allows up to 12 projects. Would the government consider allowing the Section G Matrix to be modified to include 12 projects rather than showing different projects on different pages of Section G?
On: Jan 19 2024.
Government Response. . Offerors may submit Section G in one of two ways:
1. Provide up to six (6) pages of Section G to cover all twelve project (see Bidder Inquiry 10605313), or,
2. Use the USACE provided Section G - 12 Projects Attachment on SAM.gov. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10606457 General IV. Submission Requirements, 3. SF 330 Part I, Section H Supplemental Instructions SF 330 Part I, Section H Comment Classification: Public (Public)
According to the Synopsis - Section IV. Submission Requirements, B. Supplemental Instructions, 5. SF 330 Part I, Section H, a sentence states, "Submit one Part I, Section H for each of the two requirements below." The GSA Standard Form 330 Guidelines for Section H states, "Use this section to provide additional information specifically requested by the agency or to address selection criteria that are not covered by the information provided in Sections A-G." Please confirm that Section H has no page limit, and we can use Section H to cover additional information such as additional Specialized Experience and Technical Competence, Professional Qualifications, Capacity to Accomplish the Work in the Required Time, Past Performance, Knowledge of Locality, Extent of Participation of Small Businesses, and Volume of DoD Contracts.
On: Jan 19 2024.
Government Response. . Section H has not been limited as the government cannot know the number of sheets required by offers to provide the Small Business Participation or Volume of Contracts, but it is not to be used as an avenue to provide information that has not been requested in the Synopsis. Additionally, offerors should follow direction in each Section to address guidance for information requested and provided, and reasons for "additional pages". Example, Small Business Participation states, "provide a brief narrative," and Volume of DoD Contracts allows for additional pages "only if necessary to provide complete information."
Section H should not be used to cover Specialized Experience and Technical Competence or ProfessionalCBII Help https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
Qualifications; this information should be provided using the boxes 16-19 of Section E - Resume (max two pages per resume).
Section H should not be used to show Capacity to Accomplish the Work in the Required Time or Past Performance.
This information is provided via the CPARS and PPQs required to be submitted for the projects provided in Section F.
Per the Synopsis, Contractors are already required to provide Extent of Participation of Small Businesses and Volume of DoD Contracts via Section H. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10612093 Other IV. SUBMISSION REQUIREMENTS B. Supplemental Instructions 1. SF 330 Part I, Section C
Comment Classification: Public (Public)
Please confirm if an SF330 Part I Section D Organizational Chart is required, as a template is not provided in the standard fillable SF330 forms on the GSA website. If required, may we provide the chart in our own format?
On: Jan 23 2024.
Government Response. . Section D is required and can be submitted as an Attachment. Offerors are able to use their own format to provide its Organizational Chart.
The chart should illustrate all team members (i.e., firms listed in Part I, Section C) and disciplines, identifying the applicable experience levels (SME, staff, etc.). On: Jan 24 2024 Government Response. . This new text supercedes ALL previous replies.
Section D is required and can be submitted as an Attachment. Offerors are able to use their own format to provide its Organizational Chart.
The chart should illustrate all team members (i.e., firms listed in Part I, Section C) and disciplines.
Experience Levels do NOT need to be included. On: Feb 02 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10613076 Contracting Detail Synopsis Detail Comment Classification: Public (Public)
Can projects that are currently in progress but not completed be submitted?
On: Jan 23 2024.
Government Response. . Projects submitted should be completed as of the Synopsis issue date. A completed project is defined as one in which the firm's performance of the work for which it was hired is 100% complete. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10613079 Contracting Detail Synopsis Detail Comment Classification: Public (Public)
In the Synopsis, page 6, the district requests up to 12 projects in Section F. How does the district define a project for this solicitation. Does a Master Services Agreement or IDIQ with multiple task orders meet the definition of a project?
On: Jan 23 2024.
Government Response. . For purposes of this evaluation, an indefinite-delivery/indefinite- quantity (IDIQ) base contract, Master Services Agreement (MAS), or other similar ordering vehicle itself is not considered a "project." At least one executed task order under the ordering vehicle or stand-alone contract must have been completed in order to constitute a "project." Additionally, two or more contract actions that supported only one effort, will constitute only one "project." On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10615415 General Project Comment Classification: Public (Public)
Can the District confirm the definition of "projects"? Should project be interpreted as an IDIQ contract, a single task order/stand-alone contract, or a series of task orders under a contract? CBII Help https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
On: Jan 24 2024.
Government Response. . For purposes of this evaluation, an indefinite-delivery/indefinite- quantity (IDIQ) base contract, Master Services Agreement (MAS), or other similar ordering vehicle itself is not considered a "project." At least one executed task order under the ordering vehicle or stand-alone contract must have been completed in order to constitute a "project." Additionally, two or more contract actions that supported only one effort, will constitute only one "project." On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10615418 General Project Comment Classification: Public (Public)
For past performance project sheet where joint members participated in a sub relationship please confirm it should it include the work of all the JV members, both the prime and subcontractors.
On: Jan 24 2024.
Government Response. . The project scope and work provided should demonstrate your proposed team's experience performing work similar to that described in this synopsis, see Section V.A for more detail. Clearly state in each project description the extent of work (as percentage of fee) performed by the Prime/JV and each team subconsultant, phase of work (percent completed), and date of completion. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10615421 General Project Comment Classification: Public (Public)
For past performance project sheet where the offer and members of its team participated, please confirm it should include the work of all the team members?
On: Jan 24 2024.
Government Response. . The project scope and work provided should demonstrate your proposed team's experience performing work similar to that described in this synopsis, see Section V.A for more detail. Clearly state in each project description the extent of work (as percentage of fee) performed by the Prime/JV and each team subconsultant, phase of work (percent completed), and date of completion. On: Jan 24 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10618123 General 1 1 1 Comment Classification: Public (Public)
ProjNet Response 10605313 states: "use the Section G - 12 Projects Attachment posted to SAM.gov." There is no Section G on SAM.gov. Please advise its location.
On: Jan 25 2024.
Government Response. . Attachment now posted on SAM.gov on the project opportunity. On: Jan 31 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10618128 General 1 1 1 Comment Classification: Public (Public)
ProjNet response 10605313 states: "there are only 23 Key Personnel listed for Section E." I count 21 Key Personnel. Could you please re-list all of the Key Personnel Positions under their respective functional area to eliminate any confusion about the Key Personnel.
On: Jan 25 2024.
Government Response. . The response to Bidder Inquiry 10596786 added a Hydraulic Engineer as a Key Personnel Position to the following two functional areas:
(2) Fish Conveyance Systems
(3) Coastal, Rivers, and Harbors
The government will provide an updated, tracked, synopsis to show changed made due to Bidder Inquiries. On: Jan 31 2024 Current Request Status: Request Closed
CBII Help https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
Information for this report is procurement sensitive.
10621989 Contracting A-E Synopsis Section IV Submission Requirements A. General Instructions 2. SF 330 Part I, Section E Comment Classification: Public (Public)
In regards to Section E resumes - a previous answer stated that resumes can be 2 pages. The GSA form template does not allow Block 19 item 3 (Brief Description) to be expanded. Should we assume you want 5 projects on each page for a total of 10 projects per persons resume?
On: Jan 26 2024.
Government Response. . A Relevant Project should not use more than one "Block 19(1)-(3)." Meaning offerors should not use Block 19a and Block 19b for the same project just to have more space to write. As Block's 19(3) states, the description is meant to be brief.
Offerors are not required to submit ten (10) Relevant Projects, but can submit up to ten on the two pages of Section E. On: Feb 02 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10627823 Other IV. SUBMISSION REQUIREMENTS B. Supplemental Instructions 1. SF 330 Part I, Section C
Comment Classification: Public (Public)
In response to a prior question, you stated that you would like us to identify "the applicable experience levels (SME, staff, etc.)" on the organizational chart. What experience levels should we include and what are the specific criteria to meet each experience level (i.e. education, years of experience, etc.)?
On: Jan 30 2024.
Government Response. . Disregard the statement to include "applicable experience levels." Bidder Inquiry 10612093 will be updated to remove ", identifying the applicable experience levels (SME, staff, etc.)." On: Feb 02 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10629107 General Project Project Comment Classification: Public (Public))
In regard to Inquiry 10615415, please confirm that, if an ordering vehicle has one or more executed task orders, the ordering vehicle may be presented as a single project.
On: Jan 30 2024.
Government Response. . The ordering vehicle can only be considered a single project if the executed task orders supported the same effort. On: Feb 02 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10629110 General Project Project Comment Classification:Public (Public)
Please confirm when a project sheet mentions multiple task orders, it is permissible to mention a task order past the performance window, January 12, 2018, thus allowing the discussion of a complete project.
On: Jan 30 2024.
Government Response. . If the task order was part of an overall project that was performed within the past performance window, even if that Task Order is outside the window, it can be included in order to show the entire project. On: Feb 02 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10629774 General IV. Submission Requirements B. Supplemental Instructions 5. SF330 Part I, Section H
Comment Classification: Public (Public)
Please clarify the Section H requirements. We understand from the answers to multiple questions (10606457, 10606457, 10602635) that Section H is limited to Extent of Participation of Small Business and Volume of DoD contracts andC iBs IIn oHt etlop cover https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
Specialized Experience and Technical Competence. There are also answers to multiple questions (10597296, 10597280) that state we can provide additional Section F Project Information as long as we specifically reference which project is being expanded on. Please confirm that we can add Section F information to Section H and please clarify which Section F information can be added to Section H.
On: Jan 31 2024.
Government Response. . Section H can be used to provide additional information for Block 24 of Section F since a single project can be made up of numerous task orders that may not fit in Block 24.
Blocks 20-23 should not require additional space and the synopsis allows for a continuation page for Block 25 if there are more than six firms from Part 1, Section C involved in the project. On: Feb 02 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10629842 General IV. Submission Requirements B. Supplemental Instructions 7. SF330 Part II Comment Classification: Public (Public)
Please confirm that the SF330 Part II forms are allowed to be the 7/2021 version of the form but not required to be in the fillable form. Several of our small business teaming partners have Part IIs with written signatures instead of digital signatures and it may be difficult to obtain the digital signatures necessary for the fillable form version of the SF330 Part II form.
On: Jan 31 2024.
Government Response. . Offerors may submit a PDF of the printed and hand signed SF 330 Part II (Rev. 7/2021).
On: Feb 02 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10641297 Electrical page 6 Comment Classification: Public (Public)
The solicitation states that "An individual can only support one discipline (i.e., an individual cannot submit resumes for multiple disciplines). Please confirm that we can show the same person and discipline under multiple functional areas. For example, we can use the same electrical engineer for both the Dams/FRM and Fish Conveyance Systems functional areas.
On: Feb 07 2024.
Government Response. . The same person, with the same discipline, can support multiple functional areas.
Example, the same person can be the Electrical Engineer for (1) Dams and Appurtenant Structures AND Flood Risk Management, as well as for (2) Fish Conveyance Systems. But a person cannot be a Project Manager and a Civil Engineer, as these are difference disciplines. On: Feb 08 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10641301 Electrical Page 6 Comment Classification: Public (Public)
If we use the same discipline in multiple function areas, should we include 2 resumes for that person, with each one customized to that function area? For example, if we use the same electrical engineer for Dams/FRM and for Fish Conveyance, should we include two resumes for that person, each focused on the specific function area? Or should we combine their experience in both functional areas into one resume?
On: Feb 07 2024.
Government Response. . The firm may provide a resume for each functional area but is not required to. Example: a Key Person that holds the electrical engineer's position in functional areas (1) Dams and Appurtenant Structures AND Flood Risk Management and (2) Fish Conveyance Systems, may submit one resume for each functional area, specific to that area. However, if both functional areas can be covered on one resume, the firm may submit it that way as well, as long as each functional area is annotated in the upper left-hand corner of each Part 1, Section E. On: Feb 08 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10641425 General Detail Synopsis Detail Comment Classification: Public (Public)
USACE Portland – Can we provide a separate PDF Attachment of all the DOD contracts over the past 12 months or a excel spreadsheet listing Contract/Task Orders/Modifications of All firms that can be filtered? The SF330 form will require a substantial number of pages to showcase all the work performed.
CBII Help https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
On: Feb 07 2024.
Government Response. . Section H, Block 30, is almost an entire page PDF page already. Firms can provide the information using Section H pages as per the synopsis, or can submit the information using the Section H - Volume of DoD Contracts Excel Sheet posted to SAM.gov. If the Excel Sheet is used, it can be submitted as an Excel document.
On: Feb 12 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10646057 General 1 1 1 Comment Classification: Public (Public)
With the addition of Hydraulic Engineer as a key personnel position in the functional categories of Fish Conveyance Systems and Coastal, Rivers, and Harbors there are only 21 Key Personnel positions. Can the Government clarify that there are 21 Key Personnel positions and re-list the roles with numbers associated with each role?
On: Feb 09 2024.
Government Response. . There are 23 Key Personnel with the addition of Hydraulic Engineer to (2) Fish Conveyance Systems and (3) Coastal, Rivers, and Harbors. See Bidder ID 10605313.
Once ProjNet is closed for inquiries, an updated Synopsis will be uploaded to SAM.gov to incorporate this change and a few others for clarification. Note: Responses in ProjNet still stand, even if not captured in the synopsis update. On:
Feb 09 2024 Government Response. . This new text supercedes ALL previous replies.
You are correct; with the addition of Hydraulic Engineering to two Functional Areas, the total is 21.
Disregard the incorrect count of 23. Bidder ID 10605313 will also be updated. On: Feb 13 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10646059 General 1 1 1 Comment Classification: Public (Public)
The fillable forms are proving challenging to work in due to not being able to move rows around. Can the Government extend the due date by one week to March 5?
On: Feb 09 2024.
Government Response. . At this time, the government does not anticipate extending the due date. Initial response time for the synopsis added two weeks to the standard 30-day response time to compensate for the information requested for this effort. On: Feb 12 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10646711 Environmental Engineering page 6
Comment Classification: Public (Public)
Can you clarify the type of experience you're looking for in the Environmental Engineer? Would this be related to HTRW/environmental response/cleanup, or are there other areas of expertise/experience the District is looking for?
On: Feb 09 2024.
Government Response. . This was added in error, as was the CAD/BIM Tech. See SAM.gov for AMEND 0001_13FEB24, posted 13 Feb. This supersedes AMEND 0001 (which has been deleted). Also, the count for Key Positions on Bidder Inquiries 10646057 and 10605313 has been updated to reflect the total of 21 Positions, NOT 23.
On: Feb 13 2024 Government Response. . This new text supercedes ALL previous replies.
Ignore information about the error.
The experience for an Environmental Engineer is not necessarily related to HTRW/environmental response/cleanup.
The Environmental Engineer is expected to help the government/AE collaboration/team to successfully plan and navigate the project design and construction plans through oversight agency approvals including mandatory environmental laws, rules, and regulations that must be followed throughout the design and construction process. The Environmental Engineer is also likely to be involved with helping to secure environmental permits or approvals when necessary which typically involves providing the team with guidance on how best to accomplish the goals of the project while staying within the known or foreseeable environmental constraints. On: Feb 14 2024 Current Request Status: Request Closed CBII Help https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843
Information for this report is procurement sensitive.
10646744 General 1 1 1 Comment Classification: Public (Public)
How would the Corps view a Section F project that is 100% complete for our A/E design services, but the client put it on hold at 60% design completion?
On: Feb 09 2024.
Government Response. . For Section F, if the firm's performance of the work for which it was hired is 100% complete, it is considered a completed project. On: Feb 12 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
10651370 Contracting Amend 0001 Comment Classification: Public (Public)
Can you please clarify what qualifications or experience is desired for the Project Support Specialist role for the SF 330 Part I, Section E resumes? This role was added in the amendment phase.
On: Feb 13 2024.
Government Response. . This was added in error, as was the CAD/BIM Tech. See SAM.gov for AMEND 0001_13FEB24, posted 13 Feb. This supersedes AMEND 0001 (which has been deleted). Also, the count for Key Positions on Bidder Inquiries 10646057 and 10605313 has been updated to reflect the total of 21 Positions, NOT 23.
On: Feb 14 2024 Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
Public (Public) Patent 11/892,984 ProjNet property of ERDC since 2004.
CBII Help http://projnet.com/index.php https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843 https://servicenow.eis.usace.army.mil/sp?id=kb_article_view&sysparm_article=KB0012843