This solicitation is for a firm-fixed price construction contract to repair the Tillamook South Jetty in Oregon. The U.S. Army Corps of Engineers, Portland District will rebuild approximately 100 feet of the jetty head and 1,350 feet of the trunk section to restore structural integrity and protect navigation. An estimated 9,900 cubic yards of 180-pound stone, 15,800 cubic yards of 175-pound stone, and 3,200 cubic yards of 167-pound stone will be placed. Road improvements and possible dredging of up to 5,000 cubic yards are also required. The material offloading facility may involve temporary pilings installed between November 1 and February 15. The 47-acre staging area near the jetty root must be graded after use. Work must be completed between September 2022 and November 2024. The estimated value is between $25-100 million. Responses were due by August 31, 2022 to the Portland District, Corps of Engineers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO. 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1

7/31/2022 8/31/2022

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3

D, E, AND F.) A. OFFEROR J.E. McAmis A. OFFEROR Trade West A. OFFEROR SEA Construction

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY B. BID SECURITY B. BID SECURITY

(WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price

X C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED (INCLUDING PROFIT) Yes Yes Yes

6. NUMBER OF ADDENDA ISSUED 1

7A.

ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED G. UNIT H. ESTIMATED

NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

MANDATORY LINE ITEMS

0001 Mobilization and Demobilization 1 Job 8,516,399.64$ 8,516,399.64$ 8,000,000.00$ 8,000,000.00$ 16,000,000.00$ 16,000,000.00$ 8,000,000.00$ 8,000,000.00$ 0002 A-Stone - Stations 70+00 to 76+75 11,500 CY 1,104.14$ 12,697,610.00$ 1,100.00$ 12,650,000.00$ 800.00$ 9,200,000.00$ 1,374.00$ 15,801,000.00$ 0003 A-Stone Select - Stations 70+00 to 76+75 10,000 CY 1,244.21$ 12,442,100.00$ 1,200.00$ 12,000,000.00$ 800.00$ 8,000,000.00$ 1,614.00$ 16,140,000.00$ 0004 C-Stone - Stations 70+00 to 76+75 2,500 CY 646.76$ 1,616,900.00$ 400.00$ 1,000,000.00$ 800.00$ 2,000,000.00$ 2,121.00$ 5,302,500.00$ 0005 Haul Roads and Ramps 1 Job 2,784,375.30$ 2,784,375.30$ 5,500,000.00$ 5,500,000.00$ 7,000,000.00$ 7,000,000.00$ 7,982,647.00$ 7,982,647.00$ 0006 Material Off-loading Facility 1 Job 1,460,718.89$ 1,460,718.89$ 5,000,000.00$ 5,000,000.00$ 50,000.00$ 50,000.00$ 3,872,704.00$ 3,872,704.00$ 0007 Site Restoration 1 Job 1,321,305.64$ 1,321,305.64$ 330,000.00$ 330,000.00$ 1,000,000.00$ 1,000,000.00$ 937,200.00$ 937,200.00$

40,839,409.47$ 44,480,000.00$ 43,250,000.00$ 58,036,051.00$

0008 A-Stone - Stations 76+75 to 77+00 600 CY 1,105.62$ 663,372.00$ 1,100.00$ 660,000.00$ 800.00$ 480,000.00$ 1,330.00$ 798,000.00$ 0009 A-Stone Select - Stations 76+75 to 77+00 1,300 CY 1,244.77$ 1,618,201.00$ 1,200.00$ 1,560,000.00$ 800.00$ 1,040,000.00$ 1,570.00$ 2,041,000.00$ 0010 C-Stone - 76+75 to 77+00 200 CY 653.78$ 130,756.00$ 400.00$ 80,000.00$ 278.00$ 55,600.00$ 602.00$ 120,400.00$ 0011 A-Stone - Stations 77+00 to 77+25 800 CY 1,102.96$ 882,368.00$ 1,100.00$ 880,000.00$ 800.00$ 640,000.00$ 1,330.00$ 1,064,000.00$ 0012 A-Stone Select - Stations 77+00 to 77+25 1,300 CY 1,244.77$ 1,618,201.00$ 1,200.00$ 1,560,000.00$ 800.00$ 1,040,000.00$ 1,570.00$ 2,041,000.00$ 0013 C-Stone - Stations 77+00 to 77+25 500 CY 644.21$ 322,105.00$ 400.00$ 200,000.00$ 278.00$ 139,000.00$ 602.00$ 301,000.00$ 0014 A-Stone - Stations 77+25 to 77+50 700 CY 1,104.10$ 772,870.00$ 1,100.00$ 770,000.00$ 800.00$ 560,000.00$ 1,330.00$ 931,000.00$ 0015 A-Stone - Select Stations 77+25 to 77+50 1,200 CY 1,242.93$ 1,491,516.00$ 1,200.00$ 1,440,000.00$ 800.00$ 960,000.00$ 1,570.00$ 1,884,000.00$ 0016 C-Stone - Stations 77+25 to 77+50 600 CY 648.46$ 389,076.00$ 400.00$ 240,000.00$ 278.00$ 166,800.00$ 602.00$ 361,200.00$ 0017 A-Stone - Stations 77+50 to 77+75 1,700 CY 1,104.37$ 1,877,429.00$ 1,100.00$ 1,870,000.00$ 800.00$ 1,360,000.00$ 1,330.00$ 2,261,000.00$ 0018 A-Stone Select - Stations 77+50 to 77+75 1,500 CY 1,243.46$ 1,865,190.00$ 1,200.00$ 1,800,000.00$ 800.00$ 1,200,000.00$ 1,570.00$ 2,355,000.00$ 0019 C-Stone - Stations 77+50 to 77+75 1,300 CY 647.64$ 841,932.00$ 400.00$ 520,000.00$ 278.00$ 361,400.00$ 602.00$ 782,600.00$ 0020 B-Stone - Stations 43+00 to 49+00 4,400 CY 717.24$ 3,155,856.00$ 400.00$ 1,760,000.00$ 278.00$ 1,223,200.00$ 587.00$ 2,582,800.00$ 0021 Class 50 Riprap - Stations 43+00 to 49+00 400 CY 310.10$ 124,040.00$ 160.00$ 64,000.00$ 278.00$ 111,200.00$ 700.00$ 280,000.00$

15,752,912.00$ 13,404,000.00$ 9,337,200.00$ 17,803,000.00$ 56,592,321.47$ 57,884,000.00$ 52,587,200.00$ 75,839,051.00$

53 Elk Creek Road

Raymond, WA 98577-9214

DUNS: H3CUH4W16HD7 CAGE: 5GYL0

CONTRACTING OFFICER SIGNATURE

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ABSTRACT OF OFFERS

W9127N22B0007

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

Optional CLINs

Tillamook South Jetty Repairs

7B. DESCRIPTION OF OFFERED ITEM 7C. EST D.

TOTAL

Mandatory CLINs Subtotal

Mandatory CLINs Subtotal

300 Hafen Lane

Mesquite, NV 89027-6276

UEI: EJS1AQ539EJ7 CAGE: 1MSR9

621 Country Drive

Chico, CA 95928-7148

UEI: RB21BXZMM1X3 CAGE: 0C9P9

NSN 7540-01-150-0981 1419-101 STANDARD FORM 1419 (10-3)