MPH2 – Unwatering Pump #1 Replacement Pump and Motor Requirements General Requirements
Column Assembly
| Column Diameter |
| 16 inches |
| Line shaft Diameter |
| 2 3/16 inches |
| Line shaft Material |
| 416 Stainless Steel |
| Bearing retainer material |
| Steel |
| Bolting material |
| 316 Stainless Steel |
| Exterior coating |
| FLS Gray Enamel |
| Max Section Length |
| 120 inches |
Bowl Assembly
| Shaft material |
| 416 Stainless Steel |
| Impeller Fastening Method |
| Split Ring |
| Bowl Wear Ring Material |
| None |
| Impeller Wear Ring Material |
| None |
| Bolting Material |
| 316 Stainless Steel |
| Exterior Coating |
| FLS Gray enamel |
| Non-Wit. Performance Test w/ Lab Motor |
| Yes (Bowl assembly only) |
| Non-Wit. Bowl Hydrotest |
| Yes |
Discharge Head Assembly
| Discharge Head Assembly |
| 18LF |
| Piping Plan Material |
| None |
| Soleplate Size/ Material |
| None |
| Discharge Flange Rating |
| 150 pound |
| Suction Flange Rating |
| None |
| Bolting Material |
| 316 Stainless Steel |
| Exterior Coating |
| FLS Gray Enamel |
Vertical Shaft Electric Motor
| Phase/ Frequency |
| 3PH/ 60HZ |
| Frame |
| Match discharge head |
| Insulation |
| NEMA MG-1, Part 31 |
| Other items to include |
| Lateral data |
| Other items to include |
| Rotor detail |
| Other items to include |
| Shaft print |
| Other items to include |
| Torsional data |
| Other items to include |
| CAD drawings |
| Other items to include |
| Data sheet |
Added information due to questions received.
1. Total pump length (TPL) and pumping level. Or setting depth and pumping level.
0. Drawing available? See attached drawing.
1. Is the pump in a sump (sump depth?). Or in a well (well casing diameter?). Sump, see attached drawing.
1. Does the discharge head need to match existing dimensions? Yes it needs to match existing conditions in order to match up with original discharge pipe.
1. Is the 150# flanged discharge in the head or is it below ground/grade? It is above ground level.
3. Drawing available?
1. Is there an existing water pre-lube before startup or is new system required? Yes there is an existing pre-lube system.
1. Motor
5. VHS or VSS? – Solid Shaft
5. WPI or TEFC? WPI
5. Variable speed or fixed speed? Variable speed rated.
All products must comply with the Buy American Act.