B.08 Solicitation Amendment W9127N21Q00790001.pdf

PDF 185 KB Posted

Attached to
Drainage Pumps for John Day Dam, Oregon
Solicitation number
W9127N21Q0079
Issued by

View the file

Other files

File Type Posted
B.08 Image JD Pump.jpg JPG image
B.08 Drawing JDD-1-3-3_1.pdf PDF
B.08_Combined Synopsis-Solicitation_21Q0079.pdf PDF
B.08 Drawings & Image JDP Pump 8 & 8A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W66QKZ11877086

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. The purpose of this amendment is to add Draw ing JDD 1-3-3-1 as a result of a question submitted, see Q& A to this amendment.

b. No other changes are made or implied.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N21Q0079

X 9B. DATED (SEE ITEM 11)

19-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Aug-2021

CODE

USACE, PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N21Q0079

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001 Q&A

Q&A Solicitation Amendment W9127N21Q007900001

Drainage Pumps for John Day Dam, Oregon

Question:

Please verify conditions of service. 750 GPM @ how many feet. Drawing shows 7 feet but we are thinking it is at least 70 feet. Do we know pressure at discharge head?

Answer:

The bottom of the shared well for both pumps 8 and 8A is at elevation 104'. Both pump Discharge heads plus grout is at 165'. This gives a pump height below the discharge head of 60'; allowing for 1' of free height between basket strainers below the bowl assembly and the bottom of the well. From the discharge head of the pump assembly the water is discharged at an elevation of 166'. The discharge travels through an 8" pipe for a little over 220' while remaining at elevation 166'. While traveling in this 220' discharge pipe there is one 90 degree turn and one 45 degree turn. Both pumps discharge into this common discharge 8" pipe.

SECTION SF 1449 - CONTINUATION SHEET

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Drawing & Image 19-AUG-2021 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Drawing & Image 19-AUG-2021 Attachment 2 B.08 Drawing JDD-1-3-

3_1

23-AUG-2021

The following have been modified:

TECHNICAL SPECIFICATIONS

Technical Specifications Drainage Pumps 8 & 8A Replacement

John Day Willow Creek Project

1.0 The contractor shall provide two (2) each pump assemblies as spec’d below to replace existing Drainage pumps 8 & 8A with similar performing equipment at John Day Project. [For technical reference the legacy pump installation was a Simflo vertical turbine pump model SR10C (s/n 108431-07) with a US Motors 20 Horsepower electric motor (Frame 256TPA, 230/460 Volt, 49.00/24.30 Amps, 1765 RPM)].

2.0 Two (2) stage water/lube bowl assembly & cone strainer. Bowl assembly to be cast iron A- 48CLS 30 with epoxy coating inside as required, and outside. Impeller to be Bronze B-584-836. Shaft bowl, SS A 582 GR 416. Coupling, bowl shaft, steel A-108 GR 1018. Bearing discharge case (lower) Bronze B-505-932. Bearing intermediate bowl neoprene. Bearing intermediate bowl, Bronze B-505-932.

Collet, impeller steel A-108 GR 1020. Collar, sand Bronze B-584-836. Impeller wear ring, Bronze B-594-

836. Bowl wear ring, cast iron, A-48CLS 30. Upper discharge case bearing, Bronze B-505-932. Screen cone, threaded, galvanized. Note: Maximum outside bowl diameter not to exceed 10.5”.

3.0 20HP vertical hollow shaft, w/NRR (non-rotating ratchet). S.F. 1.15. 1800 rpm, 3 phase, 60 cycle, voltage 230/460. Head shaft & Nut 1” S.S.

4.0 6” x 6” discharge head w/packing housing. Packing box to be cast iron A-48 CLS 30. Lantern ring, Bronze B-505-932. Packing ring, graphite. Packing box bearing, Bronze B-505-932. Stud and nut, SS/Brass. Split packing gland, Bronze, B-584-836. Discharge centerline must be 7” above Discharge Head mounting base.

5.0 5 each, 6” x 120” water/lube columns assemblies threaded and coupled, includes column, shaft, & spider. Line shaft to be 416 SS. Line shaft coupling, Steel A-108 GR 1018. Drop in bearing retainer, Bronze B-584-836. Line shaft bearing, neoprene. Threaded and coupled pipe column, Steel A 53 B with epoxy coating on inside and outside. Threaded column lock nut cast iron A-48 CLS 30.

6.0 6” x 38.56” water/lube column assembly threaded and coupled. With epoxy coating inside and outside.

7.0 6” x 36.81” water/lube TBE (threaded both ends) top piece. With epoxy coating inside and outside.

8.0 Note: Total inclusive measurement from underside of pump discharge head to bottom of cone strainer not to exceed 60.54’.

9.0 8” flange x flange, cast iron, swing check valve (not to exceed 19.5” in length) w/gaskets and bolt kit.

10.0 The following materials are necessary to assemble adapter from 6” Discharge housing to 8” Swing Check valve:

a) 8” x 6” class 150 slip on reducing flange w/gaskets.

b) 6” class 150 slip on flange w/gaskets.

c) 2 each, 6” x 4” water column for welding to slip flanges.

d) Pipe coupling, slip on for 6” pipe.

11.0 OEM maintenance manuals shall be provided for Motor and Pump assembly by contractor.

12.0 Vendor to deliver the finished product to the following address:

John Day Dam Project Interstate 84, Exit 109 Rufus, OR 97050

Days and hours warehouse deliveries are accepted.

Monday – Thursday 7:00am to 4:00pm

*Please note that the warehouse will be closed on any Federal Holidays.

Pump assemblies delivered will be inspected by John Day Project personnel before acceptance to assure compatibility with existing system.

Amendment 0001 Elevation & Discharge Information per Drawing JDD 1-3-3 1:

The bottom of the shared well for both pumps 8 and 8A is at elevation 104'. Both pump Discharge heads plus grout is at 165'. This gives a pump height below the discharge head of 60'; allowing for 1' of free height between basket strainers below the bowl assembly and the bottom of the well. From the discharge head of the pump assembly the water is discharged at an elevation of 166'. The discharge travels through an 8" pipe for a little over 220' while remaining at elevation 166'. While traveling in this 220' discharge pipe there is one 90 degree turn and one 45 degree turn. Both pumps discharge into this common discharge 8" pipe.

(End of Summary of Changes)