C.04_BidAbstract21B0006.pdf
PDF 162 KB Posted
- Attached to
- WEST COAST HOPPER MAINTENANCE DREDGING 2021
- Solicitation number
- W9127N21B0006
About this file
This abstract of offers is for a solicitation seeking hopper dredging services along the West Coast of the United States. The U.S. Army Corps of Engineers Portland District intends to award a contract to dredge approximately 2,750,000 cubic yards at mandatory locations including the San Francisco Mainship Channel, Humboldt Bay Bar and Entrance, Mouth of the Columbia River, and Lower Columbia River; with additional optional line items depending on needs and funding. Three offers were received by the March 22nd deadline from Manson Construction, The Dutra Group, and West Coast Hopper Dredging to provide dredging and disposal services. Pricing was solicited for mandatory and optional line items with unit rates provided for dredging, disposal, and transportation tasks. The contract is set aside for small businesses with a size standard of $30 million and has a magnitude of construction greater than $25 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Attendance.docx | DOCX document | |
| B.08_WCHMD21_Solicitation.pdf | ||
| B.08_WCHC_Advertise_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NO 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 2 PAGES
2/19/2021 3/22/2021
4. ISSUING OFFICE
DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE
PORTLAND DISTRICT, CORPS OF ENGINEERS
P.O. BOX 2946
PORTLAND, OR 97208-2946
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3
D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR
A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY
X (WITHOUT PROFIT) 20% of bid price or $3 million
C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED
(INCLUDING PROFIT)
6. NUMBER OF ADDENDA ISSUED 4
7A.
ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED
NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB 7,455,000.00$ 7,455,000.00$ 7,280,000.00$ 7,280,000.00$ 8,000,000.00$ 8,000,000.00$ 0002 HUM, Incremental Start Up (OPTIONAL) 1 JOB 619,000.00$ 619,000.00$ 90,000.00$ 90,000.00$ 250,000.00$ 250,000.00$
HUM, Bin Measure to Required Depth, In Water Placement (OPTIONAL) 300,000 CY 4.26$ 1,278,000.00$ 3.80$ 1,140,000.00$ 3.50$ 1,050,000.00$
LCR Mainteance, RM 3+00+00 to RM 25+00+00, Bin Measure, Flow Lane (FL) Placement 200,000 CY 3.63$ 726,000.00$ 2.80$ 560,000.00$ 3.00$ 600,000.00$
LCR Mainteance, RM 3+00+00 to RM 105+00+00, Pre/Post Dredge Survey, (FL) Placement 650,000 CY 4.89$ 3,178,500.00$ 4.50$ 2,925,000.00$ 3.50$ 2,275,000.00$
LCR Mainteance, RM 3+00+00 to RM 105+00+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 350,000 CY 4.89 1,711,500.00$ 3.75$ 1,312,500.00$ 3.25$ 1,137,500.00$
LCR Mainteance, RM 3+00+00 to RM 105+00+00, Pre/Post Dredge Survey, (FL) Placement (OPTIONAL) 350,000 CY 4.89 1,711,500.00$ 3.50$ 1,225,000.00$ 3.25$ 1,137,500.00$
LCR Mainteance, RM 3+00+00 to RM 105+00+00, Bin Measure to Required Depth, (FL) Placement 250,000 CY 4.01$ 1,002,500.00$ 3.20$ 800,000.00$ 3.50$ 875,000.00$
LCR Increment Transit Miles for Material Placement Site (other than five miles one-way) 1,100,000 CY*MI 0.30$ 330,000.00$ 0.20$ 220,000.00$ 0.15$ 165,000.00$
0010 LCR Intra-Project Transit Miles 250 MI 626.00$ 156,500.00$ 300.00$ 75,000.00$ 400.00$ 100,000.00$
MSC, Bin Measure to Required Depth, In Water SF-17 and SF- 8 Placement 350,000 CY 5.39$ 1,886,500.00$ 10.50$ 3,675,000.00$ 9.95$ 3,482,500.00$
MSC, Bin Measure to Required Depth, In Water SF-17 and SF- 8 Placement (OPTIONAL) 150,000 CY 5.39$ 808,500.00$ 7.00$ 1,050,000.00$ 7.00$ 1,050,000.00$
MSC, Ocean Beach Pump Ashore (Mob/Demob) (OPTIONAL) 1 JOB 2,148,000.00$ 2,148,000.00$ 3,950,000.00$ 3,950,000.00$ 978,869.00$ 978,869.00$
0014 MSC, Ocean Beach Pump Ashore (O&M) (OPTIONAL) 225,000 CY 14.82$ 3,334,500.00$ 8.70$ 1,957,500.00$ 9.00$ 2,025,000.00$
Manson Construction 5985 Richard Street, Suite 1 Jacksonville, FL 32216 (904)821-0211
West Coast Hopper Dredging 2021
7B. DESCRIPTION OF OFFERED ITEM
7C. EST D.
The Dutra Group 2350 Kerner Boulevard, Suite 200 San Rafael, CA 94901 415-258-6876
B. BID SECURITY B. BID SECURITY
ABSTRACT OF OFFERS
W9127N20B0003
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement 1,300,000 CY 2.95$ 3,835,000.00$ 2.70$ 3,510,000.00$ 3.00$ 3,900,000.00$
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 300,000 CY 2.95$ 885,000.00$ 2.20$ 660,000.00$ 2.50$ 750,000.00$
MCR, Bin Measure, Shallow Water Site (SWS) or North Jetty Site (NJS) Placement (OPTIONAL) 250,000 CY 2.95$ 737,500.00$ 2.00$ 500,000.00$ 2.50$ 625,000.00$
MCR, Bin Measure, Increment for Operations and Maintenance Deep Water Site (DWS) Placement 300,000 CY 1.27$ 381,000.00$ 1.95$ 585,000.00$ 0.70$ 210,000.00$
MCR, Bin Measure, Increment for Operations and Maintenance (DWS) Placement (OPTIONAL) 300,000 CY 1.27$ 381,000.00$ 1.75$ 525,000.00$ 0.70$ 210,000.00$
MCR, Bin Measure, Increment for Operations and Maintenance (DWS) Placement (OPTIONAL) 250,000 CY 1.27$ 317,500.00$ 1.65$ 412,500.00$ 0.70$ 175,000.00$
SUBTOTAL FOR MANDATORY LINE ITEMS 18,951,000.00$ 19,630,000.00$ 19,607,500.00$ -$ SUBTOTAL FOR OPTIONAL LINE ITEMS 13,932,000.00$ 12,822,500.00$ 9,388,869.00$ -$ -$
32,883,000.00$ 32,452,500.00$ 28,996,369.00$ -$
NSN 7540-01-150-0981 1419-101
TOTAL
ACCEPTANCE LIMITATION - DAYS
INFORMALITIES
STANDARD FORM 1419 (10-3)
| 2021-03-22T15:27:28-0700 | |
| MORROW.KRISTINA.KAYE.1290513320 |
| 2021-03-23T07:46:48-0700 | |
| QUANTOCK.JORDAN.MARK.1029826010 |
File details come from the government source that posted it. Updated .