B.08_W9127N20B00250001 - Amendment to Extend Work Window.pdf

PDF 165 KB Posted

Attached to
Coquille Bandon Boat Basin Pipeline Maintenance Dredging 2020
Solicitation number
W9127N20B0025
Issued by

About this file

This amendment modifies an existing federal contract to extend the in-water work window and contract end date for maintenance dredging services. The Coquille Bandon Boat Basin Pipeline Maintenance Dredging 2020 project involves dredging activities at sites in Oregon from October 2020 to February 2021, with all remaining work to be completed by May 2021. The U.S. Army Corps of Engineers solicited these dredging services through an invitation for bids administered by the Portland, Oregon district office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the in-w ater w ork w indow from 31 October 2020 to 15 February 2021. The contract end date has also been extended to account for the larger w ork w indow . Reference 52.211-10 for details.

Bidders shall provide a price for completing the w ork w ithin this revised period of performance.

All terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N20B0025

X 9B. DATED (SEE ITEM 11)

28-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2020

CODE

USACE PORTLAND DISTRICT

CENWP

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N20B0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-OCT-2020 TO

30-NOV-2020

N/A PORTLAND DISTRICT RESIDENT OFFICE

CENWP-EC-CV

USACE PORTLAND DISTRICT

4480 SE COLUMBIA WAY

VANCOUVER WA 98661

360-448-7796 FOB: Destination

960439

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-OCT-2020 TO

17-MAY-2021

N/A PORTLAND DISTRICT RESIDENT OFFICE

CENWP-EC-CV

USACE PORTLAND DISTRICT

4480 SE COLUMBIA WAY

VANCOUVER WA 98661

360-448-7796

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

POP 01-OCT-2020 TO

30-NOV-2020

N/A PORTLAND DISTRICT RESIDENT OFFICE

CENWP-EC-CV

USACE PORTLAND DISTRICT

4480 SE COLUMBIA WAY

VANCOUVER WA 98661

360-448-7796

To:

CAGE

W9127N20B0025

POP 01-OCT-2020 TO

15-FEB-2021

N/A PORTLAND DISTRICT RESIDENT OFFICE

CENWP-EC-CV

USACE PORTLAND DISTRICT

4480 SE COLUMBIA WAY

VANCOUVER WA 98661

360-448-7796

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract after the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than:

*COMMENCE WORK NO EARLIER THAN: 01 October 2020.

FINAL CONSTRUCTION PHYSICAL COMPLETION DATE: 15 February 2021.

CONTRACT END DATE: 17 May 2021

The time stated for FINAL CONSTRUCTION PHYSICAL COMPLETION includes physical completion of all site work, site cleanup, and demobilization.

The time stated for CONTRACT END DATE includes submission and approval of all final remaining work documents.

* Commence work means having dredge on site and ready to dredge.

** The Government intends to issue the NTP on or about 15 September 2020, or within 7 days of award (whichever is later).

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .