Prime Firm Principal 1 Principal 2 Quality Management Project Controls/Scheduler Project Support Specialist

Architectural / Construction

Architect 1 (SME) Architect 2 (Senior)

Landscape Architect 1 (SME) Landscape Architect 2 (Senior)

Interior Designer 1 (SME) Interior Designer 2 (Senior)

Design Sustainability Coordinator 1 (SME)

Construction Manager 1 (SME) Construction Manager 2 (Senior)

Cost Estimator 1 (SME) Cost Estimator 2 (Senior)

Certified Value Specialist Fac. (SME)

Force Protection Consultant

Acoustician (SME)

Sub 4: (firm “e”, [ref. SF330 Part I, block C])

Specification Writer (SME)

Code Consultant (SME)

Sub 2: Medical (firm “c”, [ref. SF330 Part I, block C])

Medical Facility Planner 1 (SME) Medical Facility Planner 2 (Senior)

Medical Equipment Planner 1 (SME) Medical Equipment Planner 2 (Senior)

Medical Physicist (X-ray/MRI) 1 (SME) Medical Physicist (X-ray/MRI) 2 (Senior)

Infection Control Nurse

Industrial Hygienist

Activation Specialist

Sub 1: Engineering (firm “b”, [ref. SF330 Part I, block C])

Structural 1 (SME) Structural 2 (Senior)

Civil 1 (SME) Civil 2 (Senior)

Geotechnical 1 (SME) Geotechnical 2 (Senior)

Engineering Geologist 1 (SME) Geologist 2 (Senior)

Traffic Engineer 1 (SME) Traffic Engineer 2 (Senior)

Environmental Engineer 1 (SME)

Mechanical 1 (SME) Mechanical 2 (Senior)

Fire Protection Engineer 1 (SME)

Electrical 1 (SME) Electrical 2 (Senior)

Communications Systems Professional 1 (SME) Communications Systems Professional 2 (Senior)

Commissioning Specialist (CxA) (SME) Commissioning Specialist (CxA) (Senior)

Prime Management

Prime Disciplines

Subcontractor

ATTACHMENT B: VAPORHCS A-E TECHNICAL

SERVICES SATOC EXAMPLE ORG CHART

Sub 3: Environmental (firm “d”, [ref. SF330 Part I, block C])

NEPA Specialist 1 (SME) NEPA Specialist 2 (Senior)

Architectural Historian

Sub 5: (firm “f”, [ref. SF330 Part I, block C])

Discipline A 1 (SME) Discipline A 2 (Senior)

Discipline B 1 (SME) Discipline B 2 (Senior)

CADD / BIM / GIS

CADD 1 (Senior) CADD 2 (Staff)

BIM 1 (Senior) BIM 2 (Staff)

GIS 1 (Senior) GIS 2 (Staff)

NOTE: The intent of the example is to demonstrate the level of detail expected by the Government, not to dictate an organizational structure for the team or format for the org chart.

Additionally, the quantities shown are not indicative of required staffing levels.

Slide Number 1

File details come from the government source that posted it.