Text version
Prime Firm Principal 1 Principal 2 Quality Management Project Controls/Scheduler Project Support Specialist
Architectural / Construction
Architect 1 (SME) Architect 2 (Senior)
Landscape Architect 1 (SME) Landscape Architect 2 (Senior)
Interior Designer 1 (SME) Interior Designer 2 (Senior)
Design Sustainability Coordinator 1 (SME)
Construction Manager 1 (SME) Construction Manager 2 (Senior)
Cost Estimator 1 (SME) Cost Estimator 2 (Senior)
Certified Value Specialist Fac. (SME)
Force Protection Consultant
Acoustician (SME)
Sub 4: (firm “e”, [ref. SF330 Part I, block C])
Specification Writer (SME)
Code Consultant (SME)
Sub 2: Medical (firm “c”, [ref. SF330 Part I, block C])
Medical Facility Planner 1 (SME) Medical Facility Planner 2 (Senior)
Medical Equipment Planner 1 (SME) Medical Equipment Planner 2 (Senior)
Medical Physicist (X-ray/MRI) 1 (SME) Medical Physicist (X-ray/MRI) 2 (Senior)
Infection Control Nurse
Industrial Hygienist
Activation Specialist
Sub 1: Engineering (firm “b”, [ref. SF330 Part I, block C])
Structural 1 (SME) Structural 2 (Senior)
Civil 1 (SME) Civil 2 (Senior)
Geotechnical 1 (SME) Geotechnical 2 (Senior)
Engineering Geologist 1 (SME) Geologist 2 (Senior)
Traffic Engineer 1 (SME) Traffic Engineer 2 (Senior)
Environmental Engineer 1 (SME)
Mechanical 1 (SME) Mechanical 2 (Senior)
Fire Protection Engineer 1 (SME)
Electrical 1 (SME) Electrical 2 (Senior)
Communications Systems Professional 1 (SME) Communications Systems Professional 2 (Senior)
Commissioning Specialist (CxA) (SME) Commissioning Specialist (CxA) (Senior)
Prime Management
Prime Disciplines
Subcontractor
ATTACHMENT B: VAPORHCS A-E TECHNICAL
SERVICES SATOC EXAMPLE ORG CHART
Sub 3: Environmental (firm “d”, [ref. SF330 Part I, block C])
NEPA Specialist 1 (SME) NEPA Specialist 2 (Senior)
Architectural Historian
Sub 5: (firm “f”, [ref. SF330 Part I, block C])
Discipline A 1 (SME) Discipline A 2 (Senior)
Discipline B 1 (SME) Discipline B 2 (Senior)
CADD / BIM / GIS
CADD 1 (Senior) CADD 2 (Staff)
BIM 1 (Senior) BIM 2 (Staff)
GIS 1 (Senior) GIS 2 (Staff)
NOTE: The intent of the example is to demonstrate the level of detail expected by the Government, not to dictate an organizational structure for the team or format for the org chart.
Additionally, the quantities shown are not indicative of required staffing levels.