scline Callout Changed from Stern (as provided by USACE) to correctly identify Bow.
Polygon scline
Markup was included on old drawing. Updated as-built using most recent document.
scline
Comment not clear what is intended.
scline Callout Original comment hard to read scline Polygon scline
Is this still here or has it been removed. If removed, should it be reflected in the drawing?
scline Callout Welding Detail necessary for As-Builts?
scline Polygon scline
Note not clear. I think note indicated that dimension lines needed to be extended. This seems like a strange markup for as-built documents. Please confirm intent.
Eliminated per note.
scline
PCS = Places or Pieces? Interpretted as "places" scline
Details eliminated per comment scline
Was not able to read contractor provided redlines.
scline Callout Hard to read contractor provided language.
scline Polygon scline
Deleted per note.
scline note stating "1 1/2" through side stiffener and bottom stiffener" is not clear what is meant or what has changed.
scline
Note was added per markup but note is not clear.
scline
Drawing provided had this marked up. But it is not clear what has changed or intended.
scline
Need to revisit viewport.
scline
Revised per markups provided. Is this intended to be included?