A.07.23.b_Attachment_Drawing_DDP-68-35-227.1.pdf
PDF 241 KB Posted
- Attached to
- Turbine Shaft Packing Gland
- Solicitation number
- W9127N18R0078
About this file
Drawing DDP-68-35-227.1
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. ARMY ENCINEER DISTRICT, PORTLAND
DDP-68-35-227.1
a
D D
P
11-3-94
9�
0.996 1.000
� R.
ITEM
QTY/SLV
DISCRIPTION
HALF SLEEVE-WITH KEYWAY
HALF SLEEVE-WITHOUT KEYWAY
KEY
CAP SCREW (SEE NOTE 8)
PARTS LIST
DRAWING NOTES:
NOTE IN THE PLAN VIEW THAT ONE JOINT CONNECTION IS
OPPOSITE HAND TO THE OTHER.
1.
SLEEVE-ALLOY 17-4PH/TYPE 630 ASTM A 564 OR AMS
5643K CONDITION H925.
2.
THE SLEEVE MATERIAL SHALL BE MACHINED AND HEAT
TREATED IN SUCH A MANNER TO PROVIDE MAXIMUM
MACHINEABILITY AND MINIMIZE DISTORTION AND SPRINGBACK.
ROCKWELL HARDNESS OF FINISHED SLEEVE SHALL BE
RC 38-42.
3.
SURFACE FINISH SHALL BE 63 UNLESS OTHERWISE
SPECIFIED.
4.
BREAK ALL CORNERS.5.
FINAL DIAMETER SHALL BE ROUND T.I.R. TO A TOLERANCE
OF PLUS OR MINUS .002.
6.
SHALL BE APPLIED TO ALL DIMENSIONS, OR AS REQUIRED
FOR PROPER ASSEMBLY.
7.
SLEEVE TO BE SHIPPED ASSEMBLED, WITH THE CAP SCREWS
USED DURING MANUFACTURE, TORQUED TO 30FT-LB. ALSO,
FOUR (4) NEW AND UNUSED CAP SCREWS TO BE SHIPPED WITH
EACH SLEEVE.
8.
SHOP INSPECTION NOTES:
PERFORM DIMENSIONAL CHECKS WITH SLEEVE
ASSEMBLED ON MANDREL
1.
ALLOWABLE FINISH CLEARANCES ANYWHERE ALONG
JOINT LINES (BETWEEN SLEEVE HALVES):
2.
OUTSIDE - .002IN.
INSIDE - .002IN.
CONCENTRICITY ON SQUARENESS OF SURFACES
ARE SHOWN IN SECTION A-A
3.
INSTALLATION NOTES:
AT FIELD ASSEMBLY, THE CAP SCREWS SHALL BE COATED
WITH NEVER-SEEZ OR EQUAL, AND INSTALLED WITH A
1.
TORQUE OF FROM 120 TO 130 FT-LBS. THE CAP SCREWS
SHALL BE TORQUED UP IN 5 FT-LB INCREMENTS AND
TIGHTENED IN A TOP TO BOTTOM AND SIDE TO SIDE
PATTERN. NOTE: THE BOLTED CONNECTION IS NOT A
SUBSTITUTE FOR THE USE OF BANDING IN BRINGING THE
SLEEVE HALVES TOGETHER, PRIOR TO INSTALLING THE
CAP SCREWS.
2.
AFTER FIELD ASSEMBLY, FILL ALL VOIDS AT JOINTS, ETC.
WITH RTV OR EQUAL, FILL TOP AND BOTTOM CAP
SCREW HOLES WITH EPOXY OR BELZONA.
3.
TURBINE SHAFT SLEEVE
MAT’L: SEE NOTES 2 & 3
NOT TO SCALE
SECTION A-A
NOT TO SCALE
KEY
MAT’L: SAE 1080 OR 4130 COLD FINISH
NOT TO SCALE
SECTION D-D
NOT TO SCALE
SECTION G-G
DETAIL ’E’
NOT TO SCALE
SECTION C-C
NOT TO SCALE
SECTION F-F
SECTION B-B
NOT TO SCALE
REVISION DATE
9 FEB 95
1 OCT 95
16 JAN 97 VARIOUS NOTE CHANGES
MODIFIED SEALANT GALLERIES
MINOR MODIFICATION
DESCRIPTION BY
DLB
DLB
ECM
DESIGNED: REDRAWN: CHECKED:APPROVED:
S.P.D.
D.L.B. C.A.R.
THE DALLES/JOHN DAY PROJECT
COLUMBIA RIVER WASHINGTON-OREGON
UNITS 15-22
TURBINE MAIN SHAFT SLEEVE
WITH BOLTED CONNECTION
CHIEF, TECHNICAL SECTION
DATE: SHEET NUMBER:
A
B
D
C
A
B
D
C
2 134
2 134
U.S. ARMYCORPS OF ENGINEERS
SECTION E-E
DURING FIELD ASSEMBLY, SECURE CAP SCREWS IN PLACE
WITH PERMANENT LOCK TITE OR EQUAL.
6 MSC1 NOV 11 CLARIFIED SEALANT PORTS, RLJ
BOLME
FEM INVENTORY G2-23617,
G2-23617A, G2-23617B
24�
47� D.
9� �
(NOTE 6)
50.495 50.500
1.002 1.000
7�8�
1� REF
TYP
24�
3�"3�
3 2
1�
RELIEF
CHAMFER
47.002 47.000
1� 1�
�R.
ALL CORNERS
KEYWAY TO
SUIT KEY
SEE DETAIL ’E’
AND NOTE 1
DIRECTION
OF ROTATION
CC
D
D
TOP OF SLEEVE
USE BOTTOM TAP.
REMOVE ALL CUTTINGS
BEFORE INSERTING
CAP SCREW.
HEXAGON SOCKET HEAD
CAP SCREW. SAE J429,
GRADE 8,
2" GOOD THREAD
SEE INSTALLATION
NOTE 3
CHAMFER
TYP.
A
4 PLACES AS SHOWN
ON TOP OF SLEEVE,
FOR EYEBOLTS
63 125
63, TYP.
TYP.
F
F
E
E
A
BB
TOP OF
SLEEVE
-A-
TYP.TYP.
125, .002A
.010A
GOOD THD.
D
D
0.998 0.999
1.001 1.000
2� 2�
TYP.
3 4
G
G
3�
7� 8�
DRILL/TAP X 1" DP
HOLES 1,12
INTERCEPT VERTICAL
INTERCEPT VERTICAL
DRILL/TAP X 1" DP
HOLES 2,4,6,8,10
DRILL/TAP X 1" DP
HOLES 3,5,7,9,11
0.781+ 0.005 REAM
INTERCEPT VERTICAL
File details come from the government source that posted it.