Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_W9127N18R0013_Amendment_0004.pdf | ||
| PreBid_Sign_In_Sheet_1-10-2018.jpg | JPG image | |
| A.07.24_W9127N18R0013_Amendment_0002.pdf | ||
| A.07.24_W9127N18R0013_Amendment_0001.pdf | ||
| VID_20170410_083556.mp4 | MP4 file | |
| VID_20170410_081828.mp4 | MP4 file | |
| B1_Catwalk.mp4 | MP4 file | |
| ATTACHMENT_A-_OFFERORS_EXPERIENCE_FORM.docx | DOCX document | |
| ATTACHMENT_B-_PAST_PERFORMANCE_QUESTIONNAIRE.docx | DOCX document | |
| A.01.13_BDP1.128_FIO.pdf | ||
| A.07.23_W9127N18R0013.pdf | ||
| A.01.13_BDP1.128_ADVERTISE_SET.pdf | ||
| A.01.13_BDP1.128_ADVERTISE_SET.pdf | ||
| A.07.23_W9127N18R0013.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: Bonneville Powerhouse 1 Personnel Safety Improvements
1. This Amendment is issued to update the technical specif ications.
2. Techical Specif ication Section 01 45 00.00 25 Part 3.4.2 has been revised.
3. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N18R0013
X 9B. DATED (SEE ITEM 11)
22-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jan-2018
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N18R0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
Bonneville Powerhouse 1 - Personnel Safety Improvements
Section. This list will be agreed upon during the coordination meeting.
3.2.2 Acceptance of CQC Plan
Acceptance of the CQC plan is required prior to the start of construction.
Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in the CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.
3.2.3 Notification of Changes
After acceptance of the CQC Plan, notify the CO in writing of any proposed change. Proposed changes are subject to acceptance by the CO.
3.3 COORDINATION MEETING
After the Preconstruction Conference, before start of construction and prior to acceptance by the Government of the CQC Plan, the Contractor must meet with the CO and discuss the Contractor's quality control system.
Submit the CQC Plan for review a minimum of 10 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management, and control with the Government's Quality Assurance. Minutes of the meeting will be prepared by the Government and signed by both the Contractor and the CO and will become a part of the Contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure Contract compliance. Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly must be included as part of the CQC organization. The Contractor's CQC staff must maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure Contract compliance. All CQC staff members must be subject to acceptance by the CO. Promptly complete and furnish all letters, material submittals, shop drawing submittals, schedules, and all other project documentation to the CQC organization. The CQC organization must maintain these documents and records at the site at all times, except as otherwise acceptable to the CO.
3.4.2 CQC System Manager Qualifications
Identify an individual, within the onsite work organization, as CQC System Manager who shall be responsible for writing and executing a complete CQC plan, overall management of CQC, and have the authority to act in all CQC matters for the Contractor. The CQC System Manager must have a minimum of five years of experience in a verifiable CQC role on jobs similar to this
SECTION 01 45 00.00 25 Page 5
Bonneville Powerhouse 1 - Personnel Safety Improvements
Contract. This CQC System Manager must be on the site at all times during construction and be employed by the prime Contractor. The CQC System Manager shall be assigned no other duties. Identify in the plan an alternate for the CQC System Manager to serve in the event of the CQC System Manager's absence and/or to cover work performed on additional shifts. The requirements for the alternate are the same as the designated CQC System Manager.
3.4.3 CQC Specialized Personnel
In addition to CQC personnel specified elsewhere in the Contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical and structural, if the CQC manager is not qualified to cover these areas at the discretion of the CO. These individuals may be employees of the prime or subcontractor; must be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; must have 5 years of experience in a verifiable CQC role on jobs similar to this contract; and must be a graduate engineer, journeyman, or licensed in their own discipline. These individuals shall have no other duties other than quality control.
3.4.4 Construction Quality Management for Contractors
The CQC System Manager and Alternate CQC System Manager must have successfully completed the course entitled "Construction Quality Management For Contractors." This course is periodically offered by the Associated Builders and Constructors, Inc., or Associated General Contractor, Inc. and must be retaken every five years. The course has been coordinated with the Navy and certificates from the Navy will be accepted. For further information regarding courses in the Portland area contact: Associated General Contractors, Oregon-Columbia Chapter at (503) 682-3363 or http://www.agc-oregon.org/education-and-training/army-corps-of-engineers/.
3.4.5 Organizational Changes
Maintain the CQC staff at full strength at all times. When it is necessary to make changes to the CQC staff, revise the CQC Plan to reflect the changes and submit the changes to the CO for acceptance.
3.5 SUBMITTALS AND DELIVERABLES
Submittals, if needed, must comply with the requirements in Section 01 33 00, SUBMITTAL PROCEDURES. The CQC organization must be responsible for certifying that all submittals and deliverables are in compliance with Contract requirements.
3.6 QUALITY CONTROL
Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the Contract. At least three phases (Preparatory, Initial, and Follow-up) of control must be conducted by the CQC System Manager for each definable feature of the construction work as follows:
3.6.1 Preparatory Phase
This phase must be performed prior to beginning work on each definable
SECTION 01 45 00.00 25 Page 6
| A.07.24_W9127N18R0013 Amendment 0003 |
| Amd 0003 tech |
| [1]: [3] |
| Amd0001: AMD #0003 |