A 4'2'0' B 4'2'0'
EXIST. ELEVATOR MACHINE
ROOM PLAN (EL. 77.0)
ELEVATOR MACHINE ROOM
MODIFICATIONS (EL. 77.0)
N N
SET (TO BE REMOVED)
EXISTING MOTOR GENERATOR
(TO BE REMOVED)
EXISTING ELEVATOR CONTROLLERS
(TO BE REMOVED)
EXISTING ELEVATOR HOIST MACHINE
(TO BE REMOVED)
EXISTING ELEVATOR GOVENOR
EXISTING WALL CABINET
EXISTING MACHINE ROOM DOOR
EXISTING VERTICAL PIPE SHAFT
ELEVATOR HOIST MACHINE
AND STORAGE CABINET
ELEVATOR CONTROLLER PC
ELEVATOR CONTROLLER CABINET
MACHINE ROOM DOOR
ADD CLOSER TO EXISTING
(TO BE REMOVED)
EXISTING ELEVATOR CONTROLLER
NOTES:
1.
2.
SMOKE-SEAL.
UNDERSIDE OF EACH NEW PIECE TO ACT AS A
NEOPRENE TAPE SHALL BE APPLIED TO THE
INUOUS STRIP OF 1-INCH WIDE ADHESIVE-BACKED
NOT MORE THAN 1'-0" ALONG EDGES. A CONT-
EACH CORNER OF THE NEW PIECE AND SPACED
THREADED COUNTERSUNK BOLTS LOCATED AT
EXISTING FLOOR PLATE WITH A MINIMUM 1/4" DIA.
NEW PLATING SHALL BE ATTACHED TO THE
APPROXIMATE THAT OF EXISTING FLOOR PLATING.
EXISTING PLATING AND THE LUG PATTERN SHALL
PLATING SHALL MATCH APPROXIMATE THAT OF
OVERLAID WITH NEW FLOOR PLATING. NEW
THE INSTALLATION OF NEW EQUIPMENT SHALL BE
FROM THE REMOVAL OF EXISTING EQUIPMENT AND
HOLES LEFT IN THE EXISTING STEEL FLOOR PLATE
AS NEEDED FOR NEW HOIST MACHINE. GAPS AND
CONTRACTOR TO MODIFY STEEL PLATE OPENINGS
REQUIREMENTS.
ELEVATOR FOR STRUCTURAL ANALYSIS
SECTION 14 21 00.10 28: ELECTRIC TRACTION
BY THE ELEVATOR UPGRADES. SEE SPECIFICATION
ELEVATOR SUPPORTS FOR THE LOADS IMPOSED
STRUCTURAL ADEQUACY OF THE EXISTING
THE CONTRACTOR SHALL ENSURE THE
3.
SECTION 08 71 00: DOOR HARDWARE.
SECTION 08 11 13: STEEL DOORS AND FRAMES AND
1 AND 2 ON SHEET A-601. SEE ALSO SPECIFICATION
FOR DOOR HEAD/JAMB INSTALLATION, SEE DETAILS
1A
6'-6"
4.
THE VERTICAL PIPE SHAFT.
PIPES AND EQUIPMENT LOCATED IN AND AROUND
DOES NOT INTERFERE WITH ANY OF THE EXISTING
AND ENSURE THAT THE NEW WALL ASSEMBLY
CONDITIONS IN THE ELEVATOR MACHINE ROOM
THE CONTRACTOR SHALL FIELD VERIFY EXISTING
B
A-301
B
A-301
ELEVATOR GOVERNOR
A
A-301
A
A-301
A
A-301
A
A-301
B
A-301
B
A-301
PIPE SHAFT, SEE NOTE NO. 4 AND A-601
FIRE-RATED WALL ENCLOSURE FOR VERTICAL
SEE NOTE NO. 3 AND SHEET A-601
3'-0" x 7'-0" FIRE-RATED HM DOOR, NOTE 5
PAD TO BE REMOVED, SEE
CONCRETE HOUSEKEEPING
EXISTING CAST-IN-PLACE
5.
PATCH OR AN APPROVED EQUAL.
COMPOUND SUCH AS A THOROCRETE CONCRETE
WITH A CEMENTITIOUS PATCHING AND REPAIR
AFTER THE CUTTING OPERATION SHALL BE FILLED
PITS OR GOUGES LEFT IN THE FLOOR SURFACE
OPERATION SHALL BE GROUND OFF SMOOTH. ANY
UNEVENNESS LEFT AS A RESULT OF THE CUTTING
ROOM FLOOR ELEVATION. ANY RIDGES OR OTHER
SHALL BE CUT FLUSH WITH THE EXISTING MACHINE
THE EXISTING CONCRETE HOUSEKEEPING PAD
ROOM
MACHINE
ROOM
MACHINE
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
P O
R T
L A
N D D
IS
T R
IC
T
PORTLAND DISTRICT
A N
S I D
B P
H
A
.D
G N
B D
P 1.
G
E D
D K S
Z
G
E D
D K S
Z
G
E D
D R
M
E L E
V A
T O
R M
A C
H
IN
E R
O O
AK102
E
V A
T O
R N
O
E L E
V A
T O
R R
E H
A B
IL
IA
T
IO
N F
IR
S T P
O W
E R
H O
U S
E
B O
N N
E V
IL
L E L
O C
K A
N D D
A M
W
N -1
-R -0
R
O B
E
H
L L
E N
B E
C K
R00002
ABATE ASBESTOS IN BRAKE LININGS
W9127N10C0031CONTRACT NO.
AS-CONSTRUCTED
S
C
N S
T R
U C
T E
D
O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
D R
A W
IN
G N
U M
B E
R of Engineers
US Army Corps
P L
O T D
A T
E
54321
D
C
B
A
SHEET OF
N
W P -F
S
B O
N \W o rk s p a c e s \8 i\
N W
P
B o n n \W o rk
S p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
DefaultSHEET NAME:G2ODBJTE JEREMY EICHNERBY USERNAME:11:02:51 AM10/19/2015DATE AND TIME PLOTTED:
/1
/2
DRAWING PLOT SIZE: ANSI D
E2-01
E
B
ELEVATOR SHAFT: CONCRETE SECTION OUTLINE
16'8'0'A
ELEVATOR SHAFT: CONCRETE SECTION OUTLINE
16'8'0'
ROOM
MACHINE
ELEVATOR
PIT
ELEV.
SHAFT
ELEV.
LOBBY
ELEVATOR
LOBBY
ELEVATOR
LOBBY
ELEVATOR
LOBBY
ELEVATOR
LOBBY
ELEVATOR
LOBBY
ELEVATOR
SHAFT
ELEV.
ROOM
MACHINE
ELEVATOR
SHAFT
ELEV.
SHAFT
ELEV.
PIT
ELEV.
SHAFT
PIPE
SHAFT
PIPE
C
MACHINE ROOM SECTION ELEVATION
8'4'0'
C
A-301
D
HOISTWAY SECTION DETAIL
4'2'0'
SHAFT
ELEV.
SHAFT
PIPE
SHAFT
ELEVATOR
D
AK301
TYP.
1B 1B
1B 1B
1B 1B
1B
1A
SEE A-601
ELEVATOR MACHINE ROOM,
FOR THE PIPE SHAFT IN THE
NEW FIRE-RATED ENCLOSURE
SHAFT, SEE A-601
NEIGHBORING PIPE
WAY FROM THE EXIST.
THE ELEVATOR HOIST-
PHYSICALLY SEPARATE
ASSEMBLY TO
NEW SHAFTWALL
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
P O
R T
L A
N D D
IS
T R
IC
S I D
B P
H
A 1- .D
G N
B D
P 1.
G
E D
D K S
Z
G
E D
D K S
Z
G
E D
D R
E
V A
T O
R S
H A
F T S
E C
T
IO
N
AK301
E
V A
T O
R N
O
E L E
V A
T O
R R
E H
A B
IL
IA
T
IO
N F
IR
S T P
O W
E R
H O
U S
E
B O
N N
E V
IL
L E L
O C
K A
N D D
A M
W
N -1
-R -0
B
E
L L
E N
B E
C K
M
D
AK402
SERVICE PENSTOCK
EXISTING STATION
F
IL
X
IS
T
IN
G
N C
R E
IS
T W
Y
P
E N
W
IT
H
F
IR
E
R A
T
D
S E
M B
L Y
W9127N10C0031CONTRACT NO.
AS-CONSTRUCTED
N S
T R
U C
T E
D
14 21 00.10 28.
IN ACCORDANCE WITH SPEC SECTION
RECESS OPENING SHALL BE INSTALLED
NEW HOISTWAY COVER IN EXISTING
PAINTER-750 LEDGE
SHEET METAL
SERVICE PENSTOCK, SEE AK402
THE EXIST. NEIGHBORING STATION
ELEVATOR HOISTWAY FROM
PHYSICALLY SEPARATE THE
NEW FIRE BRICK WALL ASSEMBLY TO
OVER GB
SHEET METAL
GALVANIZE
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
D R
A W
IN
G N
U M
B E
R of Engineers
US Army Corps
P L
O T D
A T
E
54321
D
C
B
A
N
W P -F
S
B O
N \W o rk s p a c e s \8 i\
N W
P
B o n n \W o rk
S p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
DefaultSHEET NAME:G2ODBJTE JEREMY EICHNERBY USERNAME:11:02:52 AM10/19/2015DATE AND TIME PLOTTED:
/1
/2
DRAWING PLOT SIZE: ANSI D
EL. 77.0
EL. 65.0
OIL BREAKER GALLERY
EL. 55.0
EL. 37.0
EL. 23.5
FLOOR 4
MACHINE ROOM
EL. 4.5
EL. -10.0
EL. -26.0
EL. -42.0
PENSTOCK
STATION SERVICE
FLOOR 3
FLOOR 2
FLOOR 1
(DESIGNATED EXIT)
FLOOR 6
(ALTERNATE EXIT)
FLOOR 5
MACHINE ROOM
EL. 77.0
EL. 55.0
EL. 37.0
EL. 23.5
EL. -10.0
EL. -26.0
EL. -42.0
FLOOR 4
FLOOR 3
FLOOR 2
FLOOR 1
EL. 65.0
OIL BREAKER GALLERY
EL. 4.5
PENSTOCK
STATION SERVICE
(DESIGNATED EXIT)
FLOOR 6
(ALTERNATE EXIT)
FLOOR 5
MACHINE ROOM
EL. 77.0
ELEVATOR LANDING: PLAN
B
ELEVATOR LANDING: ELEVATION
C
ELEVATOR LANDING: ELEVATION
8'4'0' 8'4'0'
B
A-402
ELEVATOR LANDING PLAN @ EL. -26.0 ELEVATION 1: HOISTWAY DOOR @ FLOOR EL. -26.0 ELEVATION 2: HOISTWAY WALL @ FLOOR EL. -26.0
SEE DETAIL 2/A-501.
AT EACH ELEV. LANDING.
FLOOR DIRECTORY SIGN
FLOOR 3
FLOOR 2
EL. -26.0
FLOOR 3
EL. -10.0
N
C
SHAFT
ELEV.
SHEET A-501.
STATION. SEE NOTES 1-4 ON
SURFACE-MOUNTED HALL CALL
SEE A-601
AT EL. -42 AND -26,
AND DOOR HARDWARE
NEW HOISTWAY DOOR
"6
C
A-501
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
P O
R T
L A
N D D
IS
T R
IC
S I D
B P
H
A 1- .D
G N
G
E D
D K S
Z
G
E D
D K S
Z
G
E D
D R
M
AK402
E
V A
T O
R N
O
E L E
V A
T O
R R
E H
A B
IL
IA
T
IO
N F
IR
S T P
O W
E R
H O
U S
E
B O
N N
E V
IL
L E L
O C
K A
N D D
A M
W
N -1
-R -0
B E
L L
E N
B E
C K
D
P 1.
E L E
V A
T O
R H
O
IS
W A
Y L
A N
D
IN
G S
P L
A N
S A
N D E
L E
V A
T
IO
N S I I
EL. -10.0
C
A-402
ON EACH SIDE. (TYP.)
600 LBS. IN SHEAR. PROVIDE
OF 3,000 LBS. IN TENSION AND
DEVELOP A MIN. YIELD STRENGTH
BAR DEPTH AS REQUIRED TO
INTO THE EXIST. CONC. WALL.
#4 BAR DRILLED AND EPOXIED
N
IS
T W
L L
N
IS
T W
L L
(TYP.)
PROVIDE ON EACH SIDE.
600 LBS. IN SHEAR.
3,000 LBS. IN TENSION AND
A MIN. YIELD STRENGTH OF
AS REQUIRED TO DEVELOP
CONC. WALL. BAR DEPTH
EPOXIED INTO THE EXIST.
#4 BAR DRILLED AND
NEW HOISTWAY DOOR AND FRAME
REBAR INTO OPEN CELLS OF THE CMU. (TYP.)
AND 600 LBS.IN SHEAR. SOLID GROUT THE
YIELD STRENGTH OF 3,000 LBS.IN TENSION
DEPTH AS REQUIRED TO DEVELOP A MIN.
EPOXY INTO THE EXIST. CONCRETE FLOOR A
VERT. #4 BARS @ 4'-0" O.C. MAX. DRILL AND
OPEN CELLS OF THE CMU. (TYP.)
SOLID GROUT THE REBAR INTO
IN TENSION AND 600 LBS.IN SHEAR.
YIELD STRENGTH OF 3,000 LBS.
AS REQUIRED TO DEVELOP A MIN.
EXIST. CONCRETE FLOOR A DEPTH
DRILL AND EPOXY INTO THE
VERT. #4 BARS @ 4'-0" O.C. MAX.
FLOOR 2
EL. -26.0
M
R E
M O
V
IS
T
O
K
P
L A
H
F
IR
E
R A
T
IS
T W
L L
CMU BLOCK NOTES:
OPENINGS SHALL BE FILLED WITH GROUT FOR FULL HEIGHT OF OPENINGS.
SHALL BE FILLED SOLID WITH GROUT. CELLS UNDER LINTEL BEARINGS ON EACH SIDE OF
HOLLOW MASONRY UNITS IN WALLS OR PARTITIONS SUPPORTING VOIDS AT DOOR JAMBS
OPENINGS AT FLOOR LEVELS. FILL CELLS CONTAINING REINFORCING BARS WITH GROUT.
48-INCHES HORIZONTALLY. BOND BEAMS ARE REQUIRED AT THE BOTTOM AND TOP OF
THE MAXIMUM SPACING OF REINFORCING BARS SHALL BE 48-INCHES VERTICALLY AND
1.
2.
3.
4.
IN BOND BEAM (TYP.)
(2) #4 BARS SOLID GROUTED
IN BOND BEAM (TYP.)
(2) #4 BARS SOLID GROUTED
BLOCK. FIRE-RATED CMU BLOCK WALL CONSTRUCTION SHALL CONFORM TO ASTM E 119.
BE 2-HOUR FIRE-RATED CONSTRUCTION ASSEMBLED FROM SMOOTH FACED, 8x8x16 CMU
WALLS AT FLOOR ELEVATIONS -42.0 AND -26.0 FOR ELEVATOR #2. THE WALLS SHALL
PROVIDE LABOR AND MATERIALS TO INSTALL NEW CMU ELEVATOR HOISTWAY INFILL
SWING DOOR
INCORPORATE NEW
HOISTWAY AND
EXIST. ELEVATOR
TO ENCLOSE
BE CONSTRUCTED
WALLS SHALL
CMU HOISTWAY
NEW FIRE-RATED
STRUCK WITH A CONCAVE JOINT.
CONCRETE MASONRY UNITS SHALL HAVE 3/8 INCH JOINTS AND ALL JOINTS SHALL BE
#4 REBAR DOWELS AT ALL BOND BEAM LOCATIONS INTO ADJOINING CONCRETE WALLS.
BAR DIAMETER AT ALL LOCATIONS. DRIVE 1/2-INCH x 4-INCH HOLES TO DRIVE AND PIN
#4 REBAR SHALL BE USED AT ALL VERTICAL GROUTED CELLS. LAP ALL BAR 40 TIMES
M
D1
8'4'0'
4'2'0'
5.
(SEE NOTE 6)
OF ELEVATOR #2 HOISTWAY
EXIST. OPENING IN SOUTH WALL
6.
ELEVATOR HOISTWAY: ELEVATION
3'-7"
(FIELD VERIFY)
SHOWN IS APPROXIMATE.
LOCATION AND ANGLE
SERVICE PENSTOCK,
EXISTING STATION
STEEL FLANGE OF
(FIELD VERIFY)
(F
IE
V
R
IF
Y
HOISTWAY
ELEVATOR
SHAFT
PIPE
REF
AK301
NEW CMU BLOCK, SEE NOTE 1
SEE NOTE 1
NEW CMU BLOCK,
(TYP.)
24 INCHES HORIZONTALLY
EACH SIDE, SPACED AT
IN SHEAR. PROVIDE ON
IN TENSION AND 600 LBS.
STRENGTH OF 3,000 LBS.
DEVELOP A MIN. YIELD
DEPTH AS REQUIRED TO
EXIST. CONC. WALL. BAR
AND EPOXIED INTO THE
#4 BAR DRILLED
F
IL
IS
T
N C
R E
IS
T W
P
E N
H
F
IR
E
R A
T
S E
M B
L Y
SPECIFICATION SECTION 09 90 00.10 28 FOR ADDITIONAL INFORMATION.
BLOCK SHALL MATCH SHERWIN-WILLIAMS COLOR SW 7008 "ALABASTER". SEE
PAINT SYSTEM SHALL BE A MINIMUM 12 MILS. THE FINISHED PAINT COLOR ON THE CMU
COATING SHALL COMPLY WITH MPI-119. THE DRY FILM THICKNESS (DFT) OF THE FINISHED
BE FILLED.THE BLOCK FILLER SHALL COMPLY WITH MPI-4; THE INTERMEDIATE AND TOP
FILLER AT ELEVATIONS -26.0 AND -42.0. ALL HOLES IN THE MASONRY SURFACE SHALL
PAINTERS INSTITUTE (MPI) SYSTEM EXT 4.2A LATEX-G5 (SEMI-GLOSS) OVER BLOCK
THE EXTERIOR FACE OF THE NEW CMU WALLS SHALL BE PAINTED WITH MASTER
W9127N10C0031CONTRACT NO.
AS-CONSTRUCTED
N S
T R
U C
T E
D
OF THE NEW FIRE BRICK INFILL ASSEMBLY.
AT THE EXISTING PENSTOCK OPENING SHALL BE REMOVED BEFORE THE INSTALLATION
AT THE CONTRACTOR'S OPTION, ALL EXISTING STEEL MESH AND STEEL ANGLES FOUND
WITH AN APPROPRIATE 2-HOUR RATED FIRE CHALKING.
AS MUCH AS POSSIBLE. ALL GAPS LEFT AROUND THE PENSTOCK FLANGE SHALL BE FILLED
THE FIRE BRICK BLOCK SHALL BE SITUATED ADJACENT TO THE PENSTOCK STEEL FLANGE
CONSTRUCTION SHALL CONFORM TO ASTM E 119. THE CLOSED, UNCUT ENDS OF
FROM SMOOTH FACED, FULLY-GROUTED, FIRE BRICK. FIRE-RATED FIRE BRICK WALL
FOR ELEVATOR #2. THE WALL SHALL BE 2-HOUR FIRE-RATED CONSTRUCTION ASSEMBLED
WALL AT THE EXISTING PENSTOCK OPENING BETWEEN FLOOR ELEVATIONS 4.5 AND 23.5
PROVIDE LABOR AND MATERIALS TO INSTALL A NEW FIRE BRICK ELEVATOR HOISTWAY INFILL
2 1/2" X 4" X 9"
FB = FIRE BRICK
FB INFILL WALL.
THE INSTALLATION OF THE
SHALL BE ASSEMBLED AFTER
ASSEMBLY. NEW PARTITION WALL
ELEVATOR "IB" SHAFT WALL
APPROXIMATE LOCATION OF NEW
SEE NOTE 5
NEW FB BLOCK INFILL,
DN
U P
E2-07
Elevators Are Out Of Service
In Case Of Fire
Use Exit
DOWN
UP
Generator Floor55
Turbine Floor
-10 CW & FW Pumps
-26 Oil Treatment Equip.
-42 Station Air Comp.
Oil Storage & Sewage Eq.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
D R
A W
IN
G N
U M
B E
R of Engineers
US Army Corps
P L
O T D
A T
E
54321
D
C
B
A
N
W P -F
S
B O
N \W o rk s p a c e s \8 i\
N W
P
B o n n \W o rk
S p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
DefaultSHEET NAME:G2ODBJTE JEREMY EICHNERBY USERNAME:11:13:50 AM10/19/2015DATE AND TIME PLOTTED:
/1
/2
DRAWING PLOT SIZE: ANSI D
PHOTO: ELEVATOR SHAFT INTERIOR
PHOTO: ELEVATOR SHAFT INTERIOR
PHOTO: ELEVATOR SHAFT INTERIOR
PHOTO: ELEVATOR SHAFT INTERIOR
PHOTO: ELEVATOR SHAFT INTERIOR
NOT TO SCALE NOT TO SCALE NOT TO SCALE
NOT TO SCALENOT TO SCALE
ASTM A17.1, SECTION 2.8.
THE HOISTWAY IN ACCORDANCE WITH
OPERATION SHALL BE REMOVED FROM
USED TO DIRECTLY SUPPORT ELEVATOR
FIELD VERIFY THAT ALL CONDUIT NOT
THE CONTRACTOR SHALL INSPECT AND
ASTM A17.1, SECTION 2.8.
THE HOISTWAY IN ACCORDANCE WITH
OPERATION SHALL BE REMOVED FROM
USED TO DIRECTLY SUPPORT ELEVATOR
FIELD VERIFY THAT ALL CONDUIT NOT
THE CONTRACTOR SHALL INSPECT AND
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
P O
R T
L A
N D D
IS
T R
IC
S I D
B P
H
A .D
G
NB
D P 1.
G
E D
D K S
Z
G
E D
D K S
Z
G
E D
D R
IS
T
IN
G C
O N
D U
IT
P
H O
T O
S
E L E
V A
T O
R H
O
IS
T W
A Y I
N T
E R
IO
AK502
E
V A
T O
R N
O
E L E
V A
T O
R R
E H
A B
IL
IA
T
IO
N F
IR
S T P
O W
E R
H O
U S
E
B O
N N
E V
IL
L E L
O C
K A
N D D
A M
W
N -1
-R -0
B
E
L L
E N
B E
C K
W9127N10C0031CONTRACT NO.
AS-CONSTRUCTED
N S
T R
U C
T E
D
FIRE RESISTIVE AIR-TIGHT ENCLOSURE.
REPAIRED TO PROVIDE A CONTINUOS,
HOISTWAY ENCLOSURE SHALL BE
ALL VISIBLE HOLES IN THE EXISTING
ASTM A17.1, SECTION 2.8.
THE HOISTWAY IN ACCORDANCE WITH
OPERATION SHALL BE REMOVED FROM
USED TO DIRECTLY SUPPORT ELEVATOR
FIELD VERIFY THAT ALL CONDUIT NOT
THE CONTRACTOR SHALL INSPECT AND
ASTM A17.1, SECTION 2.8.
THE HOISTWAY IN ACCORDANCE WITH
OPERATION SHALL BE REMOVED FROM
USED TO DIRECTLY SUPPORT ELEVATOR
FIELD VERIFY THAT ALL CONDUIT NOT
THE CONTRACTOR SHALL INSPECT AND
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
D R
A W
IN
G N
U M
B E
R of Engineers
US Army Corps
P L
O T D
A T
E
54321
D
C
B
A
SHEET OF
N
W P -F
S
B O
N \W o rk s p a c e s \8 i\
N W
P
B o n n \W o rk
S p a c e \p ro je c ts \L o c a l R e s o u rc e
D E
S
IG
N F
IL
E
DefaultSHEET NAME:G2ODBJTE JEREMY EICHNERBY USERNAME:11:02:58 AM10/19/2015DATE AND TIME PLOTTED:
/1
/2
DRAWING PLOT SIZE: ANSI D
c
A
NEW HOISTWAY DOOR AND FRAME
I
SURFACE-MOUNTED HALL CALL
STAT ION. SEE NOTES 1-4 ON
SHEET A-5D1.
ELEVATOR LANDING PLAN ~ EL. -26.0
0 ELEVATOR
APPROXIMATE LOCATION OF NEW
ELEVATOR "IB" SHAFT WALL
ASSEMBLY. NEW PARTITION WALL
SHALL BE ASSEMBLED AFTER
THE INSTALLATION OF THE
FB INFILL WALL. ..
NEW FB BLOCK INFILL,
SEE NOTE 5 ---f.::.l.
•4 BAR DRILLED •
AND EPOXIED INTO THE
EXIST. CONC. WALL. BAR
DEPTH AS REQUIRED TO
DEVELOP A MIN. YIELD
STRENGTH OF 3,000 LBS.
IN TENSION AND 600 LBS.
IN SHEAR. PROVIDE ON
EACH SIDE, SPACED AT
24 INCHES HORIZONTALLY
<TYP.>
PIPE
SHAFT
LANDING: PLAN
I
II
I
I I o· 4' 8' ---
3'-7"
VERIFY
ELEVATOR
HOISTWAY
EXIST. OPENING IN SOUTH WALL
OF ELEVATOR •2 HOISTWAY
<SEE NOTE 6>
& R;.;.;E;.;.F_-f
AK301
ELEVATOR HOISTWAY: ELEVATION
0' 2' 4'
NEW CMU BLOCK, SEE NOTE 1
FLOOR DIRECTORY SIGN
AT EACH ELEV. LANDING.
SEE DETAIL 2/A-5D1.
:t w z
6 ' 6 . . . " ' 6 . . .. . · .. .. ~ . · .. ,. : .
<2> •4 BARS SOLID GROUTED
IN BOND BEAM <TYPJ
i • .. · .. i .. . . · ..
. . .. '6 . • • ' 6 ,; ~ -- · .. 6 • ·. · ..
NEW HOISTWAY DOOR
AND DOOR HARDWARE
AT EL. -42 AND -26,
SEE A-601
VERT. •4 BARS C 4'-0" O.C. MAX. DRILL AND
EPOXY INTO THE EXIST. CONCRETE FLOOR A
DEPTH AS REQUIRED TO DEVELOP A MIN.
YIELD STRENGTH OF 3,000 LBS.IN TENSION
AND 600 LBS.IN SHEAR. SOLID GROUT THE
REBAR INTO OPEN CELLS OF THE CMU. CTYPJ
ELEVATION 1: HOISTWAY DOOR ~ FLOOR EL. -26.0
0 ELEVATOR LANDING: ELEVATION
0'
I 4' 8'
FB • FIRE BRICK
2 112" X 4" X 9" AS-CONSTRUCTED
<2> •4 BARS SOLID GROUTED
IN BOND BEAM <TYP.>
•4 BAR DRILLED AND EPOXIED
INTO THE EXIST. CONC. WALL.
BAR DEPTH AS REQUIRED TO
DEVELOP A MIN. YIELD STRENGTH
OF 3,000 LBS. IN TENSION AND
600 LBS. IN SHEAR. PROVIDE
ON EACH SIDE. <TYP.>
VERT. •4 BARS C 4'-0" O.C. MAX.
DRILL AND EPOXY INTO THE
EXIST. CONCRETE FLOOR A DEPTH
AS REQUIRED TO DEVELOP A MIN.
YIELD STRENGTH OF 3,000 LBS.
IN TENSION AND 600 LBS.IN SHEAR.
SOLID GROUT THE REBAR INTO
OPEN CELLS OF THE CMU. <TYP.>
NEW CMU BLOCK,
SEE NOTE 1 &
• • ~ . a. . .. . • .
• 6 . • . • "' . .. . . .. 6 .
..J
<i.
:t
:t 1- Vl I
::::E u
:t w z
ELEVATION 2: HOISTWAY WALL ~ FLOOR EL. -26.0
@ELEVATOR LANDING: ELEVATION
0'
I 4' a·
CMU BLOCK NOTES:
1. PROVIDE LABOR AND MATERIALS TO INSTALL NEW CMU ELEVATOR HOISTWAY INFILL
WALLS AT FLOOR ELEVATIONS -42.0 AND -26.0 FOR ELEVATOR •2. THE WALLS SHALL
BE 2-HOUR FIRE-RATED CONSTRUCTION ASSEMBLED FROM SMOOTH FACED, 8x8x16 CMU
BLOCK. FIRE-RATED CMU BLOCK WALL CONSTRUCTION SHALL CONFORM TO ASTM E 119.
2. THE MAXIMUM SPACING OF REINFORCING BARS SHALL BE 48-INCHES VERTICALLY AND
48-INCHES HORIZONTALLY. BOND BEAMS ARE REQUIRED AT THE BOTTOM AND TOP OF
OPENINGS AT FLOOR LEVELS. FILL CELLS CONTAINING REINFORCING BARS WITH GROUT.
HOLLOW MASONRY UNITS IN WALLS OR PARTITIONS SUPPORTING VOIDS AT DOOR JAMBS
SHALL BE FILLED SOLID WITH GROUT. CELLS UNDER LINTEL BEARINGS ON EACH SIDE OF
OPENINGS SHALL BE FILLED WITH GROUT FOR FULL HEIGHT OF OPENINGS.
3 . •4 REBAR SHALL BE USED AT ALL VERTICAL GROUTED CELLS. LAP ALL BAR 40 TIMES
BAR DIAMETER AT ALL LOCATIONS. DRIVE 112-INCH x 4-INCH HOLES TO DRIVE AND PIN
•4 REBAR DOWELS AT ALL BOND BEAM LOCATIONS INTO ADJOINING CONCRETE WALLS.
CONCRETE MASONRY UNITS SHALL HAVE 3/8 INCH JOINTS AND ALL JOINTS SHALL BE
STRUCK WITH A CONCAVE JOINT.
4. THE EXTERIOR FACE OF THE NEW CMU WALLS SHALL BE PAINTED WITH MASTER
PAINTERS INSTITUTE <MPD SYSTEM EXT 4.2A LATEX-G5 <SEMI-GLOSS> OVER BLOCK
FILLER AT ELEVATIONS -26.0 AND -42.0. ALL HOLES IN THE MASONRY SURF ACE SHALL
1,\ BE FILLED. THE BLOCK FILLER SHALL COMPLY WITH MPI-4; THE INTERMEDIATE AND TOP ~ COATING SHALL COMPLY WITH MPI-119. THE DRY FILM THICKNESS <OFT> OF THE FINISHED
PAINT SYSTEM SHALL BE A MINIMUM 12 MILS. THE FINISHED PAINT COLOR ON THE CMU
BLOCK SHALL MATCH SHERWIN-WILLIAMS COLOR SW 7008 "ALABASTER". SEE
SPECIFICATION SECTION 09 90 00.10 28 FOR ADDITIONAL INFORMATION .
5. PROVIDE LABOR AND MATERIALS TO INSTALL A NEW FIRE BRICK ELEVATOR HOISTWAY INFIL
WALL AT THE EXISTING PENSTOCK OPENING BETWEEN FLOOR ELEVATIONS 4.5 AND 2.3.5
FOR ELEVATOR •2. THE WALL SHALL BE 2-HOUR FIRE-RATED CONSTRUCTION ASSEMBLED
J,\ FROM SMOOTH FACED, FULLY-GROUTED, FIRE BRICK. FIRE-RATED FIRE BRICK WALL
~ CONSTRUCTION SHALL CONFORM TO ASTM E 119. THE CLOSED, UNCUT ENDS OF
THE FIRE BRICK BLOCK SHALL BE SITUATED ADJACENT TO THE PENSTOCK STEEL FLANGE
AS MUCH AS POSSIBLE. ALL GAPS LEFT AROUND THE PENSTOCK FLANGE SHALL BE FILLED
WITH AN APPROPRIATE 2-HOUR RATED FIRE CHALKING.
6. AT THE CONTRACTOR'S OPTION, ALL EXISTING STEEL MESH AND STEEL ANGLES FOUND
AT THE EXISTING PENSTOCK OPENING SHALL BE REMOVED BEFORE THE INSTALLATION & OF THE NEW FIRE BRICK INFILL ASSEMBLY.
US Army Corps of Engineers•
PORTLAND DISTRICT
. ' ::l oo z <;' • :
5l z~ §.< 0 Q.,... 1-
"' !<c z u
•. II) (3~ ~ UJo _., z ~;:. as 0 Clo en u
~ w w t9U z-a:
wf!:o
u. (/) • o-o Clz ~o:s O::zi- O:Sa:
Ul--0 >-a:: c..
::;:0 ~c..
ui
)o -' -' ;j, ~ 31:
~ 31:
1- -' Ill ;j, 5 31: J:
<.> u 0 0 .., .., 1- 1-
"' "' C>: 9' . .., .., a:
C>: -;;: ...
J: J: z 1- t:: Q i 31: li:
<.:) I.&J a::
z ~ 0 z ...J ffi .., a. " 15 ~ ?( i 31:
1- "' !!! u 0 0 o:z:ffi w~> t-w< u C>: -' :::J~u o:::oo 1-u~ (/)C)~ Z z -- X 0~ ..... u-w
Vl -' " <(=W ... C>:
SHEET
IDENTIFICATION
AK402
u.
z u;
~~~PLIT~~T~K~Rr--------------------------~~Mm~~rrrr~~~~~nw~---l--------------,-----------------::::::::::::::::::::::::::~~;;,;,;,;;~~~----------------------------~~~~~~~~----------------------------_j~::::,:7::2:o::~~ -DRAWING PLOT SIZE: $BORDER$ DATE AND TIME PLOTTED: $$$DATE$$$$ $TIME BY USERNAME: $USER$ SHEET NAME: $SHEETN$
---- CONTRACT NO. W9127N10C0031
1nn1 I n A A .... n ,....,,......_, ,..,,.._,.. , ,..,.. ....... .o .o . ....... . .-..-. A oo
EL. 95'
ELEVATOR •2
HOIST MOTOR ELEVATOR ELEVATOR
40 HP, 1200 RPM CONTROLLER _,...._ J 48ov, 1J~~
M -----11 1-3--_·_2_w_1_·_6_G_N_D__.~0 ..... A _________ ,,,........_EI.~,,,--
3- •2 W/•6 GND 100A 100A
SEE NOTE 2.
SEE NOTE 1.
1CR41-r2,4,6 208/120/ 3/ 4 w
SEE NOTE 8.
3 •2 W/•6 GND (
ELEVATOR •1 )
HOIST MOTOR
PIPE GALLERY MACHINE ROOM MACHINE ROOM
i ~}------------<'I '>----------------.., 1 ~ ' , SEE NOTE 3.
3- •8 W/12 GND, 1" RGC
~--it-- - - -,..... ,......._ ,......._ r-r-:;::::::==================================================:::::l:ir------------t-T-~-t~· ->--- -......-'\.....+-''*,/--I-·,....._ - >---,.......__
HEAT PUMP. SPLIT SYSTEM ,-~=2~~'+= ........... =:-i1..... ' . ~ V"' .--"+-1C_R,......_52~ ,_:AN-EL
FAN COIL UNIT AH r M' • f\'" 1-,~~f----~~~~ 208/120/ 3/ 4 W
-...:...:..;/ SEE NOTE 11. 60AMP
i FUSED DISCONNECT
FOR COMPRESSOR UNIT
HEAT PUMP.SPLIT SYSTEM
COMPRESSOR UNIT
FUSED DISCONNECT
FOR FAN UNIT
EL. 77'
EL. 65'
EL. 55'
EL. 37'
EL. 23.5'
EL. -10'
EL. -26'
EL. -42'
EL. 43'
AS-CONSTRUCTED
CONTRACT NO. W9127N10C0031
SEE NOTE 9.
CTYP. OF 4
ELEVATOR •2 PIT
LIGHTING 8c RECEPT.
SEE NOTE 6 AND 7.
2 PIT ~
LIGHTS------
ELEVATOR CAR 2 12 W 12 GND LIGHTING, RECEPT. 8c FAN L -'"'·--1:::.:")'10~A..:..._ ______ =----·-=-..:.:.:..!_•.=.....::.:..:=------____.
2- •10 W/•10 GND
MACHINERY ROOM LIGHTING 5,,_ _____ E_X_l_S_Tl_N_G___..s
ELEVATOR MACHINERY
ROOM RE CE PT ACLES,
EXISTING TO REMAIN
s EXISTING LC-7-18 s
SEE NOTE 6.
1-CR1
120VAC
1--------2_-_•1_o_w_1_•1_o_G_N_D_-+-~~!~
WP
FCI
r A 'I: ONE LINE DIAGRAM: ELEVATOR POWER
~ ~ NOT TO SCALE
NOT USED
GENERAL NOTES:
A. PANELBOARD SCHEDULES ARE SHOWN ON SHEET E-604.
B. SEE MECHANICAL SHEETS FOR HVAC EQUIPMENT ELECTRICAL
SPECIFICATIONS.
C. SEE SHEET M-101 FOR HVAC EQUIPMENT AND PIPING LOCATIONS.
NUMBERED NOTES:
1. REUSE EXISTING CIRCUIT BREAKER "1CQ21-q1". PROVIDE NEW
CONDUCTORS FROM BREAKER TO NEW ELEVATOR DISCONNECT.
2. PROVIDE NEW 480/.3/100AMP CIRCUIT BREAKER DISCONNECT
FOR ELEVATOR CAS REQUIRED BY NEC 620.51 IN MACHINERY
ROOM WALL.
3. PROVIDE 208/120/3/4W CIRCUIT BREAKER PANEL "1CR52"
FOR ELEVATOR CAR, HVAC EQUIPMENT AND 120VAC
RECEPTACLES. SEE SHEET E-604 FOR PANEL SCHEDULE.
4. PROVIDE NEW POWER CONDUCTORS AND CIRCUIT BREAKER
DISCONNECTS FOR ELEVATOR LIGHTING, RECEPTACLES AND
FAN AS REQUIRED BY NEC ARTICLE 620.22.A AND 620.53.
MOUNT DISCONNECT ON MACHINERY ROOM WALL NEAR
ENTRANCE DOOR.
5. ELEVATOR PHONES ARE HANDSETS CONNECTED THROUGH
TELEPHONE CIRCUITS.
6. PROVIDE 120 HVAC POWER CIRCUIT FROM "1CR12" CIRCUIT
BREAKER PANEL FOR ELEVATOR PIT LIGHTING AND WEATHER
TIGHT GFCI RECEPTACLE.
7. PROVIDE NEW CONDUIT, BOXES, SWITCHES, LIGHT FIXTURES
AND WIRE IN THE ELEVATOR PIT. ALL EQUIPMENT AND BOXES
SHALL BE NEMA 4. INST ALL LIGHT SWITCH AT THE TOP OF
THE PIT LADDER PIT FIXTURE.
8. REPLACE EXISTING BREAKER WITH A 30 AMP 3-PHASE
BREAKER, MATCH EXISTING MODELS. FEED THE NEW PANEL
"1CR52" IN THE ELEVATOR MACHINE ROOM.
9. PROVIDE ADDITIONAL ELEVATOR LOBBY FLUORESCENT
LIGHT FIXTURES AS INDICATED.
10. REPLACE EXISTING INCANDESCENT FIXTURES WITH
FLUORESCENT FIXTURES.
11. DEPENDING ON HVAC EQUIPMENT MANUFACTURER, THE
OUTDOOR AND INDOOR UNITS MAYBE EITHER BE FED BY
TWO BRANCH CIRCUITS. PROVIDE
FUSED DISCONNECTS, DISCONNECTS TO MEET THE NEC AND
MANUFACTURER'S RECOMMENDATIONS.
PORTLAND DISTRICT
i e -0 z N ~ ... N
"' ~ 0 ...
N
"' "' "' 0
a. a 0 0 0 0 0 0 "' "' Ul 0::
w w ~ I-z - 0:: w ~o LL Ul • o-o Dz ~D~ 0:: z I- 0 ~ 0::
(.) I- 0 >- 0:: 0..
::;: 0 0:: 0..
i z ,_ :i:
0:
!ii :i:
u
N ...
ii.
0 m
"' 0 w u a::
VI z u
EK601
27 31 z "' C! . .
N of iii
0:
-' o e"I·IS.4' j e~ GQIJ'P
WAR DEPARTMENT
tn' -
1° \LO" ,,:0· I~
f;\j!, =::'3t--lDr
M b -' 0)
10 c! Iv"", 28.!0· ~'-i---- -~--~--, J
" 0' _. I i I , o \9'
I
1 c~ .. --+2.,0
- ->-~_cc-.,~"" ,;-". ~_"C'<""'_~ ... ':H""
~o, , 19'r 11.5' B'f GOVT b~" 10_ L 8':1: ,84
-BY GOVT
o ., m i
I· i: , E1>p .... Ii<;'IOM '6oLT,$ ANP DRILL I--IO!.E}
IN CON(.f::EIT Pc>~ ALl. ANCHoe BOLn
/J
I
I I SECTI9N A-A
I
SCFl.LE ~"~ t FT fo- S' FT. - ~~
LC)Vv'ER
T -
Q ..
:z: 0 o J
""w
'.' '1 , , .
Vj 0 ' ..
1: ;:; -
\l .".
-' w
"'-" ~ " AO
zOO <t<ll
Vl " ilJ u 0 z
I I SLiOE
I a -, o
" o r;, ~t, !S it): .. -, o i
I I
:1 :.;~.. ~I(p' COHC.
~El..t 135 ;'I~ , .' ~....l.-~c._ , o
IU
'I No ~i io
ELEVATOR.
-. 0 r- ~.
III ,'"
i ,,' I ~o'
I~ •• ~. _~"'~iLC ~l;gi;it ~ __ --~:
. N-~-S '
!.t-"," 1iLE ,PARTITION PLA$TER~D O~E s~e
By GOY·T .
.t.i./~'(~ 8.2'1t",4!Q' I' ev EL.SVAfOF: COI'ITFt.,' I ~ ,I ~ J . ...9;
- ·,'1
-l~:
51..IDE DOORS
I , i
. ~(OI' 'P1..A.S.'\'~~~e·!) I YI~E. 'PARTITIO"M Ii
'tS' '( G 0\(1,-;
'j(,,.,~e.2~ 4'0' '1'1 . Bv El,EVAToR CONTR~, gi
~ \9:
I SWING PooR !
I I jCDtlC<Er, ro B. CH,JpJD "0" 5'" g ~ E 4t;Vt;Td~ cor; TK:AC.TO/l:, lEI- -2Go. D Iii
;)j~:,\~;;~- -~ t I I
• I
ELEVATOR MACHINE
--~--~~,-- - Roon AT ELEV +77.~
-'-'-_=c='-'-~.-'.!.C=-
SCALE i;~ 1'0·
.-- :I'O'~ liZ -:: =::;j
1"<1- I-' .-
2-12",M5ERT:i N01<TfI SIDE
+- 54. 0
+ 44.5'
E.LEVATION OF
</; OF INS",,·
ri-_c0417
oj. 5'4.0
-I-44.S' f------
-I- 34.5
"DIsTANce BETWEeN INSEi:n
IO!..O·l
I(LcD" +- '23.0 --~---
1---=---1 I 0 ~ 0" .. I 3.0
PLAN AI ELEV +-55 9 NOil::' INSEi!'TS LISil!O ABO'll'::
! j.: '. . -~ . u
COHiRAC:TOR,. 'PRILL HDL.Es IN Coticee.Tf 'FOil e)fPAt\SIQN nf'~~ ANC~Oj{: SOL-it, EL-EVATOI': CONT~
To CHIP c,ONC, FOR :SILL. ~ _____ .'llld' o TILE PARnnON PLA5TE-l':ED ONE. SIDE J BY Gov'r:
'--P=L'--'A-'-'N--'-.A-'-.'-T--=c=-=Lo=E"'-Vc.-_4=2. a AtlDc LEV - Z~_~
-,:-- -,' j 0, "'·"J'I oJ
_, ' (I.
......... ..... ~'-. _0
FURN.ISHED BY GO'le~NMEl1T
<D~ INSEItTS - 2~ o' LONG
" 'IiSERn- 1'0' lONG
T.uSCON i" SLOTTED 1~5E~T "'" EQ tlAI-, WITH WA~iI£"~
,OR 5/8 BOL'.!>
INseRTS SHOWN ARE FoR 5. "eOl..TS.
ALL DOORS To Bf" 7!.o' HIGH FINIStiEo oPEHltiG.
$\LL S f!'LUSH Will; IHSIDE OF HOISTWA'(, 1t'l51DE CAR D1MI:t;Slo/i5 MA'j VARY BY ONE INC.H ,0 5VIT MAl'!UFA(TURERS '
S"rANDAROS, I-!OI:iTWAy WILL BE PLUMB WITHIN ONE IC'l.CH.
I, COR P:5"OF ENGINEERSU.5. ARMY.
BONNEVILLE POWER NAVIGATION PROJECT
POWERI-IOVSE MECHANICAL EQUIPME.NT
EL[VATORS
HOl5TWAY AND MACHIMERY ROOM
FOR NO Z. OR STATION SERVICE ELEVATOR
P-\4-- 2
I l --
~ T-'-~ •