AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: MOUTH OF THE COLUMBIA RIVER (MCR) NORTH JETTY REHABILITATION
SEE ATTACHED PAGES
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-17-R-0008
X 9B. DATED (SEE ITEM 11)
24-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Apr-2017
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-17-R-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS
AMENDMENT 0005
This Amendment is issued to revise the following:
1. Division 32 – Exterior Improvements:
- Section 32 90 00.00 25 paragraph 1.5.3.c has been revised.
- Section 32 90 00.00 25 paragraph 1.6.1 has been added.
- Section 32 90 00.00 25 paragraph 1.9.c has been added.
- Section 32 90 00.00 25 paragraph 2.5 has been added.
- Section 32 90 00.00 25 paragraph 3.4 has been added.
2. The proposal due date has been extended from Monday, 24 April 2017 at 4:00 PM PDT to Thursday, 27 April 2017 at 4:00 PM PDT.
3. All other terms and conditions remain unchanged.
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 24-Apr-2017 04:00 PM to 27-Apr-2017 04:00 PM.
(End of Summary of Changes)
Mouth of the Columbia River North Jetty Rehabilitation 2017
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 22 00.00 25 MEASUREMENT AND PAYMENT
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.10 25 QUALITY CONTROL SYSTEM (QCS)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 31 - EARTHWORK
31 11 00.00 25 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16.00 25 HOT-MIX ASPHALT (HMA) FOR ROADS
32 31 29.13 25 SAND FENCING
32 90 00.00 25 SITE RESTORATION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 26.40 25 JETTY REPAIRS
35 52 00.00 25 MATERIAL OFF-LOADING FACILITY CONSTRUCTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 90 00.00 25
SITE RESTORATION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DEFINITIONS
1.3.1 Planting Areas
1.3.2 Drift Wood and Woody Debris
1.4 DESCRIPTION
1.4.1 Summary
1.4.2 Planting
1.5 REVEGETATION CONTRACTOR QUALIFICATIONS
1.5.1 Qualifications
1.5.2 Certified Growers
1.5.3 Revegetation Plan
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Dune Grass Sprig Storage
1.7 WEED MANAGEMENT
1.7.1 Transport
1.7.2 Mulch
1.8 MONITORING
1.9 PLANT TIMING
PART 2 PRODUCTS
2.1 HYDROSEED
2.2 WATER
2.3 BONDED FIBER MATRIX (BFM)
2.4 TACKIFIER
2.5 DUNE GRASS SPRIGS
PART 3 EXECUTION
3.1 EXTENT OF WORK
3.2 JETTY TREE REMOVAL
3.3 SITE PREPARATION
3.3.1 Soil Preparation
3.3.2 Woody Debris Areas
3.4 SPRIGGING INSTALLATION
3.5 HYDROSEEDING
3.5.1 Hydroseeding Dates
3.5.2 Hydroseeding Process
3.5.3 Application
3.5.4 Hydromulch Timing
3.5.5 BROADCAST SEEDING
3.6 WWHAM-CERTIFIED WEED-FREE STRAW
3.7 IRRIGATION
3.7.1 Irrigation Establishment Period
3.7.2 Water Supply From Offsite Fire Hydrants
3.8 CLEAN UP
3.9 MAINTENANCE
SECTION 32 90 00.00 25 Page 1 inhabitance of flora and fauna by retention and/or placement of pieces of woody debris or salvaged logs measuring a minimum of 4 inches in diameter at the largest end and a minimum of 4 feet in length. Evenly distribute woody debris as individuals, clumps or small piles not to exceed 3 feet high.
1.4 DESCRIPTION
1.4.1 Summary
This Section covers the requirements for permanent revegetation of the site. Specific requirements include site preparation, seeding and planting of areas to be permanently revegetated. Provide all materials, labor, and equipment necessary to complete the work as specified herein, to apply specified treatments to all areas designated for permanent revegetation.
Perform all work in accordance with applicable requirements of TCIA Z133.1.
1.4.2 Planting
Approximately 18 acres of area is available for contractor staging and storage however approximately 6 acres is covered in mature trees. The disturbed area must be planted and seeded (or hydroseeded) with native seed mix approved by CO.
1.5 REVEGETATION CONTRACTOR QUALIFICATIONS
1.5.1 Qualifications
A Landscape Contractor licensed to conduct business in the State of Washington must complete the revegetation work. The Landscape Contractor must have a minimum of five years of relevant experience actively and directly developing and installing native habitat restoration plans in western Washington/western Oregon, including documented, successful experience with native plant grass seeding, noxious weed control, livestake collection and installation, and installation of upland container-grown stock.
1.5.2 Certified Growers
Refer to the following link for WSDA - 2013 WWHAM Certified Growers.
http://agr.wa.gov/PlantsInsects/WWHAM/docs/WWHAMCertifiedGrowers.pdf
1.5.3 Revegetation Plan
a. Replant where disturbance occurs within the construction limits due to construction activities for this project. Submit a Revegetation Plan to the CO for approval prior to the disturbance or removal of vegetation. Retain the services of a Washington licensed Landscape Architect to prepare the plan. Disturbed areas include but are not limited to haul roads, turnouts, staging areas, and other areas disturbed by construction activities.
b. Submit Revegetation Plan for review at least 30 days Prior to any proposed plantings.
c. Revegetation Plan must include the following which are described throughout this Section:
(1) Revegetation Contractor Qualifications
SECTION 32 90 00.00 25 Page 4
(2) Mulches and Topdressing
(3) Proposed Seed Mix, sprigs, and/or rooted stock and Seed Source
(4) Include a diverse palette of native forbs and shrubs endemic to this location. Identify an appropriate reference site and include plant densities of forbs and shrubs similar to the selected reference site. Include appropriate plant species, planting location and densities in order to successfully establish in existing site conditions, which includes but is not limited to artificial fill materials, potential exposure to brackish/salt water spray, and estuarine exposure.
(5) Proposed Water Source
(6) Bonded Fiber Matrix
(7) Tackifier
(8) Time restrictions
(9) Layout of plants, sprigs, seed for each disturbed area
(10) Details of planting instructions and techniques
(11) Maintenance Data
(12) Irrigation during warranty period
1.6 DELIVERY, STORAGE, AND HANDLING
Protect materials from drying out and from contamination during delivery, on-site storage, and handling.
1.6.1 Dune Grass Sprig Storage
Lightly sprinkle with water, cover with moist burlap, straw, or other approved covering; and protect from exposure to wind and direct sunlight until planted. Provide covering that will allow air to circulate so that internal heat will not develop. Do not store longer than 24 hours. Do not store directly on concrete or bituminous surfaces.
1.7 WEED MANAGEMENT
1.7.1 Transport
Control transport of weeds to and from the Project Site. Weed management includes the prevention of introduction of weeds to the site, plus the removal of specified weeds from the site. Construction equipment, including excavators and trucks, hydroseeding equipment, personal vehicles, and hand tools used on-site must be kept free of weed seed and propagules prior to entering and leaving the site to reduce transport of seeds and plant material to and from weed infested areas.
1.7.2 Mulch
All straw (bales or loose), wood fiber hydromulch, or other plant fiber mulch used on the Project Site, access road and construction areas must be
SECTION 32 90 00.00 25 Page 5 certified in writing by the supplier as weed-free.
1.8 MONITORING
Develop a water monitoring program for surface and groundwater on the project site and consistent with the water management program utilized during construction operations. Using local NOAA Reporting Station record daily rainfall as a required entry for the Quality Control Report.
1.9 PLANT TIMING
a. Plant in accordance to the nursery recommendations for each plant species in the spring following storm season.
b. Do not conduct seeding when wind velocity exceeds 7 mph or in late summer/fall when soils are unsuitable for seeds to germinate and seedlings to survive.
c. Perform sprigging a maximum of 24 hours after initial harvesting
PART 2 PRODUCTS
2.1 HYDROSEED
Seed mix must be native and tolerant of existing conditions. Protect seed from heating, drying, and contamination during transport, storage and handling on-site. Store seed in a cool, dry location.
a. All seed must be of western Washington or western Oregon genetic source. Submit proposed seed source(s) prior to the start of construction for approval by the CO. Commercially-grown seed used on this project must be in conformance with the Washington State Seed regulations (15.49 RCW, WAC 16-301). Provide State-certified endophyte-enhanced seed of the latest season's crop delivered in original sealed packages, bearing producer's guaranteed, analysis for percentages of mixtures, purity, germination, weed seed content, and inert material. Wet, moldy, or otherwise damaged seed will be rejected.
b. For collected seed, or other non-commercially grown seed, provide the name of the seed collector, location of collection, and the dates of collection. Field mixes will be acceptable when field mix is performed on site in the presence of the CO.
2.2 WATER
Submit proposed water source for approval by the CO, and be of suitable quality for irrigation. Use collected stormwater or graywater when available.
2.3 BONDED FIBER MATRIX (BFM)
BFM will be "SoilGuard", "EcoAegis", "HydroBlanket", or approved equivalent and contain all ingredients including tackifier, crosslinkers and other proprietary ingredients.
2.4 TACKIFIER
Use Stockpam, SoilBinder or approved equivalent as tackifier for hydroseeding. For the PAM use a long chain, water-soluble or linear, SECTION 32 90 00.00 25 Page 6 non-crosslinked, anionic (>20 percent hydrolysis) or nonionic. PAM tackifier will be certified for compliance with ANSI/NSF Standard 60 for drinking water treatment and have a 0.05 percent maximum and an average
0.02 percent AMD concentration. The PAM anionic charge density may vary from 2-30 percent; a value of 18 percent is typical.
2.5 DUNE GRASS SPRIGS
Sprigs must be healthy living stems, stolons, or rhizomes and attached roots of locally adapted grass without adhering soil, including two to three nodes and from 4 to 6 inches long. Obtain sprigs from a local source.
Provide sprigs which have been grown under climatic conditions similar to those in the locality of the project. Coordinate harvesting and planting operations to prevent exposure of sprigs to the sun for more than 30 minutes before covering and moistening. Sprigs containing weeds or other detrimental material or that are heat damaged will be rejected.
BOTANICAL NAME COMMON NAME PLANT SIZE QUANTITY PER
1,000 SF
Leymus mollis mollis
American Dune Grass
Bare Root Sprig Plant 18" on center triangular spacing
PART 3 EXECUTION
3.1 EXTENT OF WORK
Provide landscape construction maintenance to include a water tank truck with pump, irrigation equipment, hoses, nozzles, cleaning and adjustments, watering, weeding, pruning, stake and guy adjusting and other tools and equipment for all landscape areas and existing plant material, unless indicated otherwise, and at all areas inside or outside the limits of the construction that are disturbed by the Contractor's operations.
3.2 JETTY TREE REMOVAL
Trees removed from the jetty must be stored on-site and placed along the foredune escarpment and along the jetty root upon completion of the work as shown on the drawings. Place trees prior to any hydromulching or plantings.
3.3 SITE PREPARATION
3.3.1 Soil Preparation
a. Areas to be seeded will be considered a satisfactory seedbed without additional treatment if it has recently been thoroughly loosened and worked to a depth of not less than 6 inches as a result of grading operations and, if immediately prior to hydroseeding, the top 3 inches of soils is loose, friable, and is shaped to the required grade.
b. Clear areas to be seeded and planted of gravel, stones, clods, rocks, roots, or other undesirable matter larger than 6 inches as a result of grading and staging operations. Place a maximum of 50 single pieces of woody debris throughout staging area to provide diversity to the landscape. Place prior to hydroseeding and a minimum of 100 feet apart and as approved by the CO.
SECTION 32 90 00.00 25 Page 7
c. Roughen all areas to be hydroseeded with equipment tracks, disc, ripper tooth, or other means approved by the CO before application of hydroseed.
d. Repair damage caused by erosion or other means after initial site preparation. This may include filling gullies, smoothing irregularities and repairing other incidental damage.
e. Seeding and hydromulching must not be done in the presence of free surface water resulting from rains, melting snow, tidal influence or other causes.
3.3.2 Woody Debris Areas
Place woody debris scattered across site as shown on drawings and directed by Contractor's licensed landscape architect and approved by CO.
3.4 SPRIGGING INSTALLATION
The sprigging method shall be Row Sprigging or other approved method.
Sprigging procedure must ensure even coverage. Dune Grass Sprigs must be planted in 18 inches on center triangular spacing and a minimum 2 inch depth, with mechanical sprig planter or other methods.
3.5 HYDROSEEDING
3.5.1 Hydroseeding Dates
Revegetation must be installed within 14 days of completion of site work as indicated on drawings, or as directed by CO.
3.5.2 Hydroseeding Process
Hydroseeding will be accomplished as a two-stage process. Apply the seed in the first step with a light layer of wood fiber hydromulch consisting of a minimum of 500 lbs per acre (and no greater than 700 lbs per acre) of wood fiber mulch plus tackifier (5-10 percent of mulch, according to manufacturer's specification) and dye. A full layer of wood fiber hydromulch consisting of a minimum of 1,500 lbs per acre plus tackifier and dye will be applied in the second step. Do not use fertilizer for the native seed mix hydroseeding. Do not use cellulose mulch.
3.5.3 Application
Apply the hydromulch slurry with or without seeds by aiming the nozzle upward rather than directly at the soil, so that the slurry does not hit the soil surface with full force. Maintain a continuous agitator action, that keeps the mulching material and tackifier in uniform suspension, throughout the distribution cycle. The pump pressure must be capable of maintaining a continuous non-fluctuating stream of slurry. The slurry distribution lines must be large enough to prevent stoppage and the discharge line must be equipped with a set of hydraulic spray nozzles that must provide an even distribution of the mulch slurry to the seedbed.
Ensure the application is uniform and at the prescribed rate, free of misses and overlapped areas. Cover a minimum of 95 percent of the soil surface area with hydromulch. Cure a minimum of 24 hours before rain events or irrigation and install per manufacturer's instructions, modified to incorporate the above-noted requirement of two separate application
SECTION 32 90 00.00 25 Page 8
| specs_Amend 0005.pdf |
| DRAFT W9127N-17-R-0008 Amendment 0005 |
| Technical_Sections |
| PROJECT TABLE OF CONTENTS |
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| 32 90 00.00 25 - SITE RESTORATION |
| 32 90 00.00 25 - SITE RESTORATION |
| PART 1 GENERAL |
| 1.4 DESCRIPTION |
| 1.4.1 Summary |
| 1.4.2 Planting |
| 1.5 REVEGETATION CONTRACTOR QUALIFICATIONS |
| 1.5.1 Qualifications |
| 1.5.2 Certified Growers |
| 1.5.3 Revegetation Plan |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| 1.6.1 Dune Grass Sprig Storage |
| 1.7 WEED MANAGEMENT |
| 1.7.1 Transport |
| 1.7.2 Mulch |
| 1.8 MONITORING |
| 1.9 PLANT TIMING |
| PART 2 PRODUCTS |
| 2.1 HYDROSEED |
| 2.2 WATER |
| 2.3 BONDED FIBER MATRIX BFM |
| 2.4 TACKIFIER |
| 2.5 DUNE GRASS SPRIGS |
| PART 3 EXECUTION |
| 3.1 EXTENT OF WORK |
| 3.2 JETTY TREE REMOVAL |
| 3.3 SITE PREPARATION |
| 3.3.1 Soil Preparation |
| 3.3.2 Woody Debris Areas |
| 3.4 SPRIGGING INSTALLATION |
| 3.5 HYDROSEEDING |
| 3.5.1 Hydroseeding Dates |
| 3.5.2 Hydroseeding Process |
| 3.5.3 Application |
| [5]: [5] |
| Amd0005: AMD #0005 |