A.07.24_W9127N-17-B-0004_Amendment_0001.pdf

PDF 20 MB Posted

Attached to
Bonneville Powerhouse 2 Roof Replacement
Solicitation number
W9127N-17-B-0004
Issued by

About this file

*****THIS IS AMENDMENT 0001 TO W9127N-17-B-0004. THERE WAS AN ISSUE WITH THE FBO WEBSITE WHICH CAUSED THE ATTACHMENT IN THE ORIGINAL AMENDMENT 0001 POSTING TO NOT BE UPLOADED.*****

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: BONNEVILLE POWERHOUSE 2 ROOF REPLACEMENT

1. This amendment is issued to include draw ings that w ere omitted from the initial solicitation. Draw ing sheets A-901 through A-908 and E-101 are included in this amendment.

2. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-17-B-0004

X 9B. DATED (SEE ITEM 11)

28-Feb-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Mar-2017

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-17-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:08:19 AM

D R

A W

N B

Y

C H

E C

K E

D B

Y

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

T

PORTLAND DISTRICT

B D

P .1

G C

.D

G N .d g n

GC101

0 0

R

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

E

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

F L

O W

F L

O W

GA B C D E F H I J K L M

N

NORTH

PROJECT

NORTH

TRUE

VOFB

EB SB

060' 60'

SCALE: 1"= 60'

N

DOWNSTREAM POOL

COLUMBIA RIVER

UPSTREAM POOL

COLUMBIA RIVER

G E

N E

R A

L

Z

N G

E R

Z A

N G

E

LEGEND:

GENERAL NOTES:

55.0'TAILRACE DECK ELEVATION:

90.0'INTAKE DECK ELEVATION:

131.0'PARAPET ELEVATION: 2.

OVERHEAD LINES.

CONSULT EM 385-1-1 FOR WORK NEAR 1.

BRIDGE

KEY NOTES:

54 4 5

E L E

C T

R

IC

A L C

L E

A R

A N

C E P

L A

N S

T A

G

IN

G S

T O

R A

G E

A N

D

EL 55.0'

TAILRACE DECK,

F

IS

H L

A D

D E

R

F

IS

H L

A D

D E

R

INTAKE DECK EL 90.0'

M

IN

C

C E

A D

M A

IN

A

C C

E S

S R

O A

D

E V

E R

G R

E E

N H

IG

H W

A Y

M

AIN

A C C E S S

R O

A D

DAM ROAD

CLEARANCE REQUIREMENTS

MATERIALS, SEE KEY NOTES FOR

CRANE USED TO MOVE DEBRIS AND

AREAS AVAILABLE FOR MOBILE

PERSONNEL

TO MOVE DEBRIS, MATERIALS, AND

CONSTRUCTION ELEVATORS USED

AREAS AVAILABLE FOR

MOBILE CRANE

STORAGE, DUMPSTERS, AND

CONTRACTOR PARKING, STAGING,

V

IS

IT

O R C

E N

T E

R P

A R

K

IN

G

E V

E R

G R

E E

N H

IG

H W

A Y

V

IS

IT

O R C

E N

T E

R P

A R

K

IN

G

VISITOR CENTER PARKING LOT

AT ALL TIMES ON ALL ROADWAYS AND AT THE

MAINTAIN AT LEAST ONE LANE OF TRAFFIC OPEN 4.

DURING NORMAL OPERATING HOURS.

TAILRACE AND INTAKE DECK GANTRY CRANES

CONTRACTOR SHALL NOT IMPEDE TRAVEL OF 3.

SEE KEY NOTES FOR RESTRICTIONS

ELECTRICAL CLEARANCE AREAS,

ROOFING.

SEE SHEET A-101 FOR INSTALLATION OF NEW 6.

ROOFING.

SEE SHEET AD101 FOR DEMOLITION OF EXISTING 5.

BAY 18 BAY 17 BAY 16 BAY 15 BAY 14 BAY 13 BAY 12 BAY 11

DECK ACCESS BRIDGE

ELEV. 90 INTAKE

/0

/2

EL 55.0'

TAILRACE DECK, 9

M A

IN

A C

C E S S

R O

A D

B R

ID

G E

A C C E

IL

R A

N

R

H

L E V

MAINTAIN AT LEAST 10 FEET OF SEPARATION.

EQUIPMENT PASSING UNDER THE ENERGIZED LINES MUST

CONTRACTING OFFICER AT LEAST 60 DAYS IN ADVANCE.

OF SERVICE AT ONE TIME. COORDINATE OUTAGES WITH BPA VIA

LINE CONDUCTOR. ONLY ONE TRANSMISSION LINE MAY BE OUT

MATERIALS OR TOOLS ON THE PARAPET WITHIN 20-FEET OF THE

TRANSMISSION LINE BEFORE WORKING WITH CONDUCTIVE

APPROACH CLOSER THAN 8'-3". DE-ENERGIZE 230-kV

WORKING WITHIN 20-FEET OF THE LINE CONDUCTOR. DO NOT

PROVIDE CONTINUOUS ESCORT BY A QUALIFIED PERSON WHEN

OF CONSTRUCTION ACTIVITY.

GOVERNMENT WILL DE-ACTIVATE THE SIREN DURING PERIODS

WEEKS IN ADVANCE.

LOCAL OPERATIONS VIA CONTRACTING OFFICER AT LEAST 2

FEET OF INSULATED CONDUCTORS. COORDINATE OUTAGES WITH

DE-ENERGIZE 480-V CRANE BUS BEFORE WORKING WITHIN 1'-0"

REQUIRED

WITHOUT AN ELECTRICAL CLEARANCE

AREAS AVAILABLE FOR MOBILE CRANE

VEHICLES

PERSONNEL, GANTRY CRANE, OR

BLOCK ACCESS TO GOVERNMENT

CONSTRUCTION ELEVATORS, DO NOT

AREAS AVAILABLE FOR ERECTION OF

FALL WITHIN THIS AREA.

SCAFFOLDING TOPPLES, IT MUST NOT

ELEVATOR, LIFT, MOBILE CRANE, OR

OVERHEAD LINES. IF A CONSTRUCTION

ENTERING WITHIN 20 FEET OF ENERGIZED

EQUIPMENT MUST NOT BE CAPABLE OF

SPILLWAY PERMITTED BEYOND THIS POINT

NO VEHICULAR ACCESS TOWARDS THE

PERSONNEL ACCESS

SCAFFOLDING FOR CONTRACTOR

AREA AVAILABLE FOR ERECTION OF

VEHICULAR GATES, RESTRICTED ACCESS

SPARE TRANSFORMER VAULT

TRANSFORMER VAULTS, T-11 & T-12

GANTRY CRANE BUS

(NIGHTS) WITH A CLEARANCE ON THE

CRANE USE FROM 6:00PM TO 6:00AM

INTAKE DECK IS AVAILABLE FOR MOBILE

OPTIONAL BID ITEMS

W

N -1

-B -0

GC201

GC201

B

ELECTRICAL CLEARANCE PLAN

STAGING, STORAGE, AND

A-905

A-901

A-901

A-901

A-901

A-907

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:10:17 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

G C

.D

G N .d g n

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

GA B C D E F H I J K L M

Z A

N G

E R

Z A

N G

E R

LEGEND: GENERAL NOTES: KEY NOTES:

G ABCDEFHIJKLM

050' 50'

SCALE: 1"= 50'

050' 50'

SCALE: 1"= 50'

BAY 11BAY 12BAY 13BAY 14BAY 15BAY 16BAY 17BAY 18BRIDGEVFOB ERECTION BAY

BAY 11 BAY 12 BAY 13 BAY 14 BAY 15 BAY 16 BAY 17 BAY 18 BRIDGE VFOBERECTION BAY

BAY

SERVICE

TOP OF PARAPET

131.0'

TAILRACE DECK ELEVATION

55.0'

TOP OF PARAPET

131.0'

INTAKE DECK ELEVATION

90.0'

G E

N E

R A

L

5 5

GUARDRAILS, TYPICAL, SEE SHEET S-101

FISH LADDER

TRANSMISSION LINE GROUNDING MAST AND GUY WIRES

7 HIGH VOLTAGE BUS, TYPICAL

WORK OVER ENERGIZED LINES.

BEFORE MOVING VEHICLES INTO THIS AREA. DO NOT

FROM LOWEST POINT OF LINE. FIELD VERIFY DIMENSIONS

MAINTAIN AT LEAST 20 FEET OF VERTICAL SEPARATION

EQUIPMENT PASSING UNDER ENERGIZED LINES MUST

6 TRANSFORMER

CLEARANCE REQUIREMENTS

480-V GANTRY CRANE BUS, SEE SHEET GC101 FOR

E L E

C T

R

IC

A L C

L E

A R

A N

C E

9 SCUPPER, TYPICAL

ELECTRICAL CLEARANCE AREAS, SEE GC101

SEE NOTES AND GC101 FOR RESTRICTIONS

USED TO MOVE DEBRIS, MATERIALS, AND PERSONNEL,

AREAS AVAILABLE FOR CONSTRUCTION ELEVATORS

TS-12 TS-11

SERVICE BAY

SPARE

OPTIONAL BID ITEMS

OPTIONAL BID ITEMS

A N

D A

C C

E S

S E

L E

V A

T

IO

N S

RELATING TO DEMOLITION.

SEE SHEET AD101 FOR INFORMATION 3.

(TRANSMISSION LINES AND THE CRANE BUS).

RELATING TO ELECTRICAL CLEARANCES

SEE SHEET GC101 FOR INFORMATION 2.

OVERHEAD LINES.

CONSULT EM 385-1-1 FOR WORK NEAR 1.

/0

/2

THIS AREA.

VERIFY DIMENSIONS BEFORE MOVING VEHICLES INTO

FROM EXPOSED ENERGIZED 230-KV EQUIPMENT. FIELD

MAINTAIN AT LEAST 8'-3" OF HORIZONTAL SEPARATION

W

N -1

-B -0

WEST ELEVATION (DOWNSTREAM)

EAST ELEVATION (UPSTREAM)

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:11:25 AM

D R

A W

N B

Y

C H

E C

K E

D B

Y

FROM BUS

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

G C

.D

G N .d g n

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

TOP OF PARAPET

131.0'

TOP OF PARAPET

131.0'

TOP OF PARAPET

131.0'

TOP OF PARAPET

131.0'

BALCONY

75.0'

LEGEND: GENERAL NOTES: KEY NOTES:

ELECTRICAL CLEARANCE AREAS

CONTRACTOR ACCESS AREAS, SEE NOTES

GUARDRAILS, TYPICAL, SEE SHEET S-101

FISH LADDER

TRANSMISSION LINE GROUNDING MAST AND GUY WIRES

7 HIGH VOLTAGE BUS, TYPICAL

WORK OVER ENERGIZED LINES.

BEFORE MOVING VEHICLES INTO THIS AREA. DO NOT

FROM LOWEST POINT OF LINE. FIELD VERIFY DIMENSIONS

MAINTAIN AT LEAST 20 FEET OF VERTICAL SEPARATION

EQUIPMENT PASSING UNDER ENERGIZED LINES MUST

6 TRANSFORMER

CLEARANCE REQUIREMENTS

480-V GANTRY CRANE BUS, SEE SHEET GC101 FOR

E L E

C T

R

IC

A L C

L E

A R

A N

C E

ELEVATION

TAILRACE DECK

55.0'

ELEVATION

INTAKE DECK

90.0'

ELEVATION

FINISH GRADE

90.0'

ELEVATION

TAILRACE DECK

55.0'

NORMAL OPERATING HOURS

GANTRY CRANE, DO NOT OBSTRUCT DURING

ELEVATION

INTAKE DECK

90.0'

1 3

020' 20'

SCALE: 1"= 20'

020' 20'

SCALE: 1"= 20'

020' 20'

SCALE: 1"= 20'

020' 20'

SCALE: 1"= 20'

'-0

10 HIGH VOLTAGE TRANSMISSION LINES

13'-0"

13'-0"

ELEVATION

TAILRACE DECK

55.0'

OPTIONAL BID ITEMS

OPTIONAL BID ITEMS

BRIDGE

GC202

A N

D A

C C

E S

S E

L E

V A

T

IO

N S

RELATING TO DEMOLITION.

SEE SHEET AD101 FOR INFORMATION 3.

(TRANSMISSION LINES AND THE CRANE BUS).

RELATING TO ELECTRICAL CLEARANCES

SEE SHEET GC101 FOR INFORMATION 2.

OVERHEAD LINES.

CONSULT EM 385-1-1 FOR WORK NEAR 1.

/0

/2

THIS AREA.

VERIFY DIMENSIONS BEFORE MOVING VEHICLES INTO

FROM EXPOSED ENERGIZED 230-KV EQUIPMENT. FIELD

MAINTAIN AT LEAST 8'-3" OF HORIZONTAL SEPARATION

W

N -1

-B -0

A-101

NORTH ELEVATION

ORIENTATION BUILDING

SOUTH ELEVATION

ORIENTATION BUILDING

SOUTH ELEVATION

POWERHOUSE 2

NORTH ELEVATION

POWERHOUSE 2

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/6 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/6/2017 7:49:43 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

S -1

.D

G N .d g n

S-101

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

F L

O W

F L

O W

N

NORTH

PROJECT

UPSTREAM POOL

COLUMBIA RIVER

INTAKE DECK

LEGEND: GENERAL NOTES: KEY NOTES:

TAILRACE DECK

EB 18 17 16 15 14 13 12

SB

P A

R K

S

S T

R U

C T

U R

A L

H A

L V

O R

S O

N

H A

L V

O R

S O

N

BRIDGE

VOFB

"2 1938'-2

040' 40'

SCALE: 1"= 40'

TAILRACE DECK ELEVATION: 55.0'

INTAKE DECK ELEVATION: 90.0'

2. PARAPET ELEVATION: 131.0'

DOWNSTREAM POOL

COLUMBIA RIVER

F A

L L P

R O

T E

C T

IO

N L

A Y

O U

T P

L A

N

1. CONSULT EM-385-1-1 FOR WORK NEAR OVERHEAD LINES.

(TRANSMISSION LINES AND THE CRANE BUS).

3. SEE SHEET GC-101 FOR INFORMATION RELATING TO ELECTRICAL CLEARANCES

/0

/2

1 FALL PROTECTION ANCHOR, SEE SHEET S-501 FOR DETAILS.

OPTIONAL BID ITEMS

"16 9148'-8

964'-6""2 1191'-2

48'-1"

4. ALL DIMENSIONS SHOWN SHALL BE FIELD VERIFIED.

1 1

SEE DETAIL 5 AND SECTION A ON SHEET S-501

1. FIBER REINFORCED PLASTIC (FRP) GUARDRAIL

2. SINGLE POINT FALL PROTECTION ANCHOR POINTS

W

N -1

-B -0

REF

GC-101 -

FALL PROTECTION LAYOUT PLAN

S-501

S-501 S-501

S-501

S-502

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/6 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/6/2017 7:50:37 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

S -5

.D

G N .d g n

S-501

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

P

R K

S

S T

R U

C T

U R

A L

H A

L V

O R

S O

N

H A

L V

O R

S O

N

THIS SHEET

SEE DETAIL 5

GUARDRAIL

GUARDRAIL SEE DETAIL 5 THIS SHEET

THIS SHEET

SEE DETAIL 5

GUARDRAIL

5'-0"

9'-2"

10'-8"

/2

ERECTION BAY ROOF

ERECTION PENTHOUSE ROOF

SERVICE BAY ROOF

PENTHOUSE ROOF

SERVICE BAY

VESTIBULE ROOF

VISITOR CENTER

F A

L L P

R O

T E

C T

IO

N D

E T

A

IL

S

C

TOP OF PARAPET

PARAPET WALL

6" THICK CONCRETE

ROOFING

LINE OF NEW

M

IN

OF THE NEW ROOF SYSTEM.

TO THE FLOOR OR IN THIS CASE THE TOP

UPPER SURFACE OF THE GUARDRAIL TOPRAIL

MINIMUM VERTICAL HEIGHT OF 42" FROM THE

PARAPET WALL SHALL HAVE A TOTAL

PLUS THE VERTICAL HEIGHT OF THE

THE VERTICAL HEIGHT OF THE GUARDRAIL

NOTE:

5'-0" MAX1'-0" MAX

RUBBER GASKET.

ROOFING DETAILS.

SEE SHEET A-501 FOR

C

PLATE (TYP.)

FRP BASE (TYP.)

FRP POST

FRP TOP RAIL (TYP.)

DETAIL 5 THIS SHEET

GUARDRAIL SEE

DETAIL 5 THIS SHEET

GUARDRAIL SEE

THIS SHEET

GUARDRAIL SEE DETAIL 5

THIS SHEET

GUARDRAIL SEE DETAIL 5

THIS SHEET

SEE DETAIL 5

GUARDRAIL

10'-8"

/0

/2

OPTIONAL BID ITEMS

ERECTION BAY ROOF

ROOF

CENTER

VISITOR

ROOF

PENTHOUSE

BRIDGE

/2

FIELD VERIFIED.

PERSON AS DESCRIBED IN THE SPECIFICATIONS. ALL DIMENSIONS SHOWN SHALL BE

TO THE AREAS SHOWN IN DETAILS 1, 2, 3 AND 4 BY A FALL PROTECTION COMPETENT

SHOWN ARE SUGGESTIONS AND SHALL BE DESIGNED AND LOCATED TO ALLOW ACCESS

CONTRACTOR DESIGN. SINGLE POINT FALL PROTECTION ANCHOR POINT LOCATIONS

5) ALL DETAILS ON THIS SHEET ARE FOR REFERENCE ONLY TO ASSIST WITH

REQUIREMENTS. SEE SPECIFICATION SECTION 06 82 14.00 FALL PROTECTION

FALL PROTECTION CODE AND SHALL MEET EM 385-1-1 FALL PROTECTION

4) SINGLE POINT FALL PROTECTION ANCHOR POINTS SHALL COMPLY WITH ASSE Z359

MEET CURRENT ACI 318 CHAPTER 17 REQUIREMENTS.

3) ALL CONCRETE ANCHOR BOLTS AND FASTENERS SHALL BE STAINLESS STEEL AND

SECTION 06 82 14.00 FALL PROTECTION.

2) GUARDRAILS SHALL BE FIBER REINFORCED PLASTIC (FRP). SEE SPECIFICATION

1) ALL GUARDRAILS SHALL MEET EM 385-1-1 FALL PROTECTION REQUIREMENTS.

NOTES:

SEE NOTES.

SHALL BE COMPATIBLE WITH NAILER MATERIAL.

CONTACT THE CONCRETE PARAPET WALL, AND

FASTENERS SHALL HAVE A HEX HEAD, NOT

OF 3 INCHES IN THE NAILERS. THE GUARDRAIL

FASTENER THREADS SHALL ENGAGE A MINIMUM

BE CONTRACTOR DESIGNED. THE GUARDRAIL

FRP GUARDRAIL AND ATTACHMENT METHOD TO

W

N -1

-B -0

REF

REF

4REF

10'-3"

FALL PROTECTION AREA DETAIL

SERVICE BAY PENTHOUSE

FALL PROTECTION AREA DETAIL

VISITOR CENTER VESTIBULE

FALL PROTECTION AREA DETAIL

ERECTION BAY PENTHOUSE

1" = 2'

1" = 2'

1" = 2'

S-101

A

5REF

- 1" = 1'S-101

AREF

GUARDRAIL SECTION

S-101 1" = 1'

GUARDRAIL ELEVATION DETAIL

3REF

- 1" = 2'S-101

FALL PROTECTION AREA DETAIL

BRIDGE PENTHOUSE

SEE NOTES

PROTECTION ANCHOR POINTS

SINGLE POINT FALL

SEE NOTES

PROTECTION ANCHOR POINT

SINGLE POINT FALL

SEE NOTES

PROTECTION ANCHOR POINT

SINGLE POINT FALL

POINT SEE NOTES

PROTECTION ANCHOR

SINGLE POINT FALL

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/6 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/6/2017 7:51:38 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

S -5

.D

G N .d g n

S-502

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

R K

S

S T

R U

C T

U R

A L

H A

L V

O R

S O

N

H A

L V

O R

S O

N

/0

/2

ERECTION BAY ROOF

B R

ID

G E P

E N

T H

O U

S E D

E T

A

IL

S

36" X 36" HATCH

" T Y

P

3"

"4

3/16

3/16

NOTE 1

M E

T A

L D

E C

K S

P A

N

8'-9" +/- EXTENT OF METAL DECK

BEAMS.

WITH END OF W21X93

ALIGN EDGE OF DECK

2) METAL DECK AND HATCH NOT SHOWN.

1) TERMINTATE WELD 1/4" FROM END OF W21X93 FLANGE

NOTE

HATCH SUPPORT.

TO W21X93 BEAMS FOR

L 2 X 2 X 1/4 ANGLE WELDED

SELF-TAPPING SCREWS.

LONG SELF-DRILLING,

AT 6" SPACING WITH #10 3/4"

SIDELAPS TO BE ATTACHED

S E

E D

E T

A

IL

T

H

IS

S

H E

E T

B R

ID

G E P

E N

T H

O U

S E R

O O

F

M E

T A

L D

E C

K

IN

G F

O R E

N T

IR

E

M E

T A

L D

E C

K

IN

G

M E

T A

L D

E C

K

IN

G

TO METAL DECKING REGION OVERLAPPING W21X122 BEAM.

AT EACH SUPPORT. CONTINUE SAME ATTACHMENT PATTERN

WITH MECHANICAL FASTENERS AT EACH RIB OF EACH SECTION

22 GAUGE METAL DECKING TO BE ATTACHED TO W21X93 BEAMS

TOP OF W21 BEAM.

BE FLUSH WITH

COPE ANGLE TO

AS-BUILT CONDITIONS.

3.) ITEMS LABELED EXISTING ON THIS SHEET ARE THE

2). SEE ARCHITECTURAL SHEETS FOR ROOFING DETAILS.

INSTRUCTIONS.

INSTALLED IN STRICT ACCORDANCE TO THE MANUFACTURER'S

STEEL DECK INSTITUTE (SDI) STANDARDS AND SHALL BE

1) ALL METAL DECKING AND FASTENERS SHALL COMPLY WITH

NOTES:

EXISTING W21X93 BEAMS

EXISTING W21X122 BEAM

EXISTING W 21 X 93

EXISTING W21X93 BEAM

W21X122 FLANGE.

EDGE OF EXISTING

WITH 3" OFFSET FROM

ALIGN EDGE OF DECK

TYPICAL BOTH SIDES.

SEE SECTION A THIS SHEET.

W

N -1

-B -0

METAL DECKING DETAIL

BRIDGE PENTHOUSE

1" = 1'

- 1" = 6"

- 1" = 3"

HATCH SUPPORT SECTIONA

A

METAL DECKING DETAIL

REF

ROOF DRAINS AND DRAINAGE SCHEME NOT SHOWN FOR CLARITY.6.

- SHEET METAL PARAPET WALL FLASHING AND COPING

- 2-PLY MODIFIED BITUMEN MEMBRANE (HOT MOP APPLIED)

- 1" INSULATION (HOT MOP APPLIED)

- 1 LAYER MODIFIED BITUMEN BASE SHEET (HOT MOP APPLIED)

RECOVER ROOFING SYSTEM

- BUILT-UP ROOFING (ASBESTOS, HOT MOP APPLIED)

- TAPERED INSULATION (HOT MOP APPLIED)

- BITUMOUS VAPOR BARRIER (ASBESTOS, HOT MOP APPLIED)

ORIGINAL ROOFING SYSTEM:

DESCRIPTION OF EXISTING ROOFING SYSTEMS TO BE REMOVED (BOTTOM-UP):5.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/6 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/6/2017 8:16:16 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A D

.D

G N .d g n

AD101

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

F L

O W

F L

O W

GA B C D E F H I J K L M

N

NORTH

PROJECT060' 60'

SCALE: 1"= 60'

DOWNSTREAM POOL

COLUMBIA RIVER

UPSTREAM POOL

COLUMBIA RIVER

Z A

N G

E R

Z A

N G

E R

INTAKE DECK

LEGEND: GENERAL NOTES: KEY NOTES:

TAILRACE DECK

A R

C H

IT

E C

T U

R A

L

R O

O F D

E M

O L

IT

IO

N P

L

N

ERECTION BAY BAY 18 BAY 17 BAY 16 BAY 15 BAY 14 BAY 13 BAY 12 BAY 11 SERVICE BAY

BRIDGE

VFOB

OPTIONAL BID ITEMS

/0

/2

SPECIFICATION SECTION 02 82 14.00 28 AND 07 01 50.00 28.

ASBESTOS. REMOVAL SHALL BE IN ACCORDANCE WITH

WARNING: EXISTING ROOFING MATERIALS ARE KNOWN TO CONTAIN 4.

30 PSFVOFB:

30 PSFBRIDGE:

50 PSFPOWERHOUSE:

MAXIMUM ALLOWABLE LIVE LOAD AS FOLLOWS:3.

55.0' TAILRACE DECK:

90.0' INTAKE DECK :

131.0'TOP OF PARAPET: 2.

PERSONNEL.

RESTRICTIONS ON EQUIPMENT USED FOR MOVING OF DEBRIS AND

CLEARANCES (TRANSMISSION LINES AND THE CRANE BUS) AND

SHEET GC101 FOR INFORMATION RELATING TO ELECTRICAL

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES. SEE 1.

UNLESS NOTED OTHERWISE).

EXISTING STRUCTURAL METAL ROOF DECK (VFOB

FLASHING TO BE COMPLETELY REMOVED TO THE

INDICATES ROOFING SYSTEM AND SHEET METAL

OTHERWISE).

DOUBLE TEE ROOF DECK (BPH2 UNLESS NOTED

EXISTING STRUCTURAL PRECAST CONCRETE

FLASHING TO BE COMPLETELY REMOVED TO THE

INDICATES ROOFING SYSTEMS AND SHEET METAL

EXISTING STRUCTURAL STEEL PLATE GIRDER (BRIDGE).

FLASHING TO BE COMPLETELY REMOVED TO THE

INDICATES ROOFING SYSTEM AND SHEET METAL

GC101 FOR ADDITIONAL INFORMATION.

INDICATES ELECTRICAL HAZARD AREAS, SEE SHEET

INFORMATION.

PHOTO 9 ON SHEET A-903 FOR ADDITIONAL

INFORMATION ONLY SHEET BDP-1-2-0/2.1 AND

ROOFING, AND SHEET METAL FLASHING). SEE FOR

WOOD FRAMING, BUILT-UP ROOFING, METAL

STRUCTURAL CONCRETE (INCLUDING EXISTING

MATERIALS DOWN TO STRUCTURAL STEEL AND

BRIDGE PENTHOUSE: DEMOLISH ALL EXISTING

ELEVATOR PENTHOUSES

CAST IN PLACE CONCRETE ROOF DECK AT

WOOD ROOF DECK AT BRIDGE PENTHOUSE

W

N -1

-B -0

ROOF DEMOLITION PLAN

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:35:16 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -1

.D

G N .d g n

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

F L

O W

F L

O W

GA B C D E F H I J K L M

N

NORTH

PROJECT060' 60'

SCALE: 1"= 60'

DOWNSTREAM POOL

COLUMBIA RIVER

UPSTREAM POOL

COLUMBIA RIVER

Z A

N G

E R

Z A

N G

E R

GENERAL NOTES: KEY NOTES:

A R

C H

IT

E C

T U

R A

L

O

F K

E Y P

L A

N

ERECTION BAY BAY 18 BAY 17 BAY 16 BAY 15 BAY 14 BAY 13 BAY 12 BAY 11 SERVICE BAY

BRIDGE

A-401

SHEET

BAY

SERVICE

SHEET A-402

BAYS 12 AND 11

SHEET A-403

BAYS 14 AND 13

SHEET A-404

BAYS 16 AND 15

SHEET A-405

BAYS 18 AND 17

SHEET A-406

ERECTION BAY

SHEET A-407

AND BRIDGE

VFOB

VFOB

F

IS

H L

A D

D E

R

M A

IN

A

C C E S S R

O A D F

IS

H L

A D

D E

R

M A

IN

A

C C E S S R

O A D

EL 55.0'

TAILRACE DECK

EL 55.0'

TAILRACE DECK

INTAKE DECK EL 90.0'

2 1 3

4 4

965'-0" BPH2

80'-0" "2 1111'-2 149'-0" 94'-0" 94'-0" 94'-0" 94'-0" 94'-0" 94'-0" 94'-0" 94'-0" 64'-0"

JOINT LOCATIONS

SEE SHEET A-102 FOR ROOF FIRESTOPPING AND SEALANT 6.

THE INTAKE DECK SIDE OF BPH2

GANTRY CRANE BUS, RUNS THE FULL LENGTH OF

TRANSMISSION LINES

SPARE TRANSFORMER VAULT BELOW

TRANSFORMER VAULT BELOW, T-12

TRANSFORMER VAULT BELOW, T-11

OPTIONAL BID ITEMS

/0

/2

3,520 SFVFOB:

1,170 SF BRIDGE:

96,876 SFBPH2:

ROOF AREA SQUARE FOOTAGES:5.

30 PSFVFOB:

30 PSFBRIDGE:

50 PSFBPH2:

MAX ALLOWABLE ROOF LIVE LOADS:4.

SEE SHEET AD101 FOR INFORMATION RELATING TO DEMOLITION.3.

(TRANSMISSION LINES AND THE CRANE BUS).

SEE SHEET GC101 FOR INFORMATION RELATING TO ELECTRICAL HAZARDS 2.

55.0'TAILRACE DECK ELEVATION:

90.0'INTAKE DECK ELEVATION:

131.0'PARAPET ELEVATION: 1.

GC101 FOR ADDITIONAL INFORMATION.

INDICATES ELECTRICAL HAZARD AREAS, SEE SHEET

LEGEND:

W

N -1

-B -0

ROOF KEY PLAN

A

GC201

B

GC202

C

GC202

D

GC202

A

GC202

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:35:25 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -1

.D

G N .d g n

A-102

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

GC D E F H I J K L M

N

NORTH

PROJECT060' 60'

SCALE: 1"= 60'

Z A

N G

E R

Z A

N G

E R

KEY NOTES:

A R

C H

IT

E C

T U

R A

L

ERECTION BAY BAY 18 BAY 17 BAY 16 BAY 15 BAY 14 BAY 13 BAY 12 BAY 11 SERVICE BAY

LEGEND:

EXISTING ROOF DRAIN PENETRATION

OPENING IN STRUCTURE

PRECAST DOUBLE TEE ROOF GIRDER

2 2

BRIDGE

SHEET NOTES:

C

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A

BBBBBBB

BBBBBB

CC

C

C

C

C C C C C C

C

BA

AND SECTION 1 ON SHEET A-501

JOINTS, SEE SHEET NOTE 7 FOR QUANTITIES

WATERPROOF FIRESTOPPING AT PERIMETER

AND SECTION 1 ON SHEET A-502

JOINTS, SEE SHEET NOTE 7 FOR QUANTITIES

WATERPROOF FIRESTOPPING AT TEE FLANGE

AND SECTION 1 ON SHEET A-502

JOINTS, SEE SHEET NOTE 7 FOR QUANTITIES

WATERPROOF FIRESTOPPING AT EXPANSION

PRECAST CONCRETE PARAPET WALL PANEL JOINTS

SHEET A-501 FOR POLYURETHANE SEALANT AT

SEE DETAIL 4 ON SHEET A-504 AND DETAIL 1 ON

A = BPH2 B = BRIDGE C = VOFB

PARAPET WALL PANEL JOINTS, SEE SHEET NOTE 11.

POLYURETHANE SEALANT AT PRECAST CONCRETE

OPTIONAL BID ITEMS

VOFB (C): 12 x 4'-0" = 48 LF [OPTIONAL BID ITEM]

BRIDGE (B): 13 x 4'-0" = 52 LF [OPTIONAL BID ITEM]

BPH2 (A):103 x 4'-0" = 412 LF

CONCRETE PARAPET WALL PANEL JOINTS:

POLYURETHANE SEALANT QUANTITIES AT PRECAST 9.

ROOF DRAINS.

PENETRATIONS, HATCHES, VENTILATORS, SCUTTLES,

LOCATIONS SUCH AS: PIPE & CONDUIT

INDICATED, AND IS NOT REQUIRED AT OTHER

FIRESTOPPING IS REQUIRED AT LOCATIONS 8.

= 1,985 LF PERIMETER JOINTS:

91 x 99'-6" = 9,055 LF TEE FLANGE JOINTS:

11 x 99'-6" = 1,095 LF EXPANSION JOINTS:

WATERPROOF FIRESTOPPING QUANTITIES7.

3,520 SF VFOB:

1,170 SF BRIDGE:

96,876 SF POWERHOUSE:

ROOF AREA SQUARE FOOTAGES:6.

B

K E

Y P

L A

N R

O O

F F

IR

E S

T O

P P

IN

G J

O

IN

T S

E A

L A

N T

12 x 4'-0" = 48 LF [OPTIONAL BID ITEM] VOFB (C):

13 x 4'-0" = 55 LF [OPTIONAL BID ITEM] BRIDGE (B):

103 x 4'-0" = 409 LF BPH2 (A):

CONCRETE PARAPET WALL PANEL JOINTS:

POLYURETHANE SEALANT QUANTITIES AT PRECAST 10.

30 PSFVOFB:

30 PSFBRIDGE:

50 PSFPOWERHOUSE:

FOLLOWS:

MAXIMUM ALLOWABLE LIVELOAD AS 5.

RELATING TO DEMOLITION.

SEE SHEET AD101 FOR INFORMATION 4.

AND THE CRANE BUS).

CLEARANCES (TRANSMISSION LINES

RELATING TO ELECTRICAL

SEE SHEET GC101 FOR INFORMATION 3.

55.0'TAILRACE DECK ELEVATION:

90.0'INTAKE DECK ELEVATION:

131.0'PARAPET ELEVATION: 2.

OVERHEAD LINES.

CONSULT EM 385-1-1 FOR WORK NEAR 1.

VFOB

/0

/2

NO FIRESTOPPING REQUIRED

CAST IN PLACE ROOF STRUCTURE,

GC101 FOR ADDITIONAL INFORMATION.

INDICATES ELECTRICAL HAZARD AREAS, SEE SHEET

FIRESTOPPING REQUIRED

CAST IN PLACE ROOF STRUCTURE, NO

SHEET GC101

HIGH VOLTAGE TRANSMISSION LINES, SEE

SEE SHEET GC101

480-V INTAKE DECK GANTRY CRANE BUS,

W

N -1

-B -0

FIRESTOPPING & SEALANT JOINT PLAN

A-409

A A-410

A A-411

HAZARDS (TRANSMISSION LINES AND THE CRANE BUS).

SEE SHEET GC101 FOR INFORMATION RELATING TO ELECTRICAL 3.

55.0' TAILRACE DECK ELEVATION:

90.0' INTAKE DECK ELEVATION:

127.5'TOP OF STRUCTURAL ROOF DECK:

131.0'PARAPET ELEVATION: 2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

MINIMUM

PROVIDE DRAINAGE SCHEME AS SHOWN, SLOPES SHALL BE 2% 5.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 4.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:35:30 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-401

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

N

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

E N

L A

R G

E D R

O O

F P

L A

N

L

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

V

M

LEGEND:

V

H

SEE TYPICAL DETAIL 3, SHEET A-501

EXISTING ROOF DRAIN AND DRAINAGE SUMP,

SEE TYPICAL DETAIL 3, SHEET A-503

EXISTING PLUMBING VENT TO REMAIN,

SEE TYPICAL DETAIL 2, SHEET A-503

EXISTING ROOF-MOUNTED VENTILATOR HOOD TO REMAIN,

GENERAL NOTES: KEY NOTES:

S E

R V

IC

E B

A Y

14'-0"26'-2"

H

9'-8"

V

64'-0" SERVICE BAY

5' 0 5' 10'

"= 1'-0"8

1SCALE:

SB1314 12 1115161718EBB

V

EMERGENCY SIREN

AREA SHOWN

KEY PLAN

NOT IN USE

RESTRICTIONS IN THIS AREA

CLEARANCE ZONES, SEE SHEET GC101 FOR

NOT IN USE

NOT IN USE

NOT IN USE

TYPICAL DETAIL 4, SHEET A-503

EXISTING ROOF MOUNTED HATCH TO REMAIN, SIM TO

WALK PADS ADHERED TO THE EPDM MEMBRANE

/0

/2

SHALL BE 2%, PROVIDE CRICKETING AS SHOWN

ARROW INDICATES DIRECTION OF ROOF SLOPE; ALL SLOPES

NOT IN USE

SCUPPER, TYPICAL

SEE SHEET S-101.

GUARDRAIL ON PARAPET, TYPICAL

WITH CURB, SEE DETAIL 1 ON SHEET A-502.

REPLACE EXISTING EXPANSION JOINT COVER

NOT IN USE

SEE SHEET GC101

480-V INTAKE DECK GANTRY CRANE BUS,

SEE E-101 AND PHOTO 21 & 22 ON SHEET A-906

COMMUNICATIONS AND ELECTRICAL EQUIPMENT,

W

N -1

-B -0

A-501

ENLARGED ROOF PLAN

SERVICE BAY

A-408

A-906

A-906

A-906

A-906

A-502

CLEARANCES (TRANSMISSION LINES AND THE CRANE BUS).

55.0' TAILRACE DECK ELEVATION:

90.0' INTAKE DECK ELEVATION:

127.5'TOP OF STRUCTURAL ROOF DECK:

131.0'PARAPET ELEVATION: 2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

MINIMUM

PROVIDE DRAINAGE SCHEME AS SHOWN, SLOPES SHALL BE 2% 5.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 4.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:35:35 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-402

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

E N

L A

R G

E D R

O O

F P

L A

N

J K

4 4

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

Y S

A

N D

V V

L

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

23'-6"47'-0" 23'-6"47'-0"

94'-0" BAY 1194'-0" BAY 12

N5' 0 5' 10'

"= 1'-0"8

1SCALE:

SB1112131415161718EBB

V

KEY NOTES:

AREA SHOWN

KEY PLAN

LEGEND: GENERAL NOTES:

TYP

T Y

P

T Y

P

/0

/2

V

SEE TYPICAL DETAIL 3, SHEET A-501

EXISTING ROOF DRAIN AND DRAINAGE SUMP,

SEE TYPICAL DETAIL 3, SHEET A-503

EXISTING PLUMBING VENT TO REMAIN,

SEE TYPICAL DETAIL 2, SHEET A-503

EXISTING ROOF-MOUNTED VENTILATOR HOOD TO REMAIN,

WALK PADS ADHERED TO THE EPDM MEMBRANE

SHALL BE 2%, PROVIDE CRICKETING AS SHOWN

ARROW INDICATES DIRECTION OF ROOF SLOPE; ALL SLOPES

NOT IN USE

SCUPPER, TYPICAL

SEE SHEET S-101.

GUARDRAIL ON PARAPET, TYPICAL

WITH CURB, SEE DETAIL 1 ON SHEET A-502.

REPLACE EXISTING EXPANSION JOINT COVER

NOT IN USE

SEE SHEET GC101

480-V INTAKE DECK GANTRY CRANE BUS,

NOT IN USE

SHEET A-503 AND SPECIFICATION SECTION 07 72 00

PERMANENT WARNING LINE, INSTALL PER DETAIL 1 ON

RESTRICTIONS IN THIS AREA

ELECTRICAL HAZARD AREAS, SEE SHEET GC101 FOR

NOT IN USE

NOT IN USE

W

N -1

-B -0

A-501

BAYS 11 AND 12

A-904

A-904

A-501

A-502

55.0' TAILRACE DECK ELEVATION:

90.0' INTAKE DECK ELEVATION:

127.5'TOP OF STRUCTURAL ROOF DECK:

131.0'PARAPET ELEVATION: 2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

MINIMUM

PROVIDE DRAINAGE SCHEME AS SHOWN, SLOPES SHALL BE 2% 5.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 4.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:35:41 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-403

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

E N

L A

R G

E D R

O O

F P

L A

N

H I

4 4

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

Y S

A

N D

V V

J

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

KEY NOTES:

23'-6"47'-0"

94'-0" BAY 14 94'-0" BAY 13

/2

/2

/2

N5' 0 5' 10'

"= 1'-0"8

1SCALE:

1314 12 11SB15161718EBB

V

AREA SHOWN

KEY PLAN

TYPE II

CURB

TYPE I

CURB

TYPE I

CURB

LEGEND: GENERAL NOTES:

TYPICAL

TYP

T Y

PT

Y

P

/0

/2

V

SEE TYPICAL DETAIL 3, SHEET A-501

EXISTING ROOF DRAIN AND DRAINAGE SUMP,

SEE TYPICAL DETAIL 3, SHEET A-503

EXISTING PLUMBING VENT TO REMAIN,

SEE TYPICAL DETAIL 2, SHEET A-503

EXISTING ROOF-MOUNTED VENTILATOR HOOD TO REMAIN,

WALK PADS ADHERED TO THE EPDM MEMBRANE

SHALL BE 2%, PROVIDE CRICKETING AS SHOWN

ARROW INDICATES DIRECTION OF ROOF SLOPE; ALL SLOPES

20'-0"R

15'-0" MAX, TYPICAL

F

IE

L D V

E R

IF

Y

NOT IN USE

SCUPPER, TYPICAL

SEE SHEET S-101.

GUARDRAIL ON PARAPET, TYPICAL

WITH CURB, SEE DETAIL 1 ON SHEET A-502.

REPLACE EXISTING EXPANSION JOINT COVER

NOT IN USE

SEE SHEET GC101

480-V INTAKE DECK GANTRY CRANE BUS,

NOT IN USE

SHEET A-503 AND SPECIFICATION SECTION 07 72 00

PERMANENT WARNING LINE, INSTALL PER DETAIL 1 ON

RESTRICTIONS IN THIS AREA

ELECTRICAL HAZARD AREAS, SEE SHEET GC101 FOR

GROUNDING MAST, SEE DETAIL 3 ON SHEET A-504

HIGH VOLTAGE TRANSMISSION LINES

SHEET A-504

GUY WIRE CURB TYPES I & II, SEE DETAILS 1 & 2 ON

W

N -1

-B -0

BAYS 13 AND 14

A-904

A-905

A-905

A-905

A-501

55.0' TAILRACE DECK ELEVATION:

90.0' INTAKE DECK ELEVATION:

127.5'TOP OF STRUCTURAL ROOF DECK:

131.0'PARAPET ELEVATION: 2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

MINIMUM

PROVIDE DRAINAGE SCHEME AS SHOWN, SLOPES SHALL BE 2% 5.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 4.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:35:46 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-404

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

E N

L A

R G

E D R

O O

F P

L A

N

F G

4 4

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

Y S

A

N D

V V

H

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

47'-0" 23'-6"

94'-0" BAY 1594'-0" BAY 16

23'-6"47'-0"

N5' 0 5' 10'

"= 1'-0"8

1SCALE:

1314 12 11SB15161718EBB

V

AREA SHOWN

KEY PLAN

TYPE II

CURB

TYPE I

CURB

TYPE I

CURB

LEGEND: GENERAL NOTES:

TYPICAL

TYP

T Y

P

T Y

P

/0

/2

V

SEE TYPICAL DETAIL 3, SHEET A-501

EXISTING ROOF DRAIN AND DRAINAGE SUMP,

SEE TYPICAL DETAIL 3, SHEET A-503

EXISTING PLUMBING VENT TO REMAIN,

SEE TYPICAL DETAIL 2, SHEET A-503

EXISTING ROOF-MOUNTED VENTILATOR HOOD TO REMAIN,

WALK PADS ADHERED TO THE EPDM MEMBRANE

SHALL BE 2%, PROVIDE CRICKETING AS SHOWN

ARROW INDICATES DIRECTION OF ROOF SLOPE; ALL SLOPES

20'-0"R

15'-0" MAX, TYPICAL

F

IE

L D V

E R

IF

Y

NOT IN USE

SCUPPER, TYPICAL

SEE SHEET S-101.

GUARDRAIL ON PARAPET, TYPICAL

WITH CURB, SEE DETAIL 1 ON SHEET A-502.

REPLACE EXISTING EXPANSION JOINT COVER

NOT IN USE

SEE SHEET GC101

480-V INTAKE DECK GANTRY CRANE BUS,

NOT IN USE

SHEET A-503 AND SPECIFICATION SECTION 07 72 00

PERMANENT WARNING LINE , INSTALL PER DETAIL 1 ON

RESTRICTIONS IN THIS AREA

ELECTRICAL HAZARD AREAS, SEE SHEET GC101 FOR

GROUNDING MAST, SEE DETAIL 3 ON SHEET A-504

HIGH VOLTAGE TRANSMISSION LINES

SHEET A-504

GUY WIRE CURB TYPES I & II, SEE DETAILS 1 & 2 ON

N -1

-B -0

A-501

BAYS 15 AND 16

A-905

A-905

A-905

A-904

A-501

55.0' TAILRACE DECK ELEVATION:

90.0' INTAKE DECK ELEVATION:

127.5'TOP OF STRUCTURAL ROOF DECK:

131.0'PARAPET ELEVATION: 2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

MINIMUM

PROVIDE DRAINAGE SCHEME AS SHOWN, SLOPES SHALL BE 2% 5.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 4.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:35:52 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-405

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

E N

L A

R G

E D R

O O

F P

L A

N

D E

4 4

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

Y S

A

N D

V V

F

94'-0" BAY 1794'-0" BAY 18

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

23'-6"47'-0" 23'-6"47'-0"

N5' 0 5' 10'

"= 1'-0"8

1SCALE:

1314 12 11SB15161718EBB

V

AREA SHOWN

KEY PLAN

LEGEND: GENERAL NOTES:

TYP

T Y

P

T Y

P

/0

/2

V

SEE TYPICAL DETAIL 3, SHEET A-501

EXISTING ROOF DRAIN AND DRAINAGE SUMP,

SEE TYPICAL DETAIL 3, SHEET A-503

EXISTING PLUMBING VENT TO REMAIN,

SEE TYPICAL DETAIL 2, SHEET A-503

EXISTING ROOF-MOUNTED VENTILATOR HOOD TO REMAIN,

WALK PADS ADHERED TO THE EPDM MEMBRANE

SHALL BE 2%, PROVIDE CRICKETING AS SHOWN

ARROW INDICATES DIRECTION OF ROOF SLOPE; ALL SLOPES

NOT IN USE

SCUPPER, TYPICAL

SEE SHEET S-101.

GUARDRAIL ON PARAPET, TYPICAL

WITH CURB, SEE DETAIL 1 ON SHEET A-502.

REPLACE EXISTING EXPANSION JOINT COVER

NOT IN USE

SEE SHEET GC101

480-V INTAKE DECK GANTRY CRANE BUS,

NOT IN USE

SHEET A-503 AND SPECIFICATION SECTION 07 72 00

PERMANENT WARNING LINE, INSTALL PER DETAIL 1 ON

RESTRICTIONS IN THIS AREA

ELECTRICAL HAZARD AREAS, SEE SHEET GC101 FOR

NOT IN USE

NOT IN USE

NOT IN USE

W

N -1

-B -0

BAYS 17 AND 18

A-904

SIM

A-501

55.0' TAILRACE DECK ELEVATION:

90.0' INTAKE DECK ELEVATION:

127.5'TOP OF STRUCTURAL ROOF DECK:

131.0'PARAPET ELEVATION: 2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

MINIMUM

PROVIDE DRAINAGE SCHEME AS SHOWN, SLOPES SHALL BE 2% 5.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 4.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:35:57 AM

D R

A W

N B

Y

C H

E C

K E

D B

Y

T Y

P

TYP

T Y

P

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-406

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

E N

L A

R G

E D R

O O

F P

L A

N

C D

H

H

V

S

6"6

5'-0" 5'-3"

1'-6"

4 4

25'-6"

47'-5" 23'-6"

E R

E C

T

IO

N B

A Y

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

149'-0" ERECTION BAY

N5' 0 5' 10'

"= 1'-0"8

1SCALE:

1314 12 11SB15161718EBB

V

AREA SHOWN

KEY PLAN

3'-0"

LEGEND:

V

H

SEE TYPICAL DETAIL 3, SHEET A-501

EXISTING ROOF DRAIN AND DRAINAGE SUMP,

SEE TYPICAL DETAIL 3, SHEET A-503

EXISTING PLUMBING VENT TO REMAIN,

SEE TYPICAL DETAIL 2, SHEET A-503

EXISTING ROOF-MOUNTED VENTILATOR HOOD TO REMAIN,

GENERAL NOTES:

TYPICAL DETAIL 4, SHEET A-503

EXISTING ROOF MOUNTED HATCH TO REMAIN, SIM TO

WALK PADS ADHERED TO THE EPDM MEMBRANE

BID ITEMS

OPTIONAL

S

/0

/2

SHALL BE 2%, PROVIDE CRICKETING AS SHOWN

ARROW INDICATES DIRECTION OF ROOF SLOPE; ALL SLOPES

E

A-503, DETAIL 1 ON A-508, AND SPECIFICATION SECTION 07 72 00

PROVIDE ROOF ACCESS HATCH TYPES E AND S. SEE DETAIL 4 ON

NOT IN USE

RESTRICTIONS IN THIS AREA

ELECTRICAL HAZARD AREAS, SEE SHEET GC101 FOR

NOT IN USE

NOT IN USE

NOT IN USE

E

NOT IN USE

SCUPPER, TYPICAL

SEE SHEET S-101.

GUARDRAIL ON PARAPET, TYPICAL

WITH CURB, SEE DETAIL 1 ON SHEET A-502.

REPLACE EXISTING EXPANSION JOINT COVER

WATER, 2% SLOPE MINIMUM.

PROVIDE CRICKET TO REDIRECT SURFACE

SEE SHEET GC101

480-V INTAKE DECK GANTRY CRANE BUS,

N -1

-B -0

A-501

ERECTION BAY

A-408

A-408

A-903

A-903

A-903

A-902

A-902

A-902

A-902

A-904

A-903

A-506

A-506

A-507

A-501

55.0' TAILRACE DECK ELEVATION:

90.0' INTAKE DECK ELEVATION:

127.5'TOP OF STRUCTURAL ROOF DECK:

131.0'PARAPET ELEVATION: 2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

MINIMUM

PROVIDE DRAINAGE SCHEME AS SHOWN, SLOPES SHALL BE 2% 5.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 4.

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:36:03 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-407

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

A B

C

2.1

V F

O B A

N D B

R

ID

G E

E N

L A

R G

E D R

O O

F P

L A

N

111'-2" BRIDGE80'-0" VFOB

13'-8" 26'-4" 26'-4"

KEY NOTES:

6 6 6

H

H

C O

N T

IN

U A

T

IO

N

A -4

F

E S

H E

N5' 0 5' 10'

"= 1'-0"8

1SCALE:

1314 12 11SB15161718EBB

V

AREA SHOWN

KEY PLAN

NOT IN USE

NOT IN USE

NOT IN USE

NOT IN USE

NOT IN USE

22'-10" 45'-6" "4 345'-5 2'-8"

LEGEND: GENERAL NOTES:

OPTIONAL BID ITEMS

T Y

P

T Y

P

T Y

P

/0

/2

V

H

SEE TYPICAL DETAIL 3, SHEET A-501

EXISTING ROOF DRAIN AND DRAINAGE SUMP,

SEE TYPICAL DETAIL 3, SHEET A-503

EXISTING PLUMBING VENT TO REMAIN,

SEE TYPICAL DETAIL 2, SHEET A-503

EXISTING ROOF-MOUNTED VENTILATOR HOOD TO REMAIN,

TYPICAL DETAIL 4, SHEET A-503

EXISTING ROOF MOUNTED HATCH TO REMAIN, SIM TO

WALK PADS ADHERED TO THE EPDM MEMBRANE

SHALL BE 2%, PROVIDE CRICKETING AS SHOWN

ARROW INDICATES DIRECTION OF ROOF SLOPE; ALL SLOPES

21'-0"10'-8"48'-4"

V

NOT IN USE

SCUPPER, TYPICAL

SEE SHEET S-101.

GUARDRAIL ON PARAPET, TYPICAL

WITH CURB, SEE DETAIL 1 ON SHEET A-507.

REPLACE EXISTING EXPANSION JOINT COVER

NOT IN USE

NOT IN USE

NOT IN USE

W

N -1

-B -0

VFOB AND BRIDGE

A-408

A-907

A-908

A-908

A-908

A-908

A-907

A-907

A-506

A-506

A-506

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:36:13 AM

D R

A W

N B

Y

C H

E C

K E

D B

Y

M

IN

M

IN

M

IN

SIM

M

IN

STEEL BEAM LOCATIONS

10'-0" +/- FIELD VERIFY

F

IE

L D V

E R

IF

Y

SIM

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-408

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

LEGEND:

H

GENERAL NOTES: KEY NOTES:

N

1314 12 11SB15161718EBB

V

KEY PLAN

P E

N T

H O

U S

E S

12"0 5'

"= 1'-0"4

1SCALE:

N12"0 5'

"= 1'-0"4

1SCALE:

N12"0 5'

"= 1'-0"4

1SCALE:

N12"0 5'

"= 1'-0"4

1SCALE:

H

H

H

H

5 5

4 AREAS SHOWN

12"0 5'

"= 1'-0"4

1SCALE:

12"0 5'

"= 1'-0"4

1SCALE:

12"0 5'

"= 1'-0"4

1SCALE:

12"0 5'

"= 1'-0"4

1SCALE:

TYPICAL DETAIL 4, SHEET A-503

EXISTING ROOF MOUNTED HATCH TO REMAIN, SIM TO

WALK PADS ADHERED TO THE EPDM MEMBRANE

127.5' TOC

130.0' TOS

127.5' TOC

131.0' TOC

131.0' TOC

130.75' TOS

130.0' TOS

131.0' TOC

DECK

METAL

TOP OF

127.5'

" 4

E N

L A

R G

E D R

O O

F P

L A

N S

E C

T

IO

N S

OPTIONAL BID ITEMS

OPTIONAL BID ITEMS

NOT IN USE

STRUCTURAL

METAL STUDS AND STEEL DECKING, SEE

STEEL BRIDGE GIRDER

PRECAST CONCRETE FACIA PANEL

BLOCK, ADHERE TO WALKPAD

REPLACE EXISTING PRECAST CONCRETE SPLASH

8 0 /0

/2

ALL SLOPES SHALL BE 2%, PROVIDE CRICKETS

ARROW INDICATES DIRECTION OF ROOF SLOPE.

MINIMUM

PROVIDE DRAINAGE SCHEME AS SHOWN, SLOPES SHALL BE 2% 5.

EQUIPMENT SEE SHEETS GC101, E-101, AND A-901 THROUGH A-906.

FOR INFORMATION ON EXISTING ELECTRICAL AND TELECOM 4.

SEE SHEET A-406 FOR BOUNDARY OF OPTIONAL WORK AT THE BRIDGE6.

CLEARANCES (TRANSMISSION LINES AND THE CRANE BUS).

SEE SHEET GC101 FOR INFORMATION RELATING TO ELECTRICAL 3.

55.0' TAILRACE DECK ELEVATION:

90.0' INTAKE DECK ELEVATION:

127.5'TOP OF STRUCTURAL ROOF DECK:

131.0'PARAPET ELEVATION: 2.

CONSULT EM 385-1-1 FOR WORK NEAR OVERHEAD LINES.1.

SEE DETAIL 4 ON SHEET A-505

SINGLE POINT FALL PROTECTION ANCHOR

NOT IN USE

SEE SHEET S-101.

GUARDRAIL ON PARAPET, TYPICAL

NOT IN USE

WATER, 2% SLOPE MINIMUM.

PROVIDE CRICKET TO REDIRECT SURFACE

NOT IN USE

SEE SHEET E-101, A-902, & A-906

COMMUNICATIONS EQUIPMENT,

E

AND SPECIFICATION SECTION 07 72 00

PROVIDE ROOF ACCESS HATCH TYPE E. SEE DETAIL 1 ON A-508,

E

127.5' TOC

12"0 5'

"= 1'-0"4

1SCALE:

W

N -1

-B -0

SERVICE BAY PENTHOUSE

ERECTION BAY PENTHOUSE

A-407

VFOB PENTHOUSE

BRIDGE PENTHOUSE

B

E

PENTHOUSE @ BRIDGE

SECTION

PENTHOUSE @ SERVICE BAY

PENTHOUSE @ ERECTION BAY

C

PENTHOUSE @ VFOB

A-505

A-505

A-505

A-505

1 A-505

A-505

A

A-506

A-507

A-508

A-507

PENTHOUSE @ VFOB

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:36:19 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-409

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

E N

L A

R G

E D R

O O

F P

L A

N

SB1314 12 1115161718EBB

V

AREA SHOWN

KEY PLAN

LEGEND:

EXISTING ROOF DRAIN PENETRATION

OPENING IN STRUCTURE

PRECAST DOUBLE TEE ROOF GIRDER

30 PSFVOFB:

30 PSFBRIDGE:

50 PSFPOWERHOUSE:

FOLLOWS:

MAXIMUM ALLOWABLE LIVELOAD AS 5.

RELATING DEMOLITION.

SEE SHEET AD101 FOR INFORMATION 4.

AND THE CRANE BUS).

CLEARANCES (TRANSMISSION LINES

RELATING TO ELECTRICAL

SEE SHEET GC101 FOR INFORMATION 3.

55.0'TAILRACE DECK ELEVATION:

90.0'INTAKE DECK ELEVATION:

131.0'PARAPET ELEVATION: 2.

OVERHEAD LINES.

CONSULT EM 385-1-1 FOR WORK NEAR 1.

SHEET NOTES:

CBA

AND SECTION 1 ON SHEET A-501

JOINTS, SEE SHEET NOTE 7 FOR QUANTITIES

WATERPROOF FIRESTOPPING AT PERIMETER

AND SECTION 1 ON SHEET A-502

JOINTS, SEE SHEET NOTE 7 FOR QUANTITIES

WATERPROOF FIRESTOPPING AT TEE FLANGE

AND SECTION 1 ON SHEET A-502

JOINTS, SEE SHEET NOTE 7 FOR QUANTITIES

WATERPROOF FIRESTOPPING AT EXPANSION

PRECAST CONCRETE PARAPET WALL PANEL JOINTS

SHEET A-501 FOR POLYURETHANE SEALANT AT

SEE DETAIL 4 ON SHEET A-504 AND DETAIL 1 ON

A = BPH2 B = BRIDGE C = VOFB

PARAPET WALL PANEL JOINTS, SEE SHEET NOTE 11.

POLYURETHANE SEALANT AT PRECAST CONCRETE

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A AA A AA A

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A AA A AA A

MLKJIH

BAY 14 BAY 13 BAY 12 BAY 11 SERVICE BAY

N

NORTH

PROJECT5' 0 10' 20' 30'

"= 1'-0"16

1SCALE:

KEY NOTES:

R O

O F F

IR

E S

T O

P P

IN

G J

O

IN

T S

E A

L A

N T

/0

/2

WALL PANEL JOINTS

QUANTITIES AT PRECAST CONCRETE PARAPET

10. SEE SHEET A-102 FOR POLYURETHANE SEALANT

WALL PANEL JOINTS.

QUANTITIES AT PRECAST CONCRETE PARAPET

SEE SHEET A-102 FOR POLYURETHANE SEALANT 9.

SCUTTLES, ROOF DRAINS.

PENETRATIONS, HATCHES, VENTILATORS,

LOCATIONS SUCH AS: PIPE & CONDUIT

INDICATED, AND IS NOT REQUIRED AT OTHER

FIRESTOPPING IS REQUIRED AT LOCATIONS 8.

QUANTITIES.

SEE SHEET A-102 FOR WATERPROOF FIRESTOPPING 7.

3,520 SF VFOB:

1,170 SF BRIDGE:

96,876 SF POWERHOUSE:

ROOF AREA SQUARE FOOTAGES:6.

FOR RESTRICTIONS IN THIS AREA

ELECTRICAL HAZARD AREAS, SEE SHEET GC101

NOT IN USE

NOT IN USE

N -1

-B -0

ENLARGED FIRESTOPPING & JOINT SEALANT PLAN

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:36:25 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-410

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

E N

L A

R G

E D R

O O

F P

L A

N

SB1314 12 1115161718EBB

V

AREA SHOWN

KEY PLAN

LEGEND:

EXISTING ROOF DRAIN PENETRATION

OPENING IN STRUCTURE

PRECAST DOUBLE TEE ROOF GIRDER

SHEET NOTES:

CBA

AND SECTION 1 ON SHEET A-501

JOINTS, SEE SHEET NOTE 7 FOR QUANTITIES

WATERPROOF FIRESTOPPING AT PERIMETER

AND SECTION 1 ON SHEET A-502

JOINTS, SEE SHEET NOTE 7 FOR QUANTITIES

WATERPROOF FIRESTOPPING AT TEE FLANGE

AND SECTION 1 ON SHEET A-502

JOINTS, SEE SHEET NOTE 7 FOR QUANTITIES

WATERPROOF FIRESTOPPING AT EXPANSION

PRECAST CONCRETE PARAPET WALL PANEL JOINTS

SHEET A-501 FOR POLYURETHANE SEALANT AT

SEE DETAIL 4 ON SHEET A-504 AND DETAIL 1 ON

A = BPH2 B = BRIDGE C = VOFB

PARAPET WALL PANEL JOINTS, SEE SHEET NOTE 11.

POLYURETHANE SEALANT AT PRECAST CONCRETE

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A AA A

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A AA A

HGFED

R O

O F F

IR

E S

T O

P P

IN

G J

O

IN

T S

E A

L A

N T

BAY 15BAY 16BAY 17BAY 18

NORTH

PROJECT5' 0 10' 20' 30'

"= 1'-0"16

1SCALE:

N

30 PSFVOFB:

30 PSFBRIDGE:

50 PSFPOWERHOUSE:

FOLLOWS:

MAXIMUM ALLOWABLE LIVELOAD AS 5.

RELATING DEMOLITION.

SEE SHEET AD101 FOR INFORMATION 4.

AND THE CRANE BUS).

CLEARANCES (TRANSMISSION LINES

RELATING TO ELECTRICAL

SEE SHEET GC101 FOR INFORMATION 3.

55.0'TAILRACE DECK ELEVATION:

90.0'INTAKE DECK ELEVATION:

131.0'PARAPET ELEVATION: 2.

OVERHEAD LINES.

CONSULT EM 385-1-1 FOR WORK NEAR 1.

WALL PANEL JOINTS

QUANTITIES AT PRECAST CONCRETE PARAPET

10. SEE SHEET A-102 FOR POLYURETHANE SEALANT

PARAPET WALL PANEL JOINTS.

SEALANT QUANTITIES AT PRECAST CONCRETE

SEE SHEET A-102 FOR POLYURETHANE 9.

SCUTTLES, ROOF DRAINS.

PENETRATIONS, HATCHES, VENTILATORS,

LOCATIONS SUCH AS: PIPE & CONDUIT

INDICATED, AND IS NOT REQUIRED AT OTHER

FIRESTOPPING IS REQUIRED AT LOCATIONS 8.

FIRESTOPPING QUANTITIES.

SEE SHEET A-102 FOR WATERPROOF 7.

3,520 SF VFOB:

1,170 SF BRIDGE:

96,876 SF POWERHOUSE:

ROOF AREA SQUARE FOOTAGES:6.

AA

KEY NOTES:

/0

/2

FOR RESTRICTIONS IN THIS AREA

ELECTRICAL HAZARD AREAS, SEE SHEET GC101

FIRESTOPPING REQUIRED

CAST IN PLACE ROOF STRUCTURE, NO

NOT IN USE

N -1

-B -0

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

SHEET OF

/5 /2

BORDER VERSION UPDATE [08-2013]

Sheet NameSHEET NAME:g2eccltm BY USERNAME:ANSI DDRAWING PLOT SIZE: DATE AND TIME PLOTTED: 1/5/2017 9:36:33 AM

D R

A W

N B

Y

C H

E C

K E

D B

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

P .1

A -4

.D

G N .d g n

A-411

O F R

E P

L A

C E

M E

N T

S E

C O

N D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

D A

N

IE

L L E F

IC

H E

R A P

E

A N

S I

D

Z A

K

Z A

N G

E R

Z A

N G

E R

A R

C H

IT

E C

T U

R A

L

E N

L A

R G

E D R

O O

F P

L A

N

SB1314 12 1115161718EBB

V

AREA SHOWN

KEY PLAN

LEGEND:

EXISTING ROOF DRAIN PENETRATION

OPENING IN STRUCTURE

PRECAST DOUBLE TEE ROOF GIRDER

SHEET NOTES:

CBA

A…