ATTACHMENT 1: QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The KTR will be evaluated periodically during performance of this Contract to ensure compliance with the proposed and accepted performance goals, regulations, and guidance. This evaluation will be performed according to the QASP. The KTR shall review the proposed QASP and propose any desired revisions with the proposal. The QASP will be used by the Government to evaluate the KTR’s performance. Failure to adequately complete any service or submittal to at least a satisfactory level of quality or timeliness may result in repeat of work, a poor performance evaluation, or both.
QUALITY ASSURANCE SURVEILLANCE PLAN FOR CONTRACT NO. W9127N-16-R-0021.
Deliverable of Service
Requirement Measurement / Metric Surveillance Method Frequency
Procedures to be taken when performance standards not met
Pre-Field Activities Compliance with requirements to include timeliness, accuracy, quality, consistency, and functionality
Submittal Review
Draft Submittal Final Submittal
a. Contractor revision of submittal at own expense;
b. Poor performance evaluation
Field Survey Compliance with requirements to
25% fieldwork inspection
Monthly Contract Update Reports
Report Compliance with requirements to
Draft Submittal Final Submittal
CONTRACT MANAGEMENT
Work Plan Timeliness, accuracy, quality, consistency, functionality
Draft and Final a. Contractor revision of submittal;
Quality Control Plan Timeliness, accuracy, quality, Minutes of all significant conversations and meetings
Timeliness, accuracy, quality, CONTRACT ADMINISTRATION AND ACCOUNTING
Monthly Progress Reports
Upon Submission a. KTR revision of
b. Delay in payment
Monthly Invoices Timeliness, accuracy, quality, Monthly Expenditure Reports
Upon Submission a. KTR revision of submittal
Monthly Exposure (man-hours) Report
Upon Submission a. KTR revision of submittal
Release of Claims Timeliness, accuracy, quality,
b. Delay in Final Payment
Attachment 2 Maps Showing Survey Areas
Attachment 3 Maps Showing Survey Areas
Attachment 4 Maps Showing Survey Areas with Known Sites
Attachment 5 Previously Recorded Cultural Resources within Survey Area
Fuels Reduction
Site Type Description NRHP Status 35JA230 Precontact Lithic Scatter Unevaluated 35JA228 Precontact Lithic Scatter Unevaluated
Attachment 6
GIS DATA
USACE Portland District will provide a blank geodatabase and the data dictionary for use on the project.
Any questions concerning GPS or GIS should be directed to Vanessa Van Der Borg, (503-808-4684), Vanessa.VanDerBorg@usace.army.mil.