About this file

Amendment 0001 removed all option years and made this a one time supply contract with one optional item. See bid schedule and revised specifications.

View the file

Other files

File Type Posted
ProjNetInstructions.pdf PDF
10Q0103Solicitation.pdf PDF
Drawing10Q103.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY CORPS OF ENGINEERS

KATHRYN A. NEWHOUSE

333 SW FIRST AVE

PORTLAND OR 97204-3495

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is for the removal of all optional Contract Line Item Numbers (CLINs) 0001AC thru 3001AE. The Specifications, second (2nd) paragraph has been modified. For proposals to be considered responsive, the contract shall use the revised bid schedule for quote submission. A Bidder-Inquiry key is incorporated to answ er questions regarding this solicitation. No questions w ill be accepted via phone or email.

This solicitation has been extended from 24 September 2010 3:00PM to 27 September 2010 3:00PM. Emailed and facsimile quotes w ill be accepted due to this short turn-around time. The email address is Kathryn.A.New house@usace.army.mil and the facsimile number is

503.808.4605. If either alternate method is used, please verify receipt of quotes after submission w ith number of pages submitted and date to the phone number listed in block 7(b) of the SF1449 page. For responsive quote submission, the contractor shall also include a signed copy of the SF30 (Blocks 15A-C) of Amendment 0001.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Sep-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-10-Q-0103

X 9B. DATED (SEE ITEM 11)

14-Sep-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Sep-2010

CODE

US ARMY CORPS OF ENGINEERS

333 SW FIRST AVE

PORTLAND OR 97204-3495

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W9127N

FACILITY CODECODE

EMAIL:TEL:

W9127N-10-Q-0103

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

INSTRUCTIONS TO OFFERORS

To a quote to be considered responsive, the contractor shall submit the following information listed below, as an original and one (1) copy to:

Department of the Army, Portland District Corps of Engineers Attn: CECT-NWP-S, K. Newhouse 333 SW 1st Avenue Portland, OR 97204-2946

Due to the short turnaround time of quotes, email and facsimile submissions will be accepted. If email or facsimile responses are utilized, then please contact Kathryn Newhouse at 503.808.4620 to ensure the entire quote was received.

1) Signed and dated Standard Form 1449 (Solicitation/Contract Order for Commercial Items).

2) Completed Bid Schedule (pricing information) for all Contract Line Item Numbers.

3) If applicable, signed and dated all Standard Form 30’s (Amendment/Modification Form) for any and all amendments issued.

4) Completed Clauses:

a. FAR Clause 52.212-2 EVALUATION OF COMMERCIAL ITEMS

i. Documentation in response to Factor 1 and all Sub-Factors above.

b. FAR Clause 52.212-3 Alt I, OFFEROR REPRESENTATIONS AND CERTIFICATIONS-- COMMERCIAL ITEMS (Alt I) (Mar 2005). If submitted online (http://orca.bpn.gov) please indicate as such.

c. DFAR Clause 252.212-7000, OFFEROR REPRESENTATIONS AND CERTIFICATIONS-- COMMERCIAL ITEMS (Jun 2005)

OPTIONAL BID ITEM

The Government may require the delivery of the optional bid item identified in the Bid Schedule as Contract Line Item Number (CLIN) 0001AB. The quantities for this item may be increased or decreased or the item may not be used at all, at the discretion of the Government. The unit price or amount of the optional item will remain unchanged whether the quantities are increased or decreased. If the Government does not exercise the optional item within 60 days of the Contract Award date, the Government will revoke its right to unilaterally execute the optional item due to the variable cost of materials. The Government will exercise the option by written notice to the Contractor, commencing from the date of contract award through the date of the end of delivery period of performance, unless otherwise specified herein. If an option is exercised, the contract completion date may be extended with mutual agreement.

BIDDER INQUIRES

ALL inquiries regarding this solicitation and ALL questions are to be submitted via ProjNet-Bidsm.

ProjNet-Bidsm is a web-based program that allows bidders to post questions regarding the solicitation and to view all questions by other bidders and answers by USACE. ProjNet-Bidsm can be accessed through ProjNetsm at https://www.projnet.org/projnet/. To access the ProjNet-Bidsm website the first time:

1) Click the Bid tab

2) Click Bidder Inquiry. (The Agency is USACE.)

3) Enter the following information for access:

a) The Bidder Inquiry Key: X7X7NF‐KIL4B5

b) Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). (required on first project only)

c) Establish secret question and answer which will be used as a password (required on first project only)

4) For subsequent access use your email address, the Bid Inquiry Key and response to the secret question to access the ProjNet-Bidsm Module.

5) Submit questions or review questions and answers. (A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review.

6) For a specific step-by-step for POSTING YOUR INQUIRIES, is available in the Reference link on the

Contract Viewer.

7) For questions about the ProjNet-Bidsm, please contact the Call Center help desk toll free at 1-800-428-

HELP, which operates from 8AM to 5PM (Central US time zone). ProjNet-Bidsm questions can also be emailed to the helpdesk at staff@rcesupport.com.

No response will be posted to inquiries after the Close of Business on the last business day preceding the proposal due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bidsm prior to bid submission. Nothing in the solicitation is changed unless an amendment is issued.

(End of Instruction of Offerors)

REVISED BID SCHEDULE PER AMENDMENT 0001

ONLY PROVIDE PRICING FOR CLINS 0001AA AND 0001AB

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 NA NA NA

Re-tubing Thrust Bearing Oil Coolers

FFP

Each oil cooler set includes two cooler halves. Price per set to include all equipment, material, and FOB Destination transportation costs. See attached specifications and drawing.

Contractor shall submit number of weeks needed for delivery of re-tubing of thrust bearing if longer than stated in the delivery section of this quote. ADC means After Date of Contract Award.

0001AA 1 Set Re-tubing Thrust Bearing Oil Coolers

FFP

0001AB 1 Set OPTION Re-tubing Thrust Bearing Oil Coolers

FFP

Optional Line Item

0001AC –

3001AE

CLINS 0001AC – 3001AE are all RESERVED. All out year optional items have been removed from the Specifications. Only CLINS 0001AA and 0001AB shall be priced.

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN description has changed from Base Year Re-tubing Thrust Bearing to Re-tubing Thrust Bearing Oil Coolers.

The CLIN extended description has changed from Oil CoolersEach oil cooler set includes two cooler halves. Price per set to include all equipment, material, and FOB Destination transportation costs. See attached specifications and drawing. to Each oil cooler set includes two cooler halves. Price per set to include all equipment, material, and FOB Destination transportation costs. See attached specifications and drawing. Contractor shall submit number of weeks needed for delivery of re-tubing of thrust bearing if longer than stated in the delivery section of this quote. ADC means After Date of Contract Award..

SUBCLIN 0001AC

The CLIN description has changed from Re-tubing Thrust Bearing Oil Coolers to RESERVED.

The CLIN extended description Optional Line Item has been deleted.

The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

SUBCLIN 0001AD

The CLIN extended description Optional Line Item has been deleted.

SUBCLIN 0001AE

The CLIN extended description Optional Line ItemTOTAL FOR BASE YEAR CLINS 0001 THRU 0001AE: $_____________ has been deleted.

CLIN 1001

The CLIN description has changed from Base Year Re-tubing Thrust Bearing to RESERVED.

The CLIN extended description Oil CoolersEach oil cooler set includes two cooler halves. Price per set to include all equipment, material, and FOB Destination transportation costs. See attached specifications and drawing.

First Option Year Period of Performance is 01 October 2011 thru 30 September 2012. has been deleted.

SUBCLIN 1001AA

The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

SUBCLIN 1001AB

The CLIN description has changed from Re-tubing Thrust Bearing Oil Coolers to RESERVED.

SUBCLIN 1001AC

SUBCLIN 1001AD

SUBCLIN 1001AE

The CLIN extended description Optional Line ItemTOTAL FOR FIRST OPTION YEAR CLINS 1001 THRU 1001AE: $_____________. has been deleted.

CLIN 2001

The CLIN extended description Oil CoolersEach oil cooler set includes two cooler halves. Price per set to include all equipment, material, and FOB Destination transportation costs. See attached specifications and drawing.

Second Option Year Period Of Performance is 01 October 2012 thru 30 September 2013. has been deleted.

SUBCLIN 2001AA

SUBCLIN 2001AB

The CLIN extended description Optional Line Item has been deleted.

The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

SUBCLIN 2001AC

The CLIN description has changed from Re-tubing Thrust Bearing Oil Coolers to RESERVED.

SUBCLIN 2001AD

SUBCLIN 2001AE

The CLIN extended description Optional Line ItemTOTAL FOR SECOND OPTION YEAR CLINS 2001 THRU 2001AE: $_____________ has been deleted.

CLIN 3001

The CLIN extended description Oil CoolersEach oil cooler set includes two cooler halves. Price per set to include all equipment, material, and FOB Destination transportation costs. See attached specifications and drawing.

Third Option Year Period of Performance is 1 October 2013 thru 30 September 2014. has been deleted.

SUBCLIN 3001AA

SUBCLIN 3001AB

SUBCLIN 3001AC

SUBCLIN 3001AD

SUBCLIN 3001AE

The CLIN extended description Optional Line ItemTOTAL FOR FOURTH OPTION YEAR CLINS 4001 THRU 4001AE: $_____________TOTAL FOR ALL CLINS 0001 THRU 4001AE: $____________________ has been deleted.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule Item has been deleted from CLIN 0001:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

POP 01-OCT-2010 TO

30-SEP-2011

N/A THE DALLES/JOHN DAY PROJECT

DAVID MACKINTOSH

USACE PORTLAND DISTRICT THE

DALLES DAM IN

THE DALLES OR 97058-9998

(541)506-7891 FOB: Destination

G2R1D00

The following Delivery Schedule item has been added to CLIN 0001:

8 wks. ADC THE DALLES/JOHN DAY PROJECT

DAVID MACKINTOSH

USACE PORTLAND DISTRICT THE

DALLES DAM IN

THE DALLES OR 97058-9998

(541)506-7891

The following Delivery Schedule Item has been deleted from SUBCLIN 0001AA:

POP 01-OCT-2010 TO

30-SEP-2011

N/A THE DALLES/JOHN DAY PROJECT

DAVID MACKINTOSH

USACE PORTLAND DISTRICT THE

DALLES DAM IN

THE DALLES OR 97058-9998

(541)506-7891

The following Delivery Schedule item has been added to SUBCLIN 0001AA:

8 wks. ADC 1 THE DALLES/JOHN DAY PROJECT

DAVID MACKINTOSH

USACE PORTLAND DISTRICT THE

DALLES DAM IN

THE DALLES OR 97058-9998

(541)506-7891

The following Delivery Schedule Item has been deleted from SUBCLIN 0001AB:

POP 01-OCT-2010 TO

30-SEP-2011

N/A THE DALLES/JOHN DAY PROJECT

DAVID MACKINTOSH

USACE PORTLAND DISTRICT THE

DALLES DAM IN

THE DALLES OR 97058-9998

(541)506-7891

The following Delivery Schedule item has been added to SUBCLIN 0001AB:

5 wks. ADC 1 THE DALLES/JOHN DAY PROJECT

DAVID MACKINTOSH

USACE PORTLAND DISTRICT THE

DALLES DAM IN

THE DALLES OR 97058-9998

(541)506-7891

The following Delivery Schedule Items have been deleted from SUBCLIN 0001AC thru SUBCLIN 3001AE:

POP 01-OCT-2010 TO

30-SEP-2011

N/A THE DALLES/JOHN DAY PROJECT

DAVID MACKINTOSH

USACE PORTLAND DISTRICT THE

DALLES DAM IN

THE DALLES OR 97058-9998

(541)506-7891

The following have been modified:

SPECIFICATIONS

SPECIFICATIONS FOR

THRUST BEARING OIL COOLER REHABILITATION

MAIN UNITS 1-16 WITH GE THRUST BEARINGS

LOCATED AT THE JOHN DAY DAM

GENERAL

This specification is intended to define materials and services required to rehabilitate heat exchangers, which are used to cool thrust-bearing oil in hydroelectric turbine generators. River water runs through the tubes, which are immersed in a bath of oil. Each cooler is comprised of two semi circular halves. Each half is constructed of a frame supporting 24 finned tubes with a supply/discharge manifold on one end and a return header on the other end. All tubing, with cooling fins, must be replaced due to wall thinning and leakage caused by wear and/or corrosion.

This will be a Firm Fixed Price Supply Contract. , base plus three option year contract. One (1) set will be procured in the base year with four (4) sets optional, and up to nine (9) potential sets could be procured in the out years. One

(1) set shall be issued at contract award date with the second (2nd) set, an optional item, to be issued unilaterally at the Government’s discretion within 60 days of contract award. If the Government exercises the optional item, the contract delivery period may be extended by mutual agreement between the Government and the Contractor.

TUBING

The replacement tubing shall be made of 90/10 CuNi with a minimum wall thickness of 0.049” (existing) to a maximum of 0.065”. Tubing OD shall be 1.00”. The tubes are 2 different lengths and radii of 12 tubes each (for each half). Approximate lengths are: inner 17’ 1-3/8” and outer 17’ 9-5/8”. Approximate radii to tube centerline are:

inner 6’ 3” and outer 6’ 6”.

The tubing shall be finned, with eight 7 to 9 fins per inch. The fins shall be copper or aluminum and shall be soldered to the tubes, or extruded “L” shaped fins that are spiral wound on the tubing under tension. The fin outside diameter shall be 1.875” to 2.00”. Fin thickness shall be a minimum of 0.012” to a maximum of 0.016”. Damage to the fins, such as bending and separation from the tubing, may occur when the tubes are threaded into the frame. Not more than 1% noticeable fin damage is allowed in the finished cooler. Manufacturer’s specifications of the proposed finned tubing shall be submitted as part of the bid.

MANIFOLDS

A new gasket shall be installed on each head. The gasket shall be a semi-rigid non-asbestos type that is formulated for both oil and water service. The gasket shall be installed using Permatex #2 sealant. Gasket materials shall be trimmed flush with the periphery of the head and tube sheet.

HARDWARE

All damaged hardware shall be replaced with like materials. If replaced, the bolts shall meet ASTM A325, and washers shall meet ASTM F436. Replacement hardware shall be plated to resist corrosion. An anti-seize compound shall be used on all threaded connections.

CLEANLINESS

The coolers shall be delivered in clean condition so that no cleaning is necessary prior to installation. No foreign matter shall be visible on the coolers.

TESTING

Each completed cooler shall receive a hydrostatic pressure test at 50 psi. This pressure must hold for a minimum of one hour. Written documentation of test shall be provided. At the discretion of the Government, a Corps representative may request to inspect the on-going work or testing of the coolers. The contractor shall be located within 400 miles of the Portland Oregon area to accommodate this need for possible inspections.

PACKAGING AND SHIPPING

The contractor shall be responsible for providing transportation to and from The John Day Dam Powerhouse east of Rufus, Oregon. The cooler halves will be picked up in Government-provided shipping crates. Each crate measures 14’ long by 5.5’ wide by 4.5’ high and weighs approximately 2,200 lbs including a cooler half. The two crates may be stacked. The contractor shall repack completed coolers for shipment to the government in the provided crates and to insure adequate protection from damage in transit, and shall be responsible for and make good any or all damage to either coolers or shipping crates that may occur prior to acceptance by the government at the specified delivery point. All shipments are FOB destination. Warehouse hours are Monday thru Thursday; 0700-1600 hours. Any other transportation arrangements shall be made prior to transportation departure and with written approval from the Contracting Officer’s Representative.

(End of statement of work)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .