W9127N-09-B-0004-0003.pdf

PDF 120 KB Posted

Attached to
Julia Butler Hansen National Wildlife Refuge Habitat Restoration
Solicitation number
W9127N-09-B-0004
Issued by

About this file

Change in Bid Schedule and Measurement & Payment

View the file

Other files

File Type Posted
09B04 Abstract.pdf PDF
W9127N-09-B-0004-0002.pdf PDF
JBH Site Visit Attendees List.pdf PDF
W9127N-09-B-0004-0001.pdf PDF
JBH-PLANS.pdf PDF
W9127N-09-B-0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

117398

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

CLIN Item Number 0009, Optional Item Typical Log Boom is DELETED.

This CLIN requires further specifications and monitoring, therefore, to enhance fairness and optimal pricing the CLIN item is DELETED.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Mar-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-09-B-0004

X 9B. DATED (SEE ITEM 11)

06-Jan-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Mar-2009

CODE

US ARMY CORPS OF ENGINEERS

333 SW FIRST AVE

PORTLAND OR 97204-3495

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-09-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

BID SCHEDULE

JULIA BUTLER HANSEN COLUMBIAN WHITE

TAILED DEER NATIONAL WILDLIFE REFUGE

SOLICITATION NO. W9127N-09-B-0004

CHANGED Amendment 0002 CHANGED Amendment 0003

LINE

ITEM

DESCRITPTION ESTIMATED

QUANTITIES

UNIT UNIT PRICE ESTIMATED

AMOUNT

0001 Mobilization/Demobilization

JOB

0002 Indian Jack Slough

0003 Duck Lake Slough

0004 W201 +30

0005 Brooks Slough

Optional

Item

Risk Creek

Optional

Item

Winter Slough

Optional

Item

Hampson Slough

Optional

Item

Typical Log Boom

DELETED

CHANGED

EA

Base CLINS:

Optional CLINS:

Total: $_________________

END OF CHANGE

G2ctcrlm

G2ctcrlm

DELETED

G2ctcrlm New Stamp

G2ctcrlm New Stamp

G2ctcrlm Amendment 0003

G2ctcrlm four asterick

G2ctcrlm New Stamp

G2ctcrlm four asterick

G2ctcrlm Amendment 0002

G2ctcrlm four asterick

G2ctcrlm four asterick

New Stamp

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 UNIT PRICE PAYMENT ITEMS

1.3 JOB PAYMENT ITEMS

1.4 MEASUREMENT AND PAYMENT

1.4.1 Mobilization and Demobilization, Line Item No. 0001

1.4.2 Indian Jack Slough, Line Item No. 0002

1.4.3 Duck Lake Slough, Line Item No. 0003

1.4.4 W201 + 30, Line Item No. 0004

1.4.5 Brooks Slough, Line Item No. 0005

1.4.6 Risk Creek, Line Item No. 0006 (OPTIONAL)

1.4.7 Winter Slough, Line Item No. 0007 (OPTIONAL)

1.4.8 Hampson Slough, Line Item No. 0008 (OPTIONAL)

1.4.9 Typical Log Boom, Line Item No. 0009 (OPTIONAL)

PART 2 - PRODUCTS - NOT USED

PART 3 - EXECUTION - NOT USED

-- End of Section Table of Contents --

01 22 00.00 10-i

G2ctcrlm

DELETED

G2ctcrlm Line

G2ctcrlm

DELETED

G2ctcrlm Amendment 0003

G2ctcrlm four asterick four asterick tide gate, survey requirements, channel excavation, road enhancement, meeting environmental requirements, as-built drawings, and incidentals associated with the Hampson Slough culvert and tide gate installation.

Site preparation will include removal and disposal of vegetation from area to be excavated as well as removal of existing elk fence. Site restoration will include seeding the levee side slopes at the structure and replacement of elk fence.

b. Payment: Payment will be made in the Contract amount under Line Item No. 0008, "Hampson Slough (OPTIONAL)."

1.4.9 Typical Log Boom, Line Item No. 0009 (OPTIONAL)

a. Measurement: Measurement will be made as an individual per site item for providing all labor, plant, equipment, materials, survey requirements, meeting environmental requirements, as-built drawings, and incidentals associated with the Log Booms. Site preparation will include removal and disposal of vegetation from log boom and anchor placement area.

b. Payment: Payment will be made in the Contract amount under Line Item No. 0009, "Typical Log Boom (OPTIONAL)."

PART 2 - PRODUCTS - NOT USED

PART 3 - EXECUTION - NOT USED

-- End of Section --

01 22 00.00 10-4

G2ctcrlm four asterick

G2ctcrlm

DELETED

G2ctcrlm Line

G2ctcrlm

DELETED

G2ctcrlm Amendment 0003 four asterick

Check Box1: Yes
Text2: 1
Text3: x
Text4: FAR 52.243-4 Changes
Text5:
Text6:
Text1:
Text7: X
Text8: