W9127826RA088_Advanced Notice.pdf
PDF 188 KB Posted
- Attached to
- Horizontal Construction MATOC
- Solicitation number
- W9127826RA088
About this file
This is an In-House Advance Notice for a construction contract opportunity issued by the U.S. Army Engineer District, Mobile. The project, titled Horizontal Construction MATOC (Multiple Award Task Order Contract), seeks a contractor to provide a full range of horizontal construction, renovation, repair, and incidental design task orders for general construction primarily at 12 locations in Alabama, Florida, Georgia, and Mississippi. The contract is structured as a best value, two-phase design-build solicitation with a five-year ordering period. The estimated cost range is $1,000,000 to $5,000,000. This is a total small business set-aside (firms with average annual receipts under $45,000,000 qualify), and no subcontracting plan is required. The NAICS code is 237990.
Solicitation documents will be available on August 11, 2026, via the Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil. Proposals are due by 2:00 P.M. on September 11, 2026. All prospective contractors, subcontractors, and suppliers must register in the System for Award Management (SAM.gov) prior to downloading solicitation information. Phase One proposals will be evaluated to determine which offerors advance to Phase Two, with selection based on technical approach and performance capability. Phase Two offerors will be invited to participate in a contractor site visit and will receive detailed project design requirements via amendment. All bid documents and amendments must be submitted in electronic format. Questions during the advertisement period must be submitted through the ProjNet internet-based system. The issuing office is located at 100 Canal Street, Mobile, Alabama 36628-0001, with primary contacts: Project Manager Joan Padgett (251-694-3708), Specification Engineer Amber Thomas (251-690-2485), and Contract Specialist Jennifer Suit (251-441-6466).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
In-House Advance Notice (Construction Contract)
1. Project No.
W9127826RA088
2. Date of Notice
23 JULY 2026
3. Date Solicitation Documents Available (Approx.)
11 AUGUST 2026
4. BIDS/OFFERS TO BE RECEIVED BY
(at place specified for receipt of offers)
A. TIME
2:00 P.M.
B. DATE
11 SEPT 2026
5.TIME FOR COMPLETION (Calendar days)
Five (5) Year Ordering Period
6A. ISSUING OFFICE (Name, address, and ZIP Code)
COMMANDER
U.S. ARMY ENGINEER DISTRICT, MOBILE
100 CANAL STREET
MOBILE, ALABAMA 36628-0001
RETURN NOTICE TO THIS ADDRESS
7. PROJECT TITLE AND LOCATION
Horizontal Construction MATOC, Multiple Locations, Operations Division
6B. ROOM NO.
6C. TELEPHONE NO. (INCLUDE AREA CODE)
(251) 441-6466 / (251) 441-5585
Internet Advertised Solicitation
THIS IS A TOTAL SMALL BUSINESS SETASIDE
THIS PROJECT IS A REQUEST FOR PROPOSAL (RFP), BEST VALUE SOURCE SELECTION SOLICITATION.
THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE FOR THIS PROJECT IS 237990.
This project is a Best Value, two-phase design-build solicitation. A detailed project description and overall project performance requirements for this project will be included in the Request For Proposals (RFP) package. The solicitation criteria relies upon industry standards, where allowable, to afford the offeror a degree of design flexibility while meeting certain specific project requirements. The successful Contractor must design and construct complete and usable facilities, as described in the RFP documents. One solicitation will be issued covering both phases. Proposals will be evaluated in Phase
One to determine which offerors will submit proposals for Phase Two, and an amendment will be issued to those selected offerors. Selection of offerors for involvement in Phase Two will be based on technical approach and performance capability. Detailed project design requirements will then be added by amendment to the solicitation at the start of the Phase
Two stage of the Request For Proposals. A limited number of firms will be invited to participate in the second phase.
10. ESTIMATED COST RANGE PROJECT
A. FROM
$ 1,000,000.00
B. TO
$5,000,000.00
11. Offers Covering The Project Restricted to Small Business Yes_ __ No_X _
*Restricted to 8(a) Competitive for Region IV Yes___ No_X__
Subcontracting Plan Required Yes_ __ No_ _X_
13. DESCRIPTION OF WORK (Physical Characteristics)
The Mobile District COE has a need for one MATOC for a full range of horizontal construction, renovation, repair, and some incidental design task orders for general construction primarily at 12 locations in AL, FL, GA, and MS.
The North American Industry Classification System (NAICS) code for this project is 237990.
Project Manager: Joan Padgett, 251-694-3708
Specification Engineer: Amber Thomas, 251-690-2485 Contract Specialist: Jennifer Suit, 251-441-6466
Note No. 1: All prospective contractors and their subcontractors and suppliers must be registered in The System for Award
Management (SAM.gov) before they will be allowed to download solicitation information. Contractors must be registered in the
System for Award Management (SAM) at https://sam.gov/content/home prior to award of this contract. Solicitation documents, plans and specifications will only be available via the Procurement Integrated Enterprise Environment (PIEE) website https://piee.eb.mil
See attachments PIEE Solicitation Module Vendor Access Instructions and SOP PIEE Proposal Manager Offeror for instructions on getting access to the PIEE Solicitation Module and submitting your proposal. Registration for plans and specifications should be made via the Procurement Integrated Enterprise Environment (PIEE) website https://piee.eb.mil. If you are not registered, the United States
Government is not responsible for providing you with notifications of any changes to this solicitation. The solicitation will be available only as a direct download. This solicitation will not be issued on CD-ROM. Neither telephonic, mailed, nor fax requests will be accepted. Registration should be completed one (1) week prior to the issue date. It is therefore the contractor’s responsibility to monitor the website daily for the solicitation to be posted, and for any posted changes or amendments to this solicitation. The plans and specifications and all notifications of changes to this solicitation shall only be made through this posting and modifications hereto.
Plans and specifications will not be provided in a printed-paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government's best interest. NOTE: This solicitation is in .pdf format and requires Adobe
Acrobat Reader. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader.
Note No. 2: All bid forms, bid bonds, and other normal documents required for the bid submittal, including amendments to the bid submittal, shall be electronic format with the proposal.
Note No. 3: Critical path method (network analysis system) is not required.
Note No. 4: For this job, a small business is defined as having average annual receipts of less than $45,000,000 for the past three or five years.
Note No. 5: It is anticipated that this solicitation will not have bid options. However, optional bid items may be added if it is determined to be in the Government’s best interest.
Note No. 6: All advertisements of Mobile District projects will be through the Procurement Integrated Enterprise Environment (PIEE) website https://piee.eb.mil. Detailed information on this and other Mobile District Projects (Ordering Solicitations, Points of Contact, Synopsis of Work, etc.) are available on the Internet at the Procurement Integrated Enterprise Environment (PIEE) website https://piee.eb.mil.
Address questions concerning downloading of plans/specifications to the Contract Specialist indicated above.
Note No. 7: A Contractor Site Visit will be conducted with those offerors advancing to Phase Two. Phase Two offerors will be notified via amendment, as to when and where the site visit will be conducted.
Note No. 8: The request for information (RFI) process for bidder inquiries during the advertisement period will be through the
ProjNet internet-based system, and specifics will be contained in the RFP solicitation package available exclusively from the
Procurement Integrated Enterprise Environment (PIEE) website https://piee.eb.mil. Other forms of communicating RFIs to the
Government will not be honored. The Government will try to respond to all questions. However, responses may not be furnished to all questions and particularly those received late in the advertisement period (0-10 days prior to bid opening.)
-- END --
https://sam.gov/content/home https://piee.eb.mil/ https://piee.eb.mil/ http://www.adobe.com/products/reader https://piee.eb.mil/ https://piee.eb.mil/ https://piee.eb.mil/
File details come from the government source that posted it. Updated .