Holt Lock Monolith R 14 Restoration Industry Day 4 Sep 24.pptx
PPTX presentation 43 MB Posted
- Solicitation number
- W9127824R0116
About this file
This document is a government notification for an Industry Day event related to the Holt Lock Monolith R14 Restoration project. The U.S. Army Corps of Engineers, Mobile District is hosting the event on September 4, 2024 to discuss the restoration plan and seek industry feedback.
The objective of the project is for the contractor to provide all labor, materials, and equipment necessary to perform horizontal and vertical drilling, installing horizontal post tension anchor bars, installing vertical strand anchors, internal pressure grouting, epoxy injection of surface cracks, installing internal and external water stops, and underwater concrete placement. The government is interested in the timeline and constructability recommendations from industry. The contract will be a firm fixed price, best value "C" type award, and the estimated cost range is $25-100 million. The NAICS code is 237990 with a $45 million size standard. Contractors interested in attending the event must respond by August 30, 2024 with their information. The government will also be conducting market research through a separate sources sought notice for this project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Day 2 Sign In Sheet 26Mar25.pdf | ||
| Industry Day Sign-In Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COTTONDALE ALABAMA, BLACK WARRIOR RIVER
FY2024
Holt Lock Monolith R 14 Restoration Industry As of: 04 September 2024
Project Manager: Scott Ellzey, P.E.
.59 Holt Lock Monolith R14 Background
On 29 May 2024, project staff reported new crack had formed in the upstream bulkhead slot and in the basement of the lock control station and existing cracks were experiencing greater amounts of water intrusion than had been previously observed
Engineers arrived on site and inspected the monolith 31 May. Available evidence suggested that the lock wall monolith was cracked along its length.
The lock was closed to navigation traffic effective 21 June based on structural analyses that showed the monolith 14R failed stability criterion during filling and emptying cycles.
Holt Lock Monolith R14 Cracks
Flow Flow
Holt Lock Monolith R14 ROV Inspection
Plan view of approximate crack locations observed in culvert. Culvert shown in blue.
Epoxy ejection and/or chemical grout repair
Elevation view extents are approximate. Dashed line indicates efflorescence but no visible crack in the culvert along el. 115 lift line.
Holt Lock Monolith R14 Preliminary Repair Plan
Top of Parapet – elevation 196’-0”
Top of Monolith – elevation 193' - 6“
Upper Pool – Elevation 186' - 6“
Finish Floor Basement – Elevation 178' - 6“
Lower Pool - Elevation 122' - 10 13/16"
Horizontal Post-Tensioned Threaded Anchor Bars – Length Varies 70’ H Max. 150’ V Max
Vertical Multi-Strand Post-Tensioned Anchors
Lower Pool - Elevation 122' - 10 13/16"
Lower Pool - Elevation 122' - 10 13/16"
Lock Wall Section View
Preliminary Work Sequence Install horizontal anchors working top down.
Pressure grout with anchor installation Vertical Anchor installation Epoxy and/or chemical grout existing cracks Install internal and external waterstops.
Holt Lock Monolith R14 Preliminary Waterstop
Section View ISO View Internal waterstop may be angled and external waterstop may be removed
Holt Lock Monolith R14 Repair, Overview The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to perform:
Horizontal and vertical drilling, Horizontal drilling and anchor installation will be installed above and below the water line.
Installing horizontal post tension anchor bars, Installing vertical strand anchors, Internal pressure grouting Epoxy injection of surface cracks Installing internal and external water stops Underwater concrete placement.
Holt Lock Monolith R14 Repair, Schedule
| Activity Name | Milestone |
| Industry Day | 4-Sep-24 |
| Sources Sought | 6-Sep-24 |
| Install Temporary Bulkhead | 30-Sep-24 |
| Advance Notice | January 2025 |
| ADVERTISE | February 2025 |
| Contract Award | May 2025 |
Holt Lock Monolith R14 Repair, Site Visit Work Currently Being Performed on Site
Preparation for Installing Temporary Culvert Intake Bulkhead Crack Monitoring Concrete Coring
Holt Lock Monolith R14 Repair, Solicitation
Firm-Fixed-Price Contract Similar projects in scope and value Performance Period Lessons Learned Risks of FFP CLIN Structure Varying quantities Mobilization; availability of special items of plant and equipment, stockpiles Solicitation Response Time with Site Visit. Typical approach with DBB is 30-45 days.
Subcontracting in the area or traveling with per diem Small business subcontracting goals for large firms Self performance and Limitations on Subcontracting Concerns
Questions?
image22.jpg image23.jpg image24.jpg image25.jpg image26.PNG image27.emf image28.emf image29.PNG image30.png image31.png image32.PNG image33.PNG image34.PNG image35.jpg image36.JPG image37.PNG image38.PNG image39.jpg image1.png image2.png image3.png image18.png image12.png image13.png image14.png image19.gif image20.png image4.png image5.png image6.jpeg image7.png image8.png image9.png image10.png image11.tiff