W9127820R0048 AM01.pdf
PDF 635 KB Posted
- Solicitation number
- W9127820R0048
About this file
This solicitation requests a two-phase design-build proposal for the construction of an indoor firing range and combat arms training facility at Tyndall Air Force Base, Florida. The project includes a 20,560 square foot facility with a 14-lane, 25-meter indoor firing range, combat arms training and maintenance areas, classrooms, weapons and ammunition vaults, administration and building services spaces. Construction cost is estimated between $10-25 million. The single award will be a firm fixed-price contract. Proposals are due through the DoD SAFE system by the date specified on the SF1442. Joint ventures must provide details on experience of both partners but no more than five recent, relevant projects total. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Mobile.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127820R0048 EM 385-1-1.pdf | ||
| W9127820R0048 PHASE ONE SPECS .PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)
W9127820R0048-0001 7 MAY 2021 MEF19012
6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)
CODE
Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION
NO.
W9127820R0048
9B. DATED (SEE ITEM 11)
15 APRIL 2021
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The subject solicitation for: TWO-PHASE DESIGN BUILD ZONE 8 INDOOR FIRING RANGE AND COMBAT ARMS
TRAINING AND MAINTENANCE (CATM) FACILITY,
TYNDALL AIR FORCE BASE, FLORIDA
Is modified in the following: REFER TO THE ENCLOSED REVISED SPECIFICATIONS FOR AMENDMENT NO. 0001
Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of contracting officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
TWO-PHASE DESIGN BUILD ZONE 8 INDOOR FIRING RANGE W9127820R0048
AND COMBAT ARMS TRAINING AND MAINTENANCE (CATM) FACILITY, MEF19012
TYNDALL AIR FORCE BASE, FLORIDA
SF 30 Page 2 W9127820R0048-0001
PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.
Corresponding Added or Revised Paragraph SECTION Page, and/or Section
00 11 00 Revised Paragraphs 3.1, 4.2.2.2, and 4.3.2.2 as indicated herein.
Encl as stated Revised pages of the specifications as indicated in Part I.
TWO-PHASE DESIGN BUILD ZONE 8 INDOOR FIRING RANGE W9127820R0048
AND COMBAT ARMS TRAINING AND MAINTENANCE (CATM) FACILITY, MEF19012
TYNDALL AIR FORCE BASE, FLORIDA
SECTION 00 11 00
Revised by Amendment No. W9127820R0048-0001
00 11 00
3.1 Submit the electronic proposal package to the U.S. Army Corps of Engineers via DoD SAFE (https://safe.apps.mil/) as indicated on the Standard Form 1442 (SF 1442) in this solicitation. Emailed submissions of proposals are not permitted and will not be accepted under any circumstances. DoD SAFE provides a time stamped notification to the Government when a file is uploaded. The Government must receive your proposal no later than the time and date specified in Block 13 of SF 1442. The DoD SAFE system notification must show the proposal “Drop-Off” or submission was prior to the specified time. DoD SAFE requires a unique “Request for Drop-Off” code in order to upload proposal files. Offerors must contact the Point of Contact listed on the SF1442 to obtain a unique “Request for Drop-Off” code. Any and all amendments to the solicitation shall be acknowledged by signing on each amendment (SF30) and by completing Block 19 of the SF 1442. Offerors shall confirm proposal receipt by emailing calling the Point of Contact listed on the SF1442.
4.2.2 Joint Venture Submission Requirements.
4.2.2.1 Like other Offerors, a JV Offeror shall provide no more than five (5) examples of recent, relevant projects performed by the JV that reflect the JV’s ability to perform the work required in this solicitation.
4.2.2.2 If the JV Offeror does not have five (5) projects performed as a JV, the Offeror may supplement those projects with recent, relevant projects performed by either member of the JV in their individual capacity. JV Offerors are not required to submit projects of both partners but Offerors who fail to submit experience for each JV partner may be rated lower.
Additionally, more consideration may be given for projects that were performed as a JV. Regardless, the total number of projects submitted by the JV shall be no more than five (5).
4.3.2 Joint Venture Submission Requirements for the Lead Design Firm.
4.3.2.1 Like other Lead Design Firms, a JV Lead Design Firm shall provide no more than five (5) examples of recent, relevant projects performed by the JV that reflect the JV’s ability to perform the work required in this solicitation.
4.3.2.2 If the JV Lead Design Firm does not have five (5) projects performed as a JV, the Lead Design Firm may supplement those projects with recent, relevant projects performed by either member of the JV in their individual capacity. JV Lead Design Firms are not required to submit projects of both partners but Offerors who fail to submit experience for each JV partner may be rated lower. Additionally, more consideration may be given for projects that were performed as a JV. Regardless, the total number of projects submitted by the JV shall be no more than five (5).
(NOTE: The remainder of this section is unchanged by the amendment.)