W9127820B00006-0001 Solicitation Amendment.pdf
PDF 534 KB Posted
- Solicitation number
- W9127820B0006Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9127820B0006 - Abstract of Offerors for Bid Opening.xlsx | XLSX spreadsheet | |
| W9127820B0006 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1
1. CONTRACT ID CODE
I
PA
E OF PAGES
I 3
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
W912782080006-0001 08/28/2020
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE I Corps of Engineers 109 St. Joseph St.
Mobile, AL 36602
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) SA. AMENDMENT OF SOLICITATION NUMBER
W912782080006-0001
SB. DATED (SEE ITEM 11)
08/28/2020
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE I FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[8J The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers D is extended. [8J is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning _____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor Dis not Dis required to sign this document and return ____ _ copies to the issuing office.
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
(Signature of person authorized to sign)
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The subject solicitation for: RENTAL OF 27-30 INCH CUTTERHEAD PIPELINE DREDGE FOR DREDGING IN ALABAMA, MISSISSIPPI, AND FLORIDA
Is modified in the following: REFER TO THE ENCLOSED REVISED STATEMENT OF WORK - DESCRIPTION/
SPECIFICATIONS, SECTION 01 00 00 FOR AMENDMENT NO. 0001
Except as provided herein, all terms and conditions of the document referenced in Item SA or 1 OA, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of Contracting Officer)
STANDARD FORM 30 (REV.11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
RENTAL OF 27-30 INCH CUTTERHEAD PIPELINE DREDGE Solicitation No.
FOR DREDGING IN ALABAMA, MISSISSIPPI, AND FLORIDA W9127820B0006
PART I-REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS
The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.
Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated t h u s .
Corresponding Added or Revised Paragraph
SECTION Page, and/or Section
01 00 00 Paragraph 3.4
IDIQ Contract for Rental of 27-30 Inch Cutterhead Pipeline Dredge for Solicitation No.
Dredging Mobile District Navigation Projects in Alabama, Mississippi and Florida W9127820B0006
01 00 00 - 11 found. In the absence of any deficiencies, the plant will be put to work. In the event that any plant is deficient safety wise or health wise to prevent safe operations, the plant will not be put to work, but will continue in a nonpayment status until the safety deficiencies are corrected to the satisfaction of the Contracting Officer, at which time the plant will be put to work.
3.3. TERMINATION OF WORK: It is anticipated that upon completion of the excavation assignment(s) all the plant will be released to the Contractor.
However, the Contracting officer, by written notice, may terminate any task order, in whole or in part, when it is in the Government's interest. If any task order is terminated, the Government shall be liable only for payment under the payment provisions of this contract for services rendered before the effective date of termination.
3.4 Plant Delivery: For bidding purposes, the assumed mobilization point will be the intersection of the Gulf Intracoastal Waterway and Gulfport Ship Channel in Gulfport, MS, however the actual mobilization point will be determined upon issuance of the first task order. If the actual mobilization point differs from this assumed mobilization point of Gulfport, MS Mobile, AL, then an adjustment for mobilization will be determined by computing the actual mileage difference between the two sites (either plus or minus depending upon whether the contractor’s plant transits more or less distance to the actual site from their original dredge location), by the paid rate for the Mobilization Bar to Bar bid item.
The actual point of delivery may be determined by the Contracting Officer as any location within the scope described in paragraph 1 of this section on the basis of shoaling rates and channel conditions.
3.5. PRIVATE WORK RELEASE: By mutual agreement of both the Contractor and the Contracting Officer, the dredge may be released from this contract for short periods of time to perform work for others in the same vicinity. The dredge shall, however, be returned to operations under this contract within 48 hours after notice by the Contracting Officer to resume such contract work.
4. PHYSICAL DATA:
Data and information furnished or referred to below is for the Contractor's information. The Government will not be responsible for any interpretation or conclusion drawn therefrom by the Contractor.
4.1. General: The indications of physical conditions on the drawings (if provided in the solicitation package) and in the specifications are the result of site investigations and surveys.
4.2. Location: The work to be done under these specifications is located anywhere within the boundaries of Mobile District.
| SF30 |
| Summary of changes |
| Amend 01 00 00 Page 11 |
File details come from the government source that posted it. Updated .