About this file

This solicitation is for a design-bid-build construction project to repair the upstream armored face of two non-overflow earthen dikes at Walter F. George Dam on the Chattahoochee River. The work will be completed in three phases, with construction of a new armoring system from elevations 186 to 190 in Phase I, from 190 to 205 in Phase II, and final stabilization and roadwork in Phase III. The project cost is estimated between $25-100 million, and one firm fixed price C contract will be awarded. The solicitation will be available on 29 October 2019 via FedBizOpps. Proposals are due by 1400 on 19 December 2019. The NAICS code is 237990. The U.S. Army Corps of Engineers Mobile District will administer the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PROJECT IS ADVERTISED ON AN UNRESTRICTED BASIS

SOLICITATION NO: W9127819R0076

CADD NO: CHC19007

SPECIFICATIONS

FOR

WALTER F. GEORGE LONG TERM RIPRAP REPAIR

WALTER F. GEORGE DAM

CHATTAHOOCHEE RIVER, ALABAMA-GEORGIA

(HENRY COUNTY, AL AND CLAY COUNTY, GA)

THIS IS A CIVIL WORKS PROGRAM PROCUREMENT AND IS NOT FUNDED BY THE DEPARTMENT OF

DEFENSE

“GOOD ENGINEERING RESULTS IN A BETTER ENVIRONMENT”

U.S. ARMY ENGINEER DISTRICT, MOBILE

109 St. Joseph St Mobile, Alabama 36602

BUILDING STRONG®

This page was intentionally left blank for duplex printing.

WALTER F. GEORGE (WFG) LONG TERM RIPRAP REPAIR W9127819R0076

WALTER F. GEORGE DAM, CHATTAHOOCHEE RIVER, AL-GA CHC19007

CHECKLIST FOR PREPARATION OF OFFERS

Before sending your offer, review it for the following documents--without these, your offer could be rejected.

If you have questions, confusion, or doubts, contact the Project Office of the Corps of Engineers.

This checklist is designed for your convenience to assist you in completing your offer. Its completion does not guarantee that your offer will be acceptable. A complete and acceptable offer is solely the responsibility of the Contractor.

1. Your attention is directed to the following clause:

Section 00 70 00, FAR Clause 52.204-7, “System for Award Management”. LACK OF REGISTRATION IN THE SAM DATABASE WILL RENDER BIDDER INELIGIBLE FOR AWARD. Information on how to register and the time it takes is detailed in the clause.

2. Standard Form 1442 Titled “SOLICITATION, OFFER AND AWARD”

a. Is it signed in Block 20B? Yes (Y)___Not Applicable(NA) ___

b. Have you verified with the Project Office that you have received all Amendments? Have you acknowledged all Amendments using block 19? Y__ NA__

c. Is the complete, correct address of the company printed in Block 14? (ALSO INCLUDE YOUR TIN, DUNS, AND CAGE NUMBERS IN THIS BLOCK) Y__ NA__

d. Are the correct phone numbers, and fax numbers including country codes, included in Block 15? Y__ NA__

e. Is the mailing address of the company is different from the address in Block 14, is the mailing address written in Block 16? (ALSO INCLUDE YOUR EMAIL ADDRESS IN THIS BLOCK) Y__ NA__

f. If you are a Partnership or Joint Venture, have all partners or joint ventures signed in Block 20; or has authority properly been delegated pursuant to the provisions of the solicitation clause entitled JOINT VENTURE BID

REQUIREMENTS? Y__ NA__

g. . If you are a Joint Venture have you submitted your Joint Venture Agreement and taken the other actions necessary to comply with the “Joint Venture Bid Requirement” Clause? Y__ NA__ h.. Is the time you are allowing for acceptance of the offer, the same or longer than the time set out in block 13?.

Y__ NA__

3. Representations, Certifications, and Other Statements of the Offeror

Are all of the clauses in this section completed and signed in the appropriate places and returned attached to the offer? Y__ NA__

4. The Bidding Schedule

a. Is it completely filled out? Y__ NA__

b. It may not be altered either as to quantities or as to items offered. Y__ NA__

c. There can be no language of limitation either as to quantities or as to items offered. Y__ NA__

d. If you corrected your numbers, have you initialed these corrections? Y__ NA__

e. If the bidding schedule has been changed by Amendment, is the bidding schedule that you are submitting from the most recent amendment ? Y__ NA__

f. Do prices for each bid item include all costs, mark-ups and taxes (if any taxes are imposed)? Y__ NA__

g. Is the cost of obtaining your bid and performance guarantee included in the total bid price specified on the bid schedule? Y__ NA__

h. In preparing your bid, remember the Corps does not make advanced payments on its contracts Y__ NA__

5. Bid Guarantees

Did you attach a Bid Guarantee Y__ NA_ If you are using a Bid Guarantee, does the Guarantee comply with the requirements set out in Section 00 21 16?

Y__ NA__

Remember insurance policies are not acceptable Y_ If you are using a Letter of Credit, does it contain the exact language set out in section 00 70 00? Y__ NA Is the amount of the Bid Guarantee/Letter of Credit equal to the amount required in section 00 21 16? Y__ NA__?

Is the time period of the Bid Guarantee/Letter of Credit equal to or greater than the period set out in block 13 of the

1442? Y__ NA__

Is there a Power of Attorney or other document attached that establishes the authority of the surety to sign the Bid Guarantee or Letter of Credit? Y__ NA__

6. Technical Documents that Pertain to Evaluation Factors, Award will be based on the specific factors set out in Section 00 12 00, “EVALUATION CRITERIA AND BASIS OF AWARD”.

a. Have you responded to all the evaluation factors (if required by the solicitation)? Y__ NA__

b. Is a summary of the experience and special qualifications of your Administration staff included (if required by the solicitation)? Y__ NA__

c. Is a quality control plan included (if required by the solicitation)? Y__ NA__

d. Are time tables and schedules included (if required by the solicitation)? Y__ NA__

e. Is a current audit of your company’s financial status included or a certificate attached to a past audit stating the financial status has not changed since the time of the past audit (if required by the solicitation)? Y__ NA__

f. Is a list of the contracts you are currently working on attached (if required by the solicitation)? Y__ NA__

g. Have you included a list of the names and phone numbers of references for whom you have done past contracts (if required by the solicitation)? Y__ NA__

All your documents must be in English

Table of Contents Page 1

TABLE OF CONTENTS

CHECKLIST FOR PREPARATION OF OFFERS

BIDDING REQUIREMENTS

Contract Clauses

STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD

BIDDING SCHEDULE

EXPLANATION OF BID ITEMS

STANDARD FORM 24 - BID BOND

STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY

STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES

00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD

00 21 16 INSTRUCTIONS TO BIDDERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS

PROJECT SIGNS

WAGE RATES – CLAY COUNTY

WAGE RATES – HENRY COUNTY

01 00 01 GENERAL CONTRACT REQUIREMENTS

CESAM FORM 1151, PROMPT PAYMENT CERTIFICATION AND SUPPORTING

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

ENGINEERING FORM 4025R

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

SAM FORM 696

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

DIVISION 02 – EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 01 16.71 COLD MILLING ASPHALT PAVING

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 20 SUBBASES FOR RIGID AND FLEXIBLE PAVING

32 11 23 GRADED CRUSHED AGGREGATE BASE COURSE

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

Table of Contents Page 2

32 17 23 PAVEMENT MARKINGS

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 – UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION

35 31 19 STONE PROTECTION FOR STRUCTURES

-- END OF TABLE OF CONTENTS --

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9127819R0076

2. TYPE OF

SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

29 OCT 2019

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

CHC19007

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S. ARMY ENGINEER DISTRICT, MOBILE

CONTRACTING DIVISION (CESAM-CT)

109 SAINT JOSEPH STREET

MOBILE, AL 36628-0001

SAME AS BLOCK 7

IF HAND CARRIED, DELIVER TO

ROOM 1009

9. FOR INFORMATION

CALL : Chanda Strenth Sara Logsdon

A. NAME

Chanda.D.Strenth@usace.army.mil Sara.G.Logsdon@usace.army.mil

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(251) 441-5595

(251) 690-3347

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

WALTER F. GEORGE (WFG) LONG TERM RIPRAP REPAIR, WALTER F. GEORGE DAM, CHATTAHOOCHEE RIVER, AL-GA

* See Section 01 00 00, Paragraph “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”.

**Block 13A. : Refer to Section 00 11 00 for the number of copies to submit with the original offer.

11. The Contractor shall begin performance within _10___ calendar days and complete it within __*__ calendar days after receiving award, notice to proceed.

This performance period is mandatory, negotiable. (See _ __ .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and ___**___ copies to perform the work required are due at the place specified in Item 8 by _1400_ (hour) local time 19 DECEMBER 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than __120__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101

STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within _________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

STANDARD FORM 1442 BACK (REV. 4-85)

BIDDING SCHEDULE - PAGE 1

BIDDER'S NAME:_______________________________________________________________

BIDDING SCHEDULE

Item Estimated Unit Estimated Estimated No. Description Quantity Unit Price Amount__ Amount_____

1. Site Work 1 Job XXX _________

Sub-Total for all Site Work BID ITEM 1. _________

2. Phase I Armoring System, Elevation 186.0 to 190.0

2.1 Demolition 1 Job XXX _________

2.2 Bedding Stone 2,300 CY _______ _________

2.3 R 50 Stone 3,600 CY _______ _________

2.4 Armor Stone 10,600 CY _______ _________

Sub-Total for all Phase I Armoring System, Elevation

186.0 to 190.0 BID ITEM 2. __________

3. Phase II Armoring System, Elevation 190.0 to 205.0

3.1 Demolition 1 Job XXX _________

3.2 Bedding Stone 8,800 CY _______ _________

3.3 R 50 Stone 13,600 CY _______ _________

3.4 Armor Stone 40,600 CY _______ _________

Sub-Total for all Phase II Armoring System, Elevation

190.0 to 205.0 BID ITEM 3. __________

4. Phase III Paving and Final Stabilization of Laydown Areas

4.1 Hot Mix Asphalt (HMA)

for Roadways, 330lbs/sy 10,050 SHORT TON _______ _________

4.2 Hot Mix Asphalt (HMA)

for Roadways, 220lbs/sy 280 SHORT TON _______ _________

4.3 Bituminous Surface

Treatment 1 Job XXX _________

BIDDING SCHEDULE - PAGE 2

BIDDER'S NAME:_______________________________________________________________

BIDDING SCHEDULE

Item Estimated Unit Estimated Estimated No. Description Quantity Unit Price Amount__ Amount_____

4.4 Stabilization of

Laydown Areas 1 Job XXX _________

Sub-Total for all Phase III Paving and Final Stabilization of Laydown Areas BID ITEM 4. __________

TOTAL BID ___________

OFFEROR ELECTS TO WAIVE THE PRICE EVALUATION PREFERENCE

FOR HUBZONE SMALL BUSINESS CONCERNS: ( )NO ( )YES

(SEE BID SCHEDULE NOTE NO. 6 and 7)

BIDDING SCHEDULE - PAGE 3

NOTES FOR BIDDING SCHEDULES

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto.

In lieu of indicating additions/deductions to bid items, all bidders should state their revised prices for each item. The company name should be indicated on the face of the bidding schedule to preclude being misplaced.

NOTE NO. 2. Bidders must insert a price on all numbered items of the Bidding Schedule. Failure to do so will disqualify the bid.

NOTE NO. 3. If a modification to a bid is submitted and provides for a job adjustment to the total estimated cost, the application of the job adjustment to each unit price and/or job price, in the bid schedule must be stated or, if it is not stated, the bidder agrees that the job adjustment shall be applied on a pro rata basis to every bid item in the bid schedule.

NOTE NO. 4. CONDITIONS GOVERNING EVALUATION OF BIDS AND AWARD OF CONTRACTS.

One contract only will be awarded on this Bid Schedule and award will be made according to the "Best Value" approach as defined in Section 00 12 00:

EVALUATION CRITERIA AND BASIS OF AWARD.

NOTE NO. 5. All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.

Reference Section 00 70 00, clause 52.211-18 Variation in Estimated Quantity (Apr 1984).

NOTE NO. 6. IMPORTANT NOTICE: FAR Clause 52.219-4, relating to a 10% price evaluation preference for HUB ZONE small business concerns, is included in and made a part of this RFP.

NOTE NO. 7. This procurement is not restricted to Hubzone Small Business Concerns. However, offerors certifying as a Hubzone Small Business Concern must be certified by the SBA on or prior to date set for receipt of offers.

END OF BID SCHEDULE

EXPLANATION OF BID ITEMS - PAGE 1

EXPLANATION OF BID ITEMS

GENERAL: This section comprises an explanation of the bid items identified in the bid schedule. This section is a general scope of work for the bid items described in the bidding schedule and is not intended to be all encompassing in the descriptions. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings. The Contractor shall bid each type of work under the applicable bid item. Payment described for the various bid items will be full compensation for all labor, materials, and equipment required to complete the work. Compensation for any item of work described in the contract but not listed in the bid schedule shall be included in the payment for the item of work to which it is made subsidiary.

Bid Item No. 1: Payment under Bid Item No. 1, “Site Work” will be made at the contract job price and will constitute full compensation for all work associated with site preparation for material storage. This includes but not limited to;

temporary safety fencing, erosion and sediment control measures, contractor furnished office space for Government use, temporary utility connections, traffic control, traffic signage, project sign; pre-construction topographic survey of haul roads, temporary road repairs, material testing for armoring system, and temporary type III barricades.

Bid Item No. 2: Phase I Armoring System, Elevation 186.0 to 190.0

Work to include the removal of the existing armor stone & bedding stone and installation of the new armoring system from elevation 186.00 to elevation

190.00 as required by the contract plans and specifications

Bid Item No. 2.1: Payment under Bid Item No. 2.1, “Demolition” will be made at the contract job price and will constitute full compensation for all work associated with the removal of the existing armoring system in accordance with the plans and specifications from elevation 186.00 to elevation 190.00.

Bid Item No. 2.2: Payment under Bid Item No. 2.2, “Bedding Stone” will be measured for payment to the nearest cubic Yard in place and will constitute full compensation for all work associated with placing the bedding stone in accordance with the plans and specifications from elevation 186.00 to elevation 190.00.

Bid Item No. 2.3: Payment under Bid Item No. 2.3, “R 50 Stone” will be measured for payment to the nearest cubic Yard in place and will constitute full compensation for all work associated with placing the stone in accordance with the plans and specifications from elevation 186.00 to elevation 190.00.

Bid Item No. 2.4: Payment under Bid Item No. 2.4, “Armor Stone” will be measured for payment to the nearest cubic Yard in place and will constitute full compensation for all work associated with placing the armor stone in accordance with the plans and specifications from elevation 186.00 to elevation 190.00.

Bid Item No. 3: Phase II Armoring System, Elevation 190.0 to 205.0

Bid Item No. 3.1: Payment under Bid Item No. 3.1, “Demolition” will be made at the contract job price and will constitute full compensation for all work associated with the removal of the existing armoring system in accordance with the plans and specifications from elevation 190.00 to elevation 205.00.

EXPLANATION OF BID ITEMS - PAGE 2

Bid Item No. 3.2: Payment under Bid Item No. 3.2, “Bedding Stone” will be measured for payment to the nearest cubic Yard in place and will constitute full compensation for all work associated with placing the bedding stone in accordance with the plans and specifications from elevation 190.00 to elevation 205.00.

Bid Item No. 3.3: Payment under Bid Item No. 3.3, “R 50 Stone” will be measured for payment to the nearest cubic Yard in place and will constitute full compensation for all work associated with placing the stone in accordance with the plans and specifications from elevation 190.00 to elevation 205.00.

Bid Item No. 3.4: Payment under Bid Item No. 3.4, “Armor Stone” will be measured for payment to the nearest cubic Yard in place and will constitute full compensation for all work associated with placing the armor stone in accordance with the plans and specifications from elevation 190.00 to elevation 205.00.

Bid Item No. 4: Phase III Paving and Final Stabilization of Laydown Areas

Work to include but not limited to; Stabilization of laydown areas; Post-construction topographic survey; reconstruction of pavements for the identified Haul roads to include roadbed grading, roadbed processing, and roadbed shaping;

crushed aggregate base course; milling or removal of existing pavements impacted throughout phase I and phase II Construction and all other associated subsidiary work: testing, mix design, road work equipment, labor, and materials, as required by the contract plans and specifications.

Bid Item No. 4.1: Payment under Bid Item No. 4.1, “Hot Mix Asphalt (HMA) For Roadways, 330 lbs/sy” will be made at the contract unit price for the tons indicated and will constitute full compensation for the construction work associated with “Hot Mix Asphalt (HMA) for Roadways, 330 LB/SY” in accordance with the plans and specifications.

Bid Item No. 4.2: Payment under Bid Item No. 4.2, “Hot Mix Asphalt (HMA) For Roadways, 220 lbs/sy” will be made at the contract unit price for the tons indicated and will constitute full compensation for the construction work associated with “Hot Mix Asphalt (HMA) for Roadways, 220 LB/SY” in accordance with the plans and specifications.

Bid Item No. 4.3: Payment under Bid Item No. 4.3, “Bituminous Surface Treatment” will be at the contract job price and will constitute full compensation for all work under Bid Item No. 4.3 for the construction work associated with Bituminous Surface Treatment in accordance with the plans and specifications.

Bid Item No. 4.4: Payment under Bid Item No. 4.4, “Stabilization of Laydown Areas” will be made at the contract job price and will constitute full compensation for all costs associated with Restoration of the laydown areas in accordance with the plans and specifications.

- END OF SECTION –

BID BOND

(See instructions on reverse)

OMB Control Number: 9000-0045 Expiration Date: 7/31/2019

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT

OF BID

PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION(S) THOUSAND(S) HUNDRED(S) CENTS

BID IDENTIFICATION

BID DATE INVITATION NUMBER

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1. 2.

2.

3.

3.

(Seal) (Seal) (Seal) Corporate Seal

INDIVIDUAL SURETY(IES)

SIGNATURE(S)

NAME(S)

(Typed)

1.

1.

2.

2.

(Seal) (Seal)

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

FOR (Construction, Supplies or Services)

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

DATE BOND EXECUTED (Must not be later than bid opening date)

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

JOINT VENTURE

OTHER (Specify)

PARTNERSHIPINDIVIDUAL

CORPORATION

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.

The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

SU

R

ET

Y

B

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

Corporate Seal

LIABILITY LIMIT ($)STATE OF INCORPORATION

2.

2.

1.

1.NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

C

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

D

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

E

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

F

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

SU

R

ET

Y

G

STANDARD FORM 24 (REV. 8/2016) BACK

DISCLOSURE OF LOBBYING ACTIVITIES

Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352

(See reverse for public burden disclosure.)

1. Type of Federal Action:

a.

b.

c.

d.

e.

f.

contract grant cooperative agreement loan loan guarantee loan insurance

2. Status of Federal Action:

a.

b.

c.

bid/offer/application initial award post-award

3. Report Type:

a.

b.

initial filing material change

For Material Change Only:

year quarter date of last report

4. Name and Address of Reporting Entity:

Congressional District, if known:

Prime Subawardee Tier , if known:

5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:

Congressional District, if known:

6. Federal Department/Agency:

7. Federal Program Name/Description:

CFDA Number, if applicable:

8. Federal Action Number, if known:

9. Award Amount, if known:

10. a. Name and Address of Lobbying Entity (if individual, last name, first name, MI):

b. Individuals Performing Services (including address if different from No. 10a) (last name, first name, MI):

(attach Continuation Sheet(s) SF-LLL-A, if necessary)

11. Amount of Payment (check all that apply):

$ actual planned

12. Form of Payment (check all that apply):

a.

b.

cash in-kind; specify: nature value

13. Type of Payment (check all that apply):

a.

b.

c.

d.

e.

f.

retainer one-time fee commission contingent fee deferred other; specify:

14. Brief Description of Services Performed or to be Performed and Date(s) of Service, including officer(s), employee(s), or Member(s) contacted, for Payment indicated in Item 11:

(attach Continuation Sheet(s) SF-LLL-A, if necessary)

15. Continuation Sheet(s) SF-LLL-A attached: Yes No

Information requested through this form is authorized by title 31 U.S.C section 1352. This disclosure of lobbyig activities is a materia representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352 . This information will be reported to the Congress semi-annually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Signature:

Print Name:

Title:

Telephone No.: Date:

Federal Use Only: Authorized for Local Reproduction Standard Form - LLL

Approved by OM 0348-0046

16.

INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES

This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C.

section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with a covered Federal action. Use the SF-LLL-A Continuation Sheet for additional information if the space on the form is inadequate. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.

Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.

Identify the status of the covered Federal action.

Identify the appropriate classification of this report. If this is a followup report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity for this covered Federal action.

Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier.

Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.

If the organization filing the report in item 4 checks “Subawardee”, then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.

Enter the name of the Federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard.

Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.

Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number; the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., “RFP-DE-90-001.”

For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.

(a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influence the covered Federal action.

(b) Enter the full names of the individuals(s) performing services, and include full address if different from 10 (a).

Enter Last Name, First Name, and Middle Initial (MI).

Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.

Check the appropriate box(es). Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.

Check the appropriate box(es). Check all boxes that apply. If other, specify nature.

Provide a specific and detailed description of the services that the lobbyist has performed, or will be expected to perform, and the date(s) of any services rendered. Include all preparatory and related activity, not just time spent in

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

Public reporting burden for this collection of information is estimated to average 30 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.

DISCLOSURE OF LOBBYING ACTIVITIES

CONTINUATION SHEET

Authorized for Local Reproduction Standard Form - LLL-A

Approved by OM 0348-0046

Reporting Entity: Page of

*U.S. G.P.O. 1990-260-708:00012

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 00 11 00-Page 1

SECTION 00 11 00

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1.0 GENERAL REQUIREMENTS

1.1 This is a Federal Acquisition Regulation (FAR) Part 15, competitive, unrestricted, one-step, best value, source selection. Competing Prime Construction Contractors, hereinafter referred to as the “Offeror”, shall submit a proposal that includes the required submission information indicated below to demonstrate the Offeror’s past performance and capabilities to perform the work described in this solicitation. In addition, each competing Offeror shall also include in their proposal its price and other administrative information described below. By submission of a proposal, the Offeror accedes to all the terms of this RFP.

The Government reserves the right to reject any and/all offers.

2.0 WHO CAN SUBMIT

2.1 Any responsible, interested construction contractors may submit a proposal.

2.2 Any design firm that participated in preparation of this solicitation, whether as a Government contractor or as a subcontractor to a Government contractor, is not eligible to participate in this solicitation as a prime contractor or a design subcontractor due to a conflict of interest. The Government considers such firms to have an unfair competitive advantage, and therefore will not consider such firms.

3.0 PROPOSAL SUBMISSION REQUIREMENTS

3.1 Submit the electronic proposal package to the U.S. Army Corps of Engineers to the contract specialist Chanda.D.Strenth@usace.army.mil and the contracting officer Sara.G.Logsdon@usace.army.mil as shown in Block 8 of Standard Form 1442 (SF 1442). The Government must receive your proposal no later than the time and date specified in Block 13 of the SF 1442. Any and all amendments to the solicitation shall be acknowledged by completion of Block 19 of the SF 1442.

3.2 Submit the electronic proposal package in two separate volumes, labeled as follows:

“Volume I – Non-Priced Evaluation Factors”; submit an electronic file in Portable Document File (PDF) format.

“Volume II – Administrative Requirements”; submit an electronic file in Portable Document File (PDF) format. Bid Bonds (original and copy) should be mailed to the address indicated in block 8 of the SF1442 by the date and time established in block 13 of the SF1442.

Failure to comply with this requirement will disqualify the offeror from competition.

Provide written portions of the proposal in 8-1/2” x 11” format. Any schedule information, if required, may be provided in 11” x 17” format.

3.3 To effectively and equitably evaluate proposals, the Source Selection Evaluation Board (SSEB) must receive information, in the order described below, that clearly describes an Offeror's capabilities to successfully execute the construction project as required by this RFP. It is therefore an

SECTION 00 11 00-Page 2

Offeror’s responsibility to submit proposal information that is fully responsive to the submission requirements of this section. Offerors are responsible for organizing material sequentially under tabs and numbered pages as set out below to facilitate evaluation. Materials that are not properly organized may easily be overlooked during evaluations, possibly affecting an Offeror’s rating. Offers should be concise, addressing only the information outlined in this section.

4.0 SPECIFIC PROPOSAL SUBMISSION INSTRUCTIONS

4.1 There are two separate volumes required in response to this solicitation.

Volume I includes four (4) non-priced evaluation factors that will be evaluated. Volume II includes administrative requirements and proposed pricing.

EVALUATION FACTORS AND ORDER OF RELATIVE IMPORTANCE

Volume Factor - Description Relative Importance

Vol I - Tab A Factor 1 – Past Performance Information of the Prime Contractor

1st in relative importance;

equally important to Factor 2

Vol I – Tab B Factor 2 – Technical Approach

1st in relative importance;

equally important to Factor 1

Vol I – Tab C Factor 3 – Key Personnel Experience and Qualifications

2nd in relative importance;

less important than Factors 1 and 2

Vol I – Tab D Factor 4 – Small Business Approach

3rd in relative importance;

least important Factor

Vol II Administrative Requirements (Including Price)

Not Rated. Price evaluated through Price Analysis.

In general, the non-priced factors are considered significantly more important than price in relative importance.

4.2 Volume I - Tab A, Factor 1 – Past Performance Information of the Prime Contractor. The Past Performance of the Prime Contractor (Offeror) consists of (a) Relevant Company Effort and (b) Quality of Past Performance. The Government will review recent, relevant company efforts and quality information provided by the owners of those efforts to assess the Offeror’s past experience and probability of successfully performing the work described in this solicitation. A recent, relevant project is a construction project:

(a) Performed under a contract or task order, as those terms are defined in FAR 2.101, for Federal projects, or similar contractual agreements for State or Local Governments, or the commercial or private sector. (Multiple projects under a single contract or task order are considered one project.

However, do not combine multiple projects under separate contracts or task orders to create a single project.);

(b) That is “recent”; one that has been completed within six (6) years of the solicitation issue date, or one where the construction is at least 50% complete (measured by performance period days) as of the solicitation issue date. (Offerors are responsible for providing start and completion dates for each completed project, or the start and scheduled completion dates for projects currently under construction.);

(c) That is “relevant”; one that is similar in scope (type, size, complexity and dollar value) to the project described in this solicitation. In terms of dollar value, a relevant project is one that is within the construction cost range of $25,000,000-$100,000,000. For a project to be assessed any degree of “relevancy” it must reflect performance of construction

SECTION 00 11 00-Page 3 type work similar to the Walter F. George Long Term Riprap Repair, Walter F.

George Dam, Chattahoochee River, AL-GA as required by this solicitation.

4.3.1 (a) Relevant Company Effort: The Offeror shall provide no more than three (3) examples of recent, relevant construction type projects performed as the prime construction contractor that demonstrate the company’s ability to perform work similar to that required by this solicitation. For each project, the Offeror shall furnish the information specified below. Attachment 2, at the end of this section, may be used to present the information. The construction effort shown does not have to be a task order under an IDIQ contract, but where it is, clearly indicate so. Item 5 below, General Scope of the Project, discuss specific details of the project, at a minimum, describe what was constructed and clearly explain the aspects that are similar to construction of this solicitation. If more than three (3) projects are submitted for evaluation, only the first three (3) projects will be evaluated.

The Relevant Company Effort portion of Factor 1 shall not exceed nine (9) pages.

(1) Company Name

(2) Name of Project

(3) Location of Project

(4) Project Owner

(5) General Scope of Project (Include type DB, DBB, Other)

(6) Your Role and Construction Type Work Your Company Self-Performed on site other than Construction Management Services.

(7) Construction Cost of the single project

(8) Extent and Type of Work Subcontracted Out

(9) Construction Period - Start and Completion/Scheduled Completion Dates

(Provide Month/Year) (10)Termination or Liquidated Damages Information; Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.

(b) Quality of Past Performance.

(1) The Offeror shall submit evidence of the quality of their past performance for each project. For Federal Government projects, the Offeror shall provide a completed contractor performance evaluation, whether interim or final, found in the Contractor Performance Assessment Reporting System (www.cpars.gov/). If a proper evaluation does not exist in CPARS, because it has not been completed or the project is a non-Federal Government project, the Offeror shall provide a completed Past Performance Questionnaire (PPQ) (See Attachment 3). If, at time of evaluation, a final contractor performance evaluation exists in CPARS, and yet the Offeror submits a PPQ, only the evaluation in CPARS will be considered.

(2) Past performance surveys/assessment/evaluation forms other than CPARS or PPQs are unacceptable and will not be considered or evaluated.

(3) Completed PPQs that were submitted in response to previous solicitations may be used in this source selection. However, Offerors shall not incorporate such PPQs by reference and thus must resubmit the PPQ with their proposal. This does not, however, preclude the Government from utilizing previously submitted PPQ information in the Past Performance evaluation.

While the Government may elect to consider data from other sources, the burden of providing current, detailed and complete past performance information rests with the Offeror.

(4) If an Offeror has been required to take corrective action for any substandard performance or experienced other performance problems such as cost

SECTION 00 11 00-Page 4 overruns, extended performance periods, numerous warranty calls, etc., the Offeror should explain the circumstances and the corrective actions taken.

(5) If an Offeror’s client/customer will only provide completed PPQs directly to the U.S. Army Corps of Engineers, Mobile District, Offerors must ensure the client/customer submits the PPQ by the proposal due date using the following electronic mailing address: Chanda.D.Strenth@usace.army.mil. The solicitation number shall be included on the PPQ form. PPQs received after the proposal due date will be considered untimely and will not be considered during the evaluation.

4.3.2 Joint Venture Submission Requirements.

4.3.2.1 Like other Offerors, a JV Offeror shall provide no more than three (3) examples of recent, relevant projects performed by the JV that reflect the JV’s ability to perform the work required in this solicitation.

4.3.2.2 If the JV Offeror does not have three (3) projects performed as a JV, the Offeror may supplement those projects it performed as a JV with recent, relevant projects performed by the members of the JV in their individual capacities. In such instance, the total number of projects submitted by the JV shall be no more than three (3).

4.3.2.3 If the JV Offeror has not previously performed as a JV, each member of the JV may submit recent, relevant projects performed in their individual capacities. The total number of projects submitted by the JV shall be no more than three (3).

4.3.3 All Business Entities: To satisfy Paragraph 4.2.1 subparagraphs (a) and (b), only information pertaining to the corporate entity listed on the SF 1442 will be considered in the evaluation. Information related to a parent company, affiliates, divisions, subsidiaries, other related entities, subcontractors, or the individual experience of key personnel will not be considered.

4.3.4 Verification: The Government reserves the right to verify the information on projects submitted for evaluation, and to review CPARS, or other Government project appraisal systems, for information on other projects performed by the Offeror whether submitted as part of a proposal or not. The Government also reserves the right to contact project clients/customer, or other references. For any adverse performance information found for which the Offeror has not had an opportunity to address, the Offeror will be afforded an opportunity to explain.

4.4 Volume I – Tab B, Factor 2 - Technical Approach. The Offeror must submit a technical approach narrative to explain their company’s capabilities to execute the construction work required by the solicitation. Reference drawings and specifications for project information required by this solicitation.

Factor 2 shall not exceed thirty (30) pages. Address the following item, in a narrative format:

(a) Project Preliminary Schedule - Provide a preliminary construction schedule to demonstrate an understanding of the entire scope. As a minimum, include key tasks with durations for such activities as shop submittals with required reviews, the construction effort, permitting, closeout, and turnover activities. Clearly indicate the major milestones for major work features.

Ensure the project duration meets the project requirements in calendar days starting from the Government’s notice to proceed (NTP) to Closeout Documents approval. Clearly indicate both the critical path and the construction phases in the schedule. The preliminary project schedule shall state the scheduling software including version to be used that is compatible with the QCS software.

SECTION 00 11 00-Page 5

(b) Project Management Approach - Provide an overall management approach narrative to explain the company’s ability to execute the contract. As a minimum, provide a narrative to demonstrate an understanding of the entire scope of the project to include overall preliminary phasing, specific discussion regarding critical Phase 1 efforts, site layout, proposed methods of construction for all three phases, sequencing of removals, material placement and equipment, major subcontractors and suppliers, and the anticipated quarry to be used for materials and proximity to the site to meet the requirements of this solicitation.

(c) Project Plan for Severe Storm Event – Provide a project plan narrative to demonstrate the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .