17-B-0004_Amendment_0002.pdf

PDF 108 KB Posted

Attached to
IDIQ for Rental of 27-30" Cutterhead Pipeline Dredge
Solicitation number
W91278-17-B-0004
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
17-B-0004_Amendment_0001.pdf PDF
17-B-0004_VOL_IV.pdf PDF
17-B-0004_VOL_I.pdf PDF
17-B-0004_VOL_III.pdf PDF
17-B-0004_VOL_II.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

W91278-17-B-0004-0002

The subject solicitation for: INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT FOR RENTAL OF A 27-30" CUTTERHEAD PIPELINE DREDGE FOR DREDGING MOBILE DISTRICT NAVIGATION PROJECTS IN AL, MS AND FL Is amended in the following: REFER TO THE ENCLOSED REVISED SPECIFICATION REVISIONS FOR AMENDMENT 0002

U.S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT

CONTRACTING DIVISION (CESAM-CT)

109 ST. JOSEPH STREET

MOBILE, AL 36602

SEE BLOCK 6

W91278-17-B-0004

1 10

07/25/2017

07/12/2017

PART I-REVISIONS MADE BY ADDED AND/OR REPLACEMENT

PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.:

deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

SECTION Corresponding Added or Revised Paragraph Page, and/or Section

Bidding Schedule Original Bidding Schedule and Notes, Section 00 00 10, pages 1, 2 and 4 are replaced with attached corresponding revised pages

Section 01 00 00 Page Nos. 3, 4, 10, 32, and 35 are replaced with attached corresponding revised pages

IDIQ Contract for Rental of a 27-inch to 30-inch W91278-17-B-0004 Cutterhead Pipeline Dredge For Dredging Mobile District Navigation Projects in Alabama, Mississippi, and Florida

Section 00 00 10

BIDDING SCHEDULE

CONTRACTOR NAME:

Item No.

Description

Estimated Quantity Unit

Unit Price Estimated Amount

1. DREDGING 100% Pay Time (For estimated quantity, see table in Sec. 01 00 00, par. 2.2) HRS

2.

DREDGING 100% Pay Time, Work For Others (For estimated quantity, see table in Sec. 01 00 00, par. 2.2) HRS

3.

MOBILIZATION BAR TO BAR (See Sect. 01 00 00 paragraph entitled PAYMENTS) 500 MI

4.

MOBILIZATION AND DEMOBILIZATION

(Dredge and Plant) See Note Below 1 JOB XXXX

5.

INTERMEDIATE MOBILIZATION AND

DEMOBILIZATION OF PIPELINE

See Note Below

150 UNIT

6. MOBILIZATION & DEMOBILIZATION OF

BOOSTER PUMP

1 JOB XXXX

7. BOOSTER PUMP 100% PAY TIME HRS

8. MISSISSIPPI STATE TAX 1 JOB XXXX $50,000.00

TOTAL

BID

Offeror elects to waive the price evaluation preference for Hubzone Small Business Concerns: ( ) Yes ( ) No (This applies only to Small Business certified as a Hubzone Small Business by the Small Business Administration).

NOTES:

1. To better facilitate the public bid opening process, all modifications to bids are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to bid items, all bidders should state their revised prices for each item. The company name should be indicated on the face of the bid schedule to preclude being misplaced.

2. Bidders must insert a price on all numbered items of the bidding schedule. Failure to do so will disqualify the bid.

Section 00 00 10 - Page 1

Navigation Projects in Alabama, Mississippi, and Florida

3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and extension, the unit price will be considered to be the bid.

4. The number of hours indicated on the Bidding Schedule is approximate. The contractor may be required to work either more or less than the number specified and these items are not subject to the Variations in Estimated Quantities Clause.

5. Refer to Section 00 00 10 paragraph entitled “BID EVALUATION” for information about the bid items.

6. For Bid Item entitled INTERMEDIATE MOBILIZATION AND DEMOBILIZATION OF PIPELINE, each UNIT is equivalent to 1,000 feet of pipeline.

7. For the purposes of bidding, the dredge Mobilization Point is Pascagoula, MS. The Government intends to commence dredging at Pascagoula oin September/October 1, 2017.

8. For Bid Item entitled, MOBILIZATION & DEMOBILIZATION OF BOOSTER PUMP, the booster pump Mobilization Point will be Mobile Harbor.

9. For Bid Item entitled, MISSISSIPPI STATE TAX, the Government will reimburse the Contractor for the actual taxes collected by the State of Mississippi for work performed under this contract. It cannot be left blank. Also, the State of Mississippi will enforce an equipment tax on equipment new to the State of Mississippi. This equipment tax will not be reimbursed by the Government.

BID EVALUATION:

(1) It is the intent of the Government to secure a dredge meeting the requirements set forth in the Statement of Work of the specifications. The table in the paragraph entitled DREDGE AND ATTENDANT PLANT REQUIREMENTS indicates the estimated average output for dredges of various power based on average theoretical conditions under which this work is to be accomplished. Bids will be evaluated and award will be made on the basis of employment of the plant that will result in the lowest overall total price, as described hereinafter, to the Government for the equipment. This is not to be construed by the Contractor that the Government guarantees this number of hours and linear feet will be worked.

(2) Bidders should insert into the bid schedule the appropriate number of hours for 100% Pay Time from the table in section 01 00 00, paragraph 2.2 and paragraph 2.3.8.1 for booster 100% pay time hours.

(3) Bids based on dredges smaller than those listed in the Table will be considered non-responsive.

(4) The Government will check the bidder's computation for accuracy and to insure that the bidder's computation was made in accordance with the above evaluation procedures. In case of variation between the bidder's computation procedures and those prescribed above, the Government will correct the bidder's computation and the bid will be evaluated by the corrected computation.

Section 00 00 10 - Page 2

Navigation Projects in Alabama, Mississippi, and Florida

DREDGING PUMP: (MAIN DREDGE PUMP)

Type and Make Diameter suction (in) Diameter discharge, as originally designed(in) Diameter of impeller (Max./Min.) (in) Max. R.P.M. of impeller Method of actuating impeller Brake H.P. applied to pump impeller

BOOSTER PUMP: (IF REQUIRED)

Type and Make Diameter suction (in) Diameter discharge, as originally designed(in) Diameter of impeller (Max./Min.) (in) Max R.P.M. of impeller Method of actuating impeller Brake H.P. applied to pump impeller

MAIN ENGINE: (DESCRIBE FULLY)

Make Type Size Age B.H.P.

R.P.M.

Estimated amount of fuel consumed per day

LIGHTING PLANT:

K.W.

ATTENDANT PLANT:

Quarterboat, size Launch or launches, size Skiffs, number Method of supporting discharge pipe Type and number of pontoons Dredge Tender, size Dredge Tender, horsepower Dredge Tender, size Dredge Tender, horsepower Towing Vessel, size Towing Vessel, horsepower Total H.P. of all fuel consuming units in the makeup of the total dredging plant (horsepower)

The plant was last operated in at The plant offered is owned by The plant may be inspected at The period of time of lay up in the past 12 months

Section 00 00 10 - Page 4

IDIQ Contract for Rental of 27-30 inch W91278-17-B-0004 Cutterhead Pipeline Dredge for Dredging Mobile District Navigation Projects in Alabama, Mississippi and Florida notification (not less than 60 days, in writing from the COR) will be given to the contractor to provide the second dredge.

1.3. DREDGED MATERIAL DISPOSAL: All removed materials will be placed in approved disposal areas as directed by the Contracting Officer or his Authorized Representative and as discussed in these specifications.

1.4. GENERAL: All work, material and services not expressly called for in these specifications which may be necessary for complete and proper operations to carry out the contract in good faith shall be performed, furnished and installed by the Contractor at no increase in cost to the Government. The Contracting Officer or his Authorized Representative may at any time require the Contractor to relocate to a different dredging site should shoaling rates, or other circumstances so dictate. The Government reserves the right to contract additional dredges to perform dredging work on the same projects and geographical area.

2. DREDGE AND ATTENDANT PLANT REQUIREMENTS:

2.1. DREDGE REQUIREMENTS: The dredge offered shall be capable of continuous operation with a minimum horsepower rate as shown below which includes the horsepower applied on the main dredge pump (and ladder pump, if applicable). For the requested dredge size, most of the work that is anticipated to be performed under this contract is considered a “walking job,” therefore, additional pump size and/or horsepower does not justify a competitive advantage in the number of hours in the bid schedule. The Contractor shall have available for use at all times a variety of serviceable interchangeable pump impellers (2 minimum), a spare pump case, and a spare serviceable cutter to permit the dredge to operate efficiently under varying conditions described in paragraph entitled, "PHYSICAL DATA". The dredge shall be capable of dredging upstream as well as downstream and will so operate as directed by the Contracting Officer.

The dredge shall be capable of dredging the full bottom dimension of up to 400 feet and depth of 52 feet, plus minimal over-swinging through one swing (cut) of the cutterhead from a given set of the dredge subject to a velocity of less than 2 feet per second given normal conditions. The cut coverage shall be accomplished in one set of the dredge and at or before the dredge reaches its normal set-ahead dredge spud positioning. That cut coverage is expected to be made while at the dredge’s maximum walking speed. The swing of the cutterhead will be accomplished through the use of conventional dredge swing anchors or previously placed deadmen. The dredge shall be equipped with an electronic positioning system and include the equipment which will record such data.

2.2. HORSEPOWER REQUIREMENTS: Dredge Minimum Horsepower - In

using the following table, only one (1) main dredge pump on board the dredge shall be used. The horsepower of auxiliary dredge pumps shall not be

01 00 00 - 3 considered. Horsepower is equal to the correlating connected brake horsepower applied to the dredge pump. Those dredges which have less horsepower or have less discharge diameter than the minimum shown below for the size dredge bid will be considered non-responsive.

27-inch Discharge main pump(s) 3750 H.P. (min) ladder pump 900 H.P. (min) 30-inch Discharge main pump(s) 5000 H.P. (min) ladder pump 1200 H.P. (min)

For the purpose of bidding and evaluating bids, it will be considered the dredge will be used for the number of hours (100% Pay Time) given in the following table. However, this is not to be construed by the Contractor that the Government guarantees that the dredge will be used for this number of hours. Bidders should use the hours given in the following TABLE for the appropriate size dredge that is being bid. Should the contractor have a dredge with a discharge diameter between 27 and 30 inches, the number of 100% Pay Time Hours to be placed on the bidding schedule shall be computed by the difference in the square diameter of the discharge pipe between the hours given in the TABLE for the 27 and 30 inch dredges, as applicable. The number of hours shown in the TABLE is estimated. The actual hours may be more or less than what is shown.

Dredge Size 100% Hours Work for Others 100% Hours 27 inch Basic Dredge 4211 27 inch Basic Dredge 500

With ladder pump 3579 With ladder pump 425 With traveling spuds 3579 With traveling spuds 425 With ladder and t. spuds 2948 With ladder and t. spuds 350

30 inch Basic Dredge 3411 30 inch Basic Dredge 405

With ladder pump 2900 With ladder pump 344 With traveling spuds 2900 With traveling spuds 344 With ladder and t. spuds 2388 With ladder and t. spuds 284

Differences in the basic dredge hours (27 and 30 inch) are computed on the difference in the square diameter squared of the discharge pipe.

Additional allowance in dredge production will be given for dredges with ladder pumps and/or traveling spuds (spud carriage). A 15% reduction is shown in the table hours for ladder pumps or traveling spuds. (A ladder pump is defined by Mobile District as a dredge pump installed no less than one-third of the distance down the ladder.)

The traveling spud must have a minimum of 20’ of travel to be considered for bid purposes. A pre-award inspection of the dredge will be conducted by the Government and the contractor must adequately demonstrate the dredge is

01 00 00 - 4 equipped in the inspector’s office and a copy of the Contractor's survey plan.

A written discussion of the method the Contractor intends to use in order to satisfy these requirements shall be included in the Contractor's bidding schedule discussions.

2.3.8. BOOSTER PUMP: The Contractor shall furnish a booster pump within 20 calendar days of notice by the Contracting Officer. The brake horsepower of the booster pump shall be equal to or greater than 80 percent of the brake horsepower of the mobilized dredge pump. The diameter of the booster pump discharge shall be the same diameter as that of the mobilized dredge. The Contracting Officer may direct the demobilization of the booster pump at any time.

2.3.8(a) Booster Pump Requirements - For the purpose of bidding and evaluating bids, the booster will use the number of hours (100% Pay Time) given in the following table for the appropriate size dredge, however, this is not to be construed by the Contractor that the Government guarantees that the booster will be used for this number of hours. Bidders should use the hours given in the following table for the size dredge that is being bid.

100% Hrs

27-inch Discharge 494 30-inch Discharge 400

3. PERFORMANCE:

3.1. GENERAL: Upon initiation of work, the Contractor shall prosecute the work assigned him with faithfulness and energy, and at all times endeavor to meet the schedule of excavation (dredging) and disposal operations as determined by the Contracting Officer. The Contractor shall be expected to conduct excavation dredging and disposal operations seven days per week, twenty-four hours per day, including those days, which have been declared by Congress to be legal holidays for per diem employees of the Federal Government (applies only to the rental portion of this contract). The order of work to be performed under this contract cannot be determined except as the work progresses. The Contractor shall be expected to pre-construct dredge pipelines needed for this work. The Government will facilitate this by issuing excavation assignments far enough in advance for the Contractor to accomplish the pre-positioned pipeline construction. The Contractor shall bear all direct, overhead and collateral expenses incidental to the operation, upkeep and repair of all items of plant. He shall maintain the plant in a good state of repair, shall arrange for a supply of renewal parts to be on hand when needed for all plant and shall provide and maintain efficient personnel for each item of plant employed in connection with

01 00 00 - 10

21.3. The Contractor shall provide that every supervisor located at the job site(s) shall attend a "Staff" safety meeting held at least monthly. These safety meetings shall review, plan and establish safety activities involved with this particular project. Documentation of these meetings shall include the employee’s name, job title, date(s) of safety meeting, subject(s) of each meeting, summary of actions, and other appropriate information. All such meeting documentation shall be furnished as an attachment to the daily Contractor's Quality Control Report (QCR) within three days after the meeting.

21.4. A representative of the Government shall attend any "Indoctrination" safety briefing and all "On-The-Job" and "Staff" safety meetings while on this project.

These briefings and meetings shall be conducted throughout all phases of any work done under this contract and shall include the Contractor and any subcontractors.

22. PAYMENTS:

22.1. Rental Bid Items: Pay time shall begin on the date and hour when the dredge actually commences operations on the initial assignment and material starts discharging from the pipeline. Payment for work on a section will stop upon completion of work in the section. There is no eligible 70% Pay Time or 40% Pay Time prior to eligible 100% Pay Time. Details regarding the payment items for moving between shoals and projects, 100%, 70%, 40%, and 0% pay times are covered within this paragraph.

22.1.1. 100% Pay Time: The following will be considered effective time and will be paid for monthly at the contract price per hour calculated to the nearest one sixtieth (1/60) hour; actual time of dredging when the dredge is under operation with the cutterhead moving material, and such material is being passed through the pipeline and satisfactorily disposed.

22.1.1.2. Booster Pump 100% Pay Time: When the dredge is under operation and material is being passed through the pipeline and booster, the booster will be paid Booster Pump 100% Pay Time (Bid Item No. 7). When the dredge is in another pay status other than 100% the booster will be in a non-pay status unless the activity is covered under Stand-By-Time Booster Pump as described in paragraph 22.1.3.10.

22.1.2. 70% Pay Time: The following time will be paid for monthly at 70% of the 100% pay time for effective dredging:

22.1.2.1. Actual time lost due to moving and changing swinging anchors, changing swinging wires to previously prepared pennants, and making necessary changes in pipeline or pontoon lines as are necessitated by the progress of the work, such as adding pontoons to the floating lines or making changes at point of

01 00 00 - 32 rate, to and from the work area and designated dockage point, and at the 40% pay rate while the dredge is shut down.

22.1.3.10 Stand By Time - Booster Pump: Stand-by-time will be paid at 20% of the 100% booster pump rate. When more economical and efficient, the Contracting Officer may elect to place the booster in a standby status in lieu of demobilization. The Contracting Officer shall approve the standby location in writing. During the standby period the Contractor will light, secure and maintain the plant until it returns to operation or is demobilized. When in a standby status, the booster will not be moved from the approved location of standby unless approved by the Contracting Officer. In the event of two consecutive booster pump assignments, the Contracting Officer may elect to assign the dredge to a non-booster pump assignment, to allow the Contractor sufficient time to set up the booster pump and pipeline for the second assignment. If such a strategy were implemented, the time during the interim (non-booster) assignment will not be covered under the Booster Pump Stand-By-Time.

22.1.4. 0% (NON-PAY TIME): Payment will not be made for:

22.1.4.1. Lay time after arrival at new location when such time is incurred at the direction of the Contractor's representative, or when through negligence of the Contractor the necessary equipment is not available at the new location.

22.1.4.2. Shutdowns to stop leaks in pipeline, repair to dredge, pull a line together when the joints open up, replace damaged pontoons, except when pontoons are damaged by drift. Discharge line will be considered in condition when pumping is commenced and stops for reasons enumerated above will be considered as repair time.

22.1.4.3. Any time or purpose other than that enumerated above, except for mobilization and demobilization, including cleaning plugged line, removing misplaced material, dredging for others, shutdowns due to safety, shutdowns due to refueling, insufficient crew size, etc.

22.1.4.4. Any time the dredge is moved from the site of work at the Contractor's convenience.

22.1.4.5. Hours of darkness when the contractor chooses not to work. If the contractor chooses to place both crew shifts on daytime hours, the contractor will be 0% pay status at night.

22.1.4.6. When the dredge shuts down for any reason or purpose enumerated above, the ensuing time shall remain under non-pay status until the cause of the shutdown shall have been removed, and no claim shall be allowed for other work performed during that time except under situations where the Inspector

01 00 00 - 35

17-B-0004 SF30 Amendment 1
Changes for 17-B-0004 Amend 0002
00 00 10 - 1 from 17-B-0004 VOL I
00 00 10 - 2 from 17-B-0004 VOL I-2
00 00 10 - 4 from 17-B-0004 VOL I-3
01 00 00 - 3 from 17-B-0004 VOL II
01 00 00 - 4 from 17-B-0004 VOL II-2
01 00 00- 10 from 17-B-0004 VOL II
01 00 00 - 32 from 17-B-0004 VOL II-2
01 00 00 -35 from 17-B-0004 VOL II-3

File details come from the government source that posted it. Updated .