1 Bidding Schedule
| | Black Warrior-Tombigbee and Alabama River, AL | | | |
| | Soliciation No. W91278-15-R-0001 | | | |
| | Section J - Appendix M1- Bidding Schedule | | | |
| ITEM NO | SUPPIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0001 | BASE YEAR | 1 | Year | | |
| Operation and Maintenance of Government-owned Facilities and Equipment for the Black Warrior and Tombigbee Rivers in Walker, Jefferson, Tuscaloosa, Hale, Greene, Sumter, Marengo, Choctaw, Clarke, Washington, Mobile, Baldwin, Monroe, Wilcox, Dallas, Lowndes and Autauga Counties in Alabama in accordance with the Technical Provisions as stated in Section C. Period of performance: 12 months from date of award. | | | | |
| | | | NET AMOUNT | $ - 0 |
| 0002 | OPTION YEAR ONE | 1 | Year | | |
| Operation and Maintenance of Government-owned Facilities and Equipment for the Black Warrior and Tombigbee Rivers in Walker, Jefferson, Tuscaloosa, Hale, Greene, Sumter, Marengo, Choctaw, Clarke, Washington, Mobile, Baldwin, Monroe, Wilcox, Dallas, Lowndes and Autauga Counties in Alabama in accordance with the Technical Provisions as stated in Section C. Period of performance: 12 months from date of award. | | | | |
| | | | NET AMOUNT | $ - 0 |
| 0003 | OPTION YEAR TWO | 1 | Year | | |
| Operation and Maintenance of Government-owned Facilities and Equipment for the Black Warrior and Tombigbee Rivers in Walker, Jefferson, Tuscaloosa, Hale, Greene, Sumter, Marengo, Choctaw, Clarke, Washington, Mobile, Baldwin, Monroe, Wilcox, Dallas, Lowndes and Autauga Counties in Alabama in accordance with the Technical Provisions as stated in Section C. Period of performance: 12 months from date of award. | | | | |
| | | | NET AMOUNT | $ - 0 |
| 0004 | OPTION YEAR THREE | 1 | Year | | |
| Operation and Maintenance of Government-owned Facilities and Equipment for the Black Warrior and Tombigbee Rivers in Walker, Jefferson, Tuscaloosa, Hale, Greene, Sumter, Marengo, Choctaw, Clarke, Washington, Mobile, Baldwin, Monroe, Wilcox, Dallas, Lowndes and Autauga Counties in Alabama in accordance with the Technical Provisions as stated in Section C. Period of performance: 12 months from date of award. | | | | |
| | | | NET AMOUNT | $ - 0 |
| 0005 | OPTION YEAR FOUR | 1 | Year | | |
| Operation and Maintenance of Government-owned Facilities and Equipment for the Black Warrior and Tombigbee Rivers in Walker, Jefferson, Tuscaloosa, Hale, Greene, Sumter, Marengo, Choctaw, Clarke, Washington, Mobile, Baldwin, Monroe, Wilcox, Dallas, Lowndes and Autauga Counties in Alabama in accordance with the Technical Provisions as stated in Section C. Period of performance: 12 months from date of award. | | | | |
| | | | NET AMOUNT | $ - 0 |
GRAND TOTAL (Base and Option Years 1, 2, 3, & 4) NET AMOUNT $ - 0
2 Cert of Current Cost-Pricing
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J -Appendix M2 - Certificate of Current Cost or Pricing Data |
This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in Section 15.801 of the Federal Acquisition Regulation (FAR) and required under FAR Subsection 15.804-2) submitted, either actually or by specific identification in writing, to the Contracting Officer or the Contracting Officer’s representative in support of are accurate, complete, and current as of .
This certification includes the cost or pricing data supporting any advance agreement(s) and forward pricing rate agreements between the offeror and the Government that are a part of this proposal.
| _________________________ | _________________ | |
| | Date |
3 Cert of Final Indirect Costs
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M3 - Certificate of Final Indirect Costs |
This is to certify that I have reviewed this proposal to establish final indirect cost rates and to the best of my knowledge and belief:
1. All costs included in this proposal for __________________________ to establish final indirect cost rates for __________________________ are allowable in accordance with the cost principles of the Federal Acquisition Regulation (FAR) and its supplements applicable to the contracts to which the final indirect cost rates will apply.
2. This proposal does not include any costs which are expressly unallowable under applicable cost principles for the FAR or its supplements.
| _____________________________ | _________________ | |
| | Date |
4 Home Office OH Allowance
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M4 - Home Office Overhead Allowance |
| Volume II Cost/Price Proposal |
| HOME OFFICE OVERHEAD ALLOWANCE |
| Home office overhead will not exceed (________%) of estimated contract cost. In no event will allowance for home officer overhead exceed the dollar amount of $ ________________________. |
| Note: As the contract is modified and the direct cost is increased, _________________________________ |
| the amount filled in here by the offeror will also increase by the same amount. |
| The name of the Government auditing Agency (if any) that has approved the use of these rates for bidding purposes. ______________________ |
| The allowance for home office overhead will be established after award by the Government audit. The Contractor will not be |
| reimbursed by expenese incurred in excess of the above-stated not-to-exceed percentages, even though actual Government audit reveals |
| that home office overhead expenses exceed the Offeror's proposed not-to-exceed percentages. |
| END OF FORM |
5 Limit on Sub
| | Black Warrior-Tombigbee and Alabama River, AL | | | | | |
| | Soliciation No. W91278-15-R-0001 | | | | | |
| | Section J - Appendix M5 - Limitations on Subcontracting | | | | | |
| | Base Year | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | TOTAL |
| A | Total Prime Labor Cost (NOT INCLUDING SUBCONTRACT LABOR) | $ | $ | $ | $ | $ | $ |
| B | Total Subcontracting Labor | $ | $ | $ | $ | $ | $ |
| C | Total Labor Cost | $ | $ | $ | $ | $ | $ |
| D | Limitation on Subcontracting Percentage | % | % | % | % | % | % |
| EXAMPLE: |
| A = Total Prime Labor = $3,000,000.00 |
| B = Total Subcontract Labor = $5,000,000.00 |
| C = Total Labor Costs = A + B = $8,000,000 |
| D = Limitation on Subcontracting Percentage = (B / C) = $5,000,000.00 / $8,000,000.00 = 62.5% |
| NOTE: |
| This percentage shall not be more than 50% for the offeror to be considered |
| for award. Therefore, the example given is NOT an acceptable bid. |
6 Summary Sheet
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M6 - Summary Sheet |
| ALL YEARS |
Cost Element Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
| A | Total Direct Labor Salary: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| B | Total Direct Labor Hourly: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| C | Total Direct Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| D | Labor Burden Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| E | Labor Burden Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| F | Total Labor Burden (Salary + Hourly) | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| G | Material & Supplies | $ 739,775.00 | $ 872,712.03 | $ 713,971.71 | $ 936,991.59 | $ 646,141.76 | $ 3,909,592.09 |
| H | Other Direct Costs | $ 358,100.00 | $ 437,908.50 | $ 383,605.71 | $ 449,965.26 | $ 336,339.05 | $ 1,965,918.52 |
| I | Subcontract Costs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
J Total Direct Costs: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
K G&A Costs % $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
L Total Direct Cost + G&A $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Fee: | | | | | | | |
| M | Base Fee | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| N | Award Fee | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
O TOTAL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| C = Total Direct Labor = A + B |
| D = Labor Burden Hourly = A (Labor Burden Hourly Percentage %) |
| E = Labor Burden Salary = B (Labor Burden Salary Percentage %) |
| F = Total Labor Burden = D + E |
| J = Total Direct Costs = (C + F + G + H + I) |
| K = G&A Costs = J (G&A %) |
| L = Total Direct Costs + G&A =J + K |
| M = Base Fee = L (Base Fee %) |
| N= Award Fee = L (Award Fee %) |
| O = Total = L + M + N |
7 Cost Element by TP
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M7 - Cost Elements by Technical Provision |
| BASE YEAR |
| A | B | C | D | E | F | G | H | I | J | K | L |
| Total Direct Labor (Hourly + Salary) | Total Labor Burden (Hourly + Salary) | Material & Supplies | Other Direct Costs | Subcontract | Total Direct Costs | G&A Costs ( ___%) | (Total Direct Cost) + G&A | Base Fee (%) | Award Fee (%) | Total |
| TP 1 | $ - 0 | $ - 0 | $ 9,500.00 | $ 209,900.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 2 | $ - 0 | $ - 0 | $ 137,525.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 3 | $ - 0 | $ - 0 | $ 271,000.00 | $ 58,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 3 Selden | $ - 0 | $ - 0 | $ 73,275.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 3 Lock Closures | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 3 Millers Ferry | $ - 0 | $ - 0 | $ 103,425.00 | $ 65,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 4 | $ - 0 | $ - 0 | $ 27,700.00 | $ 25,200.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 5 | $ - 0 | $ - 0 | $ 3,925.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 6 | $ - 0 | $ - 0 | $ 28,050.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 7 | $ - 0 | $ - 0 | $ 19,875.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 8 | $ - 0 | $ - 0 | $ 65,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP 9 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total $ - 0 $ - 0 $ 739,775.00 $ 358,100.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| D = Materials and Supplies values are as shown. The M&S escalation factor for Options Years 1 through 4 shall be 3.5%. |
| E = Other Direct Costs values are as shown. The ODC escalation factor for Options Years 1 through 4 shall be 3.5%. |
| G = Total Direct Costs = (B+C+D+E+F) |
| H = G&A Costs = G (G&A %) |
| I = Total Direct Costs + G&A = G + H |
| J = Base Fee = I (Base Fee %) |
| K = Award Fee = I (Award Fee %) |
| L = Total = I + J +K |
8 Cost by TP
| | Black Warrior-Tombigbee and Alabama River, AL | | | | |
| | Soliciation No. W91278-15-R-0001 | | | | |
| | Section J - Appendix M8 - Costs by Technical Provision | | | | |
| Technical Provision | Base Year | Option Yr 1 | Option Yr 2 | Option Yr 3 | Option Yr 4 | Total |
| TP-1 Management | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-2 Maintenance and Repair of Buildings, Recreation Facilities, and Associated Infrastructure | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-3 Lock and Dam Maintenance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-3 Lock and Dam Maintenance - SELDEN SPILLWAY REPAIR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-3 Lock and Dam Maintenance - MAJOR LOCK CLOSURES | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-3 Lock and Dam Maintenance - Millers Ferry Spillway Repair | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-4 Maintenance of Upland Dredged Material Disposal Areas | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-5 Grass Mowing and Landscaping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-6 Cleaning Services and Refuse Removal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-7 Protection of Natural Resources | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-8 Maintenance of Government Vehicles, Boats, & Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TP-9 Administraive Support | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
9 Direct Labor Hours by Labor C
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M9 - Direct Labor Hours by Labor Classification |
| List All Labor Classifications That Apply |
| BASE YEAR |
| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD |
| Labor Classification | TP1 | TP1 (OT) | TP2 | TP2 (OT) | TP3 | TP3 (OT) | TP3 (Selden) | TP3 (Selden OT) | TP3 (Lock Closures) | TP3 (Lock Closures OT) | TP3 (Millers Ferry) | TP3 (Millers Ferry OT) | TP4 | TP4 (OT) | TP5 | TP5 (OT) | TP6 | TP6 (OT) | TP7 | TP7 (OT) | TP8 | TP8 (OT) | TP9 | TP9 (OT) | Total (Reg Hours) | Total (OT Hours) | Total Hours | Hourly Rate | Overtime Rate |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Labor Classification | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Total | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | | - 0 | | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| OT = Overtime |
| Z = Total Direct Labor (Regular Hours) = B + D + F + H + J + L + N + P + R + T + V + X |
| AA = Total Direct Labor (Overtime Hours) = C + E + G + I + K + M + O + Q + S + U + W + Y |
| AB = Total Direct Labor Hours = Z + AA |
10 Subcontracts by TP
| | | | | | Black Warrior-Tombigbee and Alabama River, AL | | | | | | | |
| | | | | | Soliciation No. W91278-15-R-0001 | | | | | | | |
| | | | | | Section J - Appendix M10 - Subcontracts Breakdown by TP | | | | | | | |
| | | | | | ALL YEARS | | | | | | | |
| A | B | C | D | E | F | G | H | I | J | K | L | M | N |
| Subcontract Description | TP 1 | TP 2 | TP 3 | TP 3 Selden | TP 3 Lock Closures | TP 3 Millers Ferry | TP 4 | TP 5 | TP 6 | TP 7 | TP 8 | TP 9 | Total Subcontracts |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Subcontract Item | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
N = Total Subcontracts = B + C + D + E + F + G + H + I + J + K + L + M
11 TP 1
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M11 - Cost Breakdown |
| TP-1 Management |
Cost Element Hours Rate OT Hrs OT Rate Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | |
| Lump Sum | $ 9,500.00 | $ 9,832.50 | $ 10,176.64 | $ 10,532.82 | $ 10,901.47 | $ 50,943.43 |
| Total Material & Supplies | $ 9,500.00 | $ 9,832.50 | $ 10,176.64 | $ 10,532.82 | $ 10,901.47 | $ 50,943.43 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | |
| Lump Sum | $209,900.00 | $217,246.50 | $224,850.16 | $232,719.93 | $240,865.13 | $1,125,581.72 |
| Total ODC | $209,900.00 | $217,246.50 | $224,850.16 | $232,719.93 | $240,865.13 | $1,125,581.72 |
| Subcontracts (List all that apply): | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
12 TP 2
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M12 - Cost Breakdown |
| TP-2 Maintenance and Repair of Buildings, Recreation Facilities, and Associated Infrastructure |
Cost Element Hours Rate OT Hrs OT Rate Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | |
| Lump Sum | $ 137,525.00 | $ 142,338.38 | $ 147,320.29 | $ 152,476.50 | $ 157,813.18 | $ 737,473.35 |
| Total Material & Supplies | $ 137,525.00 | $ 142,338.38 | $ 147,320.29 | $ 152,476.50 | $ 157,813.18 | $ 737,473.35 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | |
| Lump Sum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontracts (List all that apply): | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
13 TP 3
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M13 - Cost Breakdown |
| TP-3 Lock and Dam Maintenance |
Cost Element Hours Rate OT Hrs OT Rate Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | |
| Lump Sum | $ 271,000.00 | $ 280,485.00 | $ 290,302.05 | $ 300,462.63 | $ 310,978.84 | $ 1,453,228.52 |
| Total Material & Supplies | $ 271,000.00 | $ 280,485.00 | $ 290,302.05 | $ 300,462.63 | $ 310,978.84 | $ 1,453,228.52 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | |
| Lump Sum | $ 58,000.00 | $ 60,030.00 | $ 62,131.05 | $ 64,305.64 | $ 66,556.34 | $ 311,023.03 |
| Total ODC | $ 58,000.00 | $ 60,030.00 | $ 62,131.05 | $ 64,305.64 | $ 66,556.34 | $ 311,023.03 |
| Subcontracts (List all that apply): | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
14 TP 3 (Selden)
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M14 - Cost Breakdown |
| TP-3 Lock and Dam Maintenance - SELDEN SPILLWAY REPAIR |
Cost Element Hours Rate OT Hrs OT Rate EVENT COST Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | | |
| Lump Sum | $146,550.00 | $73,275.00 | $75,839.63 | $0.00 | $0.00 | $0.00 | $149,114.63 |
| Total Material & Supplies | | $73,275.00 | $75,839.63 | $0.00 | $0.00 | $0.00 | $149,114.63 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | | |
| Lump Sum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total ODC | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontracts (List all that apply): | | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
15 TP 3 (Major Lock Closures)
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M15 - Cost Breakdown |
| TP-3 Lock and Dam Maintenance - MAJOR LOCK CLOSURES |
Cost Element Hours Rate OT Hrs OT Rate EVENT COST Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | | |
| Lump Sum | $ 312,700.00 | $ - 0 | $ - 0 | $ - 0 | $ 312,700.00 | $ - 0 | $ 312,700.00 |
| Total Material & Supplies | | $ - 0 | $ - 0 | $ - 0 | $ 312,700.00 | $ - 0 | $ 312,700.00 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | | |
| Lump Sum | $ 125,000.00 | | | | $ 125,000.00 | | $ 125,000.00 |
| Total ODC | | $ - 0 | $ - 0 | $ - 0 | $ 125,000.00 | $ - 0 | $ 125,000.00 |
| Subcontracts (List all that apply): | | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
16 TP 3 (MF Spillway)
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M16 - Cost Breakdown |
| TP-3 Lock and Dam Maintenance - Millers Ferry Spillway Repair |
Cost Element Hours Rate OT Hrs OT Rate EVENT COST Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | | |
| Lump Sum | $ 413,700.00 | $ 103,425.00 | $ 214,089.75 | $ 110,791.45 | $ - 0 | $ - 0 | $ 428,306.20 |
| Total Material & Supplies | | $ 103,425.00 | $ 214,089.75 | $ 110,791.45 | $ - 0 | $ - 0 | $ 428,306.20 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | | |
| Lump Sum | $ 260,000.00 | $ 65,000.00 | $ 134,550.00 | $ 69,629.63 | $ - 0 | $ - 0 | $ 269,179.63 |
| Total ODC | | $ 65,000.00 | $ 134,550.00 | $ 69,629.63 | $ - 0 | $ - 0 | $ 269,179.63 |
| Subcontracts (List all that apply): | | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
17 TP 4
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M17 - Cost Breakdown |
| TP-4 Maintenance of Upland Dredged Material Disposal Areas |
Cost Element Hours Rate OT Hrs OT Rate Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | |
| Lump Sum | $ 27,700.00 | $ 28,669.50 | $ 29,672.94 | $ 30,711.49 | $ 31,786.39 | $ 148,540.32 |
| Total Material & Supplies | $ 27,700.00 | $ 28,669.50 | $ 29,672.94 | $ 30,711.49 | $ 31,786.39 | $ 148,540.32 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | |
| Lump Sum | $ 25,200.00 | $ 26,082.00 | $ 26,994.87 | $ 27,939.69 | $ 28,917.58 | $ 135,134.14 |
| Total ODC | $ 25,200.00 | $ 26,082.00 | $ 26,994.87 | $ 27,939.69 | $ 28,917.58 | $ 135,134.14 |
| Subcontracts (List all that apply): | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
18 TP 5
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M18 - Cost Breakdown |
| TP-5 Grass Mowing and Landscaping |
Cost Element Hours Rate OT Hrs OT Rate Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | |
| Lump Sum | $ 3,925.00 | $ 4,062.39 | $ 4,204.59 | $ 4,351.74 | $ 4,504.03 | $ 21,047.75 |
| Total Material & Supplies | $ 3,925.00 | $ 4,062.39 | $ 4,204.59 | $ 4,351.74 | $ 4,504.03 | $ 21,047.75 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | |
| Lump Sum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontracts (List all that apply): | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
19 TP 6
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M19 - Cost Breakdown |
| TP-6 Cleaning Services and Refuse Removal |
Cost Element Hours Rate OT Hrs OT Rate Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | |
| Lump Sum | $ 28,050.00 | $ 29,031.75 | $ 30,047.86 | $ 31,099.54 | $ 32,188.02 | $ 150,417.17 |
| Total Material & Supplies | $ 28,050.00 | $ 29,031.75 | $ 30,047.86 | $ 31,099.54 | $ 32,188.02 | $ 150,417.17 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | |
| Lump Sum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontracts (List all that apply): | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
20 TP 7
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M20 - Cost Breakdown |
| TP-7 Protection of Natural Resources |
Cost Element Hours Rate OT Hrs OT Rate Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | |
| Lump Sum | $ 19,875.00 | $ 20,570.63 | $ 21,290.62 | $ 22,035.80 | $ 22,807.04 | $ 106,579.09 |
| Total Material & Supplies | $ 19,875.00 | $ 20,570.63 | $ 21,290.62 | $ 22,035.80 | $ 22,807.04 | $ 106,579.09 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | |
| Lump Sum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontracts (List all that apply): | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
21 TP 8
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M21 - Cost Breakdown |
| TP-8 Maintenance of Government Vehicles, Boats, & Equipment |
Cost Element Hours Rate OT Hrs OT Rate Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | |
| Lump Sum | $ 65,500.00 | $ 67,792.50 | $ 70,165.27 | $ 72,621.07 | $ 75,162.79 | $ 351,241.63 |
| Total Material & Supplies | $ 65,500.00 | $ 67,792.50 | $ 70,165.27 | $ 72,621.07 | $ 75,162.79 | $ 351,241.63 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | |
| Lump Sum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontracts (List all that apply): | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
22 TP 9
| Black Warrior-Tombigbee and Alabama River, AL |
| Soliciation No. W91278-15-R-0001 |
| Section J - Appendix M22 - Cost Breakdown |
| TP-9 Administraive Support |
Cost Element Hours Rate OT Hrs OT Rate Base Year Option Yr 1 Option Yr 2 Option Yr 3 Option Yr 4 Total
Direct Labor (List all that apply):
| Labor Classification 1 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 2 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Salary: | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 3 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Classification 4 | - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Labor Hourly: | | | | | | | | | | |
Total Direct Labor: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Labor Burden: | | | | | | | |
| Labor Burden - Salary | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Burden - Hourly | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Burden | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Labor + Total Labor Burden $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Materials & Supplies | | | | | | |
| Lump Sum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Material & Supplies | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other Direct Costs (ODC), (List all that apply): | | | | | | |
| Lump Sum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontracts (List all that apply): | | | | | | |
| Subcontract 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Direct Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| G&A Costs | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Direct Cost + G&A | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee: | | | | | | | |
| Base @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Award @ | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0