About this file

Amendment 01

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THIS AMENDMENT ADDS ONE (1) SENTENCE TO SECTION 01 00 00 PAGE 2 PARAGRAPH 2.1 AS FOLLOWS: PLUS THE PUMP HORSEPOWER OF ANY OTHER OPERABLE PUMPS CONNECTED IN SERIES (AND LADDAR PUMP, IF APPLICABLE).

THE PROPOSAL SUBMITTAL DATE AND TIME REMAIN UNCHANGED.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Aug-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91278-15-B-0003

X 9B. DATED (SEE ITEM 11)

10-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2015

CODE

ENDIST MOBILE CONTRACTING DIVISION

109 ST JOSEPH ST

MOBILE AL 36602

W91278 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91278-15-B-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

IDIQ Contract for Rental of 27-inch to 30-inch W91278-15-B-0003 Cutterhead Pipeline Dredge for Dredging of Pascagoula Harbor, Jackson County, Mississippi

01 00 00 - 3 the right to contract additional dredges to perform dredging work on the same projects and geographical area.

2. UDREDGE AND ATTENDANT PLANT REQUIREMENTSU:

2.1. DREDGE REQUIREMENTS: The dredge offered shall be capable of continuous operation with a minimum horsepower rate as shown below which includes the horsepower applied on the main dredge pump plus the pump horsepower of any other operable pumps connected in series (and ladder pump, if applicable). For the requested dredge size, most of the work that is anticipated to be performed under this contract is considered a “walking job” for the requested dredge size, therefore, additional pump size and/or horsepower does not justify a competitive advantage in the number of hours in the bid schedule. The contractor shall have available for use at all times a variety of serviceable interchangeable pump impellers (2 minimum), a spare pump case, and a spare serviceable cutter to permit the dredge to operate efficiently under varying conditions described in paragraph entitled, "PHYSICAL DATA". The dredge shall be capable of dredging upstream as well as downstream and will so operate as directed by the Contracting Officer. The dredge shall be capable of dredging the full bottom dimension of up to 400 feet and depth of 52 feet, plus minimal over-swinging through one swing (cut) of the cutterhead from a given set of the dredge subject to a velocity of less than 2 feet per second given normal conditions. The cut coverage shall be accomplished in one set of the dredge and at or before the dredge reaches its normal set-ahead dredge spud positioning. That cut coverage is expected to be made while at the dredge’s maximum walking speed. The swing of the cutterhead will be accomplished through the use of conventional dredge swing anchors or previously placed deadmen.

The dredge shall be equipped with an electronic positioning system and include the equipment which will record such data.

2.2. HORSEPOWER REQUIREMENTS: Dredge Minimum Horsepower - In using the following table, only one (1) main dredge pump on board the dredge shall be used. The horsepower of auxiliary dredge pumps shall not be considered. Horsepower is equal to the correlating connected brake horsepower applied to the dredge pump. Those dredges which have less horsepower or have less discharge diameter than the minimum shown below for the size dredge bid will be considered non-responsive.

27-inch Discharge main pump(s) 3750 H.P. (min) ladder pump 900 H.P. (min)

30-inch Discharge main pump(s) 5000 H.P. (min) ladder pump 1200 H.P. (min)

FOR THE PURPOSE OF BIDDING AND EVALUATING BIDS, IT WILL BE CONSIDERED THE

DREDGE WILL BE USED FOR THE NUMBER OF HOURS (100% PAY TIME) GIVEN IN THE

FOLLOWING TABLE. HOWEVER, THIS IS NOT TO BE CONSTRUED BY THE CONTRACTOR

Am01 W91278-15-B-0003
IFB W91278-15-B-0003-0001

Pages from W91278-15-B-0003 Invitation for Bids for Am0001

File details come from the government source that posted it. Updated .