Change response date to 09/12/1024 as follows:

Response Date:

08/21/ 2014 09/12/2014

Clarify name of each pool as follows:

POOL (A) Conservation/NEPA SELECTION CRITERIA:

POOL (B) Compliance/Pollution Prevention SELECTION CRITERIA:

POOL (C) Hazardous Toxic Radioactive Waste (HTRW)/Design SELECTION CRITERIA:

Clarify volume of DOD Contract Awards for each Pool (A, B and C) Selection

Criteria as follows:

Volume of DOD Contract Awards: Firms shall provide the volume of work

(number of contracts and task orders and the dollar value) awarded to the Prime by

DoD agencies during the previous 12 months.

Add submittal requirements to Pool B Selection Criteria, paragraph B as follows:

A maximum of TEN (10) projects of the prime, the subcontractor(s), or both will be reviewed in

PART I, Section F. Of these 10 a minimum of 6 projects from the prime must be completed. Use no more than one page per project. It shall be noted that a task order executed under an

Indefinite Delivery Contract is considered a Project. The 10 projects shall specifically address the following areas of emphasis: 3 projects - Complex Environmental

Compliance/Reporting/Permitting; 1 project - GIS/Data management; 2 projects - Clean Air Act;

2 projects - Clean Water Act; 1 project - Pollution Prevention; 1 project - Installation

Sustainability/asset management.

Delete Certified Energy Manager (CEM) professional registration from Pool C

Selection Criteria, paragraph A as shown in the following sentence:

Professional registration is required for the Certified Industrial Hygienist, Geologist and

Hydrogeologist (Professional Geologist PG), Certified Energy Manager (CEM) and all Engineering

(Professional Engineer PE) disciplines.

Add submittal requirements to Pool C Selection Criteria, paragraph B as follows:

A maximum of TEN (10) projects of the prime, the subcontractor(s), or both will be reviewed in

PART I, Section F. Of these 10 a minimum of 6 projects from the prime must be completed. Use no more than one page per project. It shall be noted that a task order executed under an

Indefinite Delivery Contract is considered a Project. The 10 projects shall specifically address the following areas of emphasis: 4 projects - HTRW Investigation (RFI, RI, human health and ecological risk assessments); 2 projects - HTRW remedial design; 2 projects - HTRW feasibility study, proposed plan, public meeting, and record of decision; 1 project – HTRW vapor intrusion investigation and/or vapor intrusion remedial design; 1 project – HTRW pilot study and/or bench study .

Clarified Submission Requirements as shown in the following sentences:

Interested Architect-Engineer firms or joint ventures having the capabilities to perform this work as a prime contractor, may submit ONE (1) completed, bound paper copy and one electronic copy in

Portable Document File (PDF) format on compact disk (CD) (the information submitted in the paper copy takes precedence over the information provided on the CD) of their SF 330 Proposal

(Architect-Engineer Qualifications) for each POOL (A, B, and/or C) which the firm wishes to be considered, to: U.S. Army Corps of Engineers, Mobile District, CESAM-EN-DW, ATTN: Mr.

Jeffrey H. Johnson, 109 St. Joseph Street, Mobile, AL 36602. SF 330 6/2004 current edition must be used, and may be obtained from the Government Printing Office or from the following web site:

http://www.gsa.gov/portal/forms/download/116486

Change Bidder inquiry end date as shown in the following sentence:

Questions should be submitted no later than 08/0522/ 2014 at 3:00 p.m. Central Time to allow time for a response.