AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE

4. REQUISITION/PURCHASE

5. PROJECT NO. (If applicable) W91278-14-B-0005-0003 28 Jan 2015 W31XNJ33364394

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6)

U S ARMY ENGINEER DISTRICT

ATTN: CONTRACTING DIVISION - CIVIL

109 ST. JOSEPH STREET

MOBILE AL 36602

SEE ITEM 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION NO.

X W91278-14-B-0005

9B. DATED (SEE ITEM 11)

9 Apr 2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers __ is extended, _X_ is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A

ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

The subject solicitation for IDIQ CONTRACT FOR RENTAL OF 20-24 INCH CUTTERHEAD DREDGE FOR DREDGING IN ALABAMA, MISSISSIPPI, AND FLORIDA is amended as follows:

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

IDIQ CONTRACT FOR RENTAL OF 20-24 INCH CUTTERHEAD W91278-14-B-0005

PIPELINE DREDGE FOR DREDGING IN ALABAMA, MISSISSIPPI,

AND FLORIDA

Amendment W91278-14-B-0005-0003

PART I – REVISIONS MADE BY ADDED AND/OR REPLACEMENT PAGES, SECTIONS

OR PARAGRAPHS

The items listed below are to be replaced with the corresponding added and/or revised pages/sections/paragraphs. Paragraphs added and/or revised in sections are to be replaced without regard to page number changes caused by the revision. Within the specifications, deletions from the specifications are to be indicated by: strikethrough, e.g., deletions are marked with strikethrough; and additions to the specifications, including revisions/substitutions, are indicated in bold, italic and underlined, e.g.: additions are indicated thus. Added and/or revised paragraphs/pages/sections are indicated by a note in bottom right hand corner of each page, and are hereby made a part of the contract and are to be inserted in the specification in the proper numerical-alphabetical sequence.

Page/Paragraph Corresponding Added or Revised Pages

Section 00010 Bidding Schedule Section 00010 Bidding Schedule

Section 01 00 00 Statement of Work – Sections 01 00 00 Statement of Work - Coastal Projects Coastal and Inland Projects

Section 01 00 01 General Requirements Section 01 00 01 General Requirements

Add: Section 01 35 26 Safety

Encls as stated Revised and added pages at indicated in Part I.

SF 30-Page 2

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005 Pipeline Dredge for Dredging in Alabama, Mississippi and Florida

Entire Section replaced by Amendment W91278-14-B-0005-0003 00010 - 1

SECTION 00010

BIDDING SCHEDULE

INLAND AND COASTAL PROJECTS

IDIQ Contract for Rental of Cutterhead Pipeline Dredge for Dredging Mobile District Navigation Projects in Alabama, Mississippi and Florida

Item No.

Description Estimated Quantity

Unit

Unit Price Estimated Amount

1.

DREDGING 100% Pay Time, Black Warrior/Tombigbee River System*** Note: See Production Incentive Payment below

______ HRS _________ ________________

2.

DREDGING 100% Pay Time, Alabama River System***

HRS _________ ________________

3.

DREDGING 100% Pay Time, Tennessee Tombigbee Waterway***

4.

DREDGING 100% Pay Time, Coastal Projects (For estimated quantity, see table in Sec. 010000, par. 2.2)

4a.

DREDGING 100% Pay Time, Work for Others (For estimated quantity, see table in Sec. 010000, par. 2.2)

______ HRS _________ ________________

5a.

MOBILIZATION BAR TO BAR, BWT,

ALA, and TTWW (See Sec. 01000 paragraph entitled PAYMENTS)

400 MI _________ _________________

5b.

MOBILIZATION BAR TO BAR,

COASTAL (See Sec. 010000 paragraph entitled PAYMENTS)

400 MI _________ _________________

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 2

6.

MOBILIZATION & DEMOBILIZATION

- Dredge & attendant plant IMPORTANT - See note 5 below for this bid item

1 JOB XXXX _________________

7.

Mobilization & Demobilization

- Booster-Pump

1 JOB XXXX _________________

8.

Booster Pump 100% Pay Time***

______ HRS _________ _________________

9.

Intermediate Mobilization and Demobilization of pipeline (See note below)

100 UNIT _________ _________________

10. MISSISSIPPI STATE TAX

1 JOB XXXX $50,000.00

Total Bid XXXX

*** REFERENCE CHART IN SECTION 01000, PARAGRAPHS 2.1.1. & 2.2.

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 3

SECTION 00010

BIDDING SCHEDULE

NOTES

1. PRODUCTION INCENTIVE PAYMENT

(a) The government will pay an incentive of $1.00 for each cubic yard per hour of production for dredging rates that surpass or exceed a target rate of 500 cubic yards per hour for the inland waterway assignments on the BWT and Alabama River Systems and the Tennessee Tombigbee Waterway TTWW. There is no incentive payment for Costal projects or work for others. The incentive will be calculated based on the average rate of dredge material removed in cubic yards per hour at each dredging assignment or shoal location. Cubic yard rates calculated above the target rate of 500 CY/HR will then be multiplied times the number of actual 100% PAYTIME hrs. earned at each dredging assignment to determine the actual incentive payment amount earned; (Cy/Hr above Incentive = Measured Production Rate (cy/hr) – 500 cy/hr; Incentive Payment ($) = Cy/Hr above Incentive x 100% Hours x $1/cy). This amount will be paid in addition to the regular 100% PAYTIME rate in bid item 1. The government will also require that the contractor maintain a minimum production rate of 100 CY/Hr. while in the 100% PAYTIME pay status for each individual assignment. In the event that the minimum production is not met, a decrease or deduction of $1.00 for each cubic yard per hour below the minimum will be made for each assignment. The deduction will be taken from the regular 100% PAYTIME rate in bid item 1.

(b) Incentive yardage calculations for the Black Warrior/Tombigbee River System and the Alabama River System will be based on government performed before and after dredged hydrographic sweep surveys using Ross Labs multi-transducer sweep survey vessels and HYPACK hydrographic software to collect and edit the data. Incentive yardage calculations for the Tennessee Tombigbee Waterway will be based on government performed before and after dredged hydrographic surveys. Those surveys will be collected with either single-beam, multi-transducer, and/or multi-beam surveying equipment. HYPACK hydrographic software will be used for data collection, post processing and volume calculations.

The HYPACK program will be used to calculate the actual cubic yards removed using the two surface method comparing the before dredging bottom surface to the after dredging bottom surface for materials removed for the assigned dredging limits. The incentive payment will only be made for quantities removed, within these limits, but only for materials not exceeding the depth parameters stated in Section 1000, Paragraph 7.1.1., entitled: REQUIRED DREDGING.

(c) Where conditions such as high water or other unforeseen circumstances prevent the successful performance of the govt. hydrographic survey, the

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 4 government will make every effort to resolve by attempting to perform an interim survey or by estimating the yardage removed using the existing before dredge survey. When this proves unsuccessful or impossible to reconstruct, the contractor will be paid at the regular 100% PAYTIME rate. Also, reference is made to Section 1000, Paragraph 5.2., entitled: CHARACTER OF MATERIAL which addresses the nature of dredged material expected to be encountered.

(d) Booster Pump use for Incentive Payment – The contractor may elect to use the booster pump to increase production during any period of the contract regardless of Govt. callout of the booster pump found in bid items 7, 8 and 9. For additional details, see section 2.2.10., entitled Booster Pump of SECTION 01000 - Statement of Work - Description/Specifications

(e) Special notice is given regarding upland disposal operations. In no event shall the production incentive clause the contractor to regulate and control activities in the disposal operations such that the physical condition of dikes and weirs are placed in potential danger of failing or of being operated in such a manner that efficient placement of material is not performed. When warranted, the govt.

reserves the right to control all upland disposal operations, including actual discharge locations and pipe placement, in order to assure complete site integrity.

Some dredging assignments will require special placement and handling of discharge material to the extent that dredged production is limited or slowed and in some cases reduced to the point that only the base hourly 100% rate of pay is earned.

2. BID SCHEDULE

(a) Bids based on dredges with smaller than a 20-inch inside diameter will be considered non-responsive. Dredges with a pump diameter discharge less than a 20 inch inside diameter are considered inadequate for satisfactory performance of the work required within the period of the contract. Dredges that have less horsepower than the minimum shown will be considered non-responsive. The dredge must be bid under the diameter discharge from the dredge pump as originally designed by the manufacturer. The discharge lines shall be the same diameter as the dredge pump discharge.

(b) Bidders must insert a price on all numbered items of the bidding schedule. Failure to do so will disqualify the bid.

(c) All the extensions of the unit price shown will be subject to verification by the Government. In case of variation between the unit price and extension, the unit price will be considered to be the bid.

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 5

(d) It is the intent of the Government to secure a dredge meeting the requirements set forth in the Statement of Work of the specifications. The table in the paragraph entitled DREDGE AND ATTENDANT PLANT REQUIREMENTS indicates the estimated average output for dredges of various power based on average theoretical conditions under which this work is to be accomplished. Bids will be evaluated and award will be made on the basis of employment of the plant that will result in the lowest overall total price, as described hereinafter, to the Government for the equipment. This is not to be construed by the Contractor that the Government guarantees this number of hours will be worked.

(e) Bidders should insert the appropriate number of hours for 100% Pay time from the table into the bid schedule.

(f) The Government will check the bidder's computation for accuracy and to insure that the bidder's computation was made in accordance with the above evaluation procedures. In case of variation between the bidder's computation procedures and those prescribed above, the Government will correct the bidder's computation and the bid will be evaluated by the corrected computation.

3. To better facilitate the public bid opening process, all modifications to bids are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to bid items, all bidders should state their revised prices for each item. The company name should be indicated on the face of the bid schedule to preclude being misplaced.

4. The number of hours indicated on the Bidding Schedule is approximate. The Contractor may be required to work either more or less than the number of hours specified.

5. For Bid Item No. 6. Mobilization/Demobilization for the dredge and attendant plant shall be bid as one lump sum rate for the total effort of mobilizing and demobilizing the entire plant. The mobilization site shall be Sunflower Bar on the Black Warrior-Tombigbee Waterway, BWT Mile 78.0, unless otherwise directed by the contracting officer.

6. For Bid Item No. 7. Mobilization/Demobilization Booster-Pump will be to/from BW&T Navigation Mile 90 at the Jackson/Lower Princes dredging reach.

7. For Bid Item No. 9. Intermediate Mobilization and Demobilization of Pipeline, each UNIT is equivalent to 1,000 feet of pipeline.

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 6

8. For Bid Item No. 10, MISSISSIPPI STATE TAX, the Government will reimburse the Contractor for the actual taxes collected by the State of Mississippi for work performed under this contract. Also, the State of Mississippi will enforce an equipment tax on equipment new to the State of Mississippi. This equipment tax will not be reimbursed by the Government.

9. The dividing line between the coastal and inland navigation projects is the Cochrane-Africatown Bridge, Mobile, Alabama.

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 7

INFORMATION TO BE SUBMITTED WITH BID: Each bidder shall furnish the information required below by filling in the blank spaces:

Dredge Name or Number

Fair Market Value of the Dredge

Bunker Capacity (gallons/tons)

Hull: Material of construction Length (ft) Breadth (ft) Depth (ft) Diameter of spuds (in) Traveling spud? (Yes or No) Distance traveling spud can travel (ft) Distance between spuds, athwartship (ft) Distance of spuds from stern of dredge (ft) Draft under normal working conditions (ft) When built When and where last dry docked Length of time of last dry docking (months)

Min. width of channel in which dredge can successfully operate (ft)

Max. depth of water dredge will operate (ft)

Max. draft of dredge (ft)

Max. current in which dredge can successfully operate: Miles per hour for 11 ft. depth of water.

Depth to which dredge will dig (Max./Min.)(ft.)

LADDER:

Material of construction:

Length (ft.)

Type of flexible suction pipe connection to hull Maximum continuous swing width Diameter of cutter shaft (in) Cutter actuating device: Size:

Type:

Power:

Type of cutter Horsepower of cutter motor Normal R.P.M. of cutter

DREDGING PUMP: (MAIN DREDGE PUMP)

Type and Make Diameter suction (in) Diameter discharge, as originally designed (in) Diameter of impeller (Max./Min.) (in)

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 8

Max. R.P.M. of impeller Method of actuating impeller Brake H.P. applied to pump impeller

BOOSTER PUMP: (IF REQUIRED)

Type and Make Diameter suction (in) Diameter discharge, as originally designed (in) Diameter of impeller (Max./Min.) (in) Maximum R.P.M. of impeller Method of actuating impeller Brake H.P. applied to pump impeller

MAIN ENGINE: (DESCRIBE FULLY)

Make Type Size Age B.H.P.

R.P.M.

Estimated amount of fuel consumed per day

LIGHTING PLANT:

K.W.

ATTENDANT PLANT:

Quarterboat, size Launch or launches, size Launches, horsepower Skiffs, number Method of supporting discharge pipe Type and number of pontoons Dredge Tender, size Dredge Tender, horsepower Dredge Tender, size Dredge Tender, horsepower Towing Vessel, size Towing Vessel, horsepower Total H.P. of all fuel consuming units in the makeup of the total dredging plant (horsepower)

The plant was last operated in at

The plant offered is owned by

The plant may be inspected at

The period of time of lay up in the past 12 months

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 9

EQUIPMENT: Each bidder shall list on pages 00010-7 & 00010-8 a complete description of the attendant plant proposed to be furnished.

SUBSISTENCE: The plant ( ) will ( ) will not have the facilities for furnishing the meals required by the "Accommodations and Meals for Inspectors" clause of the contract. The rate to be charged for the above plant, complete with full operating personnel and in operating status on a 24-hour day, 7 days per week basis, will be set forth on page B-1.

DREDGE PLANT OPERATION: The number of shifts to be worked per day on a 24-hour basis, 7 days per week is .

(No. of Shifts)

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 10

CONTRACTOR’S DREDGE CREW LISTING

The following personnel list should be in compliance with the crew requirements found in section 01000 paragraphs 21. entitled CREW and 22.7 entitled DEDUCTIONS FOR ABSENT CREW MEMBERS.

Supervisory & Management Personnel/Per Shift

POSITION NUMBER

Crew/Per Shift

POSITION NUMBER

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 11

DREDGING PLANT EQUIPMENT LIST

EQUIPMENT MAKE

AND

MODEL

QUANTITY SIZE HORSEPOWER YEAR EQUIPMENT

CONDITION

FAIR

MARKET

VALUE

DREDGE

TENDER/TUG NO. 1

200 HP MIN.

TENDER/TUG NO. 2

400 HP MIN.

TOWING VESSEL

DERRICK/ANCHOR

BARGE

WORK BARGE

EQUIPMENT BARGE

FUEL BARGE

SPILL BARGE

SKIDDER BARGE

PIPE BARGE (SHORE

PIPE)

PIPE BARGE

(FLOATING PIPE)

BULLDOZER NO. 1

(BWT & TTWW ONLY)

BULLDOZER NO. 2

(BWT & TTWW ONLY)

BULLDOZER NO. 1

(COASTAL ONLY)

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 12

EQUIPMENT MAKE

AND

MODEL

QUANTITY SIZE HORSEPOWER YEAR EQUIPMENT

CONDITION

FAIR

MARKET

VALUE

BULLDOZER NO. 2

(COASTAL ONLY)

HYDRAULIC

EXCAVATOR (BWT)

EXCAVATOR (TTWW)

EXCAVATOR

(COASTAL)

BARGE MOUNTED

CRANE

FLOATING PIPE

(*8,000’ REQ.)

SUBMERGED LINE

*(1250’ OF TOTAL 8,000)

SHORE PIPE (5000’

REQ.)

DREDGING PLANT EQUIPMENT LIST

EQUIPMENT MAKE

AND

MODEL

QUANTITY SIZE HORSEPOWER YEAR EQUIPMENT

CONDITION

FAIR

MARKET

VALUE

SWIVEL FLOATING

ELBOWS (2)

LANDING SECTION

BARGES (2)

Y-VALVE SPLITTER

OFF ROAD UTILITY

VEHICLE

FOR UPLAND SITES

(BWT & TTWW)

TRANSPORT VESSEL

WORK SKIFF

BOOSTER PUMP

*(BW&T & TTWW

ONLY)

IDIQ Contract for Rental of 20 – 24 inch Cutterhead W91278-14-B-0005

00010 - 13

EQUIPMENT MAKE

AND

MODEL

QUANTITY SIZE HORSEPOWER YEAR EQUIPMENT

CONDITION

FAIR

MARKET

VALUE

OTHER EQUIPMENT

NOT LISTED

ABOVE

NOTE: The equipment requirements that are identified for a specific project (BWT, TTWW, or COASTAL) are specific requirements of only the identified project.

IDIQ Contract for Rental of 20-24 inch W91278-14-B-0005 Cutterhead Pipeline Dredge for Dredging

01 00 00 - 1

Section 01 00 00

Statement of Work – Description/Specifications

COASTAL PROJECTS - MOBILE DISTRICT

INDEX

PARA NO. PARAGRAPH TITLE

1. SCOPE OF WORK

2. DREDGE AND ATTENDANT PLANT REQUIREMENTS

3. PERFORMANCE

4. PHYSICAL DATA

5. WORK LAYOUT AND ORDER OF WORK

6. RESERVED

7. DREDGING (EXCAVATING OF SHOALS)

8. DISPOSAL OF EXCAVATED MATERIALS

9. QUALITY CONTROL

10. QUALITY ASSURANCE

11. CONTRACT INVOICES/RECEIVING OFFICE

12. RESERVED

13. RESERVED

14. BIDDER’S QUALIFICATIONS AND PRE-AWARD INSPECTION

OF PLANT

15. PLANT

16. COMMUNICATION

17. EQUIPMENT OWNERSHIP AND OPERATING EXPENSE

SCHEDULE

18. PRECONSTRUCTION CONFERENCE/ADDITIONAL SAFETY

REQUIREMENTS

19. CREW

20. GENERAL SAFETY REQUIREMENTS

21. SPECIAL SAFETY REQUIREMENTS

22. PAYMENTS

23. ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS

24. TASK ORDER PROCEDURES

01 00 00 - 2

SECTION 01 00 00

STATEMENT OF WORK – DESCRIPTION/SPECIFICATIONS

1. SCOPE OF WORK:

1.1. DREDGING: The work to be performed under this contract consists of dredging at various locations within the Mobile District. These sites include deep and shallow draft projects and the Gulf Intracoastal Waterway as well as coastal restoration projects, beach nourishment projects and any other project requiring the use of a dredge in Alabama, Mississippi, and Florida. The scope of this contract also provides for any other sizes and/or type of dredge other than those specifically called for in the specifications. The scope also includes supplying dredge related supplies and equipment such as tugs, barges, cranes, geotextile tubes, sheetpile, land based heavy equipment for disposal operations, and other marine equipment associated with channels and coastal restoration projects.

Additional dredges and other marine equipment or materials such as geotextile tubes, sheetpile, additional hand labor crews, etc., that are not specifically called for within these specifications will be negotiated with the individual task order. The Contracting Officer may elect to negotiate cubic yard task orders for some projects in lieu of the standard dredge rental rate.

1.1.1 WORK FOR OTHERS: The work to be performed under this contract also consists of dredging for state ports in Alabama, Mississippi and Florida as well as other non federal entities. Material from these projects ranges from coarse sands to fine silt as well as heavy debris. The contractor can expect greater than normal debris such as steel wire, cable, driftwood and other industrial type products near the docks, piers and other structures located in the dredging template. The contractor will also be expected to dredge closer than normal to private docks, piers and other structures.

All costs associated with work for others shall be included in bid item 4a. DREDGING 100% Pay Time Work for Others.

1.2. DREDGE PLANT: The work to be performed under this contract consists of furnishing a hydraulic cutterhead pipeline dredge with pump discharge of not less than 20-inch diameter or more than 24-inch diameter. The dredge will be complete with all necessary materials, supplies, (including fuel, power, and water) labor, and transportation for maintenance dredging operations as specified in the above paragraph. More specific dredge and attendant plant requirements are discussed below.

1.3. DREDGED MATERIAL DISPOSAL: All removed materials will be placed in approved disposal areas as directed by the Contracting Officer or his Authorized Representative and as discussed in these specifications.

1.4. GENERAL: All work, material and services not expressly called for in these specifications which may be necessary for complete and proper operations to carry out the contract in good faith shall be performed, furnished and installed by the Contractor at no increase in cost to the Government. The Contracting Officer or his Authorized

01 00 00 - 3

Representative may at any time require the Contractor to relocate to a different dredging site should shoaling rates, or other circumstances so dictate. The Government reserves the right to contract additional dredges to perform dredging work on the same projects and geographical area.

2. DREDGE AND ATTENDANT PLANT REQUIREMENTS:

2.1. DREDGE REQUIREMENTS: The dredge offered shall be capable of continuous operation with a minimum horsepower rate as shown below which includes the correlating connected horsepower applied on the main dredge pump. The dredge shall be of sufficient size and with ladder of an appropriate length and construction to work efficiently and safely in a cut with a minimum bottom width of 200 feet and depths of 8 feet minimum. Dredges with pump discharges greater than 24” inside diameter, may bid this schedule; however, no additional credit will be given for the large pump or greater horsepower. For the requested dredge size, most of the work that is anticipated to be performed under this contract is considered a “walking job” for the requested dredge size, therefore, additional pump size and/or horsepower does not justify a competitive advantage in the number of hours in the bid schedule. The Contractor shall have available for use at all times a variety of serviceable interchangeable pump impellers (2 minimum), a spare pump case, and a spare serviceable cutter to permit the dredge to operate efficiently under varying conditions described in paragraph entitled, "PHYSICAL DATA". The dredge shall be capable of dredging upstream as well as downstream and will so operate as directed by the Contracting Officer. The dredge shall be capable of dredging the full bottom dimension of up to 200 feet, plus minimal over-swinging through one swing (cut) of the cutterhead from a given set of the dredge subject to a velocity of less than 2 feet per second given normal conditions. The cut coverage shall be accomplished in one set of the dredge and at or before the dredge reaches its normal set-ahead dredge spud positioning. That cut coverage is expected to be made while at the dredge’s maximum walking speed. The swing of the cutterhead will be accomplished through the use of conventional dredge swing anchors or previously placed deadmen.

The dredge shall be equipped with an electronic positioning system and include the equipment which will record such data.

2.2. HORSEPOWER REQUIREMENTS: Dredge Minimum Horsepower - In using the following table, only one (1) main dredge pump on board the dredge shall be used. The horsepower of auxiliary dredge pumps shall not be considered. Horsepower is equal to the correlating connected brake horsepower applied to the dredge pump. Those dredges which have less horsepower or have less discharge diameter than the minimum shown below for the size dredge bid will be considered non-responsive.

Discharge main pump(s) *2100 H.P. (min) 20-inch Discharge main pump(s) *2400 H.P. (min) 22-inch Discharge main pump(s) *2400 H.P. (min) 24-inch

01 00 00 - 4

FOR THE PURPOSE OF BIDDING AND EVALUATING BIDS, IT WILL BE CONSIDERED THE

DREDGE WILL BE USED FOR THE NUMBER OF HOURS (100% PAY TIME) GIVEN IN THE

FOLLOWING TABLE. HOWEVER, THIS IS NOT TO BE CONSTRUED BY THE CONTRACTOR

THAT THE GOVERNMENT GUARANTEES THAT THE DREDGE WILL BE USED FOR THIS

NUMBER OF HOURS. THE NUMBER OF HOURS SHOWN IN THE TABLE IS ESTIMATED.

THE ACTUAL HOURS MAY BE MORE OR LESS THAN WHAT IS SHOWN.

100% Hours Dredge Size Coastal Work for Others

20 inch Basic Dredge 1500 720 With traveling spuds 1275 612

22 inch Basic Dredge 1240 595 With traveling spuds 1054 506

24 inch Basic Dredge 1042 500 With traveling spuds 886 425

Additional allowance in dredge production will be given for dredges with traveling spuds (spud carriage). A 15% reduction is shown in the table hours for traveling spuds.

The traveling spud must have a minimum of 20’ of travel to be considered for bid purposes. A pre-award inspection of the dredge will be conducted by the Government and the contractor must adequately demonstrate the dredge is capable of traveling 20’ utilizing a traveling spud while the Government representative is present. If it is determined that the traveling spud does not meet this requirement then the contractors bid price will revert to the converted price based on the number of hours in the table above without a traveling spud. In addition, the contractor may elect to bid based on the number of 100% pay hours without a traveling spud and elect to add a traveling spud later in the contract. The 100% bid price for the dredge will then be converted based on the number of hours with a traveling spud provided the traveling spud meets the requirements herein.

The following equation was used to calculate the hours in the table for the bid schedule.

Equation: (1-(0.15 for traveling spud)) X Basic Dredge hours for the dredge size = Number of hours for bid schedule

Example: Dredge A has a 24 inch discharge diameter has a traveling spud.

Applying the equation yields: (1-(0.15)) X 1042 = 886 hours.

2.3. ATTENDANT PLANT:

01 00 00 - 5

2.3.1. Attendant plant shall be composed of such barges, fuel, water, pipe derrick, anchor, etc., floating, submerged, and slip joint discharge pipe, and other attendant or auxiliary plant as may be required for operations under these specifications whether or not these items are specifically mentioned. The auxiliary and attendant plant shall be in good condition and of sufficient size and capability to efficiently serve the dredge.

2.3.2. The Contractor will have available at all times during the duration of work a minimum amount of 15,000 feet combination of floating, submerged, and shore pipeline. The Contractor shall determine for himself the lengths of floating and submerged line necessary. If the Contractor’s combination of floating and submerged line lengths is found to be inefficient, the Contractor may be directed to adjust the combination thereof to a more efficient combination all at no increase in cost to the contract. Also, at the option of the Government, the Contractor may be required to mobilize and utilize additional pipeline. The cost for the initial mobilization, setup, breakdown, demobilization and utilization of the additional pipeline, if needed, will be paid at 1.5 times the bid rate for Bid Item 9 - Intermediate Mobilization and Demobilization of Pipeline per unit of 1,000 feet of pipe. All specifications that apply to Bid Item 9 will apply to the additional pipe. For example:

The contractor bid $10,000 per unit of pipe for Bid Item 9. An additional 5,000 feet of pipe is requested, or five units, above the 15,000 feet required. The contractor would be due $75,000 (1.5 X $10,000 per unit X 5 units = $75,000) for the initial mobilization, setup, breakdown, demobilization and utilization of the pipe.

No contract mod will be executed for the additional pipe. The Contractor will be notified in writing and will be expected to have the additional pipeline on site within 20 days of receiving the written notice. If the additional pipeline is not on site within the 20 days, and no further dredging can be performed as a result of the lack of additional pipeline, then the dredge will be placed on 0% pay time until the entire required pipeline is in place ready for commencement of dredging. The Contractor would then be eligible for 100% pay time once material is satisfactorily passing through the pipeline. Any material that is deposited elsewhere than in places designated or approved by the Contracting Officer may be required to be removed, and the Contractor will be required to redeposit such misplaced material where directed at his expense (no additional costs to this contract). Floating lines and shore pipe will be capable of visual inspection for leaks at all times during the operation. Submerged pipelines shall be air tested before placed in operation. One swivel floating elbow section, or a flexible pipe section, shall be furnished. All pipeline shall be essentially the same diameter as the dredge discharge as designed by the pump manufacturer. If the Contractor mixes dredge pipeline sizes, it must be shown not to adversely affect the dredge production as compared to utilizing one pipeline size.

2.3.3. The attendant plant shall include a minimum of two vessels, each a twin screw shallow draft dredge tender. Both vessels shall be of sufficient size and horsepower, capable of performing all duties necessary to efficiently carry out dredging operations in normal currents and conditions and both shall be available at all times with

01 00 00 - 6 one operator and one deckhand each to insure efficient operations. In the event the dredge is not self-propelled, the attendant plant shall include one additional towing vessel, with sufficient horsepower to be determined by the Contractor, to be available at all times to adequately move the dredging plant to allow passage of traffic, to move the dredging plant from one location to another, to completely move the dredge plant to safe harbor in case of adverse weather condition, and to assist in the total dredging operation.

No division in pay will be made for the additional towing vessel and the two dredge tenders. They will be considered as part of the dredging plant and shall be in operation at all times regardless of the pay status of the dredge.

2.3.3(a). For use in shore work and upland areas, the contractor shall furnish the following equipment: two crawler type low ground pressure tractors, at least equal in capability to a Caterpillar D-6. These tractors shall have a hydraulic operated dozer blade. These tractors will have qualified operators and be available at all times regardless of the pay status of the dredge. A separate independent light plant with radio communication to the dredge shall be used in all upland disposal areas. The Contracting Officer may elect to have the contractor substitute a track mounted crawler hoe with minimum 1 cubic yard bucket for one of the dozers, at no additional cost. Additional equipment for performing disposal area maintenance may be required by the Contracting Officer and shall be negotiated in the individual task order. The cost of the additional equipment shall be paid for using the 100% time bid item and no contract mod shall be executed for the additional equipment.

2.3.3(b). Spill Barge: The Contractor must also have, as part of the dredging plant, a “controllable spill barge” to disperse the dredged material in the open water D/A(s). The Contractor must have the mechanism built into the spill barge to allow full control of the barge’s movements, side to side, and forward/backward. The Contractor must have an electronic tracking system on-board this spill barge, with which the spill barge operator will know where the barge is at all times and be able to make controlled movements. The Contractor should submit information, as part of his DEPOSITION PLAN, explaining how this requirement will be met, mechanically, technically and functionally.

2.3.4. The dredge shall be equipped to capture real time slurry density and pump output side velocity, pump(s) vacuum, pump(s) RPM, line pressure, dredge load chart and computed dredge production. Legible printouts of the recordings shall be furnished to the Contracting Officer for each day's operation on a daily basis. The creation of these charts shall be real time and observable by the Government Inspector(s) at all times.

2.3.5. Transport Vessel/Survey Boat: The Contractor shall provide one transport vessel/survey boat, with twin propellers, not less than 40 feet in overall length, with enclosed space for three passengers after installation of all required Contractor furnished survey equipment and survey party crew (Survey Equipment/Personnel defined elsewhere), to adequately operate and survey in all channels included in the scope of work limits along with accompanying disposal areas. This vessel must have an operator on site at all times; be capable of traveling at a speed of 20 knots (23 MPH) or greater in

01 00 00 - 7 good weather and capable of traveling safely at night and in intense fog; (such vessel shall meet or exceed US Coast Guard regulations for vessels 65 feet or less in length);

and the vessel shall have a Certificate of Inspection by the US Coast Guard, or at least from a Marine Surveyor. This vessel shall be for the primary use of Government Inspector shift changes and Government directed hydrographic surveying. The use of this vessel for Contractor’s crew changes, or any other use of this vessel by the Contractor shall be secondary to Government Inspector shift changes and Government directed hydrographic surveys. This vessel shall be equipped with the following at a minimum: built-in fuel tanks with correctly operating fuel gauges; marine and company radios; windshield wipers; running and spot lights; and all required survey equipment.

The Contractor shall secure satisfactory landing location for this vessel.

2.3.6. Survey Party (Only Applies to the Rental Portion of this Contract): The

Contractor shall furnish one full survey party available for 12 hr/day survey operations 7 days a week. The minimum full-time crew for the survey boat shall be one qualified survey boat operator for the daylight shift, plus up to a 4 man survey party to perform surveys to support the entire dredging process. Also, a person responsible for plotting of surveys should be on board the dredge during the daylight shift. The survey party should have a sufficient number of qualified personnel in order to adequately survey under any condition. The party shall survey the current conditions of the area being dredged and perform the survey assignments, operating all necessary electronic positioning and computer equipment.

2.3.7. Survey Equipment: The Contractor furnished survey equipment must meet or exceed all requirements listed below as well as any other requirements referred to in these specifications:

2.3.7(a). Positioning System: The positioning system must be capable of providing positional accuracies of the vessel within three meters or less. This system must have a proven track record and have the manufacturer’s written backing stating the accuracy thereof. The system utilized must be capable of providing twenty-four hour, seven days a week positional coverage within the above stated accuracies. The contractor, if properly equipped with a Global Positioning System, may utilize such a system as long as the accuracies are confirmed and documented during the use of the system. The positioning system and survey software will have the capability of providing visual guidance to the vessel operator and acquire positioning and guidance updates on no less that one second time increments.

2.3.7(b). Sounding Equipment: The sounding equipment will consist of a sounding machine/device capable of providing updated soundings on no more than 1/20 second intervals and have an accuracy rating of not less than +/-0.5 feet. Sounding device will have analog charting (real time) within the device and will have all the capabilities of calibrating to a bar check utilizing the Norfolk Method of bar checking.

All depths acquired will consist of dual frequency soundings utilizing a high operating 208 kHz frequency transducer and a low operating 41 kHz or 24 kHz frequency transducer. All digitally acquired sounding data for the channel surveys and D/A surveys

01 00 00 - 8 will be those acquired, as directed by the Contracting Officer Representative, utilizing either high operating 208 kHz frequency transducer or 41 kHz/24 kHz transducer, as applicable. The high frequency soundings will be shown in conjunction with the 41 kHz /24 kHz soundings on the analog chart of the sounding device. All soundings will be acquired on a continuous basis with plotting of data based on the scale and size of the plot and in clearly legible print.

2.3.7(c). Soundings: Soundings for the surveys for the channel and disposal areas as required by this contract shall be made by an electronic sounding device. The electronic sounding device shall be similar and equal to the Teledyne Odom Echotrac MKIII echo sounder , as requirements dictate. . All costs associated with the required soundings and data compilation will be included in the contract price for dredging.

2.3.7(d). Acquired and Processed Data: The survey system shall use a computer and software capable of handling all required data points and plotting of those data points. If the Contractor is utilizing HYPACK to perform his required surveys, the Contractor shall use the Government provided channel files. The Contractor shall submit the HYPACK project files for the specific survey performed. These files contain all the files that make up the survey including raw and edited, line, log, and tide files associated with each survey among others. Otherwise, the Contractor shall utilize a system capable of acquiring or converting all, unedited raw data (horizontal and vertical) to an IBM, ASCII compatible format prior to submittal to the Government. The ASCII format shall be compatible with the MS DOS Operation system. Sounding files shall contain single line records. Each record shall contain the easting, northing, depth, date, and time for one sounding. Each item in the record shall be separated by a space character (ASCII 32 (10)) and the record shall be terminated by a line feed with carriage return. All records shall conform to the format shown below:

EASTING NORTHING DEPTH DATE TIME

123456.78 876543.21 -42.3 01/15/91 14:22:13.3

Said survey system shall provide a means of plotting all data points for submittal in hard copy form according to the requirements listed herein. Routine/verification surveys shall be submitted within 24 hours of the survey and larger surveys, such as for open water disposal areas, shall be submitted within 48 hours of the survey. Both surveys shall include plots and data collection information. All plots submitted shall be provided on full size 22” x 34” (ANSI ‘D’ size) plot paper (half size, 11” x 17” if approved by the Authorized Representative) and delineate no less than the following: all nav aids; north arrow; station data (corrected to MLLW); date of survey; grid ticks; surveyor’s name;

vessel name; channel lines and any other pertinent information. Scale of plan view plots shall be 1” = 200’ and cross-sectional plots as specified by the Authorized Representative. Plan view plots shall delineate actual vessel track along the specific route taken and print depths acquired along the route on a scale clearly legible; cross-sectional plots shall be plotted on hard copies which delineate the channel dimensions in a template format. All hard copy plots shall be in the form of CADD drawing files in Microstation SE format. The CADD drawing files and data (Hypack files/folder) used to

01 00 00 - 9 produce the hard copy plots shall be provided on a CD in the format previously specified and in unedited form. All hard copy submittals shall consist of edited data and all supporting field notes, squat tables, tide data, and scrolls.

2.3.7(e). Dredge Electronic Tracking Position: The Contractor shall be able to visually display continuous real time positioning of the dredge, by track plot or CRT screen, in relation to the before-dredging surveyed shoals and/or more updated surveyed shoals. Dredge location accuracy shall meet the requirement of the Corps' "Manual of Survey Instructions". A written discussion of the method the Contractor intends to use in order to satisfy these requirements shall be included in the Contractor's bidding schedule discussions.

3. PERFORMANCE:

3.1. GENERAL: Upon initiation of work, the Contractor shall prosecute the work assigned him with faithfulness and energy, and at all times endeavor to meet the schedule of excavation (dredging) and disposal operations as determined by the Contracting Officer. The Contractor shall be expected to conduct excavation dredging and disposal operations seven days per week, twenty-four hours per day, including those days, which have been declared by Congress to be legal holidays for per diem employees of the Federal Government (applies only to the rental portion of this contract). The order of work to be performed under this contract cannot be determined except as the work progresses. The Contractor shall be expected to pre-construct dredge pipelines needed for this work. The Government will facilitate this by issuing excavation assignments far enough in advance for the Contractor to accomplish the pre-positioned pipeline construction. The Contractor shall bear all direct, overhead and collateral expenses incident to the operation, upkeep and repair of all items of plant. He shall maintain the plant in a good state of repair, shall arrange for a supply of renewal parts to be on hand when needed for all plant and shall provide and maintain efficient personnel for each item of plant employed in connection with the work. Equipment will be in condition to render efficient, economical and continuous service and shall be equipped with all mechanical devices and equipment required by Federal, State and local authorities, provided that nothing in the paragraph shall be construed to limit the authority of the Contracting Officer to prohibit the use of any piece of equipment which, in the opinion of the Contracting Officer, is mechanically unsafe for use. Equipment which the Contracting Officer or his authorized representative considers does not perform in a satisfactory or efficient manner shall be repaired or replaced by the Contractor at the Contractor's expense within 24 hours after notification by the Contracting Officer or his authorized representative. Failure of the equipment to perform to the satisfaction of the Contracting Officer, and failure by the Contractor to effect timely replacement of the unsatisfactory equipment, shall be sufficient cause for the Government to procure replacement equipment and charge the Contractor for any excess costs associated therewith. The equipment shall be registered by the Contractor with all Federal, State and local authorities requiring registration, and registration plates or other evidence of registration shall be displayed in accordance with the requirements of the registering authority.

01 00 00 - 10

3.2. INSPECTION OF PLANT: Upon arrival of the dredge and attendant plant, it will be inspected for any deficiency in safety or health requirements. The Contractor should have already inspected the plant and corrected all deficiencies found. In the absence of any deficiencies, the plant will be put to work. In the event that any plant is deficient safety wise or health wise to prevent safe operations, the plant will not be put to work, but will continue in a nonpayment status until the safety deficiencies are corrected to the satisfaction of the Contracting Officer, at which time the plant will be put to work.

3.3. TERMINATION OF WORK: It is anticipated that upon completion of the excavation assignment(s) all the plant will be released to the Contractor. However, the Contracting officer, by written notice, may terminate any task order, in whole or in part, when it is in the Government's interest. If any task order is terminated, the Government shall be liable only for payment under the payment provisions of this contract for services rendered before the effective date of termination.

3.4. PRIVATE WORK RELEASE: By mutual agreement of both the Contractor and the Contracting Officer, the dredge may be released from this contract for short periods of time to perform work for others in the same vicinity. The dredge shall, however, be returned to operations under this contract within 48 hours after notice by the Contracting Officer to resume such contract work.

4. PHYSICAL DATA:

Data and information furnished or referred to below is for the Contractor's information.

The Government will not be responsible for any interpretation or conclusion drawn therefrom by the Contractor.

4.1. General: The indications of physical conditions on the drawings (if provided in the solicitation package) and in the specifications are the result of site investigations and surveys.

4.2. Location: The work to be done under these specifications is located anywhere within the boundaries of Mobile District.

4.3. Subsurface Investigation: Contractor's Investigation Responsibility: The Contractor should make his own investigation of submerged, surface and overhead structures in the work areas and other locations he finds necessary to traverse. The exact location, depths and heights of submarine cables, pipes, highlines, docks, piers, bulkheads bridges, etc. (as applicable), are not known and it will be necessary for the Contractor to ascertain interference problems and notify the respective owners in advance of dredging operations. The Contractor shall make all arrangements with the respective owners of the structure to assure satisfactory completion of dredging in the vicinity with a minimum interruption of service, and shall perform his operations in such a manner as will avoid damage to these facilities. Considering the above specified structures and any others the Contractor might find in the work areas, the Contractor shall not dredge within 50 feet of and/or dispose of dredged material in the vicinity of any marine structure. If the marine

01 00 00 - 11 structures are damaged by the dredging operations, it will be the responsibility of the Contractor to repair or rebuild the damaged facility at no cost to the Government.

4.4. Weather Conditions: The sites of the work are exposed to local disturbances in Mississippi Sound, Mobile Bay, other coastal areas and upper Gulf of Mexico which may cause suspension of the work for short periods of time. Generally the sites of the work do not provide safe refuge from tropical hurricanes which may occur from June to December. Should a hurricane occur during the course of the work, it will be the responsibility of the Contractor to select a safe harbor.