AM0002 23JUL24.pdf
PDF 47 MB Posted
- Solicitation number
- W9126G26RA028
About this file
This is Amendment 0002 to Solicitation W9126G26RA028 for a Design-Bid-Build construction contract issued by the U.S. Army Corps of Engineers (USACE), Fort Worth District, for the Basic Military Training (BMT) Dining and Classroom Facility #4 at Lackland Air Force Base. The amendment extends the proposal receipt date from August 4, 2026, at 2:00 p.m. CT to August 18, 2026, at 2:00 p.m. CT. The amendment adds two new specification sections (08 33 43 Overhead Coiling Smoke Curtains for Elevator Doors and 09 67 23.13 Resinous Flooring), deletes one section (09 67 23.14 Chemical Resistant Resinous Flooring), and provides updated or replacement sections across multiple divisions including door hardware, plumbing, telecommunications, earthwork, and underground electrical distribution.
The amendment includes numerous changes to construction drawings across architectural, civil, mechanical, plumbing, electrical, fire alarm, structural, and telecommunications disciplines. Key drawing revisions address elevator room expansions, video wall installations in classrooms, fire extinguisher cabinet modifications, mechanical equipment adjustments, power distribution updates, and clarifications regarding utility provider responsibilities for privatized services including sanitary sewer, gas, and electrical lines. The submittal register provides a comprehensive list of required preconstruction, shop drawing, product data, sample, design data, test report, certificate, manufacturer instruction, field report, operational and maintenance data, and closeout submissions organized by specification section. Offerors must acknowledge receipt of the amendment prior to the extended proposal deadline by completing the amendment form, acknowledging on each offer copy, or submitting separate written communication referencing the solicitation and amendment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AM0004 (14AUG26).pdf | ||
| AM0003 11AUG26.pdf | ||
| Site Visit-09JUL26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 2
0002 23 JUL 2026 456277
W9126G
W076 ENDIST FT WORTH
KO CONTRACTING DIVISION, 819 TAYLOR ST BOX 17300
FORT WORTH, TX 76102-6124
UNITED STATES
CHRISTINE NORIEGA, EMAIL: CHRISTINE.NORIEGA@USACE.ARMY.MIL
TELEPHONE: (817) 886-1104
SCD: PAS:
W9126G26RA028
22 JUN 2026
SEE SECTION G - CONTRACT ADMINISTRATION DATA
Project: Basic Military Training (BMT), Dining and Classroom Facility (DCF) 4
See SF 30 Continuation Page
Proposal receipt date of August 4, 2026, at 2:00pm CT, is hereby changed to August 18, 2026, at 2:00pm CT.
W9126G26RA028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO SOLICITATION W9126G26RA028
CHANGES TO PROPOSAL RECEIPT DATE
1. Proposal Receipt Date: Change the proposal receipt date from "4 August 2026, 2:00 p.m. CT" to "18 August 2026, 2:00 p.m. CT ".
CHANGES TO THE SPECIFICATIONS
2. Added Sections: The following section has been added to the solicitation, bearing the notation
W9126G26RA028-0002:
08 33 43 OVERHEAD COILING SMOKE CURTAINS FOR ELEVATOR DOORS
09 67 23.13 RESINOUS FLOORING
3. Replacement Sections: The following sections have been updated and replaced with the accompanying new sections of the same number and title bearing the notation W9126G26RA028-0002:
PROJECT TABLE OF CONTENTS
SUBMITTAL REGISTER
08 71 00 DOOR HARDWARE
22 00 00 PLUMBING, GENERAL PURPOSE
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
31 00 00 EARTHWORK
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
4. Deleted Sections: The following section have been deleted from the solicitation:
09 67 23.14 CHEMICAL RESISTANT RESINOUS FLOORING
CHANGES TO THE DRAWINGS
5. Replacement Drawings: The drawings listed below are being replaced with the attached new drawings(s) of the same number, bearing the notation W9126G26RA028-0002:
D4-A-110 FIRST FLOOR INFO PLAN – AREA B
• Changed to semi-recessed fire extinguisher cabinet.
D4-A-112 SECOND FLOOR INFO PLAN – AREA B
• Changed to semi-recessed fire extinguisher cabinet.
D4-A-114 FIRST FLOOR REFLECTED CEILING PLAN – AREA A
• Added sheet note 11 regarding video wall in classrooms.
D4-A-115 FIRST FLOOR REFLECTED CEILING PLAN – AREA B
D4-A-116 SECOND FLOOR REFLECTED CEILING PLAN – AREA A
D4-A-117 SECOND FLOOR REFLECTED CEILING PLAN – AREA B
D4-A-118 THIRD FLOOR REFLECTED CEILING PLAN
• Added sheet note 11 regarding video wall in classrooms. Added spot elevation.
D4-A-119 ROOF PLAN – AREA A
• Reversed gate swing at roof hatch access.
D4-A-307 CURVED PORCH WALL SECTIONS
• Added soffit panel information.
D4-A-404 STAIR A ENLARGED PLANS AND SECTIONS
• Removed perimeter drain. Adjusted callout arrows for clarity.
D4-A-406 STAIR C ENLARGED PLANS AND SECTIONS
• Removed perimeter drain.
D4-A-408 ELEVATOR PLANS AND SECTIONS
• Detail 2 - increase space in room 115 Elevator Equipment Room by moving the plan south wall further to the south. Added a fire extinguisher bracket. Detail 4 - Added additional callout descriptions to elevator pit.
D4-A-502 PARTITION TYPES AND DETAILS
• Added callouts to typical wall details.
D4-A-505 SECTION DETAILS
• Detail 2 removed 12” void space callout. Adjusted Detail 5 to better reflect void space in conjunction with structural drawings.
D4-A-506 SECTION DETAILS
• Added roof eave detail notes.
D4-A-510 CEILING DETAILS
• Provided additional information in Ceiling Details 6 and 8.
D4-A-601 DOOR SCHEDULE
• Multiple changes to door schedule.
D4-A-602 DOOR DETAILS
• Removed cased opening details.
D4-A-709 – EAST PANEL PARTIAL ELEVATION
• Added exhaust fan to Detail 1.
D4-C-100 CIVIL GENERAL NOTES, ABBREVIATIONS, AND LEGEND
• Added General Note 17 concerning coordination of temporary power with CPS Energy.
D4-CG401 SPOT ELEVATION PLAN
• Changed spot elevation at Point Number 40.
D4-CS401 SIDEWALK JOINT LAYOUT PLAN
• Removed the joint layout and revised the detail reference for a small portion of sidewalk.
D4-CS502 PAVING DETAILS II
• Revised low security wall section.
D4-CS505 CONSTRUCTION FENCE DETAILS
• Removed Fence Mounting on Concrete Barrier Details.
D4-CU220 SANITARY SEWER LINE A AND B PLAN AND PROFILE
• Identified sanitary sewer line responsibilities of privatized utility provider and removed associated profile information.
D4-CU221 SANITARY SEWER LINE C AND C1 PLAN AND PROFILE
• Identified sanitary sewer line responsibilities of privatized utility provider and removed associated
D4-CU222 SANITARY SEWER LINE D PLAN AND PROFILE
• Identified sanitary sewer line responsibilities of privatized utility provider and removed associated
D4-CU240 GAS LINE A PLAN AND PROFILE
• Identified gas line responsibilities of privatized utility provider and removed associated profile information.
D4-CU250 ELECTRICAL LINE A PLAN AND PROFILE
• Identified electrical line responsibilities of privatized utility provider and removed associated profile information.
D4-CU501 SANITARY SEWER DETAILS
• Removed details; responsibility of privatized utility provider.
D4-EG501 GROUNDING – LIGHTNING PROTECTION SYSTEM DETAILS
• Updated detail note concerning standing seam metal roof fasteners.
D4-EL101 FIRST FLOOR LIGHTING PLAN – AREA A
• Adjusted lighting in expanded Room 115 Elevator Equipment Room.
D4-EP100 CRAWL SPACE POWER PLAN
• Added receptacle for oil monitoring system.
D4-EP102 FIRST FLOOR POWER PLAN – AREA B
• Added power for VAV in Room 140. Added keynote regarding loading dock vehicle restraint system exterior indicator lights. Sanitary sewer line responsibilities of privatized utility provider and removed associated profile information.
D4-EP103 SECOND FLOOR POWER PLAN – AREA A
• Changed NEMA requirement in Keynote 8. Adjusted drawing for clarity.
D4-EP105 THIRD FLOOR POWER PLAN – AREA A
• Changed NEMA requirement in Keynote 8.
D4-EP401 ENLARGED ELECTRICAL POWER PLANS
• Adjusted equipment location to support expanded Room 115 Elevator Equipment Room. Updated mounting information in Keynotes 6 and 7. Added tray mounted locations.
D4-EP402 ENLARGED POWER PLANS
• Revised power plan in Room 149 (Can Wash) and added Keynote 12 with receptacle height note for hose reel.
D4-EP403 – ENLARGED POWER PLAN – KITCHEN AREA B1
• Revised power plan in Kitchen rooms 154, 155, and 156 to support mechanical equipment and hose reel.
D4-EP404 ENLARGED POWER PLAN – KITCHEN AREA B2
• Revised power plan to show VAVs. Deleted Keynote 3 and added Keynote 6.
D4-EP405 ENLARGED POWER PLAN – SERVING LINE 1 & 2 WAREWASH
• Revised power plan to show VAVs. Removed junction box. Deleted Keynote 2.
D4-EP406 ENLARGED POWER PLAN – SERVING LINE 3 & 4 WAREWASH
• Revised power plan to mechanical equipment. Removed junction box. Deleted Keynote 2.
D4-EP602 ELECTRICAL SCHEDULES
• Revised schedule for circulation pump and ERVs.
D4-EP602A ELECTRICAL SCHEDULES
• Added VAVs to schedule
D4-EP603 – ELECTRICAL SCHEDULES – KITCHEN & TRANSFORMER
• Updated schedule, primarily to support kitchen equipment, ventilation, and fire protection. Revised Note 13 and deleted Note 18.
D4-EP606 ELECTRICAL PANEL SCHEDULE – 1ST FLOOR
• Revised schedule for panel 1EKP21.
D4-EP608 ELECTRICAL PANEL SCHEDULES – 1ST FLOOR
• Revised schedules for panels 1KP27, 1KP28, and 1KP29.
D4-EP609 ELECTRICAL PANEL SCHEDULES – 1ST FLOOR
• Revised schedule for panel 1MP22.
D4-EP611 ELECTRICAL PANEL SCHEDULES – 2ND FLOOR
• Revised schedule for panel 2MP43.
D4-ES001 ELECTRICAL LEGEND AND ABBREVIATIONS
• Revised note regarding division of labor between contractor and CPS energy for medium voltage work.
D4-ES101 ELECTRICAL SITE PLAN
• Revised sheet to demonstrate contractor and CPS energy responsibilities.
D4-ES503 ELECTRICAL DETAILS
• Removed all details for work to be executed by CPS Energy.
D4-ES505 ELECTRICAL DETAILS
• Removed all details for work to be executed by CPS Energy.
D4-ES601 ELECTRICAL ONE-LINE DIAGRAM
• Removed one-line diagram for work to be executed by CPS Energy.
D4-FA001 FIRE ALARM – MASS NOTIFICATION LEGEND
• Updated carbon monoxide detector symbology.
D4-FA102 FIRST FLOOR FIRE ALARM – MASS NOTIFICATION PLAN - AREA B
• Updated carbon monoxide detector symbology.
DF-FA602 MASS NOTIFICATION MATRIX AND DETAILS
• Added mounting height note.
D4-G-103 WEST CAMPUS CONSTRUCTION AREA PLAN
• Added fence north of ATC5. Provided numerous updates to construction area, fencing, and mowing responsibilities.
D4-I-101 FIRST FLOOR FURNITURE PLAN
• Revised note to indicate reception desk is included in contract.
D4-I-102 SECOND FLOOR FURNITURE PLAN
• Revised detail note to clarify contractor responsibilities.
D4-I-103 THIRD FLOOR FURNITURE PLAN
• Corrected room numbers.
D4-I-104 FIRST FLOOR FINISH PLAN
• Improved plan hatching, added reference to specifications for elevator finishes.
D4-I-105 SECOND FLOOR FINISH PLAN
• Added reference to specifications for elevator finishes.
D4-I-107 FIRST FLOOR SIGNAGE PLAN
• Added multiple room signs at exterior doors.
D4-I-402 INTERIOR ELEVATIONS
• Added spacing dimension information.
D4-I-403 INTERIOR ELEVATIONS
• Added spacing dimension information.
D4-I-601 FINISH SELECTIONS
• Multiple changes to finishes.
D4-I-602 FINISH SCHEDULE
• Multiple changes to room finish schedule.
D4-I-603 FINISH SCHEDULE
• Multiple changes to room finish schedule.
D4-I-604 SIGNAGE TYPES
• Added Detail 2 for Sign Type H.
D4-M-100 OVERALL CRAWL SPACE – HVAC & HYDRONIC PLAN
• Added hydronic pipe location dimensions, utilidor section, Sheet note 3.
D4-M-101 FIRST FLOOR HVAC PLAN – AREA A
• Added duct sizes and tagging.
D4-M-102 FIRST FLOOR HVAC PLAN – AREA B
• Added duct sizes and tagging.
D4-M-104 SECOND FLOOR UNDER STAIRWELL HVAC PLAN
• Added duct and associated callouts that were missing from the Revit export. Return air radius elbow next to AHU-D4-1 changed to a square (miter) elbow to connect to the duct.
D4-M-401 ENLARGED MECHANICAL PLANS
• Added duct sizes and tagging and adjusted size of return duct above Office 139. Revised sheet note 4.
D4-M-501 MECHANICAL DETAILS
• Added vertically stacked coil detail with piping. Revised an existing detail to show stacked coils.
D4-M-601 MECHANICAL SCHEDULES
• Adjusted supply airflow and coil capacities on AHU schedule.
D4-M-602 MECHANICAL SCHEDULES
• Added wall caps.
D4-P-001 PLUMBING LEGEND, ABBREVIATIONS, AND GENERAL NOTES
• Updated General Note 24 regarding deconfliction of piping runs and structural elements.
D4-P-601 PLUMBING SCHEDULES
• Added Buy America Act (BAB) requirement to notes. Added pump schedule note concerning sump and sewage pump electrical requirements.
D4-P-908 PLUMBING ISOMETRICS
• Added callouts to isometric drawings.
D4-S-103 LOADING DOCK SCREEN WALL PLAN
• Added dimensions.
D4-S-110 SECOND FLOOR FRAMING PLAN – AREA A
• Added section markers.
D4-S-113 LOW ROOF FRAMING PLAN – AREA B
• Added marker for Section 14/D4-S-531.
D4-S-407 ENLARGED TOILET PARTITION SUPPORTS
• Added structural section and details.
D4-S-521 TYPICAL STEEL FRAMING DETAILS
• Revised Detail 16 to terminate beam at roofline.
D4-S-531 STEEL DETAILS
• Added section for Beam to Post Connection.
D4-TN401 ENLARGED TELECOMMUNICAITONS ROOM PLANS AND ELEVATIONS
• Removed CATV equipment note.
D4-TN601 FIRST FLOOR TELCOMMUNICATINOS RISER DIAGRAM
• Moved power from bottom to top of communications racks.
D4-TN602 SECOND FLOOR TELCOMMUNICATINOS RISER DIAGRAM
• Moved power from bottom to top of communications racks.
D4-TN603 THIRD FLOOR TELCOMMUNICATINOS RISER DIAGRAM
• Moved power from bottom to top of communications racks.
D4-TS501 COMMUNICATIONS MANHOLE DETAILS
• Changed bonding ribbon dimension on Detail 1, Section A-A.
End of Summary of Changes
Lackland DCF4 LKATCDCF4
<AMENDMENT 0002>
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 01 SOLICITATION, OFFER AND AWARD, SF-1442
00 10 00 CONTRACT LINE ITEM SCHEDULE
00 21 00 INSTRUCTIONS
00 21 16 INSTRUCTIONS TO OFFERORS
00 22 16 SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 44 CONSTRUCTION SCHEDULE
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 35 13.10 00 SPECIAL PROCEDURES-SURVEYING
01 35 13.20 00 SPECIAL PROJECT PROCEDURES-CAD
01 35 13.30 00 SPECIAL PROJECT PROCEDURES-GIS
01 35 17.00 44 SPECIAL PROJECT PROCEDURES FOR LACKLAND AIR FORCE BASE
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS AND SPECIAL INSPECTION FOR PROGRESSIVE
COLLAPSE
01 50 00.17 44 TEMPORARY CONSTRUCTION FACILITIES FOR LACKLAND AFB
01 52 00.00 44 GOVERNMENT FIELD OFFICE
01 56 00 DUST CONTROL
01 57 20 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 57 24.01 44 STORM WATER POLLUTION PREVENTION PLAN (TEXAS)
01 57 25.00 44 SWPP PLAN INSPECTION AND MAINTENANCE REPORT FORM
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE
03 45 00 PRECAST ARCHITECTURAL AND STRUCTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 14 10 WATERPROOF FLOORING MEMBRANE
07 17 00 BENTONITE WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 26 16 BELOW GRADE VAPOR RETARDERS
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES (INCLUDING FIRE RATED ENTRANCE
DOORS)
08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 33 43 OVERHEAD COILING SMOKE CURTAINS FOR ELEVATOR DOORS</AM#0002>
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS (INCLUDING FIRE RATED EXTERIOR WINDOWS)
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 RESINOUS FLOORING</AM#0002>
09 67 23.14 CHEMICAL RESISTANT RESINOUS FLOORING</AM#0002>
PROJECT TABLE OF CONTENTS Page 2
<AM#0002>
<AM#0002>
<AM#0002>
m2ecdcwn Cross-Out
09 68 00 CARPETING
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
09 96 59 HIGH-BUILD GLAZE COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 52 00 LOCKER BENCHES
DIVISION 11 - EQUIPMENT
11 13 00 LOADING DOCK EQUIPMENT
11 40 00 FOODSERVICE EQUIPMENT
DIVISION 12 - FURNISHINGS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
12 65 00 FIXED SEATING AND FIXED TRAINING TABLES
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 20 COMMISSIONING OF MECHANICAL AND PLUMBING SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13.34 40 CONTROL VALVES, SELF-CONTAINED
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 82 00.00 20 TERMINAL HEATING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS (HVAC)
PROJECT TABLE OF CONTENTS Page 3
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS (ACS)
25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS (FIRE
ALARM/FIRE SUPPRESSION)
25 05 11.04 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
(LIGHTING)
25 05 11.06 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
(CONFIGURABLE SYSTEMS)
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
DIVISION 26 - ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ACCESS CONTROL SYSTEM ACCEPTANCE TESTING
28 10 05 ACCESS CONTROL SYSTEMS (ACS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 63 26 DRILLED CAISSONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 13.13 LIME TREATED SUBGRADE
32 11 23 AGGREGATE BASE COURSE
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 13 14.13 CONCRETE PAVING FOR HEAVY DUTY PAVEMENTS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 84 24 IRRIGATION SPRINKLER SYSTEMS
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORMWATER UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
PROJECT TABLE OF CONTENTS Page 4
PROJECT TABLE OF CONTENTS Page 5
-- End of Project Table of Contents --
APPENDIX
APPENDIX A JUSTIFICATION & APPROVAL
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 114 PAGES
Lackland DCF4
01 30 00 SD-01 Preconstruction Submittals
1.4View Location Map
1.5Progress and Completion
Pictures
1.8Field Office Overhead
1.8.1Field Office Overhead
1.8.2Field Office Overhead
1.8Accounting Practice
1.9Delegation Of Authority
SD-04 Samples
1.3 GColor Boards
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
W9126G26RA028-0002
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 114 PAGES
01 33 29 1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
1.5.3.2 GFinal Sustainability eNotebook
1.5.3.2 GAmended Final Sustainability
eNotebook
1.5.3.2 GAmended Final High
Performance and Sustainable
Building Checklist
3.2 GThird Party Certification
Certificate, Assessment, or
Validation and Compliance Report
01 35 13.30 00 SD-01 Preconstruction Submittals
Digital Photos
SD-02 Shop Drawings
Surveys
ESRI File Geodatabase
Maps
01 35 26 SD-01 Preconstruction Submittals
1.8 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
1.5 GMonthly Exposure Reports
SD-07 Certificates
1.9 GActivity Hazard Analysis (AHA)
1.12.4Certificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 114 PAGES
01 35 26 1.13Hot Work Permit
1.14License Certificates
1.14.1 GPortable Gauge Operations
Planning Worksheet
1.14.1 GRadiography Operation Planning
Work Sheet
1.12.4 GStandard Lift Plan
01 45 00 SD-01 Preconstruction Submittals
1.5.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
1.12.3Verification Statement
SD-07 Certificates
1.6.6.1 GCertificate Of Readiness
01 45 35 SD-01 Preconstruction Submittals
3.1.2Written NDT Practices
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1Steel Joist Institute Membership
2.1Certified Plant
2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 114 PAGES
01 45 35 3.1.2 GInterim Report
3.1.2 GComprehensive Final Report
01 52 00.00 44 SD-03 Product Data
2.1 GGovernment Field Office
01 56 00 SD-01 Preconstruction Submittals
3.1 GDust Control
2.1 GProducts and Procedures
SD-02 Shop Drawings
1.7Recordkeeping
01 57 20 SD-01 Preconstruction Submittals
1.6 GENVIRONMENTAL
PROTECTION PLAN
GFish and Wildlife Protection
Measures
GEnvironmental Permit
GAsbestos Work Plans
GAsbestos Certifications
GAsbestos Transporter License
GAsbestos Medical clearances
GAsbestos Training Certificates
GAsbestos TDSHS License
GUnsigned copy of State
Renovation
GUnsigned Demolition Notifications
GEdwards Aquifer Protection Plan
GLead Work Plans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 114 PAGES
01 57 20 GLead Occupant Protection Plan
GTexas Department of State
Health Services Lead Licenses
GLead Notifications
GAcknowledgement Of Api Std 650
GAboveground Piping Systems
1.5.4 GStormwater Pollution Prevention
Plan
GEquipment Inventory List
GWaste Disposal Plan
GConstruction Tpdes Notice Of
Intent And Site Notices
GConstruction Site Notice Or
Notice Of Intent
GHazardous Waste Management
Plan
GIntegrated Solid Waste
Management Plan
GHazardous Material List
GEmergency Response Plan
And/Or Site Specific Spill
Prevention Response Plan
1.5.2 GSummary Transmittal Letter
SD-03 Product Data
GSafety Data Sheets (SDS) For All
Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 114 PAGES
01 57 20 SD-06 Test Reports
GCommercial Facility Lead
Contaminated Waste Shall Be
Characterized, Profiled, And
Manifested
GReturn Manifests And Weight
Tickets
GMonthly Diversion And Landfill
Reports
GAny Asbestos Inspection Reports
That Were Not Included In The
Original Assessment Or As A
Result To A Change In The Sow
Or Found As Unknown And
Unforseen Discoveries During Any
Phase Of He Project
GAsbestos Inspection Reports That
Have Not Been Provided By The
Area Specific Env Office
GLead Based Paint Reports -Not
Included In Original Assessment
Or Results In Change Of Sow
GLead Inspection Reports- Not
Provided By JBSA Env Office or by licensed Lead Inspector
GOSHA Air Monitoring
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 114 PAGES
01 57 20 GLead OSHA Negative Exposure
Assessment
GAsbestos Air Monitoring reports
GLead Air Monitoring reports
3.6.1.6 GAnalytical Results
SD-07 Certificates
GCertificate Of Training Asbestos
GCertificate Lead Training
GEPA Lead Training Or Lead
Awareness Training (Min 8Hr)
GStormwater Notice Of Change
SD-11 Closeout Submittals
GNotice Of Termination
01 57 23 SD-01 Preconstruction Submittals
1.3.2 GStorm Water Pollution Prevention
Plan
1.3.2 GStorm Water Notice of Intent
SD-06 Test Reports
1.3Erosion and Sediment Controls
SD-07 Certificates
2.1.3Mill Certificate or Affidavit
01 57 24.01 44 SD-01 Preconstruction Submittals
3.5.7 GStorm Water Pollution Prevention
Plan
3.13 GNotice of Termination
01 58 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 114 PAGES
01 58 00 GPreliminary One Line
1.3.1 GSign Legend Orders
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-06 Test Reports
Monthly Reporting
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 00 SD-02 Shop Drawings
1.5.1Preliminary Record Drawings
1.5.1.1Final Record Drawings
1.5.1.2Final Record Drawings
SD-03 Product Data
1.9.1Warranty Management Plan
1.9.5Warranty Tags
1.7Spare Parts Data
1.9.4warranty report
Inventory of Contractor Furnished and Insttalled Equipment
Inventory of Government
Furnished Contractor Insttalled
Equipment (GF/CI)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 114 PAGES
01 78 00 3.6.1.1video
3.6.5Red Zone Meeting
SD-08 Manufacturer’s Instructions
1.9.1Instructions
SD-10 Operation and Maintenance
Data
3.6 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
2.2 GRecord Model
3.5As-Built Record of Equipment and Materials
1.9.1Warranted Equipment and
Materials
3.4 GFinal Approved Shop Drawings
GCertification of EPA Designated
Items
2.3 GCertification Of USDA Designated
Items
3.8.1 GInterim DD FORM 1354
3.8.2 GHigh Performance and
Sustainable Building (HPSB)
Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 114 PAGES
01 78 00 3.8.2List Of Installed Building
Equipment Items For DD Form
3.8Checklist For Form Dd1354
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
3.2.1 GOperation And Maintenance
Manual, Progress Submittal
3.2.2 GOperation And Maintenance
Manual, Prefinal Submittal
3.2.3 GOperation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
3.1.1 GTraining Plan
1.6.6.7 GRecord Drawings And Utility
Systems
01 91 00.15 10 SD-01 Preconstruction Submittals
1.8 G DOCommissioning Firm
1.8.1 G DOLead Commissioning Specialist
1.8.2 G DOTechnical Commissioning
Specialists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 114 PAGES
01 91 00.15 10 1.8 G DOCommissioning Firm's Contract
SD-06 Test Reports
3.1.2.1 G DOInterim Construction Phase
Commissioning Plan
3.1.2.2 G DOFinal Construction Phase
Commissioning Plan
3.1.2.1.2 G DOTemplate Building Envelope
Inspection Checklists
3.1.5.2 G DOBuilding Envelope Inspection
Checklists
3.1.5.3 G DOPre-Functional Checklists
1.10Issues Log
3.2 G DOCommissioning Report
SD-07 Certificates
1.11 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
3.1.7 G DOSystems Manual
SD-11 Closeout Submittals
3.2 S DOFinal Commissioning Report
3.1.2.2 SFinal Construction Phase
Commissioning Plan
03 30 00 SD-01 Preconstruction Submittals
1.6.6 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 114 PAGES
03 30 00 1.6.7 GQuality Control Personnel
Certifications
1.6.9 GLaboratory Accreditation
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.6Vapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
1.8.1Local/Regional Materials
1.6.3.2Finishing Plan
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 114 PAGES
03 30 00 1.6.1.1 GConcrete Mix Design
1.2Pozzolan
1.7.1Pozzolan
2.3.1.2Pozzolan
2.3.1.2Pozzolan
2.3.1.3Pozzolan
2.3.1.3Pozzolan
2.5.2.4Pozzolan
2.5.2.4Pozzolan
1.6.4.1Aggregates
3.10.2.1Tolerance Report
3.13.3.3 GCompressive Strength Tests
3.13.3.4Air Content
3.13.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
1.6.3.3Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 114 PAGES
03 41 33 SD-02 Shop Drawings
2.1 GFabrication Drawings
2.1 GInstallation Drawings
SD-05 Design Data
2.1.1.1 GNormal-Weight Concrete
SD-06 Test Reports
1.3.4.2 GNormal-Weight Concrete Air
Content
1.3.4.2 GAir Entrainment for
Normal-Weight Concrete
2.1.1.1 GNormal-Weight Concrete
Compressive Strength
1.3.4.2 GDesign Mix
1.3.4.2 GUnit Weight
2.3.3.5Anchorages
3.3.6.1 GNondestructive Testing
SD-07 Certificates
1.3.3 GQualifications for Welding Work
1.3.2Installers
1.3.1 GManufacturer
2.2.7 GPretensioning
2.2.16 GDetensioning
1.3.3 GWelding Procedures
SD-08 Manufacturer’s Instructions
1.3.3Installation Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 114 PAGES
03 41 33 1.3.3Welding Sequence and
Procedure
2.3.5Epoxy-Resin Grout
2.3.5Epoxy-Resin Adhesive
03 45 00 SD-01 Preconstruction Submittals
1.12.5Pre-Installation Meeting
SD-02 Shop Drawings
1.12.1Precast Drawings
SD-03 Product Data
2.4 GCast-In Embedded Items And
Connectors
2.4.2 GConnection Devices
2.3.6Admixtures
SD-04 Samples
1.12.3 GConcrete Wall Panel Surface
Finish
1.12.4Mock-up
1.12.3Full Size Sample Wall Panel
SD-05 Design Data
1.5.5Design Calculations
2.2.1 GConcrete Mix Design
2.5.9Repair of Surface Defects
1.5.6 GMoisture and Thermal
Performance Calculations
SD-06 Test Reports
1.11.2 GStrength Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 114 PAGES
03 45 00 1.11.2Slump
1.11.1Air Content
1.11.2Air Content
1.11.1Test for Concrete Materials
2.3.7Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4 GManufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
1.10Erector's Post Audit Declaration
SD-08 Manufacturer’s Instructions
3.3 GInstallation
3.8 GCleaning
SD-11 Closeout Submittals
2.3.1 SRecycled Content for Fly Ash and
Pozzolan
04 20 00 SD-02 Shop Drawings
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2 GClay or Shale Brick
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 114 PAGES
04 20 00 2.2.3.4 GGlazed Structural Clay Facing
Tile
2.2.3.2 GConcrete Masonry Units (CMU)
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.3.3Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports
2.2.2.1.4Efflorescence Test
2.2.3.3Fire-Rated Concrete Masonry
Units
3.6.1.1 GField Testing of Mortar
3.6.1.2 GField Testing of Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
05 05 23.13 10 SD-01 Preconstruction Submittals
1.4.1 GPersonnel Qualification
2.1.1 GProcedure description
SD-03 Product Data
2.1.1Equipment and accessories
SD-06 Test Reports
1.4.5Equipment Qualifications
3.4.1Inspection Test Reports
05 05 23.16 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 114 PAGES
05 05 23.16 3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 114 PAGES
05 12 00 3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 21 00 SD-01 Preconstruction Submittals
1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 GSteel Joist Framing
SD-03 Product Data
2.3 SRecycled Content Of Steel
Products
SD-05 Design Data
2.2 GDesign Calculations
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 114 PAGES
05 21 00 3.3Erection Inspection
3.3Welding Inspections
SD-07 Certificates
1.3.2Certification of Compliance
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.6Galvanizing Repair Paint
2.2.17Mechanical Fasteners
2.1.6Touch-Up Paint
1.3.3Welding Rods and Accessories
SD-04 Samples
2.1.1Metal Roof Deck Units
2.2.4Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
05 40 00 SD-02 Shop Drawings
1.5.1 GFraming Components
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 114 PAGES
05 40 00 2.1Studs, Joists
SD-07 Certificates
3.1.1Welds
05 50 13 SD-02 Shop Drawings
2.3 GBollards/Pipe Guards
2.4 GRoof Hatches
SD-03 Product Data
2.4 GRoof Hatches
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.2.2.5 GTread Plank
2.2.2.5 GLanding Floor Plank
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.2.3 GTread
2.2.2.5 GLanding Floor Plank
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 114 PAGES
05 51 33 2.3.2Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
1.2.1 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
1.2.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2 GInstallation Instructions
06 10 00 SD-02 Shop Drawings
2.4.2 GTrussed Rafters
2.4.3 GTrussed Joists
1.9.1 GFabricated Structural Members
1.9.2 GModifications of Structural
Members
2.2.1 GNailing Strips
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 114 PAGES
06 10 00 1.8Fire-Retardant Treatment
2.3Oriented Strand Board
2.4.6Adhesives
SD-05 Design Data
1.9.2 GModifications of Structural
Members
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.11.1Certificates of Grade
2.2.1 SCertified Sustainably Harvested
Framing Lumber
1.7Preservative Treatment
2.4.6 SIndoor Air Quality for Aerosol
Adhesives
06 41 16.00 10 SD-02 Shop Drawings
2.11Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.9Wood Finishes
2.11.8.3Finish Schedule
1.5.2Certification
SD-04 Samples
2.3Plastic Laminates
2.6Cabinet Hardware
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 114 PAGES
06 41 16.00 10 SD-07 Certificates
1.5Quality Assurance
2.9Laminate Clad Casework
3.1Laminate Clad Casework
SD-11 Closeout Submittals
1.3Guiding Principles
Documentation
06 61 16 SD-02 Shop Drawings
3.1 GInstallation
SD-03 Product Data
2.1.1 GSolid Polymer
2.2.2 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter Tops
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
2.1.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1 GSolid Polymer
07 05 23 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
I…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .