AM0002 23JUL24.pdf

PDF 47 MB Posted

Attached to
Basic Military Training (BMT), Dining and Classroom Facility (DCF) 4
Solicitation number
W9126G26RA028
Issued by

About this file

This is Amendment 0002 to Solicitation W9126G26RA028 for a Design-Bid-Build construction contract issued by the U.S. Army Corps of Engineers (USACE), Fort Worth District, for the Basic Military Training (BMT) Dining and Classroom Facility #4 at Lackland Air Force Base. The amendment extends the proposal receipt date from August 4, 2026, at 2:00 p.m. CT to August 18, 2026, at 2:00 p.m. CT. The amendment adds two new specification sections (08 33 43 Overhead Coiling Smoke Curtains for Elevator Doors and 09 67 23.13 Resinous Flooring), deletes one section (09 67 23.14 Chemical Resistant Resinous Flooring), and provides updated or replacement sections across multiple divisions including door hardware, plumbing, telecommunications, earthwork, and underground electrical distribution.

The amendment includes numerous changes to construction drawings across architectural, civil, mechanical, plumbing, electrical, fire alarm, structural, and telecommunications disciplines. Key drawing revisions address elevator room expansions, video wall installations in classrooms, fire extinguisher cabinet modifications, mechanical equipment adjustments, power distribution updates, and clarifications regarding utility provider responsibilities for privatized services including sanitary sewer, gas, and electrical lines. The submittal register provides a comprehensive list of required preconstruction, shop drawing, product data, sample, design data, test report, certificate, manufacturer instruction, field report, operational and maintenance data, and closeout submissions organized by specification section. Offerors must acknowledge receipt of the amendment prior to the extended proposal deadline by completing the amendment form, acknowledging on each offer copy, or submitting separate written communication referencing the solicitation and amendment numbers.

View the file

Other files

File Type Posted
AM0004 (14AUG26).pdf PDF
AM0003 11AUG26.pdf PDF
Site Visit-09JUL26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 2

0002 23 JUL 2026 456277

W9126G

W076 ENDIST FT WORTH

KO CONTRACTING DIVISION, 819 TAYLOR ST BOX 17300

FORT WORTH, TX 76102-6124

UNITED STATES

CHRISTINE NORIEGA, EMAIL: CHRISTINE.NORIEGA@USACE.ARMY.MIL

TELEPHONE: (817) 886-1104

SCD: PAS:

W9126G26RA028

22 JUN 2026

SEE SECTION G - CONTRACT ADMINISTRATION DATA

Project: Basic Military Training (BMT), Dining and Classroom Facility (DCF) 4

See SF 30 Continuation Page

Proposal receipt date of August 4, 2026, at 2:00pm CT, is hereby changed to August 18, 2026, at 2:00pm CT.

W9126G26RA028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO SOLICITATION W9126G26RA028

CHANGES TO PROPOSAL RECEIPT DATE

1. Proposal Receipt Date: Change the proposal receipt date from "4 August 2026, 2:00 p.m. CT" to "18 August 2026, 2:00 p.m. CT ".

CHANGES TO THE SPECIFICATIONS

2. Added Sections: The following section has been added to the solicitation, bearing the notation

W9126G26RA028-0002:

08 33 43 OVERHEAD COILING SMOKE CURTAINS FOR ELEVATOR DOORS

09 67 23.13 RESINOUS FLOORING

3. Replacement Sections: The following sections have been updated and replaced with the accompanying new sections of the same number and title bearing the notation W9126G26RA028-0002:

PROJECT TABLE OF CONTENTS

SUBMITTAL REGISTER

08 71 00 DOOR HARDWARE

22 00 00 PLUMBING, GENERAL PURPOSE

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

31 00 00 EARTHWORK

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

4. Deleted Sections: The following section have been deleted from the solicitation:

09 67 23.14 CHEMICAL RESISTANT RESINOUS FLOORING

CHANGES TO THE DRAWINGS

5. Replacement Drawings: The drawings listed below are being replaced with the attached new drawings(s) of the same number, bearing the notation W9126G26RA028-0002:

D4-A-110 FIRST FLOOR INFO PLAN – AREA B

• Changed to semi-recessed fire extinguisher cabinet.

D4-A-112 SECOND FLOOR INFO PLAN – AREA B

• Changed to semi-recessed fire extinguisher cabinet.

D4-A-114 FIRST FLOOR REFLECTED CEILING PLAN – AREA A

• Added sheet note 11 regarding video wall in classrooms.

D4-A-115 FIRST FLOOR REFLECTED CEILING PLAN – AREA B

D4-A-116 SECOND FLOOR REFLECTED CEILING PLAN – AREA A

D4-A-117 SECOND FLOOR REFLECTED CEILING PLAN – AREA B

D4-A-118 THIRD FLOOR REFLECTED CEILING PLAN

• Added sheet note 11 regarding video wall in classrooms. Added spot elevation.

D4-A-119 ROOF PLAN – AREA A

• Reversed gate swing at roof hatch access.

D4-A-307 CURVED PORCH WALL SECTIONS

• Added soffit panel information.

D4-A-404 STAIR A ENLARGED PLANS AND SECTIONS

• Removed perimeter drain. Adjusted callout arrows for clarity.

D4-A-406 STAIR C ENLARGED PLANS AND SECTIONS

• Removed perimeter drain.

D4-A-408 ELEVATOR PLANS AND SECTIONS

• Detail 2 - increase space in room 115 Elevator Equipment Room by moving the plan south wall further to the south. Added a fire extinguisher bracket. Detail 4 - Added additional callout descriptions to elevator pit.

D4-A-502 PARTITION TYPES AND DETAILS

• Added callouts to typical wall details.

D4-A-505 SECTION DETAILS

• Detail 2 removed 12” void space callout. Adjusted Detail 5 to better reflect void space in conjunction with structural drawings.

D4-A-506 SECTION DETAILS

• Added roof eave detail notes.

D4-A-510 CEILING DETAILS

• Provided additional information in Ceiling Details 6 and 8.

D4-A-601 DOOR SCHEDULE

• Multiple changes to door schedule.

D4-A-602 DOOR DETAILS

• Removed cased opening details.

D4-A-709 – EAST PANEL PARTIAL ELEVATION

• Added exhaust fan to Detail 1.

D4-C-100 CIVIL GENERAL NOTES, ABBREVIATIONS, AND LEGEND

• Added General Note 17 concerning coordination of temporary power with CPS Energy.

D4-CG401 SPOT ELEVATION PLAN

• Changed spot elevation at Point Number 40.

D4-CS401 SIDEWALK JOINT LAYOUT PLAN

• Removed the joint layout and revised the detail reference for a small portion of sidewalk.

D4-CS502 PAVING DETAILS II

• Revised low security wall section.

D4-CS505 CONSTRUCTION FENCE DETAILS

• Removed Fence Mounting on Concrete Barrier Details.

D4-CU220 SANITARY SEWER LINE A AND B PLAN AND PROFILE

• Identified sanitary sewer line responsibilities of privatized utility provider and removed associated profile information.

D4-CU221 SANITARY SEWER LINE C AND C1 PLAN AND PROFILE

• Identified sanitary sewer line responsibilities of privatized utility provider and removed associated

D4-CU222 SANITARY SEWER LINE D PLAN AND PROFILE

• Identified sanitary sewer line responsibilities of privatized utility provider and removed associated

D4-CU240 GAS LINE A PLAN AND PROFILE

• Identified gas line responsibilities of privatized utility provider and removed associated profile information.

D4-CU250 ELECTRICAL LINE A PLAN AND PROFILE

• Identified electrical line responsibilities of privatized utility provider and removed associated profile information.

D4-CU501 SANITARY SEWER DETAILS

• Removed details; responsibility of privatized utility provider.

D4-EG501 GROUNDING – LIGHTNING PROTECTION SYSTEM DETAILS

• Updated detail note concerning standing seam metal roof fasteners.

D4-EL101 FIRST FLOOR LIGHTING PLAN – AREA A

• Adjusted lighting in expanded Room 115 Elevator Equipment Room.

D4-EP100 CRAWL SPACE POWER PLAN

• Added receptacle for oil monitoring system.

D4-EP102 FIRST FLOOR POWER PLAN – AREA B

• Added power for VAV in Room 140. Added keynote regarding loading dock vehicle restraint system exterior indicator lights. Sanitary sewer line responsibilities of privatized utility provider and removed associated profile information.

D4-EP103 SECOND FLOOR POWER PLAN – AREA A

• Changed NEMA requirement in Keynote 8. Adjusted drawing for clarity.

D4-EP105 THIRD FLOOR POWER PLAN – AREA A

• Changed NEMA requirement in Keynote 8.

D4-EP401 ENLARGED ELECTRICAL POWER PLANS

• Adjusted equipment location to support expanded Room 115 Elevator Equipment Room. Updated mounting information in Keynotes 6 and 7. Added tray mounted locations.

D4-EP402 ENLARGED POWER PLANS

• Revised power plan in Room 149 (Can Wash) and added Keynote 12 with receptacle height note for hose reel.

D4-EP403 – ENLARGED POWER PLAN – KITCHEN AREA B1

• Revised power plan in Kitchen rooms 154, 155, and 156 to support mechanical equipment and hose reel.

D4-EP404 ENLARGED POWER PLAN – KITCHEN AREA B2

• Revised power plan to show VAVs. Deleted Keynote 3 and added Keynote 6.

D4-EP405 ENLARGED POWER PLAN – SERVING LINE 1 & 2 WAREWASH

• Revised power plan to show VAVs. Removed junction box. Deleted Keynote 2.

D4-EP406 ENLARGED POWER PLAN – SERVING LINE 3 & 4 WAREWASH

• Revised power plan to mechanical equipment. Removed junction box. Deleted Keynote 2.

D4-EP602 ELECTRICAL SCHEDULES

• Revised schedule for circulation pump and ERVs.

D4-EP602A ELECTRICAL SCHEDULES

• Added VAVs to schedule

D4-EP603 – ELECTRICAL SCHEDULES – KITCHEN & TRANSFORMER

• Updated schedule, primarily to support kitchen equipment, ventilation, and fire protection. Revised Note 13 and deleted Note 18.

D4-EP606 ELECTRICAL PANEL SCHEDULE – 1ST FLOOR

• Revised schedule for panel 1EKP21.

D4-EP608 ELECTRICAL PANEL SCHEDULES – 1ST FLOOR

• Revised schedules for panels 1KP27, 1KP28, and 1KP29.

D4-EP609 ELECTRICAL PANEL SCHEDULES – 1ST FLOOR

• Revised schedule for panel 1MP22.

D4-EP611 ELECTRICAL PANEL SCHEDULES – 2ND FLOOR

• Revised schedule for panel 2MP43.

D4-ES001 ELECTRICAL LEGEND AND ABBREVIATIONS

• Revised note regarding division of labor between contractor and CPS energy for medium voltage work.

D4-ES101 ELECTRICAL SITE PLAN

• Revised sheet to demonstrate contractor and CPS energy responsibilities.

D4-ES503 ELECTRICAL DETAILS

• Removed all details for work to be executed by CPS Energy.

D4-ES505 ELECTRICAL DETAILS

• Removed all details for work to be executed by CPS Energy.

D4-ES601 ELECTRICAL ONE-LINE DIAGRAM

• Removed one-line diagram for work to be executed by CPS Energy.

D4-FA001 FIRE ALARM – MASS NOTIFICATION LEGEND

• Updated carbon monoxide detector symbology.

D4-FA102 FIRST FLOOR FIRE ALARM – MASS NOTIFICATION PLAN - AREA B

• Updated carbon monoxide detector symbology.

DF-FA602 MASS NOTIFICATION MATRIX AND DETAILS

• Added mounting height note.

D4-G-103 WEST CAMPUS CONSTRUCTION AREA PLAN

• Added fence north of ATC5. Provided numerous updates to construction area, fencing, and mowing responsibilities.

D4-I-101 FIRST FLOOR FURNITURE PLAN

• Revised note to indicate reception desk is included in contract.

D4-I-102 SECOND FLOOR FURNITURE PLAN

• Revised detail note to clarify contractor responsibilities.

D4-I-103 THIRD FLOOR FURNITURE PLAN

• Corrected room numbers.

D4-I-104 FIRST FLOOR FINISH PLAN

• Improved plan hatching, added reference to specifications for elevator finishes.

D4-I-105 SECOND FLOOR FINISH PLAN

• Added reference to specifications for elevator finishes.

D4-I-107 FIRST FLOOR SIGNAGE PLAN

• Added multiple room signs at exterior doors.

D4-I-402 INTERIOR ELEVATIONS

• Added spacing dimension information.

D4-I-403 INTERIOR ELEVATIONS

• Added spacing dimension information.

D4-I-601 FINISH SELECTIONS

• Multiple changes to finishes.

D4-I-602 FINISH SCHEDULE

• Multiple changes to room finish schedule.

D4-I-603 FINISH SCHEDULE

• Multiple changes to room finish schedule.

D4-I-604 SIGNAGE TYPES

• Added Detail 2 for Sign Type H.

D4-M-100 OVERALL CRAWL SPACE – HVAC & HYDRONIC PLAN

• Added hydronic pipe location dimensions, utilidor section, Sheet note 3.

D4-M-101 FIRST FLOOR HVAC PLAN – AREA A

• Added duct sizes and tagging.

D4-M-102 FIRST FLOOR HVAC PLAN – AREA B

• Added duct sizes and tagging.

D4-M-104 SECOND FLOOR UNDER STAIRWELL HVAC PLAN

• Added duct and associated callouts that were missing from the Revit export. Return air radius elbow next to AHU-D4-1 changed to a square (miter) elbow to connect to the duct.

D4-M-401 ENLARGED MECHANICAL PLANS

• Added duct sizes and tagging and adjusted size of return duct above Office 139. Revised sheet note 4.

D4-M-501 MECHANICAL DETAILS

• Added vertically stacked coil detail with piping. Revised an existing detail to show stacked coils.

D4-M-601 MECHANICAL SCHEDULES

• Adjusted supply airflow and coil capacities on AHU schedule.

D4-M-602 MECHANICAL SCHEDULES

• Added wall caps.

D4-P-001 PLUMBING LEGEND, ABBREVIATIONS, AND GENERAL NOTES

• Updated General Note 24 regarding deconfliction of piping runs and structural elements.

D4-P-601 PLUMBING SCHEDULES

• Added Buy America Act (BAB) requirement to notes. Added pump schedule note concerning sump and sewage pump electrical requirements.

D4-P-908 PLUMBING ISOMETRICS

• Added callouts to isometric drawings.

D4-S-103 LOADING DOCK SCREEN WALL PLAN

• Added dimensions.

D4-S-110 SECOND FLOOR FRAMING PLAN – AREA A

• Added section markers.

D4-S-113 LOW ROOF FRAMING PLAN – AREA B

• Added marker for Section 14/D4-S-531.

D4-S-407 ENLARGED TOILET PARTITION SUPPORTS

• Added structural section and details.

D4-S-521 TYPICAL STEEL FRAMING DETAILS

• Revised Detail 16 to terminate beam at roofline.

D4-S-531 STEEL DETAILS

• Added section for Beam to Post Connection.

D4-TN401 ENLARGED TELECOMMUNICAITONS ROOM PLANS AND ELEVATIONS

• Removed CATV equipment note.

D4-TN601 FIRST FLOOR TELCOMMUNICATINOS RISER DIAGRAM

• Moved power from bottom to top of communications racks.

D4-TN602 SECOND FLOOR TELCOMMUNICATINOS RISER DIAGRAM

• Moved power from bottom to top of communications racks.

D4-TN603 THIRD FLOOR TELCOMMUNICATINOS RISER DIAGRAM

• Moved power from bottom to top of communications racks.

D4-TS501 COMMUNICATIONS MANHOLE DETAILS

• Changed bonding ribbon dimension on Detail 1, Section A-A.

End of Summary of Changes

Lackland DCF4 LKATCDCF4

<AMENDMENT 0002>

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 00 01 SOLICITATION, OFFER AND AWARD, SF-1442

00 10 00 CONTRACT LINE ITEM SCHEDULE

00 21 00 INSTRUCTIONS

00 21 16 INSTRUCTIONS TO OFFERORS

00 22 16 SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 72 00 GENERAL CONDITIONS

00 73 00 SUPPLEMENTARY CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 44 CONSTRUCTION SCHEDULE

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING

01 35 13.10 00 SPECIAL PROCEDURES-SURVEYING

01 35 13.20 00 SPECIAL PROJECT PROCEDURES-CAD

01 35 13.30 00 SPECIAL PROJECT PROCEDURES-GIS

01 35 17.00 44 SPECIAL PROJECT PROCEDURES FOR LACKLAND AIR FORCE BASE

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS AND SPECIAL INSPECTION FOR PROGRESSIVE

COLLAPSE

01 50 00.17 44 TEMPORARY CONSTRUCTION FACILITIES FOR LACKLAND AFB

01 52 00.00 44 GOVERNMENT FIELD OFFICE

01 56 00 DUST CONTROL

01 57 20 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 57 24.01 44 STORM WATER POLLUTION PREVENTION PLAN (TEXAS)

01 57 25.00 44 SWPP PLAN INSPECTION AND MAINTENANCE REPORT FORM

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 10 TOTAL BUILDING COMMISSIONING

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE

03 45 00 PRECAST ARCHITECTURAL AND STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 14 10 WATERPROOF FLOORING MEMBRANE

07 17 00 BENTONITE WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 26 16 BELOW GRADE VAPOR RETARDERS

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 SPRAY FOAM AIR BARRIERS

07 41 13 METAL ROOF PANELS

07 42 13 METAL WALL PANELS

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES (INCLUDING FIRE RATED ENTRANCE

DOORS)

08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 33 23 OVERHEAD COILING DOORS

08 33 43 OVERHEAD COILING SMOKE CURTAINS FOR ELEVATOR DOORS</AM#0002>

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES

08 51 13 ALUMINUM WINDOWS (INCLUDING FIRE RATED EXTERIOR WINDOWS)

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.13 RESINOUS FLOORING</AM#0002>

09 67 23.14 CHEMICAL RESISTANT RESINOUS FLOORING</AM#0002>

PROJECT TABLE OF CONTENTS Page 2

<AM#0002>

<AM#0002>

<AM#0002>

m2ecdcwn Cross-Out

09 68 00 CARPETING

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

09 96 59 HIGH-BUILD GLAZE COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 52 00 LOCKER BENCHES

DIVISION 11 - EQUIPMENT

11 13 00 LOADING DOCK EQUIPMENT

11 40 00 FOODSERVICE EQUIPMENT

DIVISION 12 - FURNISHINGS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION

12 65 00 FIXED SEATING AND FIXED TRAINING TABLES

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 20 COMMISSIONING OF MECHANICAL AND PLUMBING SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13.34 40 CONTROL VALVES, SELF-CONTAINED

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 30 00 HVAC AIR DISTRIBUTION

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 00.00 20 TERMINAL HEATING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS (HVAC)

PROJECT TABLE OF CONTENTS Page 3

25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS (ACS)

25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS (FIRE

ALARM/FIRE SUPPRESSION)

25 05 11.04 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

(LIGHTING)

25 05 11.06 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

(CONFIGURABLE SYSTEMS)

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

DIVISION 26 - ELECTRICAL

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 13.10 30 ELECTRIC METERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS

26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ACCESS CONTROL SYSTEM ACCEPTANCE TESTING

28 10 05 ACCESS CONTROL SYSTEMS (ACS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 63 26 DRILLED CAISSONS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 13.13 LIME TREATED SUBGRADE

32 11 23 AGGREGATE BASE COURSE

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 ROAD-MIX ASPHALT PAVING

32 13 14.13 CONCRETE PAVING FOR HEAVY DUTY PAVEMENTS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 84 24 IRRIGATION SPRINKLER SYSTEMS

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORMWATER UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

PROJECT TABLE OF CONTENTS Page 4

PROJECT TABLE OF CONTENTS Page 5

-- End of Project Table of Contents --

APPENDIX

APPENDIX A JUSTIFICATION & APPROVAL

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 114 PAGES

Lackland DCF4

01 30 00 SD-01 Preconstruction Submittals

1.4View Location Map

1.5Progress and Completion

Pictures

1.8Field Office Overhead

1.8.1Field Office Overhead

1.8.2Field Office Overhead

1.8Accounting Practice

1.9Delegation Of Authority

SD-04 Samples

1.3 GColor Boards

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.2 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.2 GPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

W9126G26RA028-0002

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 114 PAGES

01 33 29 1.5.3.2 GFinal High Performance and

Sustainable Building Checklist

1.5.3.2 GFinal Sustainability eNotebook

1.5.3.2 GAmended Final Sustainability

eNotebook

1.5.3.2 GAmended Final High

Performance and Sustainable

Building Checklist

3.2 GThird Party Certification

Certificate, Assessment, or

Validation and Compliance Report

01 35 13.30 00 SD-01 Preconstruction Submittals

Digital Photos

SD-02 Shop Drawings

Surveys

ESRI File Geodatabase

Maps

01 35 26 SD-01 Preconstruction Submittals

1.8 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

1.5 GMonthly Exposure Reports

SD-07 Certificates

1.9 GActivity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 114 PAGES

01 35 26 1.13Hot Work Permit

1.14License Certificates

1.14.1 GPortable Gauge Operations

Planning Worksheet

1.14.1 GRadiography Operation Planning

Work Sheet

1.12.4 GStandard Lift Plan

01 45 00 SD-01 Preconstruction Submittals

1.5.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

1.12.3Verification Statement

SD-07 Certificates

1.6.6.1 GCertificate Of Readiness

01 45 35 SD-01 Preconstruction Submittals

3.1.2Written NDT Practices

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Steel Joist Institute Membership

2.1Certified Plant

2.1Certificate of Compliance

1.5 GSpecial Inspector

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 114 PAGES

01 45 35 3.1.2 GInterim Report

3.1.2 GComprehensive Final Report

01 52 00.00 44 SD-03 Product Data

2.1 GGovernment Field Office

01 56 00 SD-01 Preconstruction Submittals

3.1 GDust Control

2.1 GProducts and Procedures

SD-02 Shop Drawings

1.7Recordkeeping

01 57 20 SD-01 Preconstruction Submittals

1.6 GENVIRONMENTAL

PROTECTION PLAN

GFish and Wildlife Protection

Measures

GEnvironmental Permit

GAsbestos Work Plans

GAsbestos Certifications

GAsbestos Transporter License

GAsbestos Medical clearances

GAsbestos Training Certificates

GAsbestos TDSHS License

GUnsigned copy of State

Renovation

GUnsigned Demolition Notifications

GEdwards Aquifer Protection Plan

GLead Work Plans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 114 PAGES

01 57 20 GLead Occupant Protection Plan

GTexas Department of State

Health Services Lead Licenses

GLead Notifications

GAcknowledgement Of Api Std 650

GAboveground Piping Systems

1.5.4 GStormwater Pollution Prevention

Plan

GEquipment Inventory List

GWaste Disposal Plan

GConstruction Tpdes Notice Of

Intent And Site Notices

GConstruction Site Notice Or

Notice Of Intent

GHazardous Waste Management

Plan

GIntegrated Solid Waste

Management Plan

GHazardous Material List

GEmergency Response Plan

And/Or Site Specific Spill

Prevention Response Plan

1.5.2 GSummary Transmittal Letter

SD-03 Product Data

GSafety Data Sheets (SDS) For All

Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 114 PAGES

01 57 20 SD-06 Test Reports

GCommercial Facility Lead

Contaminated Waste Shall Be

Characterized, Profiled, And

Manifested

GReturn Manifests And Weight

Tickets

GMonthly Diversion And Landfill

Reports

GAny Asbestos Inspection Reports

That Were Not Included In The

Original Assessment Or As A

Result To A Change In The Sow

Or Found As Unknown And

Unforseen Discoveries During Any

Phase Of He Project

GAsbestos Inspection Reports That

Have Not Been Provided By The

Area Specific Env Office

GLead Based Paint Reports -Not

Included In Original Assessment

Or Results In Change Of Sow

GLead Inspection Reports- Not

Provided By JBSA Env Office or by licensed Lead Inspector

GOSHA Air Monitoring

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 114 PAGES

01 57 20 GLead OSHA Negative Exposure

Assessment

GAsbestos Air Monitoring reports

GLead Air Monitoring reports

3.6.1.6 GAnalytical Results

SD-07 Certificates

GCertificate Of Training Asbestos

GCertificate Lead Training

GEPA Lead Training Or Lead

Awareness Training (Min 8Hr)

GStormwater Notice Of Change

SD-11 Closeout Submittals

GNotice Of Termination

01 57 23 SD-01 Preconstruction Submittals

1.3.2 GStorm Water Pollution Prevention

Plan

1.3.2 GStorm Water Notice of Intent

SD-06 Test Reports

1.3Erosion and Sediment Controls

SD-07 Certificates

2.1.3Mill Certificate or Affidavit

01 57 24.01 44 SD-01 Preconstruction Submittals

3.5.7 GStorm Water Pollution Prevention

Plan

3.13 GNotice of Termination

01 58 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 114 PAGES

01 58 00 GPreliminary One Line

1.3.1 GSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-06 Test Reports

Monthly Reporting

1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

01 78 00 SD-02 Shop Drawings

1.5.1Preliminary Record Drawings

1.5.1.1Final Record Drawings

1.5.1.2Final Record Drawings

SD-03 Product Data

1.9.1Warranty Management Plan

1.9.5Warranty Tags

1.7Spare Parts Data

1.9.4warranty report

Inventory of Contractor Furnished and Insttalled Equipment

Inventory of Government

Furnished Contractor Insttalled

Equipment (GF/CI)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 114 PAGES

01 78 00 3.6.1.1video

3.6.5Red Zone Meeting

SD-08 Manufacturer’s Instructions

1.9.1Instructions

SD-10 Operation and Maintenance

Data

3.6 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

2.2 GRecord Model

3.5As-Built Record of Equipment and Materials

1.9.1Warranted Equipment and

Materials

3.4 GFinal Approved Shop Drawings

GCertification of EPA Designated

Items

2.3 GCertification Of USDA Designated

Items

3.8.1 GInterim DD FORM 1354

3.8.2 GHigh Performance and

Sustainable Building (HPSB)

Checklist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 114 PAGES

01 78 00 3.8.2List Of Installed Building

Equipment Items For DD Form

3.8Checklist For Form Dd1354

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

3.2.1 GOperation And Maintenance

Manual, Progress Submittal

3.2.2 GOperation And Maintenance

Manual, Prefinal Submittal

3.2.3 GOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

3.1.1 GTraining Plan

1.6.6.7 GRecord Drawings And Utility

Systems

01 91 00.15 10 SD-01 Preconstruction Submittals

1.8 G DOCommissioning Firm

1.8.1 G DOLead Commissioning Specialist

1.8.2 G DOTechnical Commissioning

Specialists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 114 PAGES

01 91 00.15 10 1.8 G DOCommissioning Firm's Contract

SD-06 Test Reports

3.1.2.1 G DOInterim Construction Phase

Commissioning Plan

3.1.2.2 G DOFinal Construction Phase

Commissioning Plan

3.1.2.1.2 G DOTemplate Building Envelope

Inspection Checklists

3.1.5.2 G DOBuilding Envelope Inspection

Checklists

3.1.5.3 G DOPre-Functional Checklists

1.10Issues Log

3.2 G DOCommissioning Report

SD-07 Certificates

1.11 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.6 G ROTraining Plan

3.1.6 G ROTraining Attendance Rosters

3.1.7 G DOSystems Manual

SD-11 Closeout Submittals

3.2 S DOFinal Commissioning Report

3.1.2.2 SFinal Construction Phase

Commissioning Plan

03 30 00 SD-01 Preconstruction Submittals

1.6.6 GQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 114 PAGES

03 30 00 1.6.7 GQuality Control Personnel

Certifications

1.6.9 GLaboratory Accreditation

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.1Cementitious Materials

2.4.6Vapor Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

1.8.1Local/Regional Materials

1.6.3.2Finishing Plan

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 114 PAGES

03 30 00 1.6.1.1 GConcrete Mix Design

1.2Pozzolan

1.7.1Pozzolan

2.3.1.2Pozzolan

2.3.1.2Pozzolan

2.3.1.3Pozzolan

2.3.1.3Pozzolan

2.5.2.4Pozzolan

2.5.2.4Pozzolan

1.6.4.1Aggregates

3.10.2.1Tolerance Report

3.13.3.3 GCompressive Strength Tests

3.13.3.4Air Content

3.13.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

1.6.3.3Safety Data Sheets

1.6.7.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 114 PAGES

03 41 33 SD-02 Shop Drawings

2.1 GFabrication Drawings

2.1 GInstallation Drawings

SD-05 Design Data

2.1.1.1 GNormal-Weight Concrete

SD-06 Test Reports

1.3.4.2 GNormal-Weight Concrete Air

Content

1.3.4.2 GAir Entrainment for

Normal-Weight Concrete

2.1.1.1 GNormal-Weight Concrete

Compressive Strength

1.3.4.2 GDesign Mix

1.3.4.2 GUnit Weight

2.3.3.5Anchorages

3.3.6.1 GNondestructive Testing

SD-07 Certificates

1.3.3 GQualifications for Welding Work

1.3.2Installers

1.3.1 GManufacturer

2.2.7 GPretensioning

2.2.16 GDetensioning

1.3.3 GWelding Procedures

SD-08 Manufacturer’s Instructions

1.3.3Installation Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 114 PAGES

03 41 33 1.3.3Welding Sequence and

Procedure

2.3.5Epoxy-Resin Grout

2.3.5Epoxy-Resin Adhesive

03 45 00 SD-01 Preconstruction Submittals

1.12.5Pre-Installation Meeting

SD-02 Shop Drawings

1.12.1Precast Drawings

SD-03 Product Data

2.4 GCast-In Embedded Items And

Connectors

2.4.2 GConnection Devices

2.3.6Admixtures

SD-04 Samples

1.12.3 GConcrete Wall Panel Surface

Finish

1.12.4Mock-up

1.12.3Full Size Sample Wall Panel

SD-05 Design Data

1.5.5Design Calculations

2.2.1 GConcrete Mix Design

2.5.9Repair of Surface Defects

1.5.6 GMoisture and Thermal

Performance Calculations

SD-06 Test Reports

1.11.2 GStrength Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 114 PAGES

03 45 00 1.11.2Slump

1.11.1Air Content

1.11.2Air Content

1.11.1Test for Concrete Materials

2.3.7Water

3.6.4Testing Precast Units for Strength

SD-07 Certificates

1.4 GManufacturer's Qualifications

1.8.1Fabricator Quality Certifications

1.9Erector Certification

1.10Erector's Post Audit Declaration

SD-08 Manufacturer’s Instructions

3.3 GInstallation

3.8 GCleaning

SD-11 Closeout Submittals

2.3.1 SRecycled Content for Fly Ash and

Pozzolan

04 20 00 SD-02 Shop Drawings

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2 GClay or Shale Brick

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 114 PAGES

04 20 00 2.2.3.4 GGlazed Structural Clay Facing

Tile

2.2.3.2 GConcrete Masonry Units (CMU)

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

2.2.3.3Fire-Rated Concrete Masonry

Units

3.2.5 GBracing Calculations

SD-06 Test Reports

2.2.2.1.4Efflorescence Test

2.2.3.3Fire-Rated Concrete Masonry

Units

3.6.1.1 GField Testing of Mortar

3.6.1.2 GField Testing of Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

05 05 23.13 10 SD-01 Preconstruction Submittals

1.4.1 GPersonnel Qualification

2.1.1 GProcedure description

SD-03 Product Data

2.1.1Equipment and accessories

SD-06 Test Reports

1.4.5Equipment Qualifications

3.4.1Inspection Test Reports

05 05 23.16 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 114 PAGES

05 05 23.16 3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 114 PAGES

05 12 00 3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 GSteel Joist Framing

SD-03 Product Data

2.3 SRecycled Content Of Steel

Products

SD-05 Design Data

2.2 GDesign Calculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 114 PAGES

05 21 00 3.3Erection Inspection

3.3Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.6Galvanizing Repair Paint

2.2.17Mechanical Fasteners

2.1.6Touch-Up Paint

1.3.3Welding Rods and Accessories

SD-04 Samples

2.1.1Metal Roof Deck Units

2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

1.5.1 GFraming Components

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 114 PAGES

05 40 00 2.1Studs, Joists

SD-07 Certificates

3.1.1Welds

05 50 13 SD-02 Shop Drawings

2.3 GBollards/Pipe Guards

2.4 GRoof Hatches

SD-03 Product Data

2.4 GRoof Hatches

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.1 GMetal Stair System

SD-03 Product Data

2.2.2.5 GTread Plank

2.2.2.5 GLanding Floor Plank

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.1 GWelder Qualification

SD-08 Manufacturer’s Instructions

2.2.3 GTread

2.2.2.5 GLanding Floor Plank

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 114 PAGES

05 51 33 2.3.2Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

1.2.1 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

1.2.1 GAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2 GInstallation Instructions

06 10 00 SD-02 Shop Drawings

2.4.2 GTrussed Rafters

2.4.3 GTrussed Joists

1.9.1 GFabricated Structural Members

1.9.2 GModifications of Structural

Members

2.2.1 GNailing Strips

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 114 PAGES

06 10 00 1.8Fire-Retardant Treatment

2.3Oriented Strand Board

2.4.6Adhesives

SD-05 Design Data

1.9.2 GModifications of Structural

Members

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.11.1Certificates of Grade

2.2.1 SCertified Sustainably Harvested

Framing Lumber

1.7Preservative Treatment

2.4.6 SIndoor Air Quality for Aerosol

Adhesives

06 41 16.00 10 SD-02 Shop Drawings

2.11Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.9Wood Finishes

2.11.8.3Finish Schedule

1.5.2Certification

SD-04 Samples

2.3Plastic Laminates

2.6Cabinet Hardware

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 114 PAGES

06 41 16.00 10 SD-07 Certificates

1.5Quality Assurance

2.9Laminate Clad Casework

3.1Laminate Clad Casework

SD-11 Closeout Submittals

1.3Guiding Principles

Documentation

06 61 16 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data

2.1.1 GSolid Polymer

2.2.2 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.5 GCounter Tops

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1 GSolid Polymer

07 05 23 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

I…

This is the start of the file's text. The full file is on GovTribe.