This is Amendment 0001 to a Design-Bid-Build Request for Proposals for the construction of a Central Energy Plant at Fort Hood, Texas, issued by the Department of the Army Corps of Engineers, Fort Worth District (Solicitation Number W9126G26RA020). The amendment modifies the original solicitation and should be read in conjunction with the base RFP documents. Contractors responding to this opportunity must incorporate all changes and clarifications outlined in this amendment into their proposal submissions to ensure compliance with the updated requirements.
The amendment affects the design-bid-build delivery method for constructing a centralized energy generation and distribution facility to support Fort Hood's infrastructure needs. Prospective bidders are required to review this amendment carefully, as it may include modifications to technical specifications, contract terms, evaluation criteria, schedule requirements, or other solicitation parameters. All amendments issued prior to proposal submission deadline must be acknowledged and addressed in submitted bids. Interested contractors should verify the current solicitation deadline and any other administrative requirements that may have been modified by this amendment before preparing and submitting their proposals to the Fort Worth District of the Army Corps of Engineers.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
W9126G26RA020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO SOLICITATION
CHANGES TO SPECIFICATIONS -- The revisions identified herein shall be incorporated into the referenced specification sections. All specification text not specifically revised by this amendment shall remain in full force and effect.
1. Table of Contents: Revised Table of Contents.
2. Submittal Register: Revised to remove Section 32 31 13 CHAIN LINK FENCES AND GATES, and add Section 32 31 13.53 HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES.
3. Added Requirements to Section: The revisions identified herein shall be incorporated into the referenced specification section. All specification text not specifically revised by this amendment shall remain in full force and effect. The following section is being updated and bearing the notation W9126G26RA020-0001:
00 21 00 INSTRUCTIONS – Add 52.215-1-Instructions to Offerors-Competitive Acquisition
4. Replacement Sections: The following sections are being replaced and bearing the notation W9126G26RA020- 0001:
00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
5. Delete Sections: The following sections are being deleted:
07 27 36 SPRAY FOAM AIR BARRIERS
32 31 13 CHAIN LINK FENCES AND GATES
6. Add New Section: The following section is being added and bearing the notation W9126G26RA020-0001:
32 31 13.53 HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES
CHANGES TO DRAWINGS
7. Replacement Drawings.- Replace the following drawings with the attached new drawings of the same number, bearing the notation W9126G26RA020-0001 and “AM0001” in the description box:
C-503 PAVING DETAILS III -- Added Details G1 and L1 to coordinate with the Hot Mix Asphalt specifications.
EP101 POWER PLAN -- Added 480/277V 3-P 20A circuit on EP701 for panel H1 Circuit 26,28,30 for Air Compressor and safety disconnect on wall adjacent to AC-1 on EP101 with new Keyed Note 21 480V 20A 3-POLE
DISCONNECT FOR AIR COMPRESSOR MOUNTED AT 4' AFF.
EP701 PANEL SCHEDULE 1 -- Added 480/277V 3-P 20A circuit on EP701 for panel H1 Circuit 26,28,30 for Air Compressor
End of Summary of Changes
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 01 SOLICITATION, OFFER AND AWARD, SF-1442
00 10 00 CONTRACT LINE ITEM SCHEDULE
00 21 00 INSTRUCTIONS
00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
00 22 00 SUPPLEMENTARY INSTRUCTIONS
00 22 16 DESIGN-BID-BUILD SELECTION PROCEDURES
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 44 CONSTRUCTION SCHEDULE
01 01 10.00 44 AT/OPSEC
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 35 10.00 44 SPECIAL PROJECT PROCEDURES FOR FORT HOOD (FORMERLY KNOWN
AS FT CAVAZOS)
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 24.01 44 STORM WATER POLLUTION PREVENTION PLAN (TEXAS)
01 57 25.00 44 SWPP PLAN INSPECTION AND MAINTENANCE REPORT FORM
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.15 BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
W9126G26RA020-0001
05 50 13.01 METAL ENTRY CANOPIES - OPTION 5
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 54 23 THERMOPLASTIC POLYOLEFIN ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING - OPTION 5
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.14 CHEMICAL RESISTANT RESINOUS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 44 16 FIRE EXTINGUISHERS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00 COMMISSIONING OF MECHANICAL AND PLUMBING SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
W9126G26RA020-0001
<AM0001> </AM0001>
M2CDSRLD
Cross-Out
M2CDSRLD
Cross-Out
23 11 20 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED CONDENSERS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FOR
MECHANICAL SYSTEMS
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FOR
FIRE SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 73 POWER SYSTEM STUDIES
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 13 GALVANIC (SACRIFICIAL) ANODE CATHODIC PROTECTION (GACP)
SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 70 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 32 12 13 32 13 13.06
32 15 00 32 16 19 32 31 13
32 92 19 32 92 23 32 93 00
DIVISION 33 - UTILITIES
33 01 30.16 TV INSPECTION OF SEWER LINES
33 05 23 TRENCHLESS UTILITY INSTALLATION
32 31 13.53
AGGREGATE BASE COURSE FOR FLEXIBLE PAVING
BITUMINOUS TACK AND PRIME COATS
PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
AGGREGATE SURFACING
CONCRETE CURBS, GUTTERS AND SIDEWALKS
CHAIN LINK FENCES AND GATES
HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES
SEEDING
SODDING
EXTERIOR PLANTS
<AM0001>
</AM0001>
W9126G26RA020-0001
M2CDSRLD
Cross-Out
33 40 00 STORMWATER UTILITIES
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 61 13.19 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
APPENDIX
APPENDIX A JUSTIFICATIONS AND APPROVALS
-- End of Project Table of Contents --
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 85 PAGES
Central Energy Plant
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
1.7Field Office Overhead
1.7.1Field Office Overhead
1.7.2Field Office Overhead
1.7Accounting Practice
1.8Delegation Of Authority
SD-11 Closeout Submittals
1.4.1High-Resolution Exterior
Panoramic Photographs
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 85 PAGES
01 33 29 1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
1.5.3.2 GFinal Sustainability eNotebook
GAmended Final Sustainability eNotebook
GAmended Final High
Performance and Sustainable
Building Checklist
01 35 10.00 44 SD-02 Shop Drawings
GHardware schedule
Keying system
GElectro-Mechanical Devices
SD-03 Product Data
1.11.3Casing Pipe
Paint Usage and Safety Data
Sheet (SDS)
Air Emission Inventory
Certificate of Conformity for New
Generators
Backflow Prevention Assembly
Vacuum Breakers
SD-04 Samples
1.11.2 GPlastic Marking Tape and Tracer
Wire
GLocks and Latches
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 85 PAGES
01 35 10.00 44 1.25Customer Service Inspections
3.1.2Customer Service Inspection
Certificate
1.9.1Digging And Water Use Permits
1.9.3Army Radiation Permits (ARP)
1.21.1Landfill Permit
3.1.1Landfill Permit
Backflow Prevention Assembly
Tests
Certification of Natural Gas
Heating Equipment
GWaste Diversion Report
GDe-chlorination of
Super-chlorinated New Water
Supply System
GDe-chlorination Method of
Wastewater from Disinfecting
Water Line and Water Storage
Tanks
GCertificate of Proof on Asbestos
Free Construction Material and
Safety Data Sheet (SDS) for
Construction Materials and
Products
1.12Potable Water Lines
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 85 PAGES
01 35 10.00 44 SD-10 Operation and Maintenance
Data
Operation And Maintenance
Manuals
01 35 26 SD-01 Preconstruction Submittals
1.8 GAccident Prevention Plan (APP)
1.16 SFinal IAQ Management Plan
1.16 GIndoor Air Quality (IAQ)
Management Plan
SD-06 Test Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
1.5 GMonthly Exposure Reports
SD-07 Certificates
1.9 GActivity Hazard Analysis (AHA)
1.12.4Certificate of Compliance
1.13Hot Work Permit
1.14License Certificates
1.14.1 GPortable Gauge Operations
Planning Worksheet
1.14.1 GRadiography Operation Planning
Work Sheet
1.12.4 GStandard Lift Plan
01 45 00 SD-01 Preconstruction Submittals
1.5.2 GContractor Quality Control (CQC)
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 85 PAGES
01 45 00 SD-06 Test Reports
1.12.3Verification Statement
SD-07 Certificates
1.6.5.1 GCertificate Of Readiness
01 45 35 SD-01 Preconstruction Submittals
GProject Manual
3.1.2Written NDT Practices
SD-06 Test Reports
3.1.1Special Inspection Daily Reports
3.1.2Special Inspection Daily Reports
3.1.1Special Inspection Biweekly
Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1Steel Truss Plant Quality
Assurance Program
Wood Truss Plant Quality
Assurance Program
2.1AC472 Accreditation
2.1Certified Plant
2.1Certificate of Compliance
1.5 GSpecial Inspector
3.1.2Qualification Records for
Nondestructive Testing
Technicians
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 85 PAGES
01 45 35 3.1.2 GInterim Report
3.1.2 GComprehensive Final Report
GFinal Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.3.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance
Statements
GContractor Temporary Network
Cybersecurity Compliance
Statement
SD-06 Test Reports
3.4Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.5.2 GRegulatory Notifications
GEnvironmental Manager
Qualifications
1.5.4 GEmployee Training Records
1.6 GEnvironmental Protection Plan
1.6.9.1 GDirt and Dust Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 85 PAGES
01 57 19 1.10 GSolid Waste Management Permit
3.2.1.1 GStormwater Pollution Prevention
Plan
3.2.1.2 GStormwater Notice of Intent
3.10.2 GSpill Prevention Control And
Countermeasure (SPCC) Plan
SD-06 Test Reports
1.10.1 GMonthly Solid Waste Disposal
Report
3.2.1.3Inspection Reports
SD-07 Certificates
1.5.4 GEmployee Training Records
SD-11 Closeout Submittals
1.5.2 GRegulatory Notifications
1.5.4 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.7.1 GWaste Determination
Documentation
3.7.2.1 GProject Solid Waste Disposal
Documentation Report
3.7.2.1 GSales Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 85 PAGES
01 57 19 3.7.3.1 GHazardous Waste/Debris
Management
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
01 57 24.01 44 SD-01 Preconstruction Submittals
GStorm Water Pollution Prevention
Plan
9.2 G RPECNotice of Termination
01 58 00 SD-02 Shop Drawings
1.3.1 GSign Legend Orders
01 74 19 SD-01 Preconstruction Submittals
1.6 GConstruction Waste Management
Plan
SD-06 Test Reports
1.8.2Monthly Reporting
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-02 Shop Drawings
1.5.1Preliminary Record Drawings
1.5.1.1Final Record Drawings
1.5.1.2Final Record Drawings
SD-03 Product Data
1.9.1Warranty Management Plan
1.9.5Warranty Tags
1.7Spare Parts Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 85 PAGES
01 78 00 1.9.4warranty report
Inventory of Contractor Furnished and Insttalled Equipment
3.6.1.1video
3.6.5Red Zone Meeting
SD-08 Manufacturer’s Instructions
1.9.1Instructions
SD-10 Operation and Maintenance
Data
3.6 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
3.5As-Built Record of Equipment and Materials
1.9.1Warranted Equipment and
Materials
3.4 GFinal Approved Shop Drawings
GCertification of EPA Designated
Items
2.2 GCertification Of USDA Designated
Items
3.8.1 GInterim DD FORM 1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 85 PAGES
01 78 00 3.8.2 GHigh Performance and
Sustainable Building (HPSB)
Checklist
3.8.2List Of Installed Building
Equipment Items For DD Form
3.8Checklist For Form Dd1354
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GFacility Data Workbook
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
3.2.1 GOperation And Maintenance
Manual, Progress Submittal
3.2.2 GOperation And Maintenance
Manual, Prefinal Submittal
3.2.3 GOperation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
3.1.1 GTraining Plan
1.6.6.7 GRecord Drawings And Utility
Systems
01 78 24.00 10 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 85 PAGES
01 78 24.00 10 1.5.1Facility Data Project Execution
Plan
01 91 00.15 SD-06 Test Reports
3.7 GCompleted Construction
Observation Checklists
3.1 GDesign Review Report
3.5 GInterim Construction Phase
Commissioning Plan
3.5 GFinal Construction Phase
Commissioning Plan
1.12 GIssues Log
SD-07 Certificates
1.10 GCommissioning Firm
1.13 GCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.11 GMaintenance and Service Life
Plan
3.10 GSystems Manual
SD-11 Closeout Submittals
3.12 GFinal Commissioning Report
3.13 GUpdated Final Commissioning
Report
02 41 00 SD-01 Preconstruction Submittals
1.2.2 G RODemolition Plan
G RODeconstruction Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 85 PAGES
02 41 00 1.10Existing Conditions
SD-07 Certificates
1.6 G RONotification
SD-11 Closeout Submittals
Receipts
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5Quality Control Program
1.6.6Quality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8Laboratory Accreditation
3.3.9Maturity Method Data
SD-02 Shop Drawings
1.6.2.1Formwork
1.6.2.2 GReinforcing Steel
SD-03 Product Data
2.4.5 SJoint Sealants
2.4.4 SJoint Filler
2.1Formwork Materials
2.3.3.2 SRecycled Aggregate Materials
2.3.1 SCementitious Materials
2.4.6Vapor Retarder and Vapor Barrier
2.4.1Concrete Curing Materials
2.6 SReinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 85 PAGES
03 30 00 Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
1.8.1 SLocal/Regional Materials
2.2.2Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
1.6.3.3Finishing Plan
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.2 GConcrete Mix Design
1.6.1.1Formwork Calculations
SD-06 Test Reports
1.6.1.2 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
Slag Cement
1.6.4.2Aggregates
3.12.3.3Compressive Strength Tests
3.12.3.5Unit Weight of Structural
Concrete
3.12.3.4Air Content
3.12.3.1Slump Tests
2.3.2Water
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 85 PAGES
03 30 00 SD-07 Certificates
2.6.1Reinforcing Bars
1.6.3.4VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.5Safety Data Sheets
1.8.2Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
Liquid Chemical Floor Hardeners and Sealers
2.4.5 SJoint Sealants
2.4.1Curing Compound
03 45 00 SD-01 Preconstruction Submittals
1.11.5Pre-Installation Meeting
SD-02 Shop Drawings
1.11.1 G DOPrecast Drawings
SD-03 Product Data
2.3 G POCast-In Embedded Items And
Connectors
2.3.2 G POConnection Devices
2.2.6Admixtures
2.5Gasket
2.6.1Thin Brick Veneer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 85 PAGES
03 45 00 2.7Bearing Pads
SD-04 Samples
1.11.2 G DOConcrete Wall Panel Surface
Finish
1.11.4Mock-up
2.6.1Brick Color Chips
2.6.1Form Liner
SD-05 Design Data
1.5.4 G DODesign Calculations
2.1.1 GContractor-Furnished Mix Design
2.4.9 GRepair of Surface Defects
1.5.5 GThermal Calculations
SD-06 Test Reports
1.10.2 GStrength Tests
1.10.2Slump
1.10.2Air Content
1.10.1Test for Concrete Materials
2.2.7Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4 GManufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
Erector's Post Audit Declaration
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 85 PAGES
03 45 00 3.8 GCleaning
2.6.1Thin Brick
SD-11 Closeout Submittals
1.11.3 GBatch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled Content for Silica Fume
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 85 PAGES
05 05 23.16 1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 85 PAGES
05 12 00 GDesign Calculations for Steel
Connections
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
3.7.4Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 21 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 85 PAGES
05 21 00 1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 GSteel Joist Framing
SD-03 Product Data
2.3 SRecycled Content Of Steel
Products
SD-05 Design Data
2.2 GDesign Calculations
SD-06 Test Reports
3.3Erection Inspection
3.3Welding Inspections
SD-07 Certificates
1.3.2Certification of Compliance
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.3Galvanizing Repair Paint
2.2.9Mechanical Fasteners
1.3.2Welding Equipment
1.3.2Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.1.1Metal Roof Deck Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 85 PAGES
05 30 00 SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Welder Qualifications
1.3.2Welding Procedures
1.3.3.1Fire Safety
1.3.3.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
Stud Manufacture's Certification
Stud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
Welds
05 50 13 SD-02 Shop Drawings
2.8 GStructural Steel Door Frames
2.7 GInstallation Drawings
2.5 GBollards/Pipe Guards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 85 PAGES
05 50 13 2.7 GAngles and Plates
SD-03 Product Data
2.4Corner Guards
2.8Structural Steel Door Frames
2.6 GDownspout Terminations
2.1.1 SRecycled Content
SD-07 Certificates
2.1.1 GCertificates of Compliance
2.2 GCertified Mill
05 50 13.01 SD-01 Preconstruction Submittals
1.5.1 GManufacturer's Qualifications
1.5.2 GInstaller's Qualifications
SD-02 Shop Drawings
1.6 GShop Drawings
2.3.2 GShop Drawings
SD-03 Product Data
2.1 GMetal Entry Canopies
2.2 GMaterials
SD-04 Samples
2.5 GSamples
SD-05 Design Data
1.8.1 GWind Load Design
SD-07 Certificates
1.5.4Written Minutes Of The
Pre-Installation Conference
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 85 PAGES
05 50 13.01 3.2.1 GInstallation Instructions
06 10 00 SD-02 Shop Drawings
1.9.2 GModifications of Structural
Members
Nailers and Nailing Strips
SD-03 Product Data
Plastic Lumber
Fiberboard Wall Sheathing
Cellulose Honeycomb Panels
1.8Fire-retardant Treatment
1.4.3Structural-use and OSB Panels
Oriented Strand Board
Adhesives
SD-05 Design Data
1.9.2Modifications of Structural
Members
SD-06 Test Reports
1.4.4Preservative-treated
SD-07 Certificates
SCertified Sustainably Harvested
Natural-decay and Insect-resistant
Wood
2.2.1 SCertified Sustainably Harvested
Framing Lumber
1.7Preservative Treatment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 85 PAGES
06 10 00 SD-10 Operation and Maintenance
Data
3.4Take-back Program
07 21 16 SD-03 Product Data
2.1 GBlanket Insulation
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SEnergy Star Label for Insulation
Materials
2.4Pressure Sensitive Tape
2.5Accessories
SD-07 Certificates
2.1.4 SIndoor Air Quality for Insulation
Materials
2.5.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 22 00 SD-02 Shop Drawings
1.3Insulation Board Layout
1.3Verification of Existing Conditions
SD-03 Product Data
2.1Insulation
1.4Cover Board
2.3Fasteners
2.1.2 SRecycled Content For Insulation
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 85 PAGES
07 22 00 1.7Wind Resistance
SD-06 Test Reports
1.8.1 G ROFlame Spread Rating
SD-07 Certificates
1.6Installer Qualifications
1.6Certificates Of Compliance For
Felt Materials
2.1.3 SIndoor Air Quality For Insulation
2.1.4 SAcceptable Foam Blowing Agents
SD-08 Manufacturer’s Instructions
2.3Fasteners
2.1Insulation
07 27 10 SD-02 Shop Drawings
2.1Air Barrier System Shop
Drawings
SD-03 Product Data
2.1Air Barrier System Product Data
SD-04 Samples
2.1Material Samples For Air Barrier
System
SD-05 Design Data
1.8Design Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8Design Review Report
3.1.2Testing and Inspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 85 PAGES
07 27 10 SD-07 Certificates
1.7Air Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.7.1Qualifications of Manufacturer
1.7.2Qualifications of Installer
SD-02 Shop Drawings
1.4.1Self-adhering Air Barrier Shop
Drawings
SD-03 Product Data
2.1Self-adhering Air Barrier
2.2Primers, Adhesives, and Mastics
1.4.2Safety Data Sheets
SD-04 Samples
1.4.3Self-adhering Air Barrier System
Mockup
SD-06 Test Reports
1.7.3Field Peel Adhesion Test
1.4.4Flame Propagation of Wall
Assemblies
3.4.1Site Inspections and Testing
SD-08 Manufacturer’s Instructions
1.4.2Self-adhering Air Barrier
Manufacturer's Printed Instructions
2.2Primers, Adhesives, and Mastics
07 27 26 SD-01 Preconstruction Submittals
1.9.1Qualifications of Manufacturer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 85 PAGES
07 27 26 1.9.2Qualifications of Installer
SD-02 Shop Drawings
1.4.1Fluid-Applied Membrane Air
Barrier Shop Drawings
SD-03 Product Data
1.4Fluid-Applied Membrane Air
Barrier
2.3Transition Membrane
2.2Primers, Adhesives, and Mastics
2.6Reinforcement
1.4.2Safety Data Sheets
SD-04 Samples
1.4.3Mockup
SD-06 Test Reports
1.6Capillary Moisture Test
1.4.4Field Peel Adhesion Test
1.4.4Flame Propagation of Wall
Assemblies
3.4.1Site Inspections
SD-08 Manufacturer’s Instructions
1.4.2Fluid-Applied Membrane Air
Barrier Manufacturer's Printed
Instructions
1.4.2Primers, Adhesives, and Mastics
Printed Manufacturer's Instructions
07 27 36 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
W9126G26RA020-0001
<AM0001>
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 85 PAGES
07 27 36 1.10.1Qualification of Manufacturer
1.10.2Qualification of Installer
1.11Quality Control Plan
1.11Safety Plan
1.9.1Fire Prevention Plan
1.9.2Respiratory Protection Plan
SD-02 Shop Drawings
1.5.1Spray Foam Air Barrier System
Shop Drawings
1.5.1Fire-Rated Assemblies
SD-03 Product Data
2.1.5Blowing Agents
2.1.2Closed Cell
2.2Transition Membrane
2.3Primers, Adhesives, and Mastics
2.5Sealants
1.5.2Safety Data Sheets
2.1.1Thermal Barrier Materials
2.1.6.2Accessories
2.1.2 SRecycled Content for Closed Cell
Spray Foam Air Barrier
SD-04 Samples
1.5.3Spray Foam Air Barrier Mockup
SD-06 Test Reports
1.5.4Mockup Peel Adhesion Test
3.4.5.1Thermographic Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
W9126G26RA020-0001
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 85 PAGES
07 27 36 1.8Air Barrier Test
1.5.4Fire-Ratings Of Thermal Barrier
Materials
1.5.4Flame Spread and Smoke
Developed Index Ratings of SPF
Products
1.5.4Flame Propagation of Wall
Assemblies
3.4.1Site Inspections
SD-07 Certificates
2.1.5 SIndoor Air Quality for Spray Foam
Air Barrier
SD-08 Manufacturer’s Instructions
1.6.1SPF Handling, Storage, and
Spray Procedures
3.2.1Substrate Preparation
1.5.2Thermal Barrier
3.3.2Transition Membrane
Manufacturer's Installation
Instructions
1.5.2Manufacturer's Printed
Installation Instructions for
Primers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
1.11Core Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
W9126G26RA020-0001
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 85 PAGES
07 27 36 3.3.3Daily Work Record
3.4.5Visual Inspection and Thermal
Scanning
07 54 23 SD-02 Shop Drawings
1.3.1 GRoof Plan Drawing
1.3.1 GWind Load Calculations
1.3.1 GBoundaries of Enhanced
Perimeter
1.3.1 GCorner Attachments of Roof
System Components
1.3.1 GLocation of Perimeter Half-Sheets
1.3.1 GSlopes and Drain Locations
2.1.10 GScuppers
SD-03 Product Data
2.1.1 G AOTPO Sheet
2.1.2Bonding Adhesive
2.1.4Water Cutoff Mastic/Water Block
2.1.3Lap Cleaner, Lap Sealant, and
Edge Treatment
3.3Flashings
2.1.5Flashing Accessories
2.1.8Roof Insulation
2.1.6Pre-Manufactured Accessories
1.8 G AOwarranty
SD-05 Design Data
1.4.5 G AOWind Uplift Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
W9126G26RA020-0001
</AM0001>
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 85 PAGES
07 54 23 SD-07 Certificates
1.4.1 GQualification of Manufacturer
1.4.2 GQualification of Applicator
1.4.5 G AOWind Uplift Resistance
1.4.4 G AOFire Resistance
SD-08 Manufacturer’s Instructions
3.2 G AOApplication
3.2.3 G AOApplication Method
3.3.2 G AOMembrane Flashing
3.2.4Perimeter Attachment
3.2.5Fasteners
2.1.6Pre-Manufactured Accessories
1.6 G AOCold Weather
SD-09 Manufacturer’s Field
Reports
3.8.2 GPre-Roofing Conference
SD-11 Closeout Submittals
1.8 GWarranty
1.8.2 GRoofing System Installer
Warranty
3.10 GInformation Card
3.9Instructions To Government
Personnel
07 60 00 SD-02 Shop Drawings
2.2.1Exposed Sheet Metal
3.1.16Gutters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 85 PAGES
07 60 00 3.1.17Downspouts
3.1.26Expansion Joints
2.2.1Gravel Stops and fascia
3.1.21Splash Pans
3.1.18Flashing for Roof Drains
3.1.10Base Flashing
3.1.11Counterflashing
3.1.27Flashing at Roof Penetrations and Equipment Supports
2.2.14Reglets
3.1.19Scuppers
3.1.30Copings
3.1.15Drip Edges
3.1.20Conductor Heads
3.1.22Open Valley Flashing
3.1.23Eave Flashing
2.1 SRecycled Content
SD-03 Product Data
2.2.11Cool Roof
SD-04 Samples
1.4.2Finish Samples
SD-07 Certificates
2.2.10.1Warranty on Finishes
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
3.5Quality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 85 PAGES
07 60 00 SD-10 Operation and Maintenance
Data
1.4.3Cleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.1 G ROFirestopping System
SD-03 Product Data
2.2 G ROFirestopping Materials
SD-06 Test Reports
3.3 G ROInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 G ROInstaller Qualifications
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond Breakers
2.4Backstops
2.5Cleaning Solvents
3.1Field Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 85 PAGES
07 92 00 2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1 G AODoors
2.5 G AOFrames
2.3Accessories
SD-03 Product Data
2.1 G AODoors
2.1 SRecycled Content for Steel Door
Product
2.5 G AOFrames
2.5 SRecycled Content for Steel Frame
Product
2.3Accessories
SD-04 Samples
2.8.3 G AOFactory-applied Enamel Finish
08 33 23 SD-02 Shop Drawings
2.2.1Overhead Coiling Doors
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
2.2.5Electric Door Operators
2.2.1.3Bottom Bars
2.1.1.1Guides
2.2.3.1Mounting Brackets
2.2.2.2Hood
2.1.1.1Installation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .