This document is a Project Labor Agreements (PLAs) Special Notice for the F-35 Special Access Program Facility (SAPF) at Ebbing Air National Guard Base in Fort Smith, Arkansas. The U.S. Army Corps of Engineers Fort Worth District is conducting a market survey to solicit comments from the construction community regarding potential Project Labor Agreements for this large-scale construction project valued over $35 million.
The proposed facility will be a specialized secure workspace supporting F-35 operations, featuring controlled areas for flight planning, training, and administrative functions capable of accommodating up to three foreign countries. The project includes comprehensive infrastructure such as concrete floor slabs, pile foundations, structural steel frame, brick masonry walls, metal roofing, lightning protection, fire suppression systems, and intrusion detection. The Corps is seeking industry feedback on ten specific questions related to labor agreements, including local labor market conditions, potential project efficiency, and anticipated impacts on proposal submissions. Interested parties must submit responses via email to MAJ Terence Ngoh and Nicholas Johnston by 2:00 p.m. on July 17, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PLA. SAM Post..docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LABOR AGREEMENTS (PLAs)
SPECIAL NOTICE
Title: W9126G26RA001, F-35 Special Access Program Facility (SAPF), Ebbing ANGB, Fort Smith, Arkansas
The Corps of Engineers Fort Worth District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) from large scale construction projects (exceeding $35 million). This market survey is being posted for the construction of the F-35 Special Access Program Facility (SAPF), Ebbing ANGB, Fort Smith, Arkansas.
THIS IS A PROJECT LABOR AGREEMENT SURVEY ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, OR DRAWINGS AVAILABLE AT THIS TIME.
Background / Scope Summary:
This project will Construct an F-35 Special Access Program Facility providing controlled workspace for ICD 705 compliant secure flight planning and training, unclassified aircrew training and administrative space, aircrew flight equipment storage and maintenance, and step desk to support combat crew functions. The facility is segregated to support up to three foreign countries using separate secure systems. The facility includes concrete floor slabs and footings on pile foundation, structural steel frame, brick masonry finish walls, concrete decking, and a combination pitched standing seam metal and flat roof. The facility has lightning protection, fire detection and suppression, intrusion detection, and all required supporting facilities to provide a complete and usable facility including utilities, pavements, site improvements, and communication support. Privatized utility connection fees are included in their respective supporting facilities line item. Facility will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Air Conditioning: 195 Tons.
Project Labor Agreement:
See the below for the Project Labor Agreement submittal requirements.
Please provide your comments via e-mail to the Contract Specialist, MAJ Ngoh Terence at terence.k.ngoh@usace.army.mil and courtesy copy the Contracting Officer, Nicholas Johnston at nicholas.i.johnston@usace.army.mil no later than 2:00 p.m., 17 July 2025.
All, Please respond to the questions below by 1400 CST on 17 July 2025.
1. Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
2. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
3. Are you aware of time sensitive issues/scheduling requirements that would affect the rate and price at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
4) Identify specific reasons for the referenced project why or how you believe a PLA would Advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
5) Identify specific reasons for the referenced project why or how you believe a PLA would not advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
6) Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
7) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.
8) Would the addition of PLA requirements for the solicitation for the Ebbing SAPF change your decision to submit a proposal if adequate time were given to prepare revised proposals?
9) How much time do you anticipate will be needed to revise your proposal to meet the PLA requirement?
10) Do you anticipate a significant price increase with implementation of the PLA requirement?