B08 W9126G23B0002 Amendment 0002.pdf

PDF 563 KB Posted

Attached to
Security Fence Replacement, Navarro Mills Lake Purdon, Texas
Solicitation number
W9126G23B0002
Issued by

About this file

This amendment modifies a solicitation for a security fence replacement project at Navarro Mills Lake Purdon, Texas. The scope of work includes constructing approximately 870 linear feet of chain link security fence per the provided standard drawings, using 9 gauge fabric, 2-inch mesh, and increasing the fabric height from 72 to 84 inches. Demolition of the existing fence is also required. The submission due date is extended to April 10, 2023 by 2:00pm CDT. The point of contact for any questions is provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. The purpose of Amendment 0002 is to update fence fabric height from 72" to 84" in Statement of Work Section 1.3.1 Chain Link Security Fence page 53 of Solicitation W9126G23B0002. See Summary of Changes.

2. Submission due date is extended to 10 April 2023, 2:00pm CDT.

3. Point of Contact for Amendment 0002 is Bonifacio Magdaleno at bonifacio.magdaleno@usace.army.mil or 817-886-1839.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G23B0002

X 9B. DATED (SEE ITEM 11)

03-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Mar-2023

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G23B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

SUMMARY OF CHANGES

1.3.1 Chain Link Security Fence: (Period of Performance 30 calendar days)

See Appendix 1.3.1

Contractor shall construct approximately 870' LF of chain link security fence per Standard Drawing 872-90-03 and provided maps. Chain link mesh portion shall be supported by round corner, end and pull posts 2.875" O.D.

and line posts 2.375" with concrete base placement anchorage, 16" min.

diameter and 3'6" deep minimum. Concrete shall fill all holes to a 2" dome from post to level of the surrounding natural grade as per STD 872-90-03, dry setting of concrete will not be allowed. Top Rails will be 1.66" od and line post maximum 10 ft apart and equally spaced. Fabric width shall be 9 gauge, 2" mesh, (AMD 002)72" 84”(AMD 002) width (top to bottom) and shall be topped with single 45 degree outriggers supporting a three strand barbed wire apron. Fence shall require top tension wire and bottom rail and have all necessary brace rails, tension rods, brace rail clamps, truss rods and bands per fence specification FE6-TR-72 and drawing 872-90-10. All 9 gauge steel tie wires shall be placed 15" O.C. and within 4" from top and bottom of fabric with ends twisted a minimum of three times. All attaching hardware shall be per drawing specifications and face inward to the secure area, with all threaded ends peened to prevent removal.(AMD 001)Affected work area has an existing security gate, posts are secured at a 5' depth in concrete and may be used for new fence attachment as is but, shall require all new attaching hardware per specifications.(AMD 001) Demolition of approximately 870' of existing fence will be required during and after installation of new fencing, but area shall remain secure at the end of each day.

(End of Summary of Changes)