B.01_Pre-Solicitation Notice.pdf
PDF 136 KB Posted
- Solicitation number
- W9126G22R0056
About this file
This document provides a pre-solicitation notice and sources sought synopsis for the construction of an Information Systems Facility at Fort Polk, Louisiana. The U.S. Army Corps of Engineers seeks to award a firm-fixed price design-bid-build contract between $20-40 million for the construction of a standard design facility including a data center, network operations center, secure parking, and supporting utilities. Interested parties must respond by December 13, 2021 detailing their construction experience, bonding capacity, and small business classification. The notice anticipates issuing the solicitation on April 14, 2022 with proposals due May 13, 2022 and contract award by December 8, 2022. The facility is to be completed within 730 calendar days of the notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Labor Agreement Survey_Ft Polk ISF.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Solicitation Notice
Title: Fort Polk Information Systems Facility
Classification Code: Y – Construction of Structures and Facilities
NAICS: 236220 – Commercial and Institutional Building Construction
Solicitation Number: W9126G22R0056
Agency: Department of the Army Office: U.S. Army Corps of Engineers Location: USACE District, Fort Worth
FOR Fort Polk Information Systems Facility. This solicitation is a competitive unrestricted competition for Construction of an Information Systems Facility, located at Fort Polk, Louisiana.
The objective of this project is to construct an Information Systems Facility, located at Fort Polk, Louisiana.
Construct a standard design Information Systems Facility. Project includes an information system processing area divided into specified security zones that address special use space for a Data Center, Network Operations Center (NOC), Local Session Controller Node (LSCN), and administration and warehousing. Construction includes redundant mechanical and electrical systems with backup power, secure organizational vehicle parking, loading/service areas, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Utility Monitoring Control Systems (UMCS) connection. Adherence to TEMPEST security standards will be provided.
Low Impact Development Integrated Management Practices (LID-IMPs) and sustainability and energy enhancement measures are included. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping, and signage. Heating and air conditioning will be provided by connection to a self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are not required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Access for individuals with disabilities will be provided. Cooling is estimated at 128 tons for the administrative and support areas, 232 tons for the Data Center, and 245 tons for redundant mechanical systems.
Note: The Information Systems Facility will be using a brand name for a fire alarm system from Monaco Fire Alarm Systems.
DFARS 236.204 Disclosure of the magnitude of construction project (ii) between $20,000,000 and $40,000,000
The unrestricted solicitation is anticipated to be issued on or about 2 May 2022. A firm-fixed price contract is anticipated to be awarded using Best Value Trade Off criteria IAW FAR 15.101. Anticipated contract award date on or about 8 December 2022.
Anticipated project completion date is 730 calendar days from issuance of Notice to proceed.
After solicitation issuance, contractors may view and/or download this solicitation and all amendments at the following internet address: https://piee.eb.mil/.The use of the website requires prior registration at https://piee.eb.mil/. Plans and specifications will not be made available in paper format or on compact disc. It is the Offerors responsibility to monitor the https://piee.eb.mil/ web site for amendments to the solicitation. You must be registered with the System Award for Management (SAM), to receive a Government contract award. You may register with SAM at https://sam.gov/.
The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. It is the offerors responsibility to view the https://piee.eb.mil/ website daily for amendments to the solicitation.
Accordingly, prospective contractors may view and/or download the solicitation and all amendments from the https://piee.eb.mil/ address after solicitation issuance. Solicitation Number W9126G22R0056.
https://piee.eb.mil/ https://piee.eb.mil/ https://piee.eb.mil/ https://www.sam.gov/ https://www.sam.gov/ https://piee.eb.mil/ https://piee.eb.mil/
Pre-Solicitation Notice
THIS IS NOT A SOLICITATION POSTING.
THIS IS A PRE-SOLICITAITON POSTING ONLY.
Contracting Office Address:
USACE
Attn: CESWF-CT PO Box 17300 Fort Worth, Texas 76102-0300 United States
Place of Performance:
Fort Polk, Louisiana
Primary Point of Contact:
Vernon Valigura, Contracting Specialist
Vernon.N.Valigura2@usace.army.mil
Phone: (817) 886-1634 mailto:Vernon.N.Valigura2@usace.army.mil
File details come from the government source that posted it. Updated .