This is a summary of a federal solicitation for repair and renovation work at Barksdale Air Force Base in Louisiana. The solicitation seeks a firm-fixed price contract between $25 million and $100 million to renovate Building B5454 to accommodate the Joint-Global Strike Operations Center. Scope of work includes interior renovations to support new space requirements, exterior modifications, a new HVAC distribution system with emergency shut-off, fire suppression system repairs, electrical and plumbing repairs, an elevator to support ABA requirements, secure mechanical and electrical rooms, intrusion detection system installation, and cybersecurity controls. Additional work consists of upgrading the transformer to 750kVA, relocating an air-cooled chiller, parking area reconfiguration, tree removal, seismic modifications, an antenna support structure and equipment building, an EMP-hardened generator set and fuel tank, and a secure perimeter fence with access control. The anticipated completion period is 540 days from notice to proceed. This is a 100% small business set-aside solicitation issued by the Department of the Army Corps of Engineers Fort Worth District. The NAICS code is 236220 with a $39.5 million size standard. Firms must register in SAM to be eligible for award. The response due date is not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SIte_Visit_Sign_in.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for Barksdale AFB Repair B5454, Barskdale AFB, LA is amended as follows.
See SF30 Continuation Sheet(s)
NOTE: Proposal receipt date is 2 Feb 2023 at 2:00pm CT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 31
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G22R0006
X 9B. DATED (SEE ITEM
11) 15-Dec-2022
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jan-2023
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9126G22R0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO SOLICITATION W9126G22R0006
1. TABLE OF CONTENTS: The table of contents is being replaced in its entirety, each page bearing the notation W9126G22R0006-0002.
2. APPENDIX F: The following appendix is being added to the Solicitation, each page bearing the notation W9126G22R0006-0002.
APPENDIX F J&A for Trane Chillers
End of Summary of Changes
BAFB B5454 REPAIRS
BARKSDALE AFB, LA
BD22B5454
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 05 SOLICITATION, OFFER AND AWARD, SF-1442
00 1 0 00 CONTRACT LINE ITEM SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
00 22 16 SELECTION PROCEDURES
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATION SCHEDULE
00 21 30 SITE VISITS
DIVISION 01 - GENERAL REQUIREMENTS
PROJECT SCHEDULES
SUBMITTAL PROCEDURES
SUSTAINABILITY REQUIREMENTS & REPORTINGD
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
01 30 00
01 32 01.00 10 01 33 00 01 33 29 01 35 26 01 42 00
01 57 19 01 58 00
01 62 35 RECYCLED/RECOVED MATERIALSN
SURVEY, LAYOUT, AND OTHER DATASN
ALTERATIONS TO EXISTING FACILITESN
01 00 00.00 44 01 14 00
01 71 23.00 44 01 72 00.00 44
01 74 19
01 78 00
01 78 23 OPERATION AND MAINTENANCE DATAS
ADMINISTRATIVE REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
CONSTRUCTION SCHEDULE
WORK RESTRICTIONS
W9126G22R0006-0002
PROJECT TABLE OF CONTENTS
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 20.00 27 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
BD22B5454
CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 29 SPRAY APPLIED ACOUSTIC MATERIAL
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
PROJECT TABLE OF CONTENTS Page 2
BD22B5454
PROJECT TABLE OF CONTENTS Page 3
DIVISION 09 - FINISHES
SCHEDULES FOR FINISHES
SUPPORTS FOR PLASTER AND GYPSUM BOARD
CEMENT STUCCO
GYPSUM BOARD
ACOUSTICAL CEILINGS
STATIC-CONTROL FLOORING
09 06 00 09 22 00 09 24 23 09 29 00 09 51 00 09 62 38
09 65 00 RESILIENT FLOORING
CARPETING
RIGID GRID ACCESS FLOORING
ACOUSTICAL WALL PANELS
09 68 00 09 69 13 09 84 20
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
12 59 00 SYSTEMS FURNITURE
PROJECT TABLE OF CONTENTS
13 34 19 METAL BUILDING SYSTEMS
13 49 20.00 10 RFI/EMI SHIELDING
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 18 PREACTION SPRINKLER SYSTEMS, FIRE
PROTECTION
21 22 00.00 40 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 13 - SPECIAL CONSTRUCTION
09 6 7 23.13 STANDARD RESINOUS FLOORING
12 24.13 ROLLER WINDOW SHADES
13 51 00 GEOTECHNICAL INSTRUMENTATION & MONITORINGS
BD22B5454
PROJECT TABLE OF CONTENTS
PROJECT TABLE OF CONTENTS Page 4
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR
HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 11 20 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 30 00 HVAC AIR DISTRIBUTION
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 81 23 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 13.10 30 ELECTRIC METERS
UNDER 600 VOLTS
26 32 15.00 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 23 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMSN
BD22B5454
PROJECT TABLE OF CONTENTS
DIVISION 27 - COMMUNICATIONS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.71 COLD MILLING ASPHALT PAVING
32 01 17.61 SEALING CRACKS IN ASPHALT PAVING
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 11 26 HOT-MIX BITUMINOUS BASE COURSE FOR
ROADS AND STREETS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 12 36.13 ASPHALTIC SEAL AND FOG COATS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
APPEND A HAZMAT SURVEY
APPEND B
APPEND C
APPEND D
APPEND E
J&A DOC, BUILDING AUTOMATION, REDACTED
J&A DOC, MONACO SYSTEMS, REDACTED
J&A DOC, VICAIDS, REDACTED
J&A DOC, VINDICATOR, REDACTED
APPENDICES
27 05 28.36 40 27 10 00
CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
BUILDING TELECOMMUNICATIONS CABLING SYSTEM
APPEND F J&A DOC, TRANE CHILLERS, REDACTED<AM0002> <AM0002>
Bldg. 5454 Renovation BD22B5454
APPENDIX F
J&A DOC - TRANE CHILLERS
(REDACTED)
Control No. SWF 23-27
5. Reason for Authority Cited: The Air Force is required to use the “brand name exception” to CICA because the nature of the acquisition as a strategic vehicle for Category Management (CM) requires a pre-planned brand name approach to acquiring HVAC chillers. This brand name acquisition is integral to generate significant estimated cost savings in training expenses and efficiency improvements in mission performance not otherwise available under full and open competition.
As described at FAR 6.302-1(a)(2), when the supplies or services required by the agency are available only from one responsible source, or for DoD, NASA, and the Coast Guard, from only one or a limited number of responsible sources, and no other types of supplies or services will satisfy agency requirements, full and open competition need not be provided for. This J&A applies the Only One Responsible Source authority using the application of FAR 6.302-1(b)(4), which indicates that use of FAR 6.302-1(c) is appropriate "When the agency head has determined in accordance with the agency's standardization program (Air Force Standardization program) that only specified makes and models of technical equipment and parts will satisfy the agency's needs for additional units or replacement items, and only one source is available."
a. Background:
(1) On 3 May 2019 the Department of the Air Force (DAF), Air Force Civil Engineer Center (AFCEC), issued a memorandum (Attachment 1), Subject: HVAC Chiller System Standardization, Single Manufacturer Selection.
The purpose of this memorandum was to ensure mandatory standardization of HVAC Chiller Systems to single manufacturer at the installation level.
(2) The Memo directed the Base Civil Engineer (BCE) to perform comprehensive inventory analysis to identify a single manufacturer for HVAC Chiller systems at their respective installations.
(3) Barksdale Air Force Base 2D Civil Engineering Squadron (BAFB 2D CES), pursuant to Air Force guidance and policy, conducted an analysis to justify the use of single manufacturers for HVAC chiller units. BAFB 2DCES’s analysis determined that Trane Technologies was identified as the requested manufacturer for HVAC chiller units at BAFB. The decision was based on the high percentage of currently existing Trane HVAC Chiller Systems on the installation, the greater experience that technicians have in servicing Trane equipment, the existence of adequate competition relative to this brand, and the ability to allow the installation to reduce total cost of ownership, maintenance, and training (Attachment 2).
(4) Based on the analysis across different AF Bases, United States Air Force (USAF) prepared and received approval in 2019 for a Class J&A based on a Base Selection List to support new chiller purchases until 30 Sep 2024 (Attachment 3). This Class J&A would support multiple contracts (new) throughout USACE both CONUS and OCONUS location.
(5) The overall goal is to eliminate redundancies, increase efficiency, reduce total cost of ownership to include initial procurement, subsequent maintenance, and associated training costs to operate the system over its lifecycle, deliver more value and savings across all acquisition programs and mainly to buy common goods and services as an enterprise rather than with individual acquisitions.
b. Justification:
(1) FAR 6.302-1(b)(4) permits use of the Only One Responsible Source authority when the agency head has determined in accordance with the agency's standardization program that only specified makes and models of technical equipment and parts will satisfy the agency's needs for additional units or replacement items, and only one source is available.
(2) Air Force Civil Engineering Center Director who also serves as the Air Force Category Manager for the Facilities and Construction Category has provided guidance with regards to specifications and engineering descriptions for Air Force facilities (see attachments). Please see the attached:
i. AFCEC HVAC Chiller system Standardization, Single Manufacturer Selection date 03 May 2019, (Attachment 1).
ii. Memorandum from BAFB_ Chiller Standardization Request Letter signed, signed on 30 April 2019 (Attachment 2).
iii. AF HVAC Chiller J&A dated March 2018 (Attachment 3).
iv.Addendum base Manufacturing Selection list (Attachment 4).
(3) The training costs of Air Force maintenance personnel would be greatly reduced under the standardization of HVAC Chillers. There are two aspects of training for Air Force maintenance personnel. Like, other Air Force assets, additional training beyond initial skills training is required to maintain proficiency in the system's maintenance. Initial training for Air Force personnel maintaining HVAC systems is conducted at Sheppard AFB (the “schoolhouse”) and includes basic instruction on Chillers for common maintenance and operations across the inventory of Air Force chillers. However, there is no detailed instruction on fault diagnosis and repair because the Air Force inventory of chillers has 142 different manufacturers, the unique difference in the manufacturers' processes cannot be trained to ensure trainees master all manufacturers. Therefore, Air Force personnel require additional training at the maintainer's duty location on base-specific manufactures' chillers. At every Air Force base, there are between 1 and 19 number of unique manufactures' chillers, requiring the local training to stretch across all different types of chillers.
(4) The Air Force Civil Engineering Center (AFCEC) Force
Development Manager for HVAC reviewed the Career Field Education and Training Plan (CFETP) to capture the costs for minimal training to operate and maintain multiple systems. Of the 20 HVAC chiller related tasks on the CFETP, 13 tasks would have to be re-learned or accomplished with each new manufacturer bought and installed. Thus, 65% of the baseline training costs is repeated at the duty station for each new manufacturer installed at a base.
This level of effort is not practical and cannot occur while still meeting the basic mission needs. The result is an under-trained workforce burdened to train-as-you go, which ends in failed attempts to maintain and repair critical equipment.
(5) Additional training must also be provided above the CFETP to ensure advanced troubleshooting and repair of specific systems. Advanced training requires the manufacturer to be involved to certify that the maintainer can use proprietary systems for fault diagnosis or have access to proprietary code for digital faults. The cost of this training is high and is specific to each manufacturer. Currently, the Air Force funds this training for only the top manufacturer used at the base, and any repairs required on other complex systems are contracted out.
(6) Manufacturer-specific training for CFETP requirement
13.18.2.2 (Chillers) has been priced in the Category Intelligence Report (CIR) from actual expenses, for Trane and Carrier systems. The total cost for training two of the Air Force's main OEMs Chiller's range from $7,525 to $9,300 per person. Additionally, the full price, including TDY costs, the cost for the same Chillers ranges from $18,525 to $20,300 per person, or an average cost of $19,413. To meet the Air Force standard of competency for chiller maintainers, the total cost for manufacturer training for 3,006 maintainers for just on manufacturer system, inclusive of TDY costs, is $58,355,478 in a five-year training cycle.
(7) The most savings would result by the Air Force establishing local specialized training once the installation's standardized Chiller manufacturer is designated. Through standardization and on-site organic advanced training, the cost is estimated to reduce to approximately $5M to train all 3006 maintainers on a single manufacturer's system in-house.
Alternatively, even if the Air Force paid full vendor prices and were trained at the bases instead of sending maintainers TDY that cost drops down to $25.3M.
Any mix of training reform aided by standardization results in tens of millions in cost reductions.
c. Alternatives:
(1) The alternative to HVAC chiller standardization is to continue to allow contractors to purchase any brand of chiller that meets the minimum requirements of a request for proposal. As noted in AF HVAC Chiller J&A dated March 2018 (attachment 3), the procurement of multiple different types of manufactured chillers has created high- cost impacts related to additional training required for each type of chiller, in addition the quality of each type of chiller is not equal. Further, their operation and maintenance cost are higher as a result. This alternative continues the present drawback of wasting financial resources and manpower due to the redundant costs and duplication of effort encountered by using multiple chiller manufacturers.
Manufacturer supplied training is expensive, and training with more than one manufacturer is not cost feasible. Training and maintenance activities will continue to be inadequate, and new equipment integration increasingly burdensome with this strategy, until it ultimately becomes unsustainable.
d. Prior Acquisitions: N/A. A search of USACE CT-Ft. Worth PCF shows no procurement history.
e. Impact:
(1) If this J&A is not approved, the BAFB’s chiller replacement contracts cannot be executed in accordance with the Department of the Air Force (DAF), Air Force Civil Engineer Center (AFCEC) memo. Failure to initiate this standardization effort will prevent BAFB and AFCEC, from realizing the efficiencies and reductions in costs that have been targeted by category management. The BAFB 2D CES will continue to contend with significant duplication of manpower and financial costs due to the variety of existing chiller equipment; the AF J&A shows that limiting new chiller acquisitions to one manufacturer will substantially reduce these expenditures by reducing: training requirements; need for contract repairs that are beyond in-house capability;
software engineering, documentation and procurement requirements; and lost mission man-hours due to equipment reliability issues and the resultant downtime. Failure to implement this Category Management initiative will result in forfeiture of the opportunity to use the BAFB 2D CES workforce more efficiently by increasing working knowledge of the chiller inventory while increasing HVAC system maintenance reliability and enhancing BAFB 2D CES mission capability.
6. Efforts to Obtain Competition: The Contracting Officer published the notices required by FAR 5.201, as described below, and any bids or proposals received shall be considered.
a. Effective Competition is anticipated amongst vendors authorized to sell and maintain chillers manufactured by Trane. The cost and efficiency benefits to BAFB through standardization and interoperability of exclusively using Trane Chillers, greatly outweigh the expected benefits of competing amongst different chiller manufacturers. Effective competition is not applicable at the manufacturer level, as this is a sole source equipment requirement.
Competition will be achieved at the authorized distributer level.
b. Though the brand name requirement for HVAC equipment will be stipulated in the solicitations, this is a small component of the overall renovation project of the B5454 Renovation at BAFB. The majority of renovation requirement, in both effort and total dollars for each project will be synopsized and will not be subject to lack of competition. Effective competition will be achieved in multiple ways, including full and open competition, small business participation plan and this J&A will be posted with the solicitation.
Potential contractors will be made aware that specifications for this project will require the installation of Trane Chiller. This coordination alerts them to engage subcontractors that are certified in installing this item. This coordination alerts them to engage subcontractors that are certified in installing this item.
c. Though the use of specified makes of items cannot be considered competitive regardless of the number of suppliers available, it is anticipated that multiple vendors will be available to provide and install Trane Chillers at the subcontracting level and this sole source equipment requirement will not affect the overall competition for the vertical construction requirements.
7. Actions to Increase Competition: A survey was conducted in March 2018 in preparation of the creation of the CIR. The Air Forces current main Original Equipment Manufacturer (OEM) companies were contacted, including Trane, Carrier, the York brand of Johnson Controls, and McQuay Chillers of Daikin Applied. These manufacturers account for 88% of the chillers installed on USAF Bases. The manufacturers, except for Trane who did not respond, provided summary descriptions of their product lines supporting the general idea that all of them have capability to meet the USAF requirements and support standardization efforts. The responses also supported the idea of competition among the manufacturers being maintained at the distributor level, where possible small business awards can be made.
8. Market Research: This J&A is prepared based on information from published research that was accomplished in 2018 from a joint Category intelligence review (CIR) between Air Force Installation and Mission Support (AFIMSC), Air Force Civil Engineering Center (AFCEC), and Air Force Installation Contracting Center (AFICC) to gain practical knowledge and experience in how the Air Force manages HVAC systems as well as current market and industry trends and practices. Supporting facts to the 2019 AF Class J&A were drawn from the CIR, which documents historical and future HVAC Chiller long-term and in-depth spend & trend analysis. Input was gathered from AFCEC subject-matter experts, market analysis, and gap analysis.
The Fort Worth Air Force and Job Order Contract (JOC) Acquisition Section researched the SBA Dynamic Small Business Search (DSBS) on August 03, 2022. The market research indicated competition among authorized suppliers for the Trane brand will exist since they are readily available in the commercial marketplace. Because there are multiple sources, it is reasonable to expect that a fair and reasonable price will result from adequate competition at the subcontracting level. The BAFB local vendor demographics for HVAC service providers are:
3 Service-Disabled Veteran
1 Women Owned Small Business Certified
12 SBD Certified 6 8(a) Certified
0 Economically Disadvantaged Women Owned Small Business Certified
1 HUBZone Certified 20 Small Business
9. Interested Sources: N/A, This J&A will be posted with the solicitation in accordance with FAR 5.102(a)(6).
10. Other Facts: Reasonable efforts were made to retrieve other facts from computer records, contract files, and other sources to support the use of other than full and open competition as follows:
a. Procurement History. Prior to this standardization effort, there is no known history of Trane Chillers procurement of HVAC equipment for BAFB.
Attachments:
Attachment 1- AFCEC HVAC Chiller System Standardization, Single Manufacturer Selection, 03 May 2019
Attachment 2- Memorandum from BAFB_ Chiller Standardization Request Letter signed, signed on 30 April 2019
Attachment 3 - AF HVAC Chiller J&A March 2018
Attachment 4 - Addendum Base Manufacturing Selection List
Approval
Based on the foregoing justification, I hereby approve the procurement of Daikin Applied Chillers for the estimated amount of on another than full and open competition basis pursuant to the authority of 10 U.S.C.2304(c)(1) Only One Responsible Source and No Other Supplies or Services will satisfy agency requirements subject to availability of funds, and provided that the services or property herein described have otherwise been authorized for acquisition.
Signature:
Name: Nicholas I. Johnston Title: Contracting Officer USACE, Fort Worth District
Date: 2023.01.13 13:49:59 -06'00'
Date:
DEPARTMENT OF THE AIR FORCE
2D CIVIL ENGINEER SQUADRON (AFGSC)
BARKSDALE AIR FORCE BASE LOUISIANA
MEMORANDUM FOR AFCEC/CO
30 Apr 19
FROM: 2CES/CC
334 Wcsl Davis Avenue, Suite 200
Barksdale Air Force Base, Louisiana
SUBJECT: Chiller System Manufacturer Standardization Request
1. The 2d Civil Engineer Squadron conducted a series of analyses to justify the use of a sole manufacturer for Heating, Ventilation, and Air Conditioning (HVAC) chiller units. As a result of the analyses, Trane Incorporated has been identified as the requested single manufacturer of chiller systems to be used on Barksdale Air Force Base. Louisiana.
2, A comprehensive inventory control analysis was completed by a team comprised of the CEO Infrastructure Superintendent and the HVAC Systems Sub-Activity Manager, The following data was derived from BUILDER:
Manufacturer # of Units Percent of Component Average
Total Units Replacement Remaining
Value Service Life
TRANE 85 76,59% $8,752,322 9.5
CARRIER 2 1.80% $994,418 1.5
Daikin/McQuav 9 8.10% $1,164,025 10
YORK 15 13.51% $2,694,279 11.1
3. A supply chain analysis was completed by the Chief of Material Control. Three local companies have been identified that can meet future demand requirements, and there is adequate competition to mitigate fluctuations of component and servicing pricing. Trane equipment is also listed on the Genera! Services Administration (GSA) contract which pre-determines unit pricing.
4. Given the high percentage of Trane systems currently on the installation, technicians have significantly more experience and familiarization working with their equipment than other manufacturers on the installation.
Additionally, due to the proximity of a regional Trane headquarters, they have been able to offer training in a timelier and cheaper manner than other manufacturers, which has benefited our craftsmen and improved the quality of our preventative maintenance and repairs.
5. An approval of this initiative will allow the installation to significantly reduce the total cost of ownership to include the initial procurement, subsequent maintenance, and associated training costs with these systems. An approval memorandum from AFCEC/CO is requested to concur with the above findings.
6. Please refer any questions to my POC: Mr. James W. Cupp, at 318-456-9677, or email James,cupp.3@us.af.mil.
(OBERT C, LANCE, Lt Col, USAF Commander
DEPARTMENT OF THE AIR FORCE
AIR FORCE CIVIL ENGINEER CENTER
TYNDALL AIR FORCE BASE FLORIDA
3 May 2019
MEMORANDUM FOR ALMAJCOM-FOA-DRU-PSU
FROM: AFCEC/CO
139 Barnes Drive, STE 1 Tyndall AFB, FL 32403-5319
SUBJECT: HVAC Chiller System Standardization, Single Manufacturer Selection
Reference: (a) AFCEC/CL Memo, 3 May 2019, Air Force Policy Memorandum Mandatory Standardization of Essential HVAC System Components
1. The Air Force Civil Engineer Center Director (AFCEC/CL) serves as the Air Force Category Manager (CM) for the Facilities and Construction Category and he has mandated the standardization of HVAC chiller systems to a single manufacturer at the installation level. The AFCEC/CL has further delegated the authority and responsibility of administering the single manufacturer approval process to the AFCEC Operations Directorate (AFCEC/CO).
2. Standardization of all HVAC chiller systems allows the Air Force to significantly reduce the total cost of ownership which includes the initial procurement, subsequent maintenance, and associated training costs to operate the system over its lifecycle. Since standardization is a long-term strategy, Base Civil Engineers (BCEs) must perform their due diligence during the selection process to mitigate any prolonged adverse effects. This memorandum serves as AFCEC/CO’s official guidance for the evaluation, recommendation, and subsequent approval of a single manufacturer for HVAC chiller systems at each installation.
3. BCEs are required to submit a Memorandum of Request (MOR) to the AFCEC/CO that clearly specifies the requested single manufacturer for HVAC chiller systems at the respective installation as well as provide reasoning and justification per the guidance set forth by this document. In turn, AFCEC/CO will issue an Official Memorandum approving or disapproving the requested manufacturer. Should disapproval be merited, AFCEC/CO shall provide explanation for all disqualifications as well as engage with the BCE directly to identify a suitable alternative.
4. The BCE shall assign a team to perform a comprehensive inventory analysis to identify a single manufacturer for HVAC chiller systems. It is recommended that at a mimum, the team be comprised of the Installation Mechanical and HVAC Systems Sub-AMP Manager, a qualified HVAC technician, and a Material Control representative. However, BCEs may elect to augment and/or enhance the composition of the evaluating team as necessary.
Installation
No. MAJCOM Installation Unit Manufacturer
1 ACC BEALE 9 CES TRANE
2 ACC CREECH 799ABS/CE TRANE
3 ACC DAVIS-MONTHAN 355 CES TRANE
4 ACC GRAND FORKS 319 CES TRANE
5 ACC JB LANGLEY-EUSTIS 633 CES TRANE
6 ACC MOODY 23 CES TRANE
7 ACC MOUNTAIN HOME 366 CES TRANE
8 ACC NELLIS 99 CES CARRIER
9 ACC OFFUTT 55 CES DAIKIN (MCQUAY)
10 ACC SEYMOUR JOHNSON 4 CES TRANE
11 ACC SHAW 20 CES TRANE
12 ACC TYNDALL 325 CES TRANE
13 AETC ALTUS 97 CES TRANE
14 AETC COLUMBUS 14 CES DAIKIN (MCQUAY)
15 AETC GOODFELLOW 17 CES TRANE
16 AETC HOLLOMAN 49 CES CARRIER
17 AETC LAUGHLIN 47 CES TRANE
18 AETC LUKE 56 CES CARRIER
19 AETC MAXWELL 42 CES TRANE
20 AETC SHEPPARD 82 CES TRANE
21 AFDW JB ANDREWS 11 CES TRANE
22 AFGSC BARKSDALE 2 CES TRANE
23 AFGSC DYESS 7 CES TRANE
24 AFGSC ELLSWORTH 28 CES CARRIER
25 AFCENT AL UDEID 379 CES CARRIER
26 AFGSC F.E. WARREN 90 CES TRANE
27 AFGSC KIRTLAND 377 CED
JOHNSON CONTROLS INC.
(YORK, QUANTECH)
28 AFGSC MALMSTROM 341 CES TRANE
29 AFGSC MINOT 5 CES
JOHNSON CONTROLS INC.
(YORK)
30 AFGSC WHITEMAN 509 CES TRANE
31 AFMC ARNOLD AEDC/TSDC CARRIER
32 AFMC EDWARDS 412 CES TRANE
33 AFMC EGLIN 96 CES TRANE
34 AFMC HANSCOM 66 CED TRANE
35 AFMC HILL 75 CES TRANE
36 AFMC ROBINS 78 CES CARRIER
37 AFMC WRIGHT-PATTERSON 88 CEG TRANE
38 AFRC DOBBINS 94 MSG/CE CARRIER
39 AFRC GRISSOM* 434 MSG/CE TRANE
40 AFRC WESTOVER 439 MSG/CE CARRIER
41 AFSOC CANNON 27 SOCES TRANE
42 AFSOC HURLBURT FIELD 1 SOCES TRANE
43 AFSPC BUCKLEY 460 CES INGERSOLL (TRANE)
44 AFSPC CAPE CANAVERAL 45 CES TRANE
45 AFSPC CAPE COD 6 SWS CARRIER
46 AFSPC CAVALIER 10 SWS TRANE
47 AFSPC CHEYENNE MOUNTAIN 721 CES TRANE
48 AFSPC DAHLGREN 18 SPCS TRANE
49 AFSPC LOS ANGELES 61 CELS CARRIER
50 AFSPC PATRICK 45 CES TRANE
51 AFSPC PETERSON 21 CES TRANE
52 AFSPC SCHRIEVER 50 CES CARRIER
53 AFSPC THULE 821 SPTS EXHAUSTO/NOVENCO
Addendum_Base-MFG'R Selection List
54 AFSPC VANDENBERG 30 CES TRANE
55 AMC DOVER 436 CES TRANE
56 AMC FAIRCHILD 92 CES TRANE
57 AMC JB CHARLESTON 628 CES TRANE
58 AMC JB MCGUIRE-DIX-LAKEHURST 87 CES TRANE
59 AMC LITTLE ROCK 19 CES TRANE
60 AMC MACDILL 6 CES CARRIER
61 AMC MCCONNELL 22 CES DAIKIN (MCQUAY)
62 AMC SCOTT 375 CES TRANE
63 AMC TRAVIS 60 CES CARRIER
64 PACAF EARECKSON 611 CES CARRIER
65 PACAF EIELSON 354 CES TRANE
66 PACAF JB ELMENDORF-RICHARDSON 773 CES TRANE
67 PACAF KADENA 18 CES CARRIER
68 PACAF KUNSAN 8 CES LG
69 PACAF MISAWA 35 CES MITSUBISHI
70 PACAF WHEELER 611 CES CARRIER
71 PACAF YOKOTA 374 CES
CARRIER (TOSHIBA-
CARRIER)
72 USAFA USAFA 10 CES TRANE
73 USAFE AVIANO 31 CES
SWEGON GROUP (BLUE BOX
INC.)
74 USAFE MORON 496 ABS/CE CARRIER
75 USAFE RAF ALCONBURY/MOLESWORTH 423 CES UNIFLAIR LIMITED
76 USAFE RAF CROUGHTON 422 CES CARRIER
77 USAFE RAF LAKENHEATH 48 CES CARRIER
78 USAFE RAF MILDENHALL 100 CES CARRIER
79 USAFE RAMSTEIN 786 CES TRANE
80 USAFE SPANGDAHLEM 52 CES
UNITED TECHNOLOGIES
CORP - UTC (CIAT)
81 USAFE INCIRLIK 39 CES
CARRIER/CLIVET (FORM,
MIDEA GROUP)
82 USAFE LAJES FIELD 65 CES CARRIER
83 PACAF ANDERSEN 36 CES DUNHAM BUSH
84 PACAF DAEGU 607 MMS LG
85 PACAF GIMHAE 607 MMS LG
86 PACAF SUWON 607 MMS LG
87 PACAF KWANGJU 607 MMS LG
88 PACAF OSAN 51 CES AERMEC INTERNATIONAL
89 AFRC HOMESTEAD 482 MSG CARRIER
90 AFCENT PRINCE SULTAN AB 378 ECES CARRIER
91 AETC JBSA 502 CES TRANE
92 AETC KEESLER AFB 81 CES TRANE
93 AETC VANCE AFB 71 ISS/CE CARRIER
94 AFRC MINNEAPOLIS-ST. PAUL IAP ARS 934 MSG/BCE TRANE
95 AFCENT AL DHAFRA 380 ECES CARRIER
Carrier 26
Trane 49
LG 5
UTC 0
AERMEC 0
Johnson Ctrls 0
DAIKIN 0
Ingersoll 0
Dunham Bush 1
Uniflair 0
Swegon 0
Mitsubishi 1
Exhausto 0
| AMENDMENT 0002 |
| SUMMARY OF CHANGES |
| TABLE OF CONTENTS |
| App F - J&A Doc, Trane Chillers, Redacted |