B08_Soliciation 22Q0029 Amd 2.pdf

PDF 735 KB Posted

Attached to
3R WH_PR_HC Summer FY 22 Gate Attendant
Solicitation number
W9126G22Q0029
Issued by

View the file

Other files

File Type Posted
B08_Solicitation 20Q0029 Amd 1.pdf PDF
B01_Solicitation_22Q0029a.pdf PDF
B08_Solicitation_22Q0029a.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0002 is to extend the offer due date and time to 11 March 2022 at 3:00pm for Hords Creek, Gatehouse Gate B and Proctor Lake, Copperas Gate A ONLY.

This amendment includes changes in Performance Work Statement to Proctor Lake Copperas Gate A

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G22Q0029

X 9B. DATED (SEE ITEM 11)

11-Feb-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Mar-2022

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G22Q0029

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

PWS PROCTOR, COPPERAS GATE A

Amendment 2

APPENDIX PERFORMANCE WORK STATEMENT (PWS)

GATE ATTENDANT SERVICES

PROCTOR LAKE

1. GENERAL: No additional items.

1.1 DESCRIPTION OF SERVICES/INTRODUCTION: No additional items.

1.2. SCOPE: Gate Attendant services as described in the PROCTOR LAKE Appendix PWS, Section 1.11, Work to be Performed, and the Fort Worth District Gate Attendant Services PWS.

1.3 PERIOD OF PERFORMANCE: Estimated deliverables are shown in table below:

Position Number Days Surveillance Nights

Copperas Creek A Shift

a) Base Period:

01 April 2022 through 30 September

92 92

b) Option Period 1:

01 October 2022 through 31 March

92 92

1.4 GENERAL INFORMATION:

1.4.1 Quality Control: No additional items.

1.4.2 Quality Assurance: No additional items.

1.4.3 Government Holidays: Gatehouse hours will be 10:00 hrs. to 20:00 hrs. during holidays that fall within the contractor’s shift. Government holidays are Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, July 4th, Labor Day, Columbus Day, and Veterans Day (eight (8) total holidays per year).

1.4.4 Hours of Operation: Contractors will work a four (4) day on / four (4) day off shifts. Contractor “A” shift will start on 1 April 2022 and work through 31 March 2023. Summer hours run from 1 April 2022 through 30 September 2022. Winter hours run from 1 October 2022 to 31 March, 2023.

Contractor Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Summer Hours Surveillance Hours Gate House Hours Availability Hours

0600-2200 1000-1800 2200-0600

0600-2200 1000-1800 2200-0600

0600-2200 1000-1800 2200-0600

0600-2200 1000-1800 2200-0600

0600-2200 1000-2000 2200-0600

0600-2200 1000-2000 2200-0600

0600-2200 1000-1800 2200-0600

Winter Hours Surveillance Hours Gate House Hours Availability Hours

0600-2200

1000-2000

1.4.5 Place of Performance: The work to be performed under this contract will be performed at Proctor Lake.

1.4.5.1 Copperas Creek Park: Located approximately 8 miles northeast of Comanche, Texas. From Comanche, Texas, take Highway 67/377 northeast then turn left on FM 2861. Follow road for 2 miles to the park entrance. Facilities include 67 campsites with water and electric hook-ups, 3 restrooms with hot showers, 2 group shelters, 1 day use areas, and three boat ramps.

1.4.6 Type of Contract: No additional items.

1.4.7 Security Requirements:

1.4.7.1 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

1.4.7.2 Key Control: Government keys provided to the Contractor will be issued and controlled in accordance with IAW AR 190-51 and the U.S. Army Corps of Engineers, Recreation Operations and Maintenance Guidance and Procedures, EC 1130-2-550, Chapter 9 and the USACE Recreation Use Fee Standard Operating Procedure. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor and team member. The Contractor shall prohibit the opening of locked areas by persons other than the Contractor and team member.

1.4.7.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.4.7.4 Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

1.4.7.5 For contractors who do not require CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center

Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.4.7.6 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

1.4.7.7 E-Verify Verification of Eligibility. The Contractor must use the U.S. Department of Homeland Security E-Verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the Lake Manager no later than 3 business days after the initial contract award. When contacts are with individuals, the individual will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This form will be provided to the Contracting Officer and shall become part of the official contract file.

1.4.8 Special Qualifications: No additional items.

1.4.9 Pre-Work Conference: Successful bidders will be required to attend a pre-work conference to be held at a date and time specified by the Lake Manager. It is the successful bidder’s responsibility to contact the lake office for pre-work conference time and date prior to the start of the contract. Training session will be held as scheduled with the gate attendant coordinator. Gate Attendants will not receive any separate payment for attending the pre-work conference. During this time successful bidder will bring an original copy of a current security bond to be left at the Lake Office. Gate Attendants shall attend additional training sessions as required by the Lake Manager during the contract on a regularly scheduled workday.

1.4.10 Contracting Officer Representative (COR): Not required per DFARS PGI 201.602-2(d)(v)(A).

1.4.11 Contractor Key Personnel: No additional items.

1.4.12 Identification of Contractor Employees: No additional items.

1.4.13 Contractor Travel: No additional items.

1.4.14 Data Rights: No additional items.

1.4.15 Organizational Conflict of Interest: Any real or potential conflicts of interest, such as the contractor/ subcontractor having business or family association with a USACE employees should be immediately reported to the Contracting Officer for disposition. Potential OCI may be mitigated or could result in contract termination or subcontractor removal

1.5. GOVERNMENT-FURNISHED ITEMS AND SERVICES:

1.5.1 Facilities: No additional items.

1.5.2 Equipment: The Government will provide computer, computer monitors, printers, telephone and radio communication equipment.

1.5.3 Materials: The Government will provide in the gate house forms, maps, brochures, handouts, light bulbs, air condition filters, computer paper, staplers, staples, china markers, and water hose. The Government will also supply the Fort Worth District Use Fee Program SOP, and the Proctor Lake Gate Attendant Handbook.

1.5.4 Trailer Site: A storage building is available for the Contractor’s use.

1.6 CONTRACTOR-FURNISHED ITEMS AND RESPONSIBILITIES:

1.6.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 1.5 of this PWS.

1.6.2 Equipment: The Contractor shall provide a transportation vehicle, which can be operated independently of the RV free of leaks and in good mechanical condition for use in performing the requirements of the contract. Minimum state required liability insurance must be carried. Proof of liability insurance will be submitted to the Lake Manager prior to work start date.

1.6.3. Materials: The Contractor shall furnish all materials, excluding those furnished by government as specified above and needed to operate the gatehouse. This list includes, but is not limited to, hi-liters, color markers, notepads, pens, pencils, tape, trash bags, cleaning supplies, restroom supplies and any other items that may be necessary to operate the gatehouse.

1.6.3.1 In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired;

(1) Competitively within a timeframe providing for compliance with the contract performance schedule;

(2) Meeting contract performance requirements; or

(3) At a reasonable price.

Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program . The list of EPA-designated items is also available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products, items may include, but are not limited to the following products used on-site in execution of this contract.

• Two ply toilet tissue

• Paper hand towels

• Trash can liners

• Bio based content cleaners, solvents, detergents and disinfectants.

1.6.3.2 As required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C.

6962(c)(3)(A)(i)), the offeror certifies, by signing this offer, that the percentage of recovered materials content for EPA-designated items to be delivered or used in the performance of the contract will be at least the amount required by the applicable contract specifications or other contractual requirements.

1.6.3.3 References

• FAR Provision 52.223-1 – Biobased Product Certification

• FAR Clause 52.223-2 – Affirmative Procurement of Biobased Products Under Service and

Construction Contracts

• FAR Provision 52.223-4 – Recovered Material Certification

• FAR Clause 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA-

Designated Items

• FAR Clause 52.223-17 – Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

1.6.4. Personnel: Minimum of two (2) person team over 21 years of age shall remain in the park during the entire work shift as specified by the Lake Manager.

1.7 CONTRACTOR MANAGEMENT REPORTING (CMR): No additional items.

1.8 APPLICABLE PUBLICATIONS (CURRENT EDITIONS): The Contractor must abide by all applicable State, Federal and Local Laws and regulations, publications, manuals, and local policies and procedures, including the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, the Fort Worth District Use Fee Program SOP, and the Proctor Lake Office Gate Attendant Handbook.

1.9 ATTACHMENT/TECHNICAL EXHIBIT LIST:

1.9.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary: See Attachments at end of document.

1.9.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule: See Attachments at end of document.

1.10 SAFETY: No additional items.

1.11 WORK TO BE PERFORMED: Additional items as described below.

TASK 1. User Fees: No additional items.

(a) User Fee Collection: The contractor will collect all user fees in accordance with the Fort Worth District Use Fee Program SOP. User fees will be collected through the operation of a computer and the National Recreation Reservation System (NRRS), Recreation One Stop (Recreation.gov), Outdoor Recreation Management System (ORMS), cash register or User Fee Permit Books. Monies, fee books, annual day use fee passes, credit vouchers, credit card receipts, America the Beautiful Senior Pass, America the Beautiful Access Pass and other America the Beautiful passes, and user fee permits will be stored in a permanently installed vault or safe provided by the Government, or as directed by the Lake Manager. The Contractor is then required to purchase a money order for the amount of the User Fees collected. The Gate Attendants are required to turn in the money order and the user fee documents to a Park Ranger at the Lake Office.

(b) Audits and Fee Security: No additional items.

(c) Cash on Hand: Contractors will be required to start the day with one hundred dollars to be used for change.

TASK 2. Campsite Reservations: No additional items.

TASK 3. Group Shelters: If group/screen shelters in the park are rented, Gate Attendants will unlock electric panels and entrance gates for the renter. Upon departure of a renter, Gate Attendant will conduct an inspection of the group/screen shelter, barbecue pit and associated items. Gate Attendant will advise renter if additional cleaning is required. Park Ranger will be notified if renter fails to properly clean group/screen shelter, barbecue pit, or associated items. Gate Attendant will complete required inspection reports and turn in the reports to the Lake Manager or designated representative a minimum of once per week.

TASK 4. Camping Status: The Contractor’s camping status will match the reservation arrival reports. The Contractor will make sure that the campers who are listed on the reservation arrival reports are current and are in agreement with NRRS, ORMS (Outdoor Recreation Management System) or the ORMS reservation reports. Contractor shall perform the duty of changing campsite status markers in accordance with established policies of the Lake Manager. In the event all electrical and/or non-electrical campsites are occupied, Contractor will maintain a waiting list and notify those individuals, in order of placement on the waiting lists, whenever a campsite becomes vacant.

TASK 5. Park Inspection: Gate attendants will make a minimum of four (4) park inspections each workday. Additional inspections may be required to check on visitor complaints, deliver messages, and check park status. The Contractor shall inform park visitors and campers of any violation of rules, regulations, and policies in a friendly, informative manner and ask for compliance.

TASK 6. Visitor Assistance: No additional items.

TASK 7. Disturbances: No additional items.

TASK 8. Complaints: No additional items.

TASK 9. Lost and Found: The Contractor will maintain a lost and found department in the gatehouse. Any items not picked up after two (2) weeks will be turned in to a Park Ranger. The Contractor will prepare a lost and found report on all lost and found property. The Contractor will ensure that proper identification is obtained from individuals before release of any lost and found property.

TASK 10. Image, Personal Appearance and Dress: Contractors may be required to dress to a standard that will be determined by the Lake Manager. If required to dress to a standard, uniform attire will be provided by the Lake Office.

TASK 11. Cooperation with Others: No additional items.

TASK 12. Living Area and Gatehouse Maintenance:

(a) Trailer Area Maintenance: Gate attendant campsite shall be kept clean and maintained by the contract gate attendant to a perimeter of 30 feet surrounding the campsite.

(b) Pets: No additional items.

(c) Excessive Personal Items: No additional items.

(d) Smoking: No additional items.

(e) Gatehouse Maintenance: The Contractor will maintain the gatehouse, both inside and outside, in a clean, orderly and sanitary condition at all times. The gatehouse will be thoroughly cleaned at the end of each shift to the Lake Manager or designated representative’s satisfaction to include the following:

toilet facilities, carpet (vacuumed), hard floors (swept and mopped), windows, entire interior building surfaces (dusted and cleaned if necessary) and litter free outside building and walking surfaces for seventy-five (75) feet perimeter of gatehouse. Gate Attendants will provide all equipment, tools, supplies, and materials necessary to clean the gatehouse. Gate Attendant shall water the lawn, flowers, trees, and shrubs in the immediate area of the gatehouse and/or trailer site as instructed by lake personnel. The Government will provide hose and sprinklers.

(f) Trash Removal: No additional items.

(g) Living Quarters Security: No additional items.

TASK 13. No Soliciting: No additional items.

TASK 14. Weapons: No additional items.

TASK 15. Alcohol: No additional items.

TASK 16. Government Property: No additional items.

TASK 17. Absenteeism: No additional items.

TASK 18. Visitors of the Contractor/Gate Attendant: No additional items.

TASK 19. Security Bonding: No additional items.

TASK 20. Physical Security and Key Control: No additional items.

1.12 GENERAL LIABILITY AND OTHER INSURANCE: No additional items.

1.13 DAMAGE RESPONSIBILITY: No additional items.

1.14 LIABILITY: No additional items.

1.15 PERMITS/COMPLIANCE: No additional items.

1.16 COMMUNICATIONS EQUIPMENT: No additional items

1.17 PAYMENT FOR SERVICES: The Contractor shall provide an invoice for payment to the Lake Manager after the last day worked each month.

1.18 TERMINATION. No additional items.

1.19 DUTY OF CONTRACTOR TO FINISH CONTRACT: No additional items.

1.20 OTHER REQUIREMENTS: Gate Attendant teams will consist of a minimum of a two (2) person team and all team member must be at least 21 years of age. A minimum of one of the two person team will man the gatehouse during duty hours. During times of high usage as determined by the lake manager or his representative, both members of the contracting team are required to be in the gatehouse to provide prompt customer service.

Customer waiting time will be kept as short as possible. Some parks have different schedules.

Attachments

TECHNICAL EXHIBIT 1

Performance Requirements Summary: The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The Acceptable Levels of Quality briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Required Services (Tasks):

Reference Section 1.11 Work to Be Performed of lake’s appendix for

Specific Task Requirements.

Performance Standards:

Reference Section 1.11 Work to Be Performed of lake’s appendix for Specific Performance

Standards.

Acceptable Quality Levels

(Allowable Deviation)

Methods of

Surveillance

Incentive (Positive and/or

Negative) (Impact on Contractor Payments)

1. User Fees- Delivery/Inspection of Use Fees

The contractor will collect all user fees in accordance with the Fort Worth District Use Fee

Program SOP.

One written warning

100% inspection 25% deduction after one written warning.

2. Campsite Reservations

The Contractor will adhere to guidelines and procedures using Recreation One Stop

(R1S) in the campground.

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

3. Group Shelters

The Contractor will keep records and ensure compliance of group shelter use as required by the Lake Manager including the use of the

R1S system, where applicable

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

4. Camping Status

The Contractor will record the campsite occupied and maintain record of the current status for each campsite occupied.

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

5. Park Inspection

The Contractor will inspect the park area and facilities a minimum number of times each day as required by each Lake

Appendix.

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

6. Visitor Assistance

The gatehouse will be occupied by the

Contractor during the posted hours of the park during which time they will assist the park visitors by providing information concerning the visitor’s stay.

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

7. Disturbances

The Contractor will promptly report all accidents, violations of law, disturbances and situations that could affect health and safety of visitors to the Park

Ranger or Lake Manager

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

8. Complaints

The Contractor will keep a written record of all complaints and criticisms of park facilities.

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

9. Lost and Found

The Contractor will keep lost and found articles in the gatehouse or trailer and turn over all found articles with as much information as possible to a Park Ranger in accordance to each lake policy.

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

10. Contractor Identification and Personal Appearance

The Contractor shall, at all times when on duty and when dealing with the public, Two written warnings

Unscheduled inspections

5% deduction be required to maintain a fully-clothed and neat, well-groomed appearance.

11. Cooperation with Others

The Contractor will maintain good communications and relations with the public, other Contractors, volunteers, Corps of

Engineers employees and others who work with the

Corps of Engineers for the construction of new facilities, repair of existing facilities, sanitation services, trash pick-up services, and grass mowing, etc.

Two written warnings

Unscheduled inspections

10% deduction after two written warnings.

12. Living Area and Gatehouse Maintenance

The Contractor will maintain the area where the trailer is parked (Gate Attendant Site) and Gate

House in a clean and sanitary condition at all time.

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

13. No Soliciting

Contractor will not solicit, advertise, sell or offer to sell any unauthorized goods or services to campers or visitors on public property

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

14. Weapons

Firearms or any type of object that could be considered a weapon will not be carried or kept in the park (e.g. pepper spray, clubs)

One written warning

Unscheduled inspections

5% deduction

15. Alcohol

The Contractor will not consume or be under the influence of alcoholic beverages, illicit drugs and/or medication unless administered under a doctor’s prescription while on duty or while in view of the public.

One written warning

Unscheduled inspections

15% deduction after one written warning

16. Government Property

The Contractor will be required to return

Government property on the last day of the contract.

Two written warnings

Unscheduled inspections

10% deduction after two written warnings

17. Absenteeism

The Lake Manager should be contacted and given as much advance notice as possible about anticipated absences.

Two written warnings

100% inspection or unscheduled inspections

5% deduction after two written warnings.

18. Visitors of the Contractor/Gate Attendant

Adult family members and friends will not live with the Contractor.

Two written warnings

Unscheduled inspections

5% deduction after two written warnings.

19. Security Bonding

The Contractor must be fully bonded or insured to cover collected funds not received by the designated Government agent or ReserveAmerica by furnishing the

Contracting Officer proof of such bond or security in the minimum amount of $5,000.00 payable to the U.S. Army Corps of

Engineers.

One written warning

100% inspection Work cannot begin without bond

20. Physical Security and Key Control

See Sections 1.4.7.1 and

1.4.7.2 above

One written warning

Unscheduled inspections

15% deduction after one written warning

Technical Exhibit 2 – Deliverables Schedule

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

Financial Statements Within one day of completing shifts

Original and two (2) copies

Hard Copy Lake Office

Deposit Statements Within one day of completing shift

Original and two (2) copies

Hard Copy Lake Office

Security Bond Once, prior to beginning work Original Hard Copy Lake Office

Automobile Insurance Card

Prior to work beginning and at any point that it must be renewed.

Original Hard Copy Lake Office

(End of Summary of Changes)

File details come from the government source that posted it. Updated .